Prior art keywords
pipe
water
fire
drinking
fire hydrant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720811122.8U
Other languages
Chinese (zh)
Inventor
周成军
范建威
王新喜
董点令
韩素川
赵攀强
董坤
王根华
刘佳宾
苏永超
董小涛
胡二永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720811122.8U priority Critical patent/CN207042128U/en
Application granted granted Critical
Publication of CN207042128U publication Critical patent/CN207042128U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
  • Nozzles (AREA)

Abstract

The system that construction site carries out spraying and dedusting using climbing frame and fire main, including fire water box, shower, drinking-water pipe, feed pipe, fire hydrant pump, extinguishing pipe and fire hydrant, shower is arranged to rectangular configuration along climbing frame surrounding, extinguishing pipe is vertically arranged, drinking-water pipe one end is connected with fire water box, the water inlet of drinking-water pipe is provided with screen pack in fire water box, the drinking-water pipe other end is connected with extinguishing pipe lower end, fire hydrant pump is arranged on drinking-water pipe, fire hydrant is uniformly arranged several from top to bottom along extinguishing pipe, each fire hydrant is connected by pipeline with extinguishing pipe, the delivery port of fire hydrant is connected by metal hose with feed pipe lower end, feed pipe upper end is connected with shower, the shower nozzle of several atomized water sprays down is evenly arranged with shower.The utility model is novel in design, is easily achieved, and climbing frame and fire main are combined, and top-down spray dust is carried out from high-altitude to construction site, dust-laying effect is good, and depositing dust scope is big.

Description

The system that construction site carries out spraying and dedusting using climbing frame and fire main
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of construction site utilizes climbing frame and fire main The system for carrying out spraying and dedusting.
Background technology
Influence getting worse of the haze to city at present, worse and worse, often smog covers each metropolitan air quality Cover, visibility is very poor, and the blue sky weather in 1 year is fewer and fewer, and resident is to improving the cry of urban life environment increasingly It is high.The airborne dust in construction site is also one of the main reason for causing urban air-quality to be deteriorated in city.For Optimizing City air Environment, people's lives environmental quality is improved, current construction site airborne dust preventing and treating, especially aerial airborne dust preventing and treating turns into be applied Priority and difficulty problem in work management work.
In order to reduce construction site airborne dust, spray dust's method is mainly taken to eliminate airborne dust in construction site at present.In general Way is:Spray equipment is installed on enclosing at the construction field (site), the airborne dust knot in the water smoke and air that are sprayed by spray equipment Close, the proportion of airborne dust is increased so as to fall into building site.Other job site enclosing is frequently necessary to be changed according to construction, sets For the height of spray equipment on enclosing typically at three meters or so, when enclosing changes, disassembly and assembly is inconvenient, uses spirit Poor activity, it is difficult to remove for higher aerial dust, larger deficiency is present, influences dust-laying effect.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided it is a kind of it is simple in construction, dust-laying effect is good, from The upper and lower spray for dust suppression that carries out improves the system that the construction site of dust removing effects carries out spraying and dedusting using climbing frame and fire main.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Construction site utilizes climbing frame and fire-fighting The system that pipeline carries out spraying and dedusting, including fire water box, shower, drinking-water pipe, feed pipe, fire hydrant pump, extinguishing pipe and disappear Fiery bolt, shower are arranged to rectangular configuration along climbing frame surrounding, and extinguishing pipe is vertically arranged, and drinking-water pipe one end is connected with fire water box, Screen pack is provided with the water inlet of drinking-water pipe in fire water box, the drinking-water pipe other end is connected with extinguishing pipe lower end, fire hydrant Pump is arranged on drinking-water pipe, and hydrant installation has several, and fire hydrant is uniformly arranged from top to bottom along extinguishing pipe, each fire hydrant It is connected by pipeline with extinguishing pipe, the delivery port of fire hydrant is connected by metal hose with feed pipe lower end, feed pipe upper end It is connected with shower, the shower nozzle of several atomized water sprays down is evenly arranged with shower.
Also include manual water inlet pipe, be provided with magnetic valve on feed pipe, the water inlet of manual water inlet pipe is connected to feed pipe Go up and be located at the water inlet of magnetic valve, the delivery port of manual water inlet pipe is connected on feed pipe and positioned at the delivery port of magnetic valve Locate, hand-operated valve is set on manual water inlet pipe.
The first butterfly valve is provided with drinking-water pipe between fire hydrant pump and water tank, in fire hydrant pump and extinguishing pipe on drinking-water pipe Between along water (flow) direction be disposed with the second butterfly valve, hose connector, the 3rd butterfly valve, check-valves, pressure gauge and the 4th butterfly valve.
Using above-mentioned technical proposal, the utility model is by the use of the fire water box that high-rise building is built as water source, in climbing frame Upper to set a circle shower, power of the fire hydrant pump as spray water mist, fire hydrant pump bottom is provided with shockproof structure, will disappeared Water in caisson first passes through the filtering of screen pack, can so prevent the impurity in water from blocking shower nozzle, then by drinking-water pipe, fire-fighting Pipe, pipeline, fire hydrant, metal hose, feed pipe are entered in shower, and the shower nozzle through being uniformly arranged on shower is sprayed water downwards Mist, so as to carry out depositing dust to construction site.
Climbing frame in the utility model is raised with the rise of building, and extinguishing pipe increases section also with rise Number, fire hydrant are also set gradually from bottom to top., can be by being implemented in combination with controlling automatically with the time relay by using magnetic valve System, timing or the spray dust of progress at times, cooling operation.When temporary needs carries out spray dust or magnetic valve damages, lead to Crossing operation hand-operated valve makes manual water inlet pipe be supplied water around magnetic valve to shower, and realization more easily sprays operation.Metal The setting of flexible pipe, the convenient connection with fire hydrant every time.
Four butterfly valves set on drinking-water pipe, when the part between two neighboring butterfly valve needs repairing replacing, it can close The butterfly valve of both sides, due to tens meters even hundreds of meters of height of building floor, supply water needs in real time in monitoring drinking-water pipe upwards Pressure, while set check-valves also avoid fire hydrant pump stop after, water passes back into fire water box again.
In summary, the utility model is novel in design, is easily achieved, and climbing frame and fire main is combined, from high-altitude Top-down spray dust is carried out to construction site, dust-laying effect is good, and depositing dust scope is big.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the enlarged drawing of the part connected in Fig. 1 on drinking-water pipe.
Embodiment
As depicted in figs. 1 and 2, construction site of the present utility model is using what climbing frame and fire main carried out spraying and dedusting System, including fire water box 1, shower 2, drinking-water pipe 3, feed pipe 4, fire hydrant pump 5, extinguishing pipe 6 and fire hydrant 7, the edge of shower 2 Climbing frame surrounding is arranged to rectangular configuration, and extinguishing pipe 6 is vertically arranged, and the one end of drinking-water pipe 3 is connected with fire water box 1, in fire water box 1 Screen pack is provided with the water inlet of drinking-water pipe 3, the other end of drinking-water pipe 3 is connected with the lower end of extinguishing pipe 6, and fire hydrant pump 5 is set On drinking-water pipe 3, fire hydrant 7 is provided with several, and fire hydrant 7 is uniformly arranged from top to bottom along extinguishing pipe 6, each fire hydrant 7 It is connected by pipeline with extinguishing pipe 6, the delivery port of fire hydrant 7 is connected by metal hose 8 with the lower end of feed pipe 4, feed pipe 4 Upper end is connected with shower 2, and the shower nozzle 9 of several atomized water sprays down is evenly arranged with shower 2.
The utility model also includes manual water inlet pipe 10, is provided with magnetic valve 11 on feed pipe 4, manual water inlet pipe 10 enters The mouth of a river is connected on feed pipe 4 and is connected to feed pipe 4 positioned at the water inlet of magnetic valve 11, the delivery port of manual water inlet pipe 10 Go up and be located at the water outlet of magnetic valve 11, hand-operated valve 12 is set on manual water inlet pipe 10.
Be provided with the first butterfly valve 13 on drinking-water pipe 3 between fire hydrant pump 5 and water tank, on drinking-water pipe 3 fire hydrant pump 5 with Between extinguishing pipe 6 the second butterfly valve 14, hose connector 15, the 3rd butterfly valve 16, check-valves 17, pressure are disposed with along water (flow) direction The butterfly valve 19 of table 18 and the 4th.
The utility model sets a circle shower by the use of the fire water box 1 that high-rise building is built as water source on climbing frame 2, power of the fire hydrant pump 5 as spray water mist, the bottom of fire hydrant pump 5 is provided with shockproof structure, by the water in fire water box 1 First pass through the filtering of screen pack, can so prevent that impurity in water from blocking shower nozzle 9, then by drinking-water pipe 3, extinguishing pipe 6, pipeline, Fire hydrant 7, metal hose 8, feed pipe 4 are entered in shower 2, and the shower nozzle 9 through being uniformly arranged on shower 2 is sprayed water downwards Mist, so as to carry out depositing dust to construction site.
Climbing frame in the utility model is raised with the rise of building, and extinguishing pipe 6 increases section also with rise Number, fire hydrant are also set gradually from bottom to top., can be by being implemented in combination with controlling automatically with the time relay by using magnetic valve 11 System, timing or the spray dust of progress at times, cooling operation.When temporary needs carries out spray dust or magnetic valve 11 damages, Manual water inlet pipe 10 is set to be supplied water around magnetic valve 11 to shower 2 by operating hand-operated valve 12, realization more easily sprays Operation.The setting of metal hose 8, the convenient connection with fire hydrant every time.
Four butterfly valves set on drinking-water pipe 3, when the part between two neighboring butterfly valve needs repairing replacing, it can close The butterfly valve of both sides, due to tens meters even hundreds of meters of height of building floor, supplying water upwards, it is real-time by pressure gauge 18 to need Monitor drinking-water pipe 3 in pressure, while set check-valves 17 also avoid fire hydrant pump 5 stop after, water passes back into fire water box again 1。
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc. Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality With the protection domain of new technique scheme.

Claims (3)

1. the system that construction site carries out spraying and dedusting using climbing frame and fire main, it is characterised in that:Including fire water box, spray Shower pipe, drinking-water pipe, feed pipe, fire hydrant pump, extinguishing pipe and fire hydrant, shower are arranged to rectangular configuration along climbing frame surrounding, disappeared Anti- pipe is vertically arranged, and drinking-water pipe one end is connected with fire water box, and the water inlet of drinking-water pipe is provided with filtering in fire water box Net, the drinking-water pipe other end are connected with extinguishing pipe lower end, and fire hydrant pump is arranged on drinking-water pipe, and hydrant installation has several, is disappeared Fiery bolt is uniformly arranged from top to bottom along extinguishing pipe, and each fire hydrant is connected by pipeline with extinguishing pipe, the delivery port of fire hydrant It is connected by metal hose with feed pipe lower end, feed pipe upper end is connected with shower, and several are evenly arranged with shower The shower nozzle of atomized water spray down.
2. the system that construction site according to claim 1 carries out spraying and dedusting using climbing frame and fire main, its feature It is:Also include manual water inlet pipe, magnetic valve is provided with feed pipe, the water inlet of manual water inlet pipe is connected on feed pipe simultaneously Positioned at the water inlet of magnetic valve, the delivery port of manual water inlet pipe is connected on feed pipe and is located at the water outlet of magnetic valve, Hand-operated valve is set on manual water inlet pipe.
3. the system that construction site according to claim 1 or 2 carries out spraying and dedusting using climbing frame and fire main, it is special Sign is:The first butterfly valve is provided with drinking-water pipe between fire hydrant pump and water tank, in fire hydrant pump and extinguishing pipe on drinking-water pipe Between along water (flow) direction be disposed with the second butterfly valve, hose connector, the 3rd butterfly valve, check-valves, pressure gauge and the 4th butterfly valve.
CN201720811122.8U 2017-07-06 2017-07-06 The system that construction site carries out spraying and dedusting using climbing frame and fire main Expired - Fee Related CN207042128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720811122.8U CN207042128U (en) 2017-07-06 2017-07-06 The system that construction site carries out spraying and dedusting using climbing frame and fire main

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720811122.8U CN207042128U (en) 2017-07-06 2017-07-06 The system that construction site carries out spraying and dedusting using climbing frame and fire main

Publications (1)

Publication Number Publication Date
CN207042128U true CN207042128U (en) 2018-02-27

Family

ID=61494434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720811122.8U Expired - Fee Related CN207042128U (en) 2017-07-06 2017-07-06 The system that construction site carries out spraying and dedusting using climbing frame and fire main

Country Status (1)

Country Link
CN (1) CN207042128U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184239A (en) * 2018-10-15 2019-01-11 巢湖市聚汇遮阳设备科技有限公司 A kind of dustproof sunshading net
CN112604217A (en) * 2020-12-18 2021-04-06 四川安宏智能科技有限公司 Fire-fighting mobile construction platform and operation method thereof
CN113750423A (en) * 2021-09-23 2021-12-07 陕西建工集团有限公司 High-temperature automatic spraying system for temporary building
CN114588721A (en) * 2022-03-16 2022-06-07 中交第四公路工程局有限公司 Fixed frame spray set that climbs of construction usefulness is built in room

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184239A (en) * 2018-10-15 2019-01-11 巢湖市聚汇遮阳设备科技有限公司 A kind of dustproof sunshading net
CN112604217A (en) * 2020-12-18 2021-04-06 四川安宏智能科技有限公司 Fire-fighting mobile construction platform and operation method thereof
CN112604217B (en) * 2020-12-18 2022-05-27 四川安宏智能科技有限公司 Fire-fighting mobile construction platform and operation method thereof
CN113750423A (en) * 2021-09-23 2021-12-07 陕西建工集团有限公司 High-temperature automatic spraying system for temporary building
CN114588721A (en) * 2022-03-16 2022-06-07 中交第四公路工程局有限公司 Fixed frame spray set that climbs of construction usefulness is built in room
CN114588721B (en) * 2022-03-16 2024-02-09 中交建筑集团有限公司 Fixed frame spray set that climbs that construction was used is built in room

Similar Documents

Publication Publication Date Title
CN207042128U (en) The system that construction site carries out spraying and dedusting using climbing frame and fire main
CN203115493U (en) Comprehensive processing system with automatic cooling and leakage alarming functions for liquid ammonia tank
CN203944254U (en) A kind of tower crane water injection system
CN204490916U (en) A kind of casting house atomization spray dust removal device
CN105065056B (en) A kind of underground coal mine multi-stage, energy-saving tunnel cleaning device
CN204073734U (en) High-altitude, job site water mist dust fall device
CN205235647U (en) Environment -friendly tower crane mist spray dust removal equipment
CN206045664U (en) Tower crane spray dust system
CN207919942U (en) A kind of teaching building fire-fighting guardrail
CN106592675A (en) Dust collecting device used for excavator
CN211025579U (en) Green construction intelligent spraying dust suppression system
CN208975406U (en) A kind of multifunctional protection system that construction site is sprayed using climbing frame
CN208770712U (en) A kind of external wall of high-rise building curtain type fire extinguishing system
CN206693132U (en) A kind of automatic sprinkler fire-extinguishing system for job site depositing dust
CN105536392A (en) Attached-type spray dust suppression system for air-film totally-enclosed coal storage shed
CN205084608U (en) Indoor formaldehyde removing device
CN212175644U (en) Dust fall equipment for construction
CN203408409U (en) Rapid automatic water replenishing and fire extinguishing device
CN213527268U (en) Fireproof structure of wooden structure ancient building
CN210434198U (en) Green construction net-shaped spraying automatic dust settling system
CN203634996U (en) Spiral ring mist spray tank suction gas absorption device
CN207682668U (en) A kind of concrete batching and mixing tower atomization dust-collecting equipment
CN206366276U (en) Construction tower crane and fixed point spraying and dust-removing system
CN209154969U (en) A kind of mobile model fire hydrant with cooling function
CN208041361U (en) Construction site atomizing de-dusting hose

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227