CN207063018U - Frame linkwork before and after land leveller - Google Patents

Frame linkwork before and after land leveller Download PDF

Info

Publication number
CN207063018U
CN207063018U CN201720723674.3U CN201720723674U CN207063018U CN 207063018 U CN207063018 U CN 207063018U CN 201720723674 U CN201720723674 U CN 201720723674U CN 207063018 U CN207063018 U CN 207063018U
Authority
CN
China
Prior art keywords
cover plate
afer bay
pin
taper roll
iii
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720723674.3U
Other languages
Chinese (zh)
Inventor
卜莉莉
魏静
孟庆轩
王跃
范杨
刘颖
吴迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou XCMG Road Construction Machinery Co Ltd
Original Assignee
Xuzhou XCMG Road Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou XCMG Road Construction Machinery Co Ltd filed Critical Xuzhou XCMG Road Construction Machinery Co Ltd
Priority to CN201720723674.3U priority Critical patent/CN207063018U/en
Application granted granted Critical
Publication of CN207063018U publication Critical patent/CN207063018U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Support Of The Bearing (AREA)

Abstract

It the utility model is related to frame linkwork before and after a kind of land leveller, taper roll bearing is arranged between upper pin and forebay, taper roll bearing is arranged between lower bearing pin and forebay, taper roll bearing upper and lower ends are fixed by cover plate II and cover plate III, and outside framework oil seal is housed between cover plate II and upper pin;Outside framework oil seal is housed, adjusting pad II is used to adjust the axial gap between cover plate II and taper roll bearing between cover plate III and lower bearing pin;Cover plate V connects lower bearing pin and afer bay;Adjustment axis is sleeved between cover plate V and afer bay;Cover plate I connects upper pin and afer bay;Adjusting pad I is mounted between cover plate I and afer bay, and cover plate IV is connected with upper pin, and adjusting pad III is loaded between upper pin and cover plate IV.The beneficial effects of the utility model are that this mechanism coordinates accurate installation by taper roll bearing, adjusting pad, outside framework oil seal, regulation axle sleeve etc., complete machine is born big load and impact, structure is reliable, and prevents bolt looseness.

Description

Frame linkwork before and after land leveller
Technical field
It the utility model is related to frame linkwork before and after a kind of land leveller.
Background technology
Frame is connected in the form of be hinged more before and after land leveller at present, can so reduce radius of turn, is turned to more Flexibly, frame before and after linkwork connection, support complete machine and bear what impact caused by equipment carries.Especially high-power Land leveller is used for the operating mode of the harsh environmental conditions such as colliery, because complete machine working strength and shock loading are larger, can make to be hinged Bolt looseness, damage of components in mechanism, changing parts herein and dismantling all pipelines of vehicle and separates front/rear frame, Manpower and materials are caused to waste serious.
Utility model content
The problem of existing for above-mentioned existing equipment, the utility model provide frame linkwork before and after a kind of land leveller, This mechanism ensures structural strength and installation accuracy using taper roll bearing, adjusting pad and regulation axle sleeve etc., can bear larger Shock loading and damage parts caused by preventing bolt looseness.
To achieve these goals, technical scheme is used by the utility model:Frame linkwork before and after land leveller, Including forebay and afer bay, it is characterised in that:The junction of forebay and afer bay is divided into first connecting portion position and second and connected Socket part position, first connecting portion position, the center of second connecting portion position are respectively upper pin, lower bearing pin, and taper roll bearing is arranged on Between upper pin and forebay, taper roll bearing is also mounted between lower bearing pin and forebay, two above and below taper roll bearing End is fixed by cover plate II and cover plate III;In first connecting portion position, cover plate I connects upper pin and afer bay simultaneously, and cover plate IV connects Upper pin;In second connecting portion position, cover plate V connects lower bearing pin and afer bay simultaneously.
Axle sleeve is cased with upper pin and lower bearing pin, axle sleeve is used to withstand taper roll bearing.
Adjusting pad II is arranged between forebay and cover plate II, for adjusting the axle between cover plate II and taper roll bearing To gap.
Axle sleeve is adjusted to be arranged between cover plate V and afer bay, by adjust axle sleeve and bolt cover plate V simultaneously with it is rear Frame, lower bearing pin connection.
Adjusting pad I is arranged between cover plate I and afer bay, and adjusting pad III is installed between upper pin and cover plate IV.
Outside framework oil seal is housed between cover plate II and upper pin;Outside framework oil seal is housed between cover plate II and lower bearing pin;Cover plate III Outside framework oil seal is housed between axle sleeve;Outside framework oil seal is housed between cover plate III and lower bearing pin.
For first connecting portion position, cover plate I, adjusting pad I, afer bay, cover plate II, forebay, cover plate III, afer bay, lid Plate IV is sequentially set;For second connecting portion position, afer bay, cover plate III, forebay, cover plate II, afer bay, the order of cover plate V are set Put.
Relative to prior art, the beneficial effects of the utility model are, this mechanism by taper roll bearing, adjusting pad, Outside framework oil seal, regulation axle sleeve etc. coordinate accurate installation, complete machine is born big load and impact, structure is reliable, and prevents Bolt looseness.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment;
Fig. 2 is Fig. 1 C-C sectional views;
In figure:1. cover plate I, 2. adjusting pads I, 3. outside framework oil seals, 4. upper pins, 5. cover plates III, 6. adjusting pads III, 7. spiral shells Bolt, 8. cover plates IV, 9. axle sleeves, 10. taper roll bearings, 11. forebays, 12. adjusting pads II, 13. afer bays, 14. cover plates II, 15. lower bearing pin, 16. regulation axle sleeves, 17. cover plates V, 18 forebays, 19 afer bays.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in figure 1, frame linkwork before and after land leveller, including forebay 18 and afer bay 19, in forebay with after The link position of support chooses section and obtains Fig. 2 sectional view, and because link position sheet is as at 2, therefore Fig. 2 corresponds to C-C respectively The first half of section and lower half, and both the first half and lower half are not connected with each other.The connection punishment of forebay and afer bay For first connecting portion position and second connecting portion position, first connecting portion position(Fig. 2 upper half figures), second connecting portion position(Fig. 2 figure below)'s Center is respectively upper pin, lower bearing pin, and upper and lower bearing pin is individually present.
For first connecting portion position, cover plate I, adjusting pad I, afer bay, cover plate II, forebay, lid are from top to bottom followed successively by Plate III, afer bay, cover plate IV.For second connecting portion position, afer bay, cover plate III, forebay, cover plate are from top to bottom followed successively by IIth, afer bay, cover plate V.
Frame linkwork before and after land leveller, by cover plate I 1, adjusting pad I 2, outside framework oil seal 3, upper pin 4, cover plate III 5, tune Whole pad III 6, bolt 7, cover plate IV 8, axle sleeve 9, taper roll bearing 10, forebay 11, adjusting pad II 12, afer bay 13, cover plate II 14, lower bearing pin 15, regulation axle sleeve 16, cover plate V 17 form;Taper roll bearing 10 be arranged on upper pin 4 and forebay 11 it Between, taper roll bearing 10 is also mounted between lower bearing pin 15 and forebay 11, and the upper and lower ends of taper roll bearing 10 are by cover plate II 14 and cover plate III 5 fix, outside framework oil seal is housed between cover plate II 14 and upper pin 4;Filled between cover plate II 14 and lower bearing pin 15 There is outside framework oil seal;Outside framework oil seal is housed, axle sleeve 9 is enclosed on upper pin or lower bearing pin between cover plate III 5 and axle sleeve 9;Cover plate III 5 with Outside framework oil seal is housed, adjusting pad II 12 is by adjusting thickness, for adjusting cover plate II 14 and taper roller axle between lower bearing pin 15 The axial gap between 10 is held, adjusting pad II 12 is positioned between cover plate II and forebay;Before upper pin and lower bearing pin are respectively positioned on The center of link position at the 2 of frame and after-poppet.
Adjust axle sleeve 16 to be mounted between cover plate V and afer bay, bolt is through cover plate V, regulation axle sleeve and enters afer bay. Cover plate V 17 is also bolted lower bearing pin, realizes the fixation of lower bearing pin and afer bay.Specifically, under cover plate V 17 is located at Below bearing pin and afer bay, cover plate V 17 is provided with hole, and regulation axle sleeve 16 is provided with hole, and bolt is gone forward side by side through cover plate V, regulation axle sleeve Enter afer bay.
Cover plate I 1 connects upper pin and afer bay respectively, is realized and connected by bolt 7, and cover plate I is located above upper pin;Adjust Whole pad I 2 is mounted between cover plate I and afer bay 13;Cover plate IV 8 is connected with upper pin, and cover plate IV 8 is located at below upper pin, passes through Bolt 7 realizes connection;Adjusting pad III 6 is loaded between upper pin and cover plate IV.
Taper roll bearing 10 is first installed in forebay, specifically, between upper pin 4 and forebay 11, It is also mounted between lower bearing pin and forebay;Outside framework oil seal 3 is respectively charged into cover plate II 14 and cover plate III 5 or is respectively charged into Between cover plate II and upper pin, between cover plate III 5 and lower bearing pin 15, by adjusting pad II 12 mounted in cover plate II 14 and forebay 11 it Between, then with the securing cover plate II 14 of bolt 7;With the securing cover plate III 5 of bolt 7;Lower bearing pin 15 is installed;Cover plate is installed by bolt 7 V 17, the blending bolt 7 of installation and adjustment axle sleeve 16 is fixed;Axle sleeve 9 is fitted into cover plate III 5, and withstands taper roll bearing 10;Peace Load onto bearing pin 4;Adjusting pad III 6 is loaded between upper pin 4 and cover plate IV 8, cover plate IV 8 is connected by bolt 7 with upper pin 4; Adjusting pad I 2 is arranged between cover plate I 1 and afer bay 13, passes through the securing cover plate I 1 of bolt 7.
General principle of the present utility model, main features and advantages have been shown and described above.The technical staff of the industry It should be appreciated that the utility model is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification is originally The principle of utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model also has various change And improvement, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model requires protection scope By appended claims and its equivalent thereof.

Claims (7)

1. frame linkwork before and after land leveller, including forebay and afer bay, it is characterised in that:The company of forebay and afer bay It is first connecting portion position and second connecting portion position to connect punishment, and first connecting portion position, the center of second connecting portion position are respectively upper sell Axle, lower bearing pin, taper roll bearing are arranged between upper pin and forebay, and taper roll bearing is also mounted at lower bearing pin with before Between frame, taper roll bearing upper and lower ends are fixed by cover plate II and cover plate III;In first connecting portion position, cover plate I connects simultaneously Bearing pin and afer bay are connected, cover plate IV connects upper pin;In second connecting portion position, cover plate V connects lower bearing pin and rear machine simultaneously Frame.
2. frame linkwork before and after land leveller according to claim 1, it is characterised in that covered on upper pin and lower bearing pin There is axle sleeve, axle sleeve is used to withstand taper roll bearing.
3. frame linkwork before and after land leveller according to claim 1, it is characterised in that adjusting pad II is arranged at preceding machine Between frame and cover plate II, for adjusting the axial gap between cover plate II and taper roll bearing.
4. frame linkwork before and after land leveller according to claim 1, it is characterised in that regulation axle sleeve is arranged on cover plate Between V and afer bay, it is connected simultaneously with afer bay, lower bearing pin by adjusting axle sleeve and bolt cover plate V.
5. frame linkwork before and after land leveller according to claim 1, it is characterised in that adjusting pad I is arranged on cover plate I Between afer bay, adjusting pad III is installed between upper pin and cover plate IV.
6. frame linkwork before and after land leveller according to claim 1, it is characterised in that:Between cover plate II and upper pin Equipped with outside framework oil seal;Outside framework oil seal is housed between cover plate II and lower bearing pin;Outside framework oil seal is housed between cover plate III and axle sleeve;Cover plate Outside framework oil seal is housed between III and lower bearing pin.
7. frame linkwork before and after land leveller according to claim 1, it is characterised in that:For first connecting portion position, Cover plate I, adjusting pad I, afer bay, cover plate II, forebay, cover plate III, afer bay, cover plate IV are sequentially set;For the second connection Position, afer bay, cover plate III, forebay, cover plate II, afer bay, cover plate V are sequentially set.
CN201720723674.3U 2017-06-21 2017-06-21 Frame linkwork before and after land leveller Active CN207063018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720723674.3U CN207063018U (en) 2017-06-21 2017-06-21 Frame linkwork before and after land leveller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720723674.3U CN207063018U (en) 2017-06-21 2017-06-21 Frame linkwork before and after land leveller

Publications (1)

Publication Number Publication Date
CN207063018U true CN207063018U (en) 2018-03-02

Family

ID=61508345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720723674.3U Active CN207063018U (en) 2017-06-21 2017-06-21 Frame linkwork before and after land leveller

Country Status (1)

Country Link
CN (1) CN207063018U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359894A (en) * 2020-10-30 2021-02-12 江苏徐工工程机械研究院有限公司 Land leveler saddle and land leveler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359894A (en) * 2020-10-30 2021-02-12 江苏徐工工程机械研究院有限公司 Land leveler saddle and land leveler

Similar Documents

Publication Publication Date Title
CN203201562U (en) Shield tunneling machine initial counter-force frame convenient to detach, install and transport
CN103334782B (en) Movable pulley traction connecting device of inclined roadway winch used for transportation of hydraulic support
CN207063018U (en) Frame linkwork before and after land leveller
CN201952134U (en) Crawler crane mainframe rear counterweight self-assembling and disassembling device
CN201406842Y (en) Concrete pump truck
CN206394709U (en) A kind of low clearance vehicle frame of radar antenna carrier vehicle
CN102976232B (en) Shovel-type support conveying vehicle
CN214267774U (en) Auxiliary frame assembly and concrete pump truck
CN209254944U (en) The feeding hopper of movable Crushing Station
CN207062762U (en) Bridge inspection vehicle slewing equipment
CN206374036U (en) Mobile filling formula trucd mixer
CN206141860U (en) Adopt nested formula passageway of compound gyro wheel bearing
CN207128499U (en) A kind of attachment structure of articulated truck vehicle bridge and suspension
CN208698779U (en) Process bogie for car inspection and repair
CN102351130B (en) Crawler crane and counterweight supporting device thereof
CN201856816U (en) Vehicle frame used for relocation of towers
CN101992804B (en) Frame for moving tower
CN102311055B (en) Tower crane and its lower support assembly
CN204999324U (en) Dumping plough receives material arm simply to support car
CN203449997U (en) Wide-bodied mining dumper compartment turnover hinging structure
CN106198061B (en) A kind of railway freight-car static load test equipment
CN209492819U (en) A kind of bearing turnover box being readily transported
CN207173605U (en) Vehicle frame collar tie beam structure and quarry tipper
CN205148619U (en) A novel rail mounted feed mechanism for concrete mixer
CN104150352A (en) Portal frame and portal crane using portal frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant