CN207048724U - High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe - Google Patents

High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe Download PDF

Info

Publication number
CN207048724U
CN207048724U CN201720871947.9U CN201720871947U CN207048724U CN 207048724 U CN207048724 U CN 207048724U CN 201720871947 U CN201720871947 U CN 201720871947U CN 207048724 U CN207048724 U CN 207048724U
Authority
CN
China
Prior art keywords
sleeve pipe
screw thread
coal bed
bed gas
gas well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720871947.9U
Other languages
Chinese (zh)
Inventor
孟召平
郭向前
李超
田永东
姚爱军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Lanyan Coalbed Methane Group Co ltd
China University of Mining and Technology Beijing CUMTB
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Lanyan Coalbed Methane Group Co ltd
China University of Mining and Technology Beijing CUMTB
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Lanyan Coalbed Methane Group Co ltd, China University of Mining and Technology Beijing CUMTB, Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Lanyan Coalbed Methane Group Co ltd
Priority to CN201720871947.9U priority Critical patent/CN207048724U/en
Application granted granted Critical
Publication of CN207048724U publication Critical patent/CN207048724U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model belongs to a layer gas resource exploitation technical field, in order to realize sleeve pipe and well wall clearance grouting are carried out in the region that drilling well is specified or section, the utility model provides in a kind of coal bed gas well sleeve pipe and is segmented high-pressure plaster-spraying implement, including body, the body is three-segment integral structure, the middle part of body is the floral tube for being provided with some slip casting grooves, the upper and lower part of body is respectively screw thread, on, stop grouting plug combination is separately installed with the screw thread of bottom, on, segment between the stop grouting plug combination of bottom is slip casting section, wherein, top stop grouting plug combination can move up and down along slurry casting machine top screw thread;The top of the top slurry casting machine top screw thread is provided with the latching connector for the drilling rod that is connected, Grouting Pipe.The high-pressure slip-casting of variable section length in specified drilling well inner section or position, can be realized using the present apparatus, Sidewall Surrounding Rock outside the sleeve pipe of designated area is reinforced, sleeve pipe is closely connected with the borehole wall, greatly strengthen the stability of coal bed gas well.

Description

High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe
Technical field
The utility model belongs to a layer gas resource exploitation technical field, and in particular to a kind of borehole wall for coal bed gas well is reinforced High-pressure plaster-spraying implement is segmented in the coal bed gas well sleeve pipe of mortar depositing construction.
Background technology
The drilling well of coal bed gas ground construction need to use casing cementing, and when particularly passing through goaf, sleeve pipe is difficult with drilling well country rock Realize closely connected, have impact on the long-time stability of pipe well.This just needs to carry out grouting and reinforcing, note at this stage between sleeve pipe and the borehole wall Paste-making method is from hole-bottom slurry-injection, but because of the presence in goaf, it is impossible to realizes and returns to predetermined altitude on slip casting liquid.Therefore, if energy Take method and improve grouting device, realize the region specified in drilling well or section, carry out sleeve pipe and well wall clearance grouting, then greatly It is big to improve slip casting efficiency and effect.
The content of the invention
In order to realize sleeve pipe and well wall clearance grouting, Jincheng, Shanxi anthracite mine are carried out in the region that drilling well is specified or section Co., Ltd of industry group coal specially have developed in a kind of coal bed gas well sleeve pipe with coal bed gas Gong Cai National Key Laboratories to be divided Section high-pressure plaster-spraying implement.
The utility model adopts the following technical scheme that:
High-pressure plaster-spraying implement, including body are segmented in a kind of coal bed gas well sleeve pipe, the body is three-segment integral structure, pipe The middle part of body is the floral tube for being provided with some slip casting grooves, and the upper and lower part of body is respectively screw thread, is distinguished at the screw thread of upper and lower part Stop grouting plug combination is installed, the segment between the combination of upper and lower part stop grouting plug is slip casting section, wherein, the combination of top stop grouting plug can Moved up and down along slurry casting machine top screw thread;The top of the top slurry casting machine top screw thread be provided with for be connected drilling rod, The latching connector of Grouting Pipe.
The stop grouting plug combination includes grip bolt, rubber seal and Elastic flexible glue ring, and grip bolt coordinates with screw thread Connection, rubber seal and Elastic flexible glue ring are parallel to each other, are coaxially close to be socketed between grip bolt and sleeve pipe, are formed double-deck Structure is only starched in sealing.
The rubber seal is on the outside of Elastic flexible glue ring.Combined for the stop grouting plug on top, Elastic flexible glue ring peace Loaded on rubber seal lower section, and being combined for the stop grouting plug of bottom, Elastic flexible glue ring is installed on above rubber seal, because This, inner side is that relative injection slurry describes, and the first layer that Elastic flexible glue ring is formed with injection slurry directly contacts seals, rubber seal Form second layer sealing.
The length of the slip casting section is 0.5-1m.
The slip casting groove is the rectangle notch of parallel tubes axis direction, is set along body axis direction and is no less than three Layer, every layer is no less than 3 notches, and the notch of adjacent layer shifts to install.Ensure that pulp is uniform in the slip casting section.
The utility model mainly solves following technical problem:
(a)Realize that segmentation carries out sleeve pipe and well wall clearance grouting in sleeve pipe, and slip casting segment length may be selected;
(b)Double-deck grouting stop-valve is set, realizes high pressure slip casting;
(c)Separate high pressure Grouting Pipe is set, common exploration drilling rod can be used to be connected with slurry casting machine, simplify slip casting equipment.
Therefore, grouting and reinforcing outside the sleeve pipe of coal bed gas well is carried out using the present apparatus, can in specified drilling well inner section or Position, the high-pressure slip-casting of variable section length is realized, Sidewall Surrounding Rock outside the sleeve pipe of designated area is reinforced, sleeve pipe and the borehole wall It is closely connected, it greatly strengthen the stability of coal bed gas well.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1. drilling rod;2. Grouting Pipe;3. sleeve pipe;4. latching connector;5. slurry casting machine top screw thread;6. grip bolt;7. rubber Glue sealing ring;8. Elastic flexible glue ring;9. slip casting groove;10. slurry casting machine bottom screw thread;11. body.
Embodiment
With reference to accompanying drawing, specific embodiment of the present utility model is described further:
High-pressure plaster-spraying implement is segmented in coal bed gas well sleeve pipe as shown in Figure 1, its body 11 divides upper, middle and lower three parts, and top is Length 0.1-0.5m slurry casting machine top screw thread 5, middle part are the floral tube part, length 0.5m or so for being provided with 3 pairs of slip casting grooves 9, under Portion is the slurry casting machine bottom screw thread 10 of 0.2m length.It is respectively mounted only at slurry casting machine top screw thread 5 and slurry casting machine bottom screw thread 10 Slurry plug combination(Including three grip bolts 6, rubber seal 7 and Elastic flexible glue ring 8).Top stop grouting plug combination can be along slurry casting machine Top screw thread 5 moves, and so as to realize, segmentation carries out sleeve pipe and well wall clearance grouting in sleeve pipe, and slip casting segment length may be selected, and one As select length range 0.5-1.0m.Rubber seal 7 and Elastic flexible glue ring 8 are set in stop grouting plug combination, possess double-deck only slurry Effect, under grouting pressure effect, Elastic flexible glue ring 8 is squeezed closely connected with sleeve pipe, significantly improves and only starches performance, realizes High pressure slip casting.
Special latching connector 4 can be with jointed rod 1, Grouting Pipe 2 and slurry casting machine top screw thread 5, and common survey may be selected in drilling rod Prospecting bit bar, Grouting Pipe use high-pressure slip-casting pipe, improve the flexibility of equipment and materials selection, reduce cost.
The process for using of the utility model device is as follows:
(1)The slurry casting machine body 11 of suitable diameter is selected, gets out respective accessory, including drilling rod 1, Grouting Pipe 2, latching connector 4th, grip bolt 6, rubber seal 7, Elastic flexible glue ring 8 etc..
(2)The stop grouting plug of bottom is combined(Including three grip bolts 6, rubber seal 7 and Elastic flexible glue ring 8)Successively It is screwed on slurry casting machine bottom screw thread 10.
(3)The stop grouting plug on top is combined(Including three grip bolts 6, rubber seal 7 and Elastic flexible glue ring 8)Successively It is screwed on slurry casting machine top screw thread 5, and adjusts the length of slip casting section as needed, stop grouting plug combination is parked in some fixed bit Put.
(4)By first segment drilling rod 1 and corresponding Grouting Pipe 2 and the screwed connection of latching connector 4, and slurry casting machine is lifted by crane and is sent into set In pipe 3.
(5)As stated above, continued drilling rod 1 and Grouting Pipe 2 successively, and the position of slip casting is needed in through sleeve pipe.
(6)In collar piping mouth, from the high pressure injected clear water of Grouting Pipe 2, water under high pressure enters in slurry casting machine, and extruding elasticity is soft Rubber ring 8, make it closely connected with tube wall, while the injected hole on sleeve pipe 3 is broken.
(7)In ground well head, deployed injection slurry, slurries are injected from Grouting Pipe high pressure, slurries are pressed into from the injected hole of sleeve pipe 3 Sleeve pipe is with borehole wall space, realizing segmenting slip casting reinforcing.
(8)Reach slip casting requirement, timely hoisting grouting device to the mouth of pipe, rinse slurry casting machine.
The connection main points and relation of the device are as follows:
Drilling rod 1 and Grouting Pipe are connected by latching connector 4, and latching connector 4 is connected with top slurry casting machine screw thread 5.Slurry casting machine top Stop grouting plug combination include grip bolt 6(3), rubber seal 7 and Elastic flexible glue ring 8, there is inner ring, inner sleeve spiral shell in inner ring Line, slurry casting machine upper one end is passed sequentially through, screwed along slurry casting machine top screw thread to fixed position.Rubber seal 7 and elasticity The clamped bolt 6 of flexible glue ring 8 clamps.Equally, the stop grouting plug combination of slurry casting machine bottom includes grip bolt 6(3), rubber it is close Seal 7 and Elastic flexible glue ring 8, have an inner ring, interior external threading in inner ring, pass sequentially through slurry casting machine bottom screw thread 10, screw to solid Positioning is put.Rubber seal 7 and Elastic flexible glue ring 8 are clamped by three grip bolts 6.Upper and lower stop grouting plug combination is close with sleeve pipe 3 Patch.

Claims (5)

1. it is segmented high-pressure plaster-spraying implement, including body in a kind of coal bed gas well sleeve pipe(11), it is characterised in that:The body(11)For Three-segment integral structure, body(11)Middle part to be provided with some slip casting grooves(9)Floral tube, body(11)Upper and lower part point Not Wei screw thread, stop grouting plug combination is separately installed with the screw thread of upper and lower part, the segment between the combination of upper and lower part stop grouting plug is note Section is starched, wherein, stop grouting plug combination in top can move up and down along slurry casting machine top screw thread;The top of the top slurry casting machine top screw thread End is provided with for the drilling rod that is connected(1), Grouting Pipe(2)Latching connector(4).
2. it is segmented high-pressure plaster-spraying implement in coal bed gas well sleeve pipe according to claim 1, it is characterised in that:The stop grouting plug group Conjunction includes grip bolt(6), rubber seal(7)With Elastic flexible glue ring(8), grip bolt(6)It is connected with screw thread, rubber Sealing ring(7)With Elastic flexible glue ring(8)It is parallel to each other, is coaxially close to be socketed on grip bolt(6)With sleeve pipe(3)Between, formed Double-layer seal only starches structure.
3. according to being segmented high-pressure plaster-spraying implement in the coal bed gas well sleeve pipe described in claim 2, it is characterised in that:The rubber seal (7)Located at Elastic flexible glue ring(8)Outside.
4. it is segmented high-pressure plaster-spraying implement in coal bed gas well sleeve pipe according to claim 3, it is characterised in that:The slip casting section Length is 0.5-1m.
5. it is segmented high-pressure plaster-spraying implement in coal bed gas well sleeve pipe according to claim 4, it is characterised in that:The slip casting groove (9)For parallel tubes(11)The rectangle notch of axis direction, along body(11)Axis direction, which is set, is no less than three layers, and every layer is not Less than 3 notches, the notch of adjacent layer shift to install.
CN201720871947.9U 2017-07-18 2017-07-18 High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe Active CN207048724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720871947.9U CN207048724U (en) 2017-07-18 2017-07-18 High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720871947.9U CN207048724U (en) 2017-07-18 2017-07-18 High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe

Publications (1)

Publication Number Publication Date
CN207048724U true CN207048724U (en) 2018-02-27

Family

ID=61496549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720871947.9U Active CN207048724U (en) 2017-07-18 2017-07-18 High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe

Country Status (1)

Country Link
CN (1) CN207048724U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708768A (en) * 2018-06-04 2018-10-26 徐州中国矿大岩土工程新技术发展有限公司 Slip casting tube head, grouting device and its construction method
CN108756945A (en) * 2018-06-04 2018-11-06 徐州中国矿大岩土工程新技术发展有限公司 The device and construction method administered for multilayer goaf grouting
CN110644469A (en) * 2019-10-31 2020-01-03 中铁二院工程集团有限责任公司 Sectional grouting device and grouting method for steel perforated pipe grouting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708768A (en) * 2018-06-04 2018-10-26 徐州中国矿大岩土工程新技术发展有限公司 Slip casting tube head, grouting device and its construction method
CN108756945A (en) * 2018-06-04 2018-11-06 徐州中国矿大岩土工程新技术发展有限公司 The device and construction method administered for multilayer goaf grouting
CN110644469A (en) * 2019-10-31 2020-01-03 中铁二院工程集团有限责任公司 Sectional grouting device and grouting method for steel perforated pipe grouting

Similar Documents

Publication Publication Date Title
CN207048724U (en) High-pressure plaster-spraying implement is segmented in a kind of coal bed gas well sleeve pipe
CN105696598B (en) A kind of application method for being adapted to mini-valve tube elevation angle grouting device
CN205918361U (en) Perpendicular drilling tool of machinery
CN100489361C (en) Method for reducing prop force with ring-shape mud sheath in pipe-jacking construction
CN107313744A (en) A kind of small guide hole grouting and reinforcing coal bed gas well passes through the construction method in goaf
CN106223897B (en) A kind of broken coal petrography deep hole segmenting slip casting method of fully-mechanized mining working
CN102704971A (en) Grouting and Grouting-stopping anchor cable inside hole
CN202810680U (en) Well drilling combination device using double-wall drill pipe
CN107313745A (en) A kind of cementing method for crossing the intensive grouting and reinforcing coal bed gas well of many nodes in goaf
CN201753606U (en) Dual-purpose grouting pipe for deep and shallow holes
CN107120072B (en) A kind of steel pipe type cable traversing device
CN203808918U (en) Inflatable oil well plugging device
CN202417416U (en) High-pressure packer for testing deep hole geostress
CN109973051A (en) A kind of high pressure water conversion control device and stress measurement system
CN105089631A (en) Horizontal well rod conveying dynamic logging method
CN102561987B (en) Steam injection thermosensitive expanding and folding type multiple-segment packer
CN211851768U (en) Novel grouting drill rod
CN210422682U (en) Air compression sealing device for coal mine gas extraction drill hole
CN208565659U (en) A kind of waterway conversion valve for the interior test that drills
CN202560188U (en) High-inclination well layered water injection technical tubular column
CN209212167U (en) Novel offshore drilling movable casing
CN207245656U (en) A kind of high frequency hydroscillator
CN108590569B (en) Drilling plugging and leakage detecting integrated multi-section observation system
CN201679468U (en) Coiled tubing anchoring device
CN216553884U (en) Reverse gravel filling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant