CN207092529U - Die carrier structure with exactly vertical elevation and horizontal location function - Google Patents
Die carrier structure with exactly vertical elevation and horizontal location function Download PDFInfo
- Publication number
- CN207092529U CN207092529U CN201720861053.1U CN201720861053U CN207092529U CN 207092529 U CN207092529 U CN 207092529U CN 201720861053 U CN201720861053 U CN 201720861053U CN 207092529 U CN207092529 U CN 207092529U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- nut
- roller
- carrier structure
- die carrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of die carrier structure with exactly vertical elevation and horizontal location function, including the vertical adjusting apparatus and leveling device being connected with lifting body, the vertical adjusting apparatus can move along vertical, leveling device can be moved along horizontal direction, and vertical adjusting apparatus is arranged on above leveling device.This mould frame mechanism, which is not only realized, fast and accurately to be positioned, greatly improve the location and installation efficiency of template, also pass through the accurate adjustment of vertical and horizontal direction special adjusting means simultaneously, make mould bases that there is exactly vertical elevation and horizontal location function, good booster action is played to construction survey positioning, drastically increases efficiency of construction.
Description
Technical field
It the utility model is related to a kind of building construction technology, and in particular to one kind has exactly vertical elevation and horizontal location
The die carrier structure of function.
Background technology
Super High is often referred to more than 40 layers or highly more than 200 meters of building.And Super High typically uses tube structure
And steel construction.The formwork system that current domestic construction of super highrise building generally uses and occupy world technology has Shanghai to build
The entirety of work is climbed the big backform formwork system of steel platform formwork system and Chinese architecture.
Their form frame system is attached using manually or electrically chain cucurbit with template, due to hitch point and template it
Between the discrepancy in elevation it is big, the shortcomings that length of the chain cucurbit of use is very long, and this flexible connected mode one is common is:Template exists
Positioning accuracy is not high when in place, in order to ensure that being accurately positioned for template will do many regulations, loses time, effect is low.
Utility model content
Technical problem to be solved in the utility model is existing template when in place, and positioning accuracy is not high, it is necessary to repeatedly
Regulation, the time is caused to waste low with efficiency, its object is to provide a kind of to have exactly vertical elevation and horizontal location function
Die carrier structure, the die carrier structure have mould bases accurate by the accurate adjustment of vertical and horizontal direction special adjusting means
Vertical elevation and horizontal location function, good booster action is played to construction survey positioning, drastically increases efficiency of construction.
The utility model is achieved through the following technical solutions:
Die carrier structure with exactly vertical elevation and horizontal location function, including the vertical adjustment being connected with lifting body
Device and leveling device, the vertical adjusting apparatus can move along vertical, and leveling device can be along
Horizontal direction is moved, and vertical adjusting apparatus is arranged on above leveling device.At present when carrying out construction of super highrise building,
All it is in every layer of recycling, i.e., with the construction of architecture storey, by the template of next layer of wall with being moved after jacking by template
Moving last layer needs to reuse at construction, and to reduce the waste of template, it is in plate-like structure that template, which is typically all, current
Construction of super highrise building form frame system is all to be drawn high using manually or electrically chain cucurbit after being attached with template, due to
The discrepancy in elevation between hitch point and template is big, and the length of the chain cucurbit of use is very long, belongs to flexible connection, high-rise building due to
Story height, high altitude wind is big, and flexible connection may result in template and have swing so that and template positioning accuracy when in place is not high,
In order to ensure that being accurately positioned for template will do many regulations, lose time, effect is low, while it is all by operating personnel that template, which is laid,
Rule of thumb control, do not ensure that it moves quickly into the position for needing to lay, while swung even caused by being flexibly connected
So that damaged template or injury to personnel, and the die carrier structure of this programme design, then it is to use rigid connection, it is not only realized soon
Fast accurately positioning, the location and installation efficiency of template is greatly improved, also passes through vertical and horizontal direction special tune simultaneously
The accurate adjustment of regulating device, make mould bases that there is exactly vertical elevation and horizontal location function, construction survey positioning is played very well
Booster action, drastically increase efficiency of construction.
Further, leveling device includes level(l)ing mechanism, supporting plate and installing plate, and the bottom surface of installing plate is attached to
On the top surface of supporting plate, supporting plate is connected with lifting body, and level(l)ing mechanism is fixed on the top surface of installing plate, and horizontal tune
Section mechanism can move on the supporting plate, the locating wheel contacted with wall is provided with governor motion, level(l)ing mechanism can
The position of locating wheel is adjusted so that locating wheel moves horizontally.When carrying out Super High construction, according to bearing capacity with
And the consideration of other factorses, form taper or carry out step contraction towards center, be i.e. inner space tapers into, or wall
Thickness produces change to mitigate building structure own load, and the horizontal regulating structure of this programme design, it is arranged on jack-up system
In, for being contacted with metope, by adjusting its horizontal horizontal level so that reasonably compressed with metope all the time and
Endurance, all the time in vertical vertical state, so as to ensure the job stability of structure, while being capable of basis during jacking
The change of inner space and adjust and meet jacking demand, its is easy to adjust and rapid, meets horizontal location function.
Further, level(l)ing mechanism includes casing, has two kinds admittedly according to the quantity locating wheel and connecting plate of connecting plate
Determine mode, when connecting plate quantity is one piece, casing is set on a mounting board, and feed screw nut pair, connecting plate are provided with casing
It is arranged on outside casing, connecting plate one end is inserted into casing to be connected with feed screw nut pair, and connecting plate can be in feed screw nut
Moved horizontally under side effect, locating wheel is connected with connecting plate, and locating wheel can rotate around its own axis, in locating wheel
Bearing pin is provided with, bearing pin is arranged in connecting plate through one end behind the center of locating wheel, and locating wheel can rotate around bearing pin.
In order to which locating wheel is contacted with wall so that keep thrust, it is remote that the wheel face of locating wheel is arranged on into connecting plate
From the outside of one end of casing.
When connecting plate quantity is two pieces, casing is set on a mounting board, and feed screw nut pair, two pieces of companies are provided with casing
Fishplate bar is arranged on outside casing, and connecting plate one end is inserted into casing to be connected with feed screw nut pair, and connecting plate can be in silk
Moved horizontally under stem nut side effect, locating wheel is arranged between two pieces of connecting plates and is connected with connecting plate, locating wheel
It can be rotated around its own axis.Bearing pin is provided with locating wheel, bearing pin is separately positioned on through both ends behind the center of roller
In connecting plate, and locating wheel can rotate around bearing pin.It is same in order to locating wheel is contacted with wall so that guarantor
Thrust is held, the wheel face of locating wheel is arranged on to the outside of the one end of connecting plate away from casing.
And feed screw nut pair is existing structure, it includes screw mandrel, nut and nut seat, and nut sleeve is on screw mandrel, nut seat
On nut, connecting plate is fixed with nut seat, and screw mandrel one end is arranged on the outer of the one end of casing away from roller through casing
Portion, screw mandrel are arranged on the part outside casing and are cased with lock nut.Connecting plate is driven to move by rotary screw rod, so as to adjust
The impaction state of whole locating wheel and metope, after adjusting good position, rotational lock nut is fixed with casing to be locked so that work
Displacement will not be produced when making and ensures arrangement works stability.
Stability during in order to increase connection, is also provided with several screwed holes on the supporting plate, and screwed hole is divided into two
Group, and the line of centres of every group of screwed hole is parallel to each other, casing is arranged between two groups of screwed holes, is provided with installing plate some
Individual clamping screw, clamping screw both pass through corresponding screwed hole.The quantity of clamping screw is four, and is symmetrically arranged at case
The both sides of body.According to practical operation experience, four high-strength bolts can fully meet fixed demand as clamping screw, rotate
Screw mandrel be as fine setting, and adjust as needed the position of installing plate on the supporting plate be used on a large scale adjust shear wall
At thickness, after adjusting correct position, corresponding screwed hole is passed through to fix by four clamping screws so that arrangement works are more
Add stabilization.
Further, vertical adjusting apparatus includes the guide rail being arranged on jacking frame, and jacking frame connects with lifting body
Connect, guide rail can move horizontally on jacking frame, be provided with what can be moved horizontally along guide rail on guide rail
Mounting bracket is oriented to, block is provided with guide rail, and block can be moved and fixed in guide rail, be oriented to mounting bracket
Motion track is in block and guide rail away between one end of block.This programme uses rigid connection, and hitch point uses
Suspension strut of the guide rail as template, template is then by suspension rod suspension guiding track, and when shear wall's thickness changes,
Guide rail is just moved horizontally on jacking frame, is fixed after being moved to correct position, has in the end of guide rail
The block that guide roller position can be adjusted, is entered when first time template is in place to accurate on-station position by position block
Position block, is fixed on guide rail by row regulation after regulating, and for the first time after the completion of construction in place, template afterwards is just
Just template need not be adjusted during position, it is only necessary to roller is slided into forward by the roller suspended structure of template and adjusted for the first time
Good stop location can greatly improve the effect of template is installed in place to realize accurately positioning to template.
Being oriented to the concrete structure of mounting bracket includes roller and mast-up, and roller is arranged in guide rail and can be along leading
Moved horizontally to track, mast-up is arranged on below guide rail and is connected with roller.So roller is used not only for mobile
It is oriented to, but also limit function can be played, and the regulation in vertical direction is just realized by connecting rod, connecting rod, which is arranged on, hangs
In shelving, connecting rod is through mast-up and below guide rail, and connecting rod bottom passes through the lifting being connected with template
Plate, and connecting rod can be moved along vertical, and fine thread section and coarse thread section are provided with connecting rod outer wall,
And fine thread section is arranged on above coarse thread section, fine tuning nut, locking nut and coarse adjustment are cased with successively on connecting rod outer wall
Nut, and mast-up is arranged between fine tuning nut and locking nut, lifting plate is arranged between locking nut and coarse adjustment nut.
Coarse adjustment nut carries out coarse adjustment, and the turn around distance up and down of regulation of nut positive and reverse return be 2.5MM, maximal regulated apart from being ± 10CM,
Preliminary regulation is arrived and standard value error is within ± 3MM, and fine tuning nut carries out fine tuning, usually just uses coarse adjustment when mounted,
Due to integrally-built compactedness, the later stage changes so long as not wall, and basic fine tuning just disclosure satisfy that requirement.
Acquisition indeed according to material in project is ease, and guide rail is usually to be formed using I-steel or channel-section steel,
When guide rail is I-steel, roller and block are two, and one of roller and block are correspondingly arranged at I-steel
In one inner chamber, another roller and block are correspondingly arranged in another inner chamber of I-steel, and can be along I-steel
Move inner chamber.When guide rail is channel-section steel, the openings of two blocks of channel-section steels is welded as overall structure after being located remotely from each other, and roller and block are equal
For two, one of roller and block are correspondingly arranged in the inner chamber of a channel-section steel, and another roller and block are correspondingly arranged
In the inner chamber of another channel-section steel, and it can be moved along the inner chamber of channel-section steel.The cross section of mast-up is in Qian font, roller and is led
It is arranged to track in the cavity of mast-up, and roller is connected with mast-up and can lifted around own axis
Connecting bolt is provided with frame, and connecting bolt is fixed through mast-up and with template.It is this to can be realized as hanging with template
Dress is fixed, while two groups of rollers so that is more balanced when mobile and safe.
Strip through-hole is provided with block, locking pin is provided with strip through-hole, and locking pin leads to also cross bar shaped
Hole and guide rail, locking pin can move in strip through-hole.Block preferred angle steel is made, and first time template is aligned when in place
True on-station position is adjusted by position block, will be fixed by this high-strength bolt of locking pin by position block after regulating
On guide rail, for the first time after the completion of construction in place, just template need not be adjusted when template afterwards is in place, only
Need the roller suspended structure of template roller is slided into the stop location that regulates for the first time forward can be to realize to template
Accurately positioning, greatly improves the effect of template is installed in place.
Pass through the guided way in I-steel or the combination of double flute steel for the place to be changed in the shear wall's thickness poured
What processing in advance was formed on road follows several connecting holes that shear wall's thickness synchronously changes, and identical shear wall's thickness corresponds to phase
Corresponding connecting hole, clamping screw is provided with connecting hole, clamping screw be connected after passing through connecting hole with jacking frame, so reality
Being accurately positioned for template is quickly realized during existing shear wall's thickness change.
The utility model compared with prior art, has the following advantages and advantages:This mould frame mechanism is not only realized
Fast and accurately position, greatly improve the location and installation efficiency of template, also simultaneously by vertical and horizontal direction special
The accurate adjustment of adjusting means, make mould bases that there is exactly vertical elevation and horizontal location function, construction survey positioning is played very
Good booster action, drastically increases efficiency of construction.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the utility model embodiment, forms the one of the application
Part, the restriction to the utility model embodiment is not formed.In the accompanying drawings:
Fig. 1 is the utility model structure diagram;
Fig. 2 is the scheme of installation of leveling device;
Fig. 3 is the A-A of vertical adjusting apparatus to sectional view;
Fig. 4 is the adjustment schematic diagram of sleeve.
Mark and corresponding parts title in accompanying drawing:
1- vertical adjusting apparatus, 2- templates, 3- walls, 4- leveling devices, 5- lifting bodies, 6- locating wheels, 7- silks
Bar, 8- connecting plates, 9- lock nuts, 10- supporting plates, 11- casings, 12- installing plates, 13- rollers, 14- connecting shafts, 15- liftings
Frame, 16- fine tuning nuts, 17- connecting rods, 18- lower locking nuts, 19- coarse adjustment nuts, 20- lifting plates, 21- upper locking nuts,
22- box spanners, 23- guide rails.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, with reference to embodiment and accompanying drawing,
The utility model is described in further detail, and exemplary embodiment of the present utility model and its explanation are only used for explaining this
Utility model, it is not intended as to restriction of the present utility model.
Embodiment 1:
As shown in figure 1, the die carrier structure with exactly vertical elevation and horizontal location function, including connect with lifting body 5
The vertical adjusting apparatus 1 and leveling device 4 connect, the vertical adjusting apparatus 1 can be moved along vertical, and level is adjusted
Engagement positions 4 can move along horizontal direction, and vertical adjusting apparatus 1 is arranged on the top of leveling device 4.This programme passes through
Template 2 is lifted on vertical adjusting apparatus 1, vertical can be carried out by the regulation template 2 of vertical adjusting apparatus 1
It is mobile, and leveling device 4 is to be used to adjust horizontal level, realizes and holds out against guiding with wall 3, realizes horizontal location function.
Embodiment 2:
As shown in Fig. 2 on the basis of embodiment 1, leveling device 4 includes level(l)ing mechanism, the and of supporting plate 10
Installing plate 12, the bottom surface of installing plate 12 are attached on the top surface of supporting plate 10, and supporting plate 10 is connected with lifting body 5, Level tune
Mechanism is fixed on the top surface of installing plate 12, and level(l)ing mechanism can move in supporting plate 10, be set on governor motion
There is the locating wheel 6 contacted with wall 3, the position of locating wheel 6 can be adjusted for level(l)ing mechanism so that locating wheel 6 is carried out
Move horizontally.Due to thering are two kinds of situations to need to adjust in jacking, so this programme has two kinds of regulatory functions, first, passing through water
Flat governor motion is mobile in supporting plate 10 to realize regulation on a large scale, and this regulation is usually that jacking interior volume produces change
When use;Another kind is moved horizontally by adjusting locating wheel 6, when this regulation is primarily directed to metope out-of-flatness
Use, to keep withstanding forces the impaction state of metope, so as to prevent tilting, this structure, which possesses magnitude range, to be adjusted simultaneously
Whole function, the stability of structure is ensure that in jacking.
It is first adjusted on a large scale in use, the scope adjusted as needed, and mobile installing plate 12 is in supporting plate 10
Position, after reaching correct position, then four high-strength bolts are correspondingly inserted into be formed in screwed hole and fixed, then rotary screw rod
7 so that connecting plate 8 produces movement, and locating wheel 6 is pressed on metope, in order to which locating wheel 6 is connect with wall
Touch so that keep thrust, the wheel face of locating wheel 6 is arranged on to the outside of the one end of connecting plate 8 away from casing 11, Ran Houzhuan
Dynamic lock nut 9 so that it is pressed on the wall of casing 11, realizes and the position of screw mandrel 7 is fixed, and prevents from producing at work
Move and destroy stability and cause to tilt.
When connecting plate 8 is two pieces, this mode that locating wheel 6 is arranged between connecting plate 8 enables to the stabilization of locating wheel 6
Property is higher, will not be deformed, stability under loading during compression.
It is that multiple the utility model are used cooperatively during actual use, according to wall thickness or flatness change so as to right
Realize and the Multi-contact of metope is compressed so that structure keeps vertical state, and its each point stress causes structure not tilt, and works
Shi Gengjia is stable.
Embodiment 3:
As shown in Figure 3, Figure 4, on the basis of above-described embodiment, vertical adjusting apparatus includes being arranged on leading on jacking frame
To track 23, jacking frame is connected with lifting body, and guide rail 23 can move horizontally on jacking frame, is pacified on guide rail 23
Equipped with can be along the guiding mounting bracket that guide rail moves horizontally.The suspended structure of existing template is all using manually or electrically chain
Sub- cucurbit is attached with template, and because the discrepancy in elevation between hitch point and template is big, the length of the chain cucurbit of use is very long, this
It is not high that kind of flexible connected mode results in template positioning accuracy when in place, in order to ensure that being accurately positioned for template will do very
More regulations, waste substantial amounts of installation and time, effect are low.And this programme design template suspended structure due to and hitch point
The discrepancy in elevation between template is small, and using rigid connection, hitch point uses suspension strut of the guide rail 23 as template, mould
Plate is then suspended on guide rail 23 by being oriented to mounting bracket, is had in the end of guide rail 23 and can be adjusted with pair roller position
The block of section, first time template is accurately in place when in place, and its position is adjusted by position block, keeps off positioning after regulating
Block is fixed on guide rail 23, and for the first time after the completion of construction in place, just template need not be entered when template afterwards is in place
Row regulation, it is only necessary to which the guidings mounting bracket of template will be slided into forward to the stop location that regulates for the first time can be with to template reality
Now accurately positioning, greatly improves the effect of template is installed in place.Its order adjusted is that shear wall's thickness changed before this
When adjust guide rail 23 jacking frame horizontal level, then just adjust block relative to guide rail 23 position, finally
It is only and is oriented to position of the mounting bracket relative to guide rail 23, realizes and adjust step by step and as needed, improve installation effectiveness.
It is directed to mounting bracket and is divided into roller 13 and mast-up 15, roller 13 is arranged in guide rail 23 and can be along leading
Moved horizontally to track 23, mast-up 15 is arranged on the lower section of guide rail 23 and is connected with roller 13.Preferably by mast-up 15
Cross section is in Qian font, stability when being easy to the template to hang, and roller 13 and guide rail 23 are arranged at the sky of mast-up 15
In chamber, connecting shaft 14 is provided with roller 13, connecting shaft 14 is connected after passing through the center of roller 13 with mast-up 15, and roller
13 can rotate around the axis of connecting shaft 14.Connecting rod 17 is also provided with mast-up 15, connecting rod 17 passes through mast-up
15 center and positioned at the lower section of guide rail 23, and the bottom of connecting rod 17 passes through the lifting plate 20 be connected with template 2, and connection
Bar 17 can move along vertical.Fine thread section and coarse thread section are provided with the outer wall of connecting rod 17, and carefully
Pitch thread section is arranged on above coarse thread section, be cased with successively on the outer wall of connecting rod 17 fine tuning nut 16, upper locking nut 21, under
Locking nut 18 and coarse adjustment nut 19, and mast-up 15 is arranged between fine tuning nut 16 and upper locking nut 21, lifts plate 20
It is arranged between lower locking nut 18 and coarse adjustment nut 19.
Guide rail 23 has two kinds of materials to form, first, with I-steel, roller 13 is two, and one of roller 13 is set
In an inner chamber of I-steel, another roller 13 is arranged in another inner chamber of I-steel, and can be along I-steel
Inner chamber movement, the material of I-steel obtains on-site, or can use the I-steel discarded on building site, utilize both sides pair
Roller 13 and block are placed in the inner chamber for claiming to be formed, stationarity when can ensure to move.Second, use channel-section steel, two blocks of channel-section steels
Opening is welded as overall structure after being located remotely from each other, roller 13 is two, and one of roller 13 is arranged on the inner chamber of a channel-section steel
In, another roller 13 is arranged in the inner chamber of another channel-section steel, and can be moved along the inner chamber of channel-section steel.The material of channel-section steel exists
Obtained on building site, or the channel-section steel discarded on building site can be used, two pieces of channel-section steel openings welded to behind, then roller 13 is each
Moved in comfortable one block of channel-section steel, its groove depth is easy to clamping difficult for drop-off, stationarity when can ensure to move.
Block is provided with guide rail 23, and block can be moved in guide rail 23 and fixed, guiding mounting bracket
Motion track lead in block and guide rail 23 away from strip through-hole, bar shaped between one end of block, is provided with block
Locking pin is provided with hole, and locking pin can be in strip through-hole also cross strip through-hole and guide rail 23, locking pin
It is mobile.The block that angle steel makes typically is provided in the end of support frame, and it can be adjusted with pair roller position for the first time
Accurate on-station position is adjusted by position block when template is in place, it is after regulating that position block is this by locking pin
High-strength bolt will be fixed on guide rail 23, for the first time after the completion of construction in place, just need not when template afterwards is in place
Template is adjusted, it is only necessary to which the roller suspended structure of template is forward slided into roller to the stop location regulated for the first time
The effect of template is installed in place can be greatly improved to realize accurately positioning to template.For in the shear wall poured
What the place that thickness changes was formed by being processed in advance on I-steel or the guide rail of double flute steel combination follows shearing
The connecting hole that wall thickness synchronously changes, and connecting hole is also equipped with jacking frame, the connecting hole and identical shear wall's thickness phase
Corresponding, this connection hole number is less than the connecting hole on guide rail, and guide rail 23 is relative to jacking frame transverse shifting, suitable
Position fix, be provided with clamping screw in connecting hole, clamping screw is connected after passing through connecting hole with jacking frame, is achieved in
Shear wall's thickness quickly realizes being accurately positioned for template when changing.
This programme design specific regulative mode be:
(1) by M20 connecting rod 17 to being attached between template and hitch point, the upper end of rigid connecting rod 17 is
M20x1 high-precision fine thread, lower end are M20x2.5 common coarse thread, and the upper and lower side of connecting rod 17 has each pair
Regulation and locking nut;
(2) first to there is the template 2 of jacking installation connecting hole, according to the peace of M36 connecting bolts on the upper and lower bearing of design
Size is filled, after template 2 completes, through Wetted constructures after internal stress completely release, machining factory is sent to and utilizes boring
Bed is processed according to the installation dimension of design, and dimension control meets model sheetinstallat pinpoint at ± 0.1 millimeter
First step requirement;
(3) in template first time installation and debugging, two step sections are carried out to vertical elevation:
The first step is adjusted:We to vertical elevation location by rigid connecting rod lower end be M20x2.5 common coarse thread spiral shell
Line is adjusted, nut positive and reverse return turn around regulation template about 2 adjustable range be 2.5MM, maximal regulated distance for ±
10CM, tentatively regulation is arrived and standard value error is within ± 3MM, is then carried out being locked from distance variation with locking nut.
Second step is adjusted:The vertical measurement of higher degree is carried out, accurately determines the difference with design standard value, to needing second
The difference of regulation is adjusted by the high-precision fine thread that upper end is M20x1, and nut passes through special box spanner with a scale
22 are adjusted, and are divided into 10 scales divided equally on sleeve in the range of tour, often rotate the base of the corresponding regulation of a scale
Vertical elevation can be made to produce 0.1MM accurate change on schedule, and (10 scales have the vertical height of 1 millimeter of generation altogether in the range of 360 degree
Cheng Bianhua), realized by the regulation of the high-precision fine thread to upper end M20x1 and vertically be accurately positioned, adjustable range for 0 to ±
3 millimeters, it is can be controlled in by the vertical elevation location precision of sleeve with a scale within ± 0.1 millimeter (so that vertical elevation has
Imitate and realize accurate control), with locking nut be locked from apart from variation after adjusting.
In template first time installation and debugging, horizontal displacement is adjusted as follows:
By being measured to the position of horizontal direction, the difference measured, utilization side parallel with the template of suspension are write down
To regulation roller above regulating bolt be adjusted, regulation roller have arrangement in four supporting surfaces of shear wall, every time
It is adjusted with the regulating bolt above the regulation roller of the template parallel direction of suspension by Dui, reaches and horizontal level is carried out
The purpose accurately controlled.
After the completion of to the template debugging of installation measurement for the first time, M36 positioning built-in fitting is installed in the anchor point of template.So
The installation of template is carried out afterwards, is installed as concrete placings terminate to complete the construction of an index bed.
After the completion of the construction of first time index bed, the construction regulation of later each index bed only needs first to be detected, by
There is reliable vertical anti-tilt device in this die carrier structure, under each normal jacking state, horizontal level will not become
Change without be adjusted (as generated because construction is unexpected change only need to by according to during installation for the first time to horizontal displacement
Adjusting method is adjusted).The vertical accurate adjustment of a step is also at most carried out according to error amount after the detection of vertical elevation,
Greatly improve the template construction efficiency of follow-up index bed every time.
By from the point of view of the project construction of Nanning, afterwards in the work progress of each index bed, measure every time vertical and
The position deviation of horizontal direction is few, just needs once to be adjusted to horizontally and vertically positioning by the construction of ten index beds
Examination, is truly realized to vertical elevation and the pinpoint function of horizontal level, while construction survey positioning is played well
Booster action, drastically increase efficiency of construction.It is not high effectively to overcome traditional chain cucurbit connection positioning accuracy, often
It is secondary template be required for when being accurately positioned do many regulations, lose time, the shortcomings that construction effect is low.
To sum up, the utility model uses this flexible connected mode of chain cucurbit by changing between hitch point and template
To be rigidly connected, by the accurate adjustment of vertical and horizontal direction special adjusting means, plus position block on guide rail
Fast positioning and the simply applicable connecting hole for following shear wall's thickness synchronously to change floor of the mode to template afterwards
Realize in positioning and fast and accurately position, make mould bases that there is exactly vertical elevation and horizontal location function, construction survey is positioned
Good booster action is played, drastically increases efficiency of construction.
Above-described embodiment, the purpose of this utility model, technical scheme and beneficial effect are entered
One step describes in detail, should be understood that and the foregoing is only specific embodiment of the present utility model, is not used to limit
Determine the scope of protection of the utility model, it is all within the spirit and principles of the utility model, any modification for being made, equally replace
Change, improve, should be included within the scope of protection of the utility model.
Claims (10)
1. the die carrier structure with exactly vertical elevation and horizontal location function, it is characterised in that including connecting with lifting body (5)
The vertical adjusting apparatus (1) and leveling device (4) connect, the vertical adjusting apparatus (1) can move along vertical,
Leveling device (4) can be moved along horizontal direction, and vertical adjusting apparatus (1) is arranged on leveling device (4)
Side.
2. the die carrier structure according to claim 1 with exactly vertical elevation and horizontal location function, it is characterised in that
The leveling device (4) includes level(l)ing mechanism, supporting plate (10) and installing plate (12), the bottom surface patch of installing plate (12)
On the top surface of supporting plate (10), supporting plate (10) is connected with lifting body (5), and level(l)ing mechanism is fixed on installing plate (12)
Top surface on, and level(l)ing mechanism can move in supporting plate (10), be provided with what is contacted with wall (3) on governor motion
Locating wheel (6), the position of locating wheel (6) can be adjusted for level(l)ing mechanism so that locating wheel (6) moves horizontally.
3. the die carrier structure according to claim 2 with exactly vertical elevation and horizontal location function, it is characterised in that
The level(l)ing mechanism includes casing (11), and casing (11) is arranged on installing plate (12), and casing is provided with screw mandrel in (11)
Pair of nut, connecting plate (8) is provided with outside casing, connecting plate (8) one end is inserted into casing (11) to be connected with feed screw nut pair,
And connecting plate (8) can be moved horizontally under feed screw nut's side effect, locating wheel (6) is connected with connecting plate (8), locating wheel
(6) can be rotated around its own axis.
4. the die carrier structure according to claim 3 with exactly vertical elevation and horizontal location function, it is characterised in that
The feed screw nut pair includes screw mandrel (7), nut and nut seat, and on screw mandrel (7), nut seat is arranged on nut nut sleeve,
Connecting plate (8) is fixed with nut seat, and screw mandrel (7) one end is arranged on the one of the remotely located wheel (6) of casing (11) through casing (11)
The outside at end, screw mandrel (7) are arranged on the outside part of casing (11) and are cased with lock nut (9).
5. the die carrier structure according to claim 1 with exactly vertical elevation and horizontal location function, it is characterised in that
The vertical adjusting apparatus (1) includes the guide rail (23) being arranged on jacking frame, and jacking frame is connected with lifting body (5),
Guide rail (23) can move horizontally on jacking frame, and being provided with guide rail (23) can move along guide rail is horizontal
Dynamic guiding mounting bracket.
6. the die carrier structure according to claim 5 with exactly vertical elevation and horizontal location function, it is characterised in that
The guiding mounting bracket includes roller (13) and mast-up (15), and roller (13) is arranged in guide rail (23) and can be along
Guide rail (23) moves horizontally, and mast-up (15) is arranged on below guide rail (23) and is connected with roller (13), mast-up
(15) connecting rod (17) is provided with, connecting rod (17) connects through mast-up (15) and below guide rail (23)
Extension bar (17) bottom passes through the lifting plate (20) being connected with template (2), and connecting rod (17) can be moved along vertical
It is dynamic.
7. the die carrier structure according to claim 6 with exactly vertical elevation and horizontal location function, it is characterised in that
Fine thread section and coarse thread section are provided with connecting rod (17) outer wall, and fine thread section is arranged on coarse thread section
Top, fine tuning nut (16), locking nut and coarse adjustment nut (19), and mast-up (15) are cased with successively on connecting rod (17) outer wall
Fine tuning nut (16) is arranged between locking nut, lifting plate (20) is arranged between locking nut and coarse adjustment nut (19).
8. the die carrier structure according to claim 6 with exactly vertical elevation and horizontal location function, it is characterised in that
The cross section of the mast-up (15) is in Qian font, and roller (13) and guide rail (23) are arranged at the cavity of mast-up (15)
In, and roller (13) and mast-up (15) connect and can pass through mast-up around own axis, connecting rod (17)
(15) center.
9. the die carrier structure according to claim 6 with exactly vertical elevation and horizontal location function, it is characterised in that
The guide rail (23) is I-steel, and roller (13) is two, and one of roller (13) is arranged in one of I-steel
In chamber, another roller (13) is arranged in another inner chamber of I-steel, and can be moved along the inner chamber of I-steel;It is described
Guide rail (23) is channel-section steel, and the openings of two blocks of channel-section steels is welded as overall structure after being located remotely from each other, and roller (13) is two, wherein
One roller (13) is arranged in the inner chamber of a channel-section steel, and another roller (13) is arranged in the inner chamber of another channel-section steel, and
It can be moved along the inner chamber of channel-section steel.
10. the die carrier structure according to claim 5 with exactly vertical elevation and horizontal location function, its feature exist
In, block is provided with the guide rail (23), and block can be moved and fixed in guide rail (23), guiding is installed
The motion track of frame is provided with strip through-hole, bar between the one end of block and guide rail (23) away from block on block
Locking pin is provided with shape through hole, and locking pin can be in bar shaped also cross strip through-hole and guide rail (23), locking pin
Moved in through hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720861053.1U CN207092529U (en) | 2017-07-14 | 2017-07-14 | Die carrier structure with exactly vertical elevation and horizontal location function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720861053.1U CN207092529U (en) | 2017-07-14 | 2017-07-14 | Die carrier structure with exactly vertical elevation and horizontal location function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207092529U true CN207092529U (en) | 2018-03-13 |
Family
ID=61545253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720861053.1U Active CN207092529U (en) | 2017-07-14 | 2017-07-14 | Die carrier structure with exactly vertical elevation and horizontal location function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207092529U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130793A (en) * | 2017-07-14 | 2017-09-05 | 四川华西集团有限公司 | Form frame system with exactly vertical elevation and horizontal location function |
-
2017
- 2017-07-14 CN CN201720861053.1U patent/CN207092529U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130793A (en) * | 2017-07-14 | 2017-09-05 | 四川华西集团有限公司 | Form frame system with exactly vertical elevation and horizontal location function |
CN107130793B (en) * | 2017-07-14 | 2023-08-25 | 华西工程科技(深圳)股份有限公司 | Die carrier system with accurate vertical elevation and horizontal positioning functions |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107190975A (en) | Construction of super highrise building integrates form frame system | |
CN107130793A (en) | Form frame system with exactly vertical elevation and horizontal location function | |
CN106134364B (en) | A kind of satellite automated mounting plate | |
CN104110140A (en) | Net rack node location adjusting device and location adjusting method | |
CN102926538A (en) | Reaction box and construction method of reaction wall | |
CN111963865A (en) | Ultra-high-rise building engineering measuring device with improved precision and measuring method thereof | |
CN102287058B (en) | Method for installing and leveling large-plane high-precision embedded part | |
CN107869195A (en) | A kind of shaped steel steel column and column cap sizing punching block construction method | |
CN207092529U (en) | Die carrier structure with exactly vertical elevation and horizontal location function | |
CN113622316A (en) | Steel truss girder multipoint traction type pushing construction system and construction method thereof | |
CN101251223A (en) | Apparatus and method for adjusting horizon of low speed diesel engine frame | |
CN203628159U (en) | Quick installation centering apparatus for pedestal of large-scale equipment | |
CN109179222A (en) | A kind of pre-buried section gradient of derrick crane and levelness control construction method | |
CN201756666U (en) | Ballastless track slab regulator | |
CN109930858A (en) | A kind of method and apparatus in building integral jacking bottom transformation market | |
CN104594647A (en) | Steel beam locating and adjusting device | |
CN205896580U (en) | Large -scale equipment fixing is with base of making level | |
CN206071066U (en) | Concreting surface smoothness precise control instrument | |
CN202787999U (en) | Movable type support bridge for efficient large area concrete terrace construction | |
CN101852066A (en) | Device and method for arranging track of drilling machine | |
CN106436499B (en) | A kind of streetcar track mounting device and its installation and application | |
CN205908014U (en) | Support arrangement for a but, turbine screw continuously adjustable for hydraulic climbing formwork system | |
CN100366855C (en) | Inclined triangular pyramid truss type frame construction and method for making, mounting and measuring the same | |
CN206737445U (en) | The vertical dual-purpose adjuster of Simple horizontal | |
CN202992543U (en) | Sizing block adjusting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |