CN207045508U - A kind of lugs being installed on bicycle expressway - Google Patents

A kind of lugs being installed on bicycle expressway Download PDF

Info

Publication number
CN207045508U
CN207045508U CN201720598054.1U CN201720598054U CN207045508U CN 207045508 U CN207045508 U CN 207045508U CN 201720598054 U CN201720598054 U CN 201720598054U CN 207045508 U CN207045508 U CN 207045508U
Authority
CN
China
Prior art keywords
bicycle
binder
lugs
track
expressway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720598054.1U
Other languages
Chinese (zh)
Inventor
郑伟盛
廖选茂
韦晓琪
胡哲
冷瀚宇
袁晓民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science And Industry Co ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201720598054.1U priority Critical patent/CN207045508U/en
Application granted granted Critical
Publication of CN207045508U publication Critical patent/CN207045508U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model embodiment is applied to building technical field, there is provided a kind of lugs being installed on bicycle expressway.Bicycle expressway includes pier stud, binder and two tracks ridden for bicyclist, binder and is fixed on pier stud, and the both ends of binder are respectively and fixedly provided with track.Lugs include being used for the Liang Geka roads parked for vehicle, Liang Geka roads are arranged on binder spaced reciprocally, and it is connected with track, the walkway for being easy to bicyclist to walk is formed between Liang Geka roads, each Ka Dao includes two clamps, has a neck for being used for holding cycle wheel between two clamps.Bicyclist can come to a complete stop bicycle placement out of track pushing card road neck, and the facility stopped in bicycle high speed is provided for bicyclist.

Description

A kind of lugs being installed on bicycle expressway
Technical field
The utility model belongs to building technical field, more particularly to a kind of parking dress being installed on bicycle expressway Put.
Background technology
The final purpose of Traffic Development is that the outside environment of sequence is provided with for the mankind, with it is people-oriented, green go out The it is proposed of the Modern City Traffic theories such as row, the city slow-vehicle system using bicycle expressway as representative are progressively taken seriously.
Bicycle expressway refers to the urban transportation infrastructure for being exclusively used in cycling, has 3 features:1) row It is fast to sail speed, traffic efficiency is high.At present due to Computer method in city, the travel speed of bicycle is less than 10km/h, and voluntarily Scooter 30km/h during the design of car highway, the efficiency that greatly improves that cyclists only alleviate the congestion of large size city indirectly Effect.2) people-oriented, it is fair to embody.Bicycle highway carries out the non-separation of machine so that bicycle enjoys independent right of way, fills Code insurance protects injury of the cycling person from motor vehicle, and reduces influencing each other for two kinds of vehicles.3) it is green, it is low Carbon health.Green Travel is advocated in bicycle expressway, life idea, protection urban ecology to improving modern city low-carbon environment-friendly Environment has positive meaning.
Carry out bicycle highway construction, structure is adapted with the urban development stage, with public transport seamless connection, green Safely, conveniently efficient new transport system, it is to strengthen urban infrastructure construction low-carbon improvement and design, encourages resident more Use public transport and bicycle, practice City Green trip important embodiment.
For this reason, it is necessary to reference to planning of the BRT to large size city bicycle expressway and build key issue research, pass through Rational planning, perfect design and overall process construction, propose city bicycles expressway system integration solution, to promoting Green, low-carbon and the sustainable development for entering city are significant.
Utility model content
The utility model embodiment technical problem to be solved is to provide a kind of be installed on bicycle expressway Lugs, it is intended to solve the problems, such as in bicycle high speed path-chromatic number.
The utility model embodiment is achieved in that a kind of lugs being installed on bicycle expressway, voluntarily Car expressway includes pier stud, binder and two tracks ridden for bicyclist, binder and is fixed on pier stud, and the both ends of binder are equal It is fixed with track;The lugs include being used for the Liang Geka roads parked for vehicle, and described Liang Geka roads are mutual It is arranged on the binder every ground, and is connected with track, the people for being easy to bicyclist to walk is formed between described Liang Geka roads Row of channels, each Ka Dao include two clamps, have one to be used for holding cycle wheel between described two clamps Neck.
Further, two described tracks are parallel to each other.
Further, one is respectively provided with two described clamps to be used to limit the forward stopper of cycle wheel.
Further, it is provided with the clamp for the locked lockset of cycle wheel and for controlling the lockset Perform the controlling switch unlocked and shut.
Further, the lugs also include bicycle shed, and described Liang Geka roads are located in the bicycle shed, the bicycle shed It is fixedly mounted on binder, and its both sides is fixedly connected with track respectively, and the bicycle shed, which offers, to be provided from driving a vehicle to enter from track Enter the opening in the bicycle shed,
Compared with prior art, beneficial effect is the utility model embodiment:The utility model is in bicycle expressway Two spaced Ka Dao are installed, each Ka Dao includes two clamps, two clamps on the binder between upper two tracks Between there is a neck for being used for holding cycle wheel so that bicycle can be promoted in neck and come to a complete stop placement by bicyclist, The facility stopped in bicycle high speed is provided for bicyclist..
Brief description of the drawings
Fig. 1 is the lugs overall structure being installed on the bicycle expressway signal that the utility model embodiment provides Figure;
Fig. 2 is the lugs main structure diagram being installed on bicycle expressway shown in Fig. 1;
Fig. 3 is the lugs overlooking the structure diagram being installed on bicycle expressway shown in Fig. 1;
Fig. 4 is the a-quadrant enlarged diagram in Fig. 3.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
As shown in Figure 1 to Figure 3, it is a kind of parking dress being installed on bicycle expressway of the utility model embodiment Put.Bicycle expressway includes pier stud 10, binder 20 and two tracks 30 ridden for bicyclist, binder 20 and is fixed on pier stud On 10, the both ends of binder 20 are respectively and fixedly provided with track 30.Lugs include bicycle shed 100 and for two cards for bicycle parking Road 200, Liang Geka roads 200 are arranged on binder 20 spaced reciprocally, and in bicycle shed 100.Bicycle shed 100 passes through welding side Formula is fixedly mounted on binder 20, and its both sides is fixedly connected with track 30 respectively, and bicycle shed 100, which offers, is provided from driving from car The opening 101 that road 20 enters in bicycle shed 100, so as to be plugged into track 20.Liang Geka roads 200 are fixedly mounted on by welding manner On binder 20, for carrying out holding placement to cycle wheel, bicycle shed 100 can be bicycle sun-shading rain-proof, extend bicycle Service life.
In above-described embodiment, please referring collectively to shown in Fig. 3 and Fig. 4, Liang Geka roads 200 are parallel to each other, and are formed between the two The walkway 204 for being easy to bicyclist to walk, each Ka Dao include two clamps 201, have one to be used between two clamps 201 Block the neck 203 of cycle wheel.So, bicycle can be pushed into bicycle shed 100 by bicyclist conveniently by walkway 204 It is interior, and by cycle wheel holding in neck 203, bicycle to be fixed placement, bicyclist is facilitated voluntarily Stopped in overall height speed.It is respectively provided with one on two clamps to be used to limit the forward stopper 205 of cycle wheel, to ensure voluntarily Car push-in bicycle shed 100 in holding in place.
In above-described embodiment, it is provided with clamp 201 for being locked to the locked lockset 202 of cycle wheel and for controlling Tool 202 performs the controlling switch (not shown) unlocked and shut.So, when bicycle card is placed in neck 203 by bicyclist After interior, start controlling switch, carried out cycle wheel by lockset 202 locked, strengthen making the fixed of bicycle parking With.Lockset 202 is opened when bicyclist has pick-up demand, then by controlling switch, bicycle is taken out from card road 200, side Just ridden on bicycle expressway use, it is significant to the green, low-carbon and the sustainable development that promote city.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (5)

1. a kind of lugs being installed on bicycle expressway, bicycle expressway includes pier stud, binder and two confessions The track that bicyclist rides, binder are fixed on pier stud, and the both ends of binder are respectively and fixedly provided with track;Characterized in that, the parking Device includes being used for the Liang Geka roads parked for vehicle, and described Liang Geka roads are arranged on the binder spaced reciprocally On, and be connected with track, the walkway for being easy to bicyclist to walk, each Ka Dao are formed between described Liang Geka roads Including two clamps, there is a neck for being used for holding cycle wheel between described two clamps.
2. the lugs as claimed in claim 1 being installed on bicycle expressway, it is characterised in that two described cars Road is parallel to each other.
3. the lugs as claimed in claim 1 being installed on bicycle expressway, it is characterised in that two described cards One is respectively provided with plate to be used to limit the forward stopper of cycle wheel.
4. the lugs as claimed in claim 1 being installed on bicycle expressway, it is characterised in that pacify on the clamp Equipped with for the locked lockset of cycle wheel and for controlling the lockset to perform the controlling switch unlocked and shut.
5. the lugs being installed on bicycle expressway as described in any one in Claims 1-4, its feature exist In the lugs also include bicycle shed, and described Liang Geka roads are located in the bicycle shed, and the bicycle shed is fixedly mounted on binder On, and its both sides is fixedly connected with track respectively, and the bicycle shed offers to be provided from driving a vehicle to be entered in the bicycle shed from track Opening.
CN201720598054.1U 2017-05-25 2017-05-25 A kind of lugs being installed on bicycle expressway Active CN207045508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720598054.1U CN207045508U (en) 2017-05-25 2017-05-25 A kind of lugs being installed on bicycle expressway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720598054.1U CN207045508U (en) 2017-05-25 2017-05-25 A kind of lugs being installed on bicycle expressway

Publications (1)

Publication Number Publication Date
CN207045508U true CN207045508U (en) 2018-02-27

Family

ID=61491326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720598054.1U Active CN207045508U (en) 2017-05-25 2017-05-25 A kind of lugs being installed on bicycle expressway

Country Status (1)

Country Link
CN (1) CN207045508U (en)

Similar Documents

Publication Publication Date Title
CN106347172B (en) A kind of application method of unmanned public electric car
CN101992782A (en) Urban unmanned electronic railcar taxi traffic system
CN104778832B (en) A kind of multimode Urban Road Cross-section resource coordination collocation method
CN106945674A (en) A kind of suspension type traffic system
CN104527499A (en) Public bike transport truck
CN202257959U (en) Non-motorized vehicle lane running speed-reduction prompting device
CN102142173A (en) Bicycle rental billing system and method
CN103129562A (en) Monorail magnetic suspension electric car
CN207045508U (en) A kind of lugs being installed on bicycle expressway
CN103241246B (en) A kind of city railroad public transportation system
CN102693557B (en) Taxi operation condition monitoring method and apparatus thereof
CN207017711U (en) A kind of parking kiosk of bicycle expressway
CN101492903A (en) Composite fast access way for entrance and exit of highway
CN106143535B (en) A kind of subway train optimization of operating parameters method based on immune algorithm
CN105761512B (en) A kind of one-way road pedestrian's street crossing control method based on bus or train route collaboration
CN109859563A (en) A kind of driving simulation system in rail traffic
CN207017090U (en) Bicycle high-speed channel box culvert structure
CN103924493A (en) Expressway with error correcting road
CN207017167U (en) A kind of interim door frame for being used to support bike lane's bridge
CN208395594U (en) A kind of Traffic Systems
CN107165442A (en) The parking kiosk and its application method of a kind of bicycle expressway
CN208472493U (en) Aerocycle road traffic core
CN206097479U (en) Intelligent transportation lamp controller based on cloud computing technology
CN202827570U (en) Carriage returning bench of double-layer bidirectional road-rail compatible green public transportation system
CN204270364U (en) A kind of highway with error correction road

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.