CN207090807U - Pylon cable wind rope with erecting device - Google Patents
Pylon cable wind rope with erecting device Download PDFInfo
- Publication number
- CN207090807U CN207090807U CN201721094039.XU CN201721094039U CN207090807U CN 207090807 U CN207090807 U CN 207090807U CN 201721094039 U CN201721094039 U CN 201721094039U CN 207090807 U CN207090807 U CN 207090807U
- Authority
- CN
- China
- Prior art keywords
- wind rope
- cable wind
- link
- upright column
- pylon
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses a kind of pylon cable wind rope with erecting device, including upright column joint, anchor, cable wind rope and tensioning equipment, upright column joint is tubulose, the bottom of upright column joint is column connection end, the top of upright column joint is provided with ring flange, and the lateral wall of upright column joint is fixed with cable wind rope seat board;Anchor includes the first link and the second link, first link is hinged with cable wind rope seat board by the first jointed shaft laterally set, one end of the other end of first link and the second link is hinged by the second jointed shaft, second jointed shaft is fixedly connected with one end of cable wind rope perpendicular to the first jointed shaft, the other end of the second link;Tensioning equipment includes anchor frame, and anchor frame upper end is fixedly connected with the other end of cable wind rope, and anchor frame lower end is hinged with anchoring bottom plate, and anchoring bottom plate is fixed with some anchor bars.The pylon cable wind rope with erecting device can solve the technical problem that cable wind rope is easily fractureed with pylon junction by power repeatedly.
Description
Technical field
It the utility model is related to cable crane pylon wind cable technical field, particularly a kind of pylon guy with erecting device
Rope.
Background technology
Need suitably to set wind cable on pylon during the tower erection of cable crane, in order in construction stage
Pylon perpendicularity is adjusted by these wind cables and increase tower stability with the lifting stage.
Pylon cable wind rope is largely directly tied on pylon at present, has not only been influenceed the service life of cable wind rope but also has been not easy to cable
The anchoring tensioning of wind rope.Under a variety of uneven horizontal forces repeatedly effect, the side cable wind rope of pylon four will certainly will be pulled back and forth back and forth
Cable wind rope bolt is directly easily caused drawing damage disrumpent feelings by pylon to maintain it stable on pylon, to pylon safety and stability
Property causes extreme influence.Therefore, working out a kind of new pylon cable wind rope mounting structure turns into necessary.
Utility model content
Technical problem to be solved in the utility model is:A kind of pylon cable wind rope with erecting device, band peace are provided
The pylon cable wind rope of assembling device can solve the technical problem that cable wind rope is easily fractureed with pylon junction by power repeatedly.
In order to solve the above technical problems, the technical solution of the utility model is:A kind of pylon cable wind rope with erecting device,
Including upright column joint, anchor, cable wind rope and tensioning equipment, the upright column joint is tubulose, the bottom of the upright column joint
Hold and be provided with ring flange for column connection end, the top of the upright column joint, the lateral wall of the upright column joint is fixed with guy
Rope seat board;The anchor includes the first link and the second link, first link and the cable wind rope seat board
It is hinged by the first jointed shaft laterally set, one end of the other end of first link and second link passes through
Second jointed shaft is hinged, and second jointed shaft is fixed perpendicular to first jointed shaft, the other end of second link
Connect one end of the cable wind rope;The tensioning equipment includes anchor frame, and the anchor frame upper end is fixedly connected with the cable wind rope
The other end, the anchor frame lower end is hinged with anchoring bottom plate, and the anchoring bottom plate is fixed with some anchor bars.
As an improvement mode, first link includes two the first side plates that are vertical and being oppositely arranged, two
About two the first supporting plates being oppositely arranged, first supporting plate and first hinge are provided between individual first side plate
Spindle is located at the opposite end of first side plate respectively, and second jointed shaft is located at first supporting plate.
As an improvement mode, second link includes about two the second side plates being oppositely arranged, two
One end of second side plate by the first link described in the described second be hinged axis connection, two second side plates it is another
The second supporting plate is provided between end, the cable wind rope is connected to second supporting plate.
As an improvement mode, the anchor frame lower end be hinged with two anchoring bottom plates, two anchoring bottom plates
Parallel and be oppositely arranged, the anchor bar is located at the anchoring bottom plate.
As an improvement mode, the cable wind rope seat board is provided with two, and two cable wind rope seat boards are parallel and phase
To being arranged at the column sleeve pipe.
As an improvement mode, be fixed with a connecting base plate, the company on the lateral wall of the upright column joint
Joint chair plate is disposed opposite to each other with the cable wind rope seat board.
As an improvement mode, be fixed with cross-beam connecting plate, the crossbeam on the lateral wall of the upright column joint
Connecting plate is provided with connecting hole.
Use technique effect acquired by above-mentioned technical proposal for:
First link and the second link can be mutual at two rotating around first jointed shaft and the second jointed shaft
Vertical side is rotated up, and so as to arbitrarily adjust the tensioning direction for the cable wind rope being connected with pylon, is avoided because cable wind rope is more
Kind uneven horizontal force repeatedly back and forth pulls pylon under effect back and forth makes cable wind rope tether to connect and occur to draw damage disrumpent feelings at pylon.Tensioning
The anchoring bottom plate of device, which is provided with anchor bar, can be such that tensioning equipment is firmly connected with earth anchor, and anchor frame is hinged and can made with anchoring bottom plate
Cable wind rope flexibly deflects relative to earth anchor.
Because first link includes two the first side plates that are vertical and being oppositely arranged, two first side plates it
Between be provided with about two the first supporting plates being oppositely arranged, first supporting plate and first jointed shaft are respectively positioned at described
The opposite end of first side plate, the first connecting frame structure of the structure is simple, easy for installation.
Because second link includes about two the second side plates being oppositely arranged, the one of two second side plates
End is hinged the first link described in axis connection by described second, and second is provided between the other end of two second side plates
Fagging, the cable wind rope are connected to second supporting plate, and the second connecting frame structure of the structure is simple, easy for installation.
Because the cable wind rope seat board is provided with two, two cable wind rope seat boards are parallel and are relatively arranged on the column
Sleeve pipe, two cable wind rope base plate structures are symmetrical, stability under loading, firmly install.
Brief description of the drawings
Fig. 1 is the anchor structural representation of the pylon cable wind rope of the present utility model with erecting device;
Fig. 2 is the first link of the pylon cable wind rope of the present utility model with erecting device and the structure of the second link
Schematic diagram;
Fig. 3 is the tensioning equipment structural representation of the pylon cable wind rope of the present utility model with erecting device;
Fig. 4 is the pylon cable wind rope overall structure diagram of the present utility model with erecting device;
In figure, 1- anchors, 11- columns connection end, 12- ring flanges, 2- cable wind rope seat boards, 13- cross-beam connecting plates, 3-
First link, the side plates of 31- first, the supporting plates of 32- first, the jointed shafts of 33- first, the links of 4- second, the side plates of 41- second,
The supporting plates of 42- second, the jointed shafts of 43- second, the supporting plates of 44- the 4th, 5- connecting base plates, 6- cross-ties, 7- tensioning equipments,
71- anchors side plate, 72- anchoring bottom plates, the supporting plates of 73- the 3rd, 74- anchor bars, the supporting plates of 75- the 5th, 8- cable wind ropes.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
It is jointly shown with reference to Fig. 1 and Fig. 2, a kind of pylon cable wind rope with erecting device, including upright column joint, anchor
1st, cable wind rope 8 and tensioning equipment 7.Upright column joint is tubulose, and the bottom of upright column joint is column connection end 11, column connection end
11 can be provided with the solder side with the welding of column termination.The top of upright column joint is provided with ring flange 12, and the lateral wall of upright column joint is consolidated
Surely cable wind rope seat board 2 is provided with, cable wind rope seat board 2 is provided with two, and two cable wind rope seat boards 2 are parallel and are relatively arranged on upright post sleeve
Pipe.
Anchor 1 includes the first link 3 and the second link 4, and the first link 3 includes two vertically and set relatively
The first side plate 31 put, about two the first supporting plates 32 being oppositely arranged, the first support are provided between two the first side plates 31
The jointed shaft 33 of plate 32 and first is located at the opposite end of the first side plate 31 respectively, and the second jointed shaft 43 is located at the first supporting plate 32,
First link 3 of the structure is simple in construction, easy to assembly.First link 3 and cable wind rope seat board 2 by laterally set the
One jointed shaft 33 is be hinged.One end of first link 3 and the second link 4 is be hinged by the second jointed shaft 43, the second link 4
Including about two the second side plates 41 being oppositely arranged, one end of two the second side plates 41 connects first by the second jointed shaft 43
Link 3, the second jointed shaft 43 are provided with the second support between the first jointed shaft 33, the other end of two the second side plates 41
The supporting plate 44 of plate 42 and the 4th, one end of cable wind rope 8 are fixedly connected on the second supporting plate 42, and two the 4th supporting plates 44 are positioned at the
Both sides of two supporting plates 42 and parallel with the first side plate 31, the second link 4 of the structure is simple in construction, is easy to process.
As Fig. 3 and Fig. 4 are jointly shown, tensioning equipment 7 includes anchor frame, anchor frame include two it is parallel and be oppositely arranged
3rd anchoring side plate 71, the 3rd anchors the 3rd supporting plate 73 provided with connection cable wind rope 8 between side plate 71, the 3rd anchoring side plate 71
Between be additionally provided with the 5th supporting plate 75, the 5th supporting plate 75 and the anchoring supporting plate 73 of side plate 71 and the 3rd are vertical.On anchor frame
End is fixedly connected with the bottom of cable wind rope 8, and anchor frame lower end is hinged with two anchoring bottom plates 72, and two anchoring bottom plates 72 are parallel and phase
To setting.Anchoring bottom plate 72 is fixed with some anchor bars 74.
The lateral wall of upright column joint is fixed with connecting base plate 5.Connecting base plate 5 includes two companies that are parallel and being oppositely arranged
Joint chair plate 5, ribs is provided between two connecting base plates 5.Connecting base plate 5 and the seat board of cable wind rope 8 are arranged on same vertical backwards
On column joint.The side wall of upright column joint is fixed with cross-beam connecting plate 13, and cross-beam connecting plate 13 is provided with connecting hole, connected by crossbeam
Two upright column joints can be connected by the connecting hole of fishplate bar 13 with other crossbeams.
Cross-tie 6 is square hollow stem, corresponding in two relative side walls of cross-tie 6 to offer loss of weight
Hole, so as to mitigate the weight of cross-tie 6, material is saved, is easily installed.One end of cross-tie 6 is articulated with a column and connect
The connecting base plate 5 of head, the other end of cross-tie 6 are articulated with the connecting base plate 5 of another upright column joint,
Cable wind rope seat board 2 on upright column joint can be set to integrative-structure with connecting base plate 5, and not only structure is firm for overall structure
Gu and it is easily installed.
Two upright column joint column connection ends 11 are respectively welded forms a linkage section in the end of a column, the two
Upright column joint top can be fixedly connected by ring flange 12 with other column linkage sections, and the both ends of cross-tie 6 are cut with scissors respectively
Two upright column joints are connected to by two column lateral connections, pylon is remained stable in the horizontal.Pylon wind in pylon both sides
Cable is connected by tensioning equipment 7 with ground, pylon is remained stable.
Claims (7)
- A kind of 1. pylon cable wind rope with erecting device, it is characterised in that:Including upright column joint, anchor, cable wind rope and Tensioning equipment, the upright column joint are tubulose, and the bottom of the upright column joint is column connection end, the top of the upright column joint Provided with ring flange, the lateral wall of the upright column joint is fixed with cable wind rope seat board;The anchor includes the first link With the second link, first link is hinged with the cable wind rope seat board by the first jointed shaft laterally set, described One end of the other end of first link and second link is hinged by the second jointed shaft, and second jointed shaft is vertical In first jointed shaft, the other end of second link is fixedly connected with one end of the cable wind rope;The tensioning equipment Including anchor frame, the anchor frame upper end is fixedly connected with the other end of the cable wind rope, and the anchor frame lower end is hinged with anchoring Bottom plate, the anchoring bottom plate are fixed with some anchor bars.
- 2. the pylon cable wind rope with erecting device as claimed in claim 1, it is characterised in that:First link includes two The first side plate that is individual vertical and being oppositely arranged, be provided between two first side plates about two be oppositely arranged first support Plate, first supporting plate and first jointed shaft are located at the opposite end of first side plate respectively, and described second is be hinged It is located in first supporting plate.
- 3. the pylon cable wind rope with erecting device as claimed in claim 2, it is characterised in that:Second link includes two Individual the second side plate being oppositely arranged up and down, one end of two second side plates pass through first described in the described second be hinged axis connection Link, the second supporting plate is provided between the other end of two second side plates, the cable wind rope is connected to described second Fagging.
- 4. the pylon cable wind rope with erecting device as claimed in claim 1, it is characterised in that the anchor frame lower end is hinged with Two anchoring bottom plates, two anchoring bottom plates are parallel and are oppositely arranged, and the anchor bar is located at the anchoring bottom plate.
- 5. the pylon cable wind rope with erecting device as claimed in claim 1, it is characterised in that the cable wind rope seat board is provided with two Individual, two cable wind rope seat boards are parallel and are relatively arranged on the column sleeve pipe.
- 6. the pylon cable wind rope with erecting device as claimed in claim 1, it is characterised in that the lateral wall of the upright column joint On be fixed with a connecting base plate, the connecting base plate is disposed opposite to each other with the cable wind rope seat board.
- 7. the pylon cable wind rope with erecting device as claimed in claim 1, it is characterised in that the lateral wall of the upright column joint On be fixed with cross-beam connecting plate, the cross-beam connecting plate is provided with connecting hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721094039.XU CN207090807U (en) | 2017-08-30 | 2017-08-30 | Pylon cable wind rope with erecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721094039.XU CN207090807U (en) | 2017-08-30 | 2017-08-30 | Pylon cable wind rope with erecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207090807U true CN207090807U (en) | 2018-03-13 |
Family
ID=61540398
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721094039.XU Expired - Fee Related CN207090807U (en) | 2017-08-30 | 2017-08-30 | Pylon cable wind rope with erecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207090807U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107324209A (en) * | 2017-08-30 | 2017-11-07 | 广西路桥工程集团有限公司 | Pylon cable wind rope with erecting device |
-
2017
- 2017-08-30 CN CN201721094039.XU patent/CN207090807U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107324209A (en) * | 2017-08-30 | 2017-11-07 | 广西路桥工程集团有限公司 | Pylon cable wind rope with erecting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20110283640A1 (en) | Folding tower | |
KR101999500B1 (en) | Equipment for installing and dismantling of wind turbine and construction methods with it | |
CN104695752B (en) | Rapid rush-repair Tower System and its erection method | |
CN107100187B (en) | Tower crane steel girder erection structure and installation method | |
CN207090807U (en) | Pylon cable wind rope with erecting device | |
CA2418021C (en) | Method of constructing and erecting a tower | |
CN207227957U (en) | Pier construction security protection platform | |
CN107324209A (en) | Pylon cable wind rope with erecting device | |
CN111852074B (en) | Adjustable lifting type supporting device | |
CN2923644Y (en) | Superhigh super-large high-tonnage walking derricktype lifting machine | |
CN110259258B (en) | Combined self-standing rod for emergency repair of medium-low voltage distribution network and construction method thereof | |
CN208479032U (en) | A kind of cantilever crossing frame from lifting rotary type | |
CN216950221U (en) | Staple bolt of high mound cat ladder attaches wall device | |
CN212358012U (en) | Widening platform device of hydraulic creeping formwork for quickly constructing double-limb cable tower | |
CN211422500U (en) | A ladder that continues for steel pipe pole is climbed | |
CN114086594A (en) | Support welding frock of offshore wind power jacket | |
CN218415674U (en) | Steel truss structure capable of laying power pipeline | |
CN207090833U (en) | Pylon wind cable column cross-connecting apparatus | |
CN218881530U (en) | Adjustable elevator shaft operating platform support frame | |
CN216517237U (en) | Folding helicopter deck safety net | |
CN108718058A (en) | A kind of cantilever crossing frame from lifting rotary type | |
CN212849571U (en) | Substation equipment erection equipment | |
CN210685870U (en) | Assembled drilling tower for center drilling | |
CN220432160U (en) | T-shaped cross-railway light portal frame | |
CN216251945U (en) | Novel assembled strideing across equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 530200 No.21 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region Patentee after: GUANGXI ROAD AND BRIDGE ENGINEERING GROUP Co.,Ltd. Address before: 530011 No. 17 Zhonghua Road, the Guangxi Zhuang Autonomous Region, Nanning Patentee before: GUANGXI ROAD AND BRIDGE ENGINEERING GROUP Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180313 Termination date: 20210830 |