CN207042128U - The system that construction site carries out spraying and dedusting using climbing frame and fire main - Google Patents
The system that construction site carries out spraying and dedusting using climbing frame and fire main Download PDFInfo
- Publication number
- CN207042128U CN207042128U CN201720811122.8U CN201720811122U CN207042128U CN 207042128 U CN207042128 U CN 207042128U CN 201720811122 U CN201720811122 U CN 201720811122U CN 207042128 U CN207042128 U CN 207042128U
- Authority
- CN
- China
- Prior art keywords
- pipe
- water
- fire
- drinking
- fire hydrant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 230000009194 climbing Effects 0.000 title claims abstract description 20
- 238000005507 spraying Methods 0.000 title claims abstract description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 68
- 239000003651 drinking water Substances 0.000 claims abstract description 33
- 235000020188 drinking water Nutrition 0.000 claims abstract description 33
- 239000007921 spray Substances 0.000 claims abstract description 20
- 239000002184 metal Substances 0.000 claims abstract description 8
- 238000001914 filtration Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 239000000428 dust Substances 0.000 abstract description 21
- 230000000694 effects Effects 0.000 abstract description 6
- 238000000151 deposition Methods 0.000 abstract description 4
- 239000003595 mist Substances 0.000 description 4
- 230000000903 blocking effect Effects 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 239000012535 impurity Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 239000008400 supply water Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
- Nozzles (AREA)
Abstract
The system that construction site carries out spraying and dedusting using climbing frame and fire main, including fire water box, shower, drinking-water pipe, feed pipe, fire hydrant pump, extinguishing pipe and fire hydrant, shower is arranged to rectangular configuration along climbing frame surrounding, extinguishing pipe is vertically arranged, drinking-water pipe one end is connected with fire water box, the water inlet of drinking-water pipe is provided with screen pack in fire water box, the drinking-water pipe other end is connected with extinguishing pipe lower end, fire hydrant pump is arranged on drinking-water pipe, fire hydrant is uniformly arranged several from top to bottom along extinguishing pipe, each fire hydrant is connected by pipeline with extinguishing pipe, the delivery port of fire hydrant is connected by metal hose with feed pipe lower end, feed pipe upper end is connected with shower, the shower nozzle of several atomized water sprays down is evenly arranged with shower.The utility model is novel in design, is easily achieved, and climbing frame and fire main are combined, and top-down spray dust is carried out from high-altitude to construction site, dust-laying effect is good, and depositing dust scope is big.
Description
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of construction site utilizes climbing frame and fire main
The system for carrying out spraying and dedusting.
Background technology
Influence getting worse of the haze to city at present, worse and worse, often smog covers each metropolitan air quality
Cover, visibility is very poor, and the blue sky weather in 1 year is fewer and fewer, and resident is to improving the cry of urban life environment increasingly
It is high.The airborne dust in construction site is also one of the main reason for causing urban air-quality to be deteriorated in city.For Optimizing City air
Environment, people's lives environmental quality is improved, current construction site airborne dust preventing and treating, especially aerial airborne dust preventing and treating turns into be applied
Priority and difficulty problem in work management work.
In order to reduce construction site airborne dust, spray dust's method is mainly taken to eliminate airborne dust in construction site at present.In general
Way is:Spray equipment is installed on enclosing at the construction field (site), the airborne dust knot in the water smoke and air that are sprayed by spray equipment
Close, the proportion of airborne dust is increased so as to fall into building site.Other job site enclosing is frequently necessary to be changed according to construction, sets
For the height of spray equipment on enclosing typically at three meters or so, when enclosing changes, disassembly and assembly is inconvenient, uses spirit
Poor activity, it is difficult to remove for higher aerial dust, larger deficiency is present, influences dust-laying effect.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided it is a kind of it is simple in construction, dust-laying effect is good, from
The upper and lower spray for dust suppression that carries out improves the system that the construction site of dust removing effects carries out spraying and dedusting using climbing frame and fire main.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Construction site utilizes climbing frame and fire-fighting
The system that pipeline carries out spraying and dedusting, including fire water box, shower, drinking-water pipe, feed pipe, fire hydrant pump, extinguishing pipe and disappear
Fiery bolt, shower are arranged to rectangular configuration along climbing frame surrounding, and extinguishing pipe is vertically arranged, and drinking-water pipe one end is connected with fire water box,
Screen pack is provided with the water inlet of drinking-water pipe in fire water box, the drinking-water pipe other end is connected with extinguishing pipe lower end, fire hydrant
Pump is arranged on drinking-water pipe, and hydrant installation has several, and fire hydrant is uniformly arranged from top to bottom along extinguishing pipe, each fire hydrant
It is connected by pipeline with extinguishing pipe, the delivery port of fire hydrant is connected by metal hose with feed pipe lower end, feed pipe upper end
It is connected with shower, the shower nozzle of several atomized water sprays down is evenly arranged with shower.
Also include manual water inlet pipe, be provided with magnetic valve on feed pipe, the water inlet of manual water inlet pipe is connected to feed pipe
Go up and be located at the water inlet of magnetic valve, the delivery port of manual water inlet pipe is connected on feed pipe and positioned at the delivery port of magnetic valve
Locate, hand-operated valve is set on manual water inlet pipe.
The first butterfly valve is provided with drinking-water pipe between fire hydrant pump and water tank, in fire hydrant pump and extinguishing pipe on drinking-water pipe
Between along water (flow) direction be disposed with the second butterfly valve, hose connector, the 3rd butterfly valve, check-valves, pressure gauge and the 4th butterfly valve.
Using above-mentioned technical proposal, the utility model is by the use of the fire water box that high-rise building is built as water source, in climbing frame
Upper to set a circle shower, power of the fire hydrant pump as spray water mist, fire hydrant pump bottom is provided with shockproof structure, will disappeared
Water in caisson first passes through the filtering of screen pack, can so prevent the impurity in water from blocking shower nozzle, then by drinking-water pipe, fire-fighting
Pipe, pipeline, fire hydrant, metal hose, feed pipe are entered in shower, and the shower nozzle through being uniformly arranged on shower is sprayed water downwards
Mist, so as to carry out depositing dust to construction site.
Climbing frame in the utility model is raised with the rise of building, and extinguishing pipe increases section also with rise
Number, fire hydrant are also set gradually from bottom to top., can be by being implemented in combination with controlling automatically with the time relay by using magnetic valve
System, timing or the spray dust of progress at times, cooling operation.When temporary needs carries out spray dust or magnetic valve damages, lead to
Crossing operation hand-operated valve makes manual water inlet pipe be supplied water around magnetic valve to shower, and realization more easily sprays operation.Metal
The setting of flexible pipe, the convenient connection with fire hydrant every time.
Four butterfly valves set on drinking-water pipe, when the part between two neighboring butterfly valve needs repairing replacing, it can close
The butterfly valve of both sides, due to tens meters even hundreds of meters of height of building floor, supply water needs in real time in monitoring drinking-water pipe upwards
Pressure, while set check-valves also avoid fire hydrant pump stop after, water passes back into fire water box again.
In summary, the utility model is novel in design, is easily achieved, and climbing frame and fire main is combined, from high-altitude
Top-down spray dust is carried out to construction site, dust-laying effect is good, and depositing dust scope is big.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the enlarged drawing of the part connected in Fig. 1 on drinking-water pipe.
Embodiment
As depicted in figs. 1 and 2, construction site of the present utility model is using what climbing frame and fire main carried out spraying and dedusting
System, including fire water box 1, shower 2, drinking-water pipe 3, feed pipe 4, fire hydrant pump 5, extinguishing pipe 6 and fire hydrant 7, the edge of shower 2
Climbing frame surrounding is arranged to rectangular configuration, and extinguishing pipe 6 is vertically arranged, and the one end of drinking-water pipe 3 is connected with fire water box 1, in fire water box 1
Screen pack is provided with the water inlet of drinking-water pipe 3, the other end of drinking-water pipe 3 is connected with the lower end of extinguishing pipe 6, and fire hydrant pump 5 is set
On drinking-water pipe 3, fire hydrant 7 is provided with several, and fire hydrant 7 is uniformly arranged from top to bottom along extinguishing pipe 6, each fire hydrant 7
It is connected by pipeline with extinguishing pipe 6, the delivery port of fire hydrant 7 is connected by metal hose 8 with the lower end of feed pipe 4, feed pipe 4
Upper end is connected with shower 2, and the shower nozzle 9 of several atomized water sprays down is evenly arranged with shower 2.
The utility model also includes manual water inlet pipe 10, is provided with magnetic valve 11 on feed pipe 4, manual water inlet pipe 10 enters
The mouth of a river is connected on feed pipe 4 and is connected to feed pipe 4 positioned at the water inlet of magnetic valve 11, the delivery port of manual water inlet pipe 10
Go up and be located at the water outlet of magnetic valve 11, hand-operated valve 12 is set on manual water inlet pipe 10.
Be provided with the first butterfly valve 13 on drinking-water pipe 3 between fire hydrant pump 5 and water tank, on drinking-water pipe 3 fire hydrant pump 5 with
Between extinguishing pipe 6 the second butterfly valve 14, hose connector 15, the 3rd butterfly valve 16, check-valves 17, pressure are disposed with along water (flow) direction
The butterfly valve 19 of table 18 and the 4th.
The utility model sets a circle shower by the use of the fire water box 1 that high-rise building is built as water source on climbing frame
2, power of the fire hydrant pump 5 as spray water mist, the bottom of fire hydrant pump 5 is provided with shockproof structure, by the water in fire water box 1
First pass through the filtering of screen pack, can so prevent that impurity in water from blocking shower nozzle 9, then by drinking-water pipe 3, extinguishing pipe 6, pipeline,
Fire hydrant 7, metal hose 8, feed pipe 4 are entered in shower 2, and the shower nozzle 9 through being uniformly arranged on shower 2 is sprayed water downwards
Mist, so as to carry out depositing dust to construction site.
Climbing frame in the utility model is raised with the rise of building, and extinguishing pipe 6 increases section also with rise
Number, fire hydrant are also set gradually from bottom to top., can be by being implemented in combination with controlling automatically with the time relay by using magnetic valve 11
System, timing or the spray dust of progress at times, cooling operation.When temporary needs carries out spray dust or magnetic valve 11 damages,
Manual water inlet pipe 10 is set to be supplied water around magnetic valve 11 to shower 2 by operating hand-operated valve 12, realization more easily sprays
Operation.The setting of metal hose 8, the convenient connection with fire hydrant every time.
Four butterfly valves set on drinking-water pipe 3, when the part between two neighboring butterfly valve needs repairing replacing, it can close
The butterfly valve of both sides, due to tens meters even hundreds of meters of height of building floor, supplying water upwards, it is real-time by pressure gauge 18 to need
Monitor drinking-water pipe 3 in pressure, while set check-valves 17 also avoid fire hydrant pump 5 stop after, water passes back into fire water box again
1。
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc.
Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality
With the protection domain of new technique scheme.
Claims (3)
1. the system that construction site carries out spraying and dedusting using climbing frame and fire main, it is characterised in that:Including fire water box, spray
Shower pipe, drinking-water pipe, feed pipe, fire hydrant pump, extinguishing pipe and fire hydrant, shower are arranged to rectangular configuration along climbing frame surrounding, disappeared
Anti- pipe is vertically arranged, and drinking-water pipe one end is connected with fire water box, and the water inlet of drinking-water pipe is provided with filtering in fire water box
Net, the drinking-water pipe other end are connected with extinguishing pipe lower end, and fire hydrant pump is arranged on drinking-water pipe, and hydrant installation has several, is disappeared
Fiery bolt is uniformly arranged from top to bottom along extinguishing pipe, and each fire hydrant is connected by pipeline with extinguishing pipe, the delivery port of fire hydrant
It is connected by metal hose with feed pipe lower end, feed pipe upper end is connected with shower, and several are evenly arranged with shower
The shower nozzle of atomized water spray down.
2. the system that construction site according to claim 1 carries out spraying and dedusting using climbing frame and fire main, its feature
It is:Also include manual water inlet pipe, magnetic valve is provided with feed pipe, the water inlet of manual water inlet pipe is connected on feed pipe simultaneously
Positioned at the water inlet of magnetic valve, the delivery port of manual water inlet pipe is connected on feed pipe and is located at the water outlet of magnetic valve,
Hand-operated valve is set on manual water inlet pipe.
3. the system that construction site according to claim 1 or 2 carries out spraying and dedusting using climbing frame and fire main, it is special
Sign is:The first butterfly valve is provided with drinking-water pipe between fire hydrant pump and water tank, in fire hydrant pump and extinguishing pipe on drinking-water pipe
Between along water (flow) direction be disposed with the second butterfly valve, hose connector, the 3rd butterfly valve, check-valves, pressure gauge and the 4th butterfly valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720811122.8U CN207042128U (en) | 2017-07-06 | 2017-07-06 | The system that construction site carries out spraying and dedusting using climbing frame and fire main |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720811122.8U CN207042128U (en) | 2017-07-06 | 2017-07-06 | The system that construction site carries out spraying and dedusting using climbing frame and fire main |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207042128U true CN207042128U (en) | 2018-02-27 |
Family
ID=61494434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720811122.8U Expired - Fee Related CN207042128U (en) | 2017-07-06 | 2017-07-06 | The system that construction site carries out spraying and dedusting using climbing frame and fire main |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207042128U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184239A (en) * | 2018-10-15 | 2019-01-11 | 巢湖市聚汇遮阳设备科技有限公司 | A kind of dustproof sunshading net |
CN112604217A (en) * | 2020-12-18 | 2021-04-06 | 四川安宏智能科技有限公司 | Fire-fighting mobile construction platform and operation method thereof |
CN113750423A (en) * | 2021-09-23 | 2021-12-07 | 陕西建工集团有限公司 | High-temperature automatic spraying system for temporary building |
CN114588721A (en) * | 2022-03-16 | 2022-06-07 | 中交第四公路工程局有限公司 | Fixed frame spray set that climbs of construction usefulness is built in room |
-
2017
- 2017-07-06 CN CN201720811122.8U patent/CN207042128U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184239A (en) * | 2018-10-15 | 2019-01-11 | 巢湖市聚汇遮阳设备科技有限公司 | A kind of dustproof sunshading net |
CN112604217A (en) * | 2020-12-18 | 2021-04-06 | 四川安宏智能科技有限公司 | Fire-fighting mobile construction platform and operation method thereof |
CN112604217B (en) * | 2020-12-18 | 2022-05-27 | 四川安宏智能科技有限公司 | Fire-fighting mobile construction platform and operation method thereof |
CN113750423A (en) * | 2021-09-23 | 2021-12-07 | 陕西建工集团有限公司 | High-temperature automatic spraying system for temporary building |
CN114588721A (en) * | 2022-03-16 | 2022-06-07 | 中交第四公路工程局有限公司 | Fixed frame spray set that climbs of construction usefulness is built in room |
CN114588721B (en) * | 2022-03-16 | 2024-02-09 | 中交建筑集团有限公司 | Fixed frame spray set that climbs that construction was used is built in room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207042128U (en) | The system that construction site carries out spraying and dedusting using climbing frame and fire main | |
CN203115493U (en) | Comprehensive processing system with automatic cooling and leakage alarming functions for liquid ammonia tank | |
CN203944254U (en) | A kind of tower crane water injection system | |
CN204490916U (en) | A kind of casting house atomization spray dust removal device | |
CN105065056B (en) | A kind of underground coal mine multi-stage, energy-saving tunnel cleaning device | |
CN204073734U (en) | High-altitude, job site water mist dust fall device | |
CN205235647U (en) | Environment -friendly tower crane mist spray dust removal equipment | |
CN206045664U (en) | Tower crane spray dust system | |
CN207919942U (en) | A kind of teaching building fire-fighting guardrail | |
CN106592675A (en) | Dust collecting device used for excavator | |
CN211025579U (en) | Green construction intelligent spraying dust suppression system | |
CN208975406U (en) | A kind of multifunctional protection system that construction site is sprayed using climbing frame | |
CN208770712U (en) | A kind of external wall of high-rise building curtain type fire extinguishing system | |
CN206693132U (en) | A kind of automatic sprinkler fire-extinguishing system for job site depositing dust | |
CN105536392A (en) | Attached-type spray dust suppression system for air-film totally-enclosed coal storage shed | |
CN205084608U (en) | Indoor formaldehyde removing device | |
CN212175644U (en) | Dust fall equipment for construction | |
CN203408409U (en) | Rapid automatic water replenishing and fire extinguishing device | |
CN213527268U (en) | Fireproof structure of wooden structure ancient building | |
CN210434198U (en) | Green construction net-shaped spraying automatic dust settling system | |
CN203634996U (en) | Spiral ring mist spray tank suction gas absorption device | |
CN207682668U (en) | A kind of concrete batching and mixing tower atomization dust-collecting equipment | |
CN206366276U (en) | Construction tower crane and fixed point spraying and dust-removing system | |
CN209154969U (en) | A kind of mobile model fire hydrant with cooling function | |
CN208041361U (en) | Construction site atomizing de-dusting hose |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180227 |