CN207032662U - A kind of prefabricated beam - Google Patents

A kind of prefabricated beam Download PDF

Info

Publication number
CN207032662U
CN207032662U CN201720805292.5U CN201720805292U CN207032662U CN 207032662 U CN207032662 U CN 207032662U CN 201720805292 U CN201720805292 U CN 201720805292U CN 207032662 U CN207032662 U CN 207032662U
Authority
CN
China
Prior art keywords
reinforcing bar
bearing
bar
precast beam
enter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720805292.5U
Other languages
Chinese (zh)
Inventor
刘晓亮
梁伟
高义民
李文华
于琇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Sanchuan Building Technology Co Ltd
Original Assignee
Dalian Sanchuan Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Sanchuan Building Technology Co Ltd filed Critical Dalian Sanchuan Building Technology Co Ltd
Priority to CN201720805292.5U priority Critical patent/CN207032662U/en
Application granted granted Critical
Publication of CN207032662U publication Critical patent/CN207032662U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

A kind of prefabricated beam, is related to technical field of building construction.Precast beam generally band chooses the beam channel structure type of ear, middle part section is inverted T-shaped, the top of precast beam is disposed with top additional bar and elongated reinforcing bar at bearing, and elongated reinforcing bar is evenly arranged in the corner of stirrup and enters pillar support, and top additional bar is between elongated reinforcing bar at bearing;The lower disposed of precast beam has into bearing lower rebar and does not enter bearing reinforcing bar, does not enter corner and centre position that bearing reinforcing bar is evenly arranged in stirrup, enter bearing lower rebar be located at precast beam bottom and two arrangement put.The utility model is directly lifted in place using the vertical transport such as big machinery or live tower crane at the scene, avoid setting up the waste of the manpower, material tool that formwork-support brings etc. again, constructing operation is simple, save the material such as model sheetinstallat tool and artificial input, reinforcement installation amount is less at node bearing simultaneously, process is easy, is advantageous to accelerate the duration and greatly improves the impression quality of agent structure.

Description

A kind of prefabricated beam
Technical field
It the utility model is related to technical field of building construction, and in particular to a kind of prefabricated beam.
Background technology
With the development of modern architecture industry technology, assembled architecture turns into the focus of building trade.At present, implement both at home and abroad Assembled architecture concrete structural system and steel structure system can be divided into according to the difference using material, and concrete body System is divided into cast-in-place concrete structure again according to prefabricated rate is different(Partial component is prefabricated)And prefabricated concrete structure.Study carefully its development Reason, wherein an important technology factor of guiding assembled architecture development is exactly precast concrete(That is PC components)Tear open Set up meter separately.The fractionation of PC components is gradually developed into the fractionation of agent structure component by building enclosure or architectural concrete component. In assembled architecture, method for splitting is Prefabricated superposed beam to horizontal member precast beam earlier, while is needed before precast beam in-site installation Again formwork-support is set up, so as to cause assembled main structure construction process more, material has and manually puts into more and shadow Ring the duration.
Utility model content
For solution, beam structure construction process is more in the prior art, and material has and manually put into more and the influence duration Technical problem, the utility model provide a kind of prefabricated beam.
To achieve the above object, the technical solution adopted in the utility model is:A kind of prefabricated beam, its feature It is:Including precast beam, cage bar, stirrup, main ribs include top additional bar at bearing, enter bearing lower rebar, be elongated Reinforcing bar, bearing reinforcing bar is not entered;
Precast beam generally band chooses the beam channel structure type of ear, and middle part section is inverted T-shaped, and the top of precast beam is disposed with Top additional bar and elongated reinforcing bar at bearing, wherein elongated reinforcing bar is evenly arranged in the corner of stirrup and enters pillar support, branch Top additional bar is between elongated reinforcing bar at seat;
The lower disposed of precast beam has into bearing lower rebar and does not enter bearing reinforcing bar, wherein not entering the uniform cloth of bearing reinforcing bar Be placed in the corner and centre position of stirrup, enter bearing lower rebar be located at precast beam bottom and two arrangement put.
The elongated reinforcing bar meets that the anchoring of reinforcing bar atlas bean column node requires into standoff length.
Top additional bar enters pillar support length at the bearing and length must meet reinforcing bar atlas beam branch in beam The length legislations of seat upper longitudinal bar.
It is described enter bearing lower rebar enter pillar support length must meet reinforcing bar atlas bean column node anchoring require.
The clear spacing of each cage bar horizontal direction is in more than 25mm, and more than reinforcing bar maximum gauge.
Each cage bar up and down two layers of arrangement when, the clear spacing between each layer reinforcing bar is and maximum in reinforcing bar in more than 25mm It is more than diameter.
The utility model is directly hung after transporting precast beams to scene using the vertical transport such as big machinery or live tower crane Dress is in place, avoids setting up the waste of manpower, material tool that formwork-support brings etc. again, after component is in place at in-situ layer and bearing Mounting portion stress cage bar, can be poured at bearing and cast-in-place layer concrete after acceptance(check), and constructing operation is simple, save template The material such as installation tool and artificial input, while reinforcement installation amount is less at node bearing, and process is easy, be advantageous to accelerate the duration and Greatly improve the impression quality of agent structure.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
Fig. 2 is Fig. 1 A-A profiles.
Fig. 3 is Fig. 1 B-B profiles.
In figure:1- precast beams, top additional bar at 2- bearings, 3- enter bearing lower rebar, the elongated reinforcing bars of 4-, and 5- does not enter Bearing reinforcing bar, 6- stirrups.
Embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, but the utility model is not limited to specific embodiment.
Embodiment 1
As shown in Figure 1-Figure 3, a kind of prefabricated beam, including precast beam 1, cage bar, stirrup 6, wherein cage bar bag Top additional bar 2 at bearing is included, enters bearing lower rebar 3, elongated reinforcing bar 4, enter bearing reinforcing bar 5;
The generally band of precast beam 1 chooses the beam channel structure type of ear, and middle part is inverted T-shaped.Beam top is disposed with bearing Locate top additional bar 2 and elongated reinforcing bar 4, wherein elongated reinforcing bar 4 is evenly arranged in the corner of stirrup 6 and enters pillar support, enter Enter standoff length and meet that the anchoring of reinforcing bar atlas bean column node requires;Top additional bar 2 is between elongated reinforcing bar 4 at bearing, Position is blocked into pillar support length and in beam(The length i.e. in beam)Reinforcing bar atlas beam support upper longitudinal bar must be met Length legislations.Beam lower disposed has into bearing lower rebar 3 and does not enter bearing reinforcing bar 5, is evenly arranged wherein not entering bearing reinforcing bar 5 In the corner of stirrup 6 and centre position;Enter bearing lower rebar 3 be located at beam channel bottom and two arrangement put, into pillar support Length must meet that the anchoring of reinforcing bar atlas bean column node requires.The clear spacing of any of the above cage bar horizontal direction is no less than 25mm With reinforcing bar maximum gauge;During upper and lower two layers of arrangement, the clear spacing between each layer reinforcing bar is no less than 25mm and reinforcing bar maximum gauge. Cage bar and stirrup specification in precast beam unit should be according to carrying and deformation, component span, section form, bar spacing and protections The requirements such as thickness degree are computed integrating determination.
Precast beam 1 is processed making in component factory, and splitting drawing according to component before the concreting of precast beam 1 first installs Do not enter bearing reinforcing bar 5, stirrup 6 and remaining distributing bar, then pour the concrete of precast beam 1.After the component of precast beam 1 dispatches from the factory, Carry out lifting at the scene in place, bearing lower rebar 3 is installed into after acceptance(check), top adds steel at elongated reinforcing bar 4 and bearing Muscle 2, acceptance(check) after-pouring bearing and cast-in-place layer concrete.

Claims (6)

  1. A kind of 1. prefabricated beam, it is characterised in that:Including precast beam(1), cage bar, stirrup(6), main ribs include Top additional bar at bearing(2), enter bearing lower rebar(3), elongated reinforcing bar(4), do not enter bearing reinforcing bar(5);
    Precast beam(1)Generally band chooses the beam channel structure type of ear, and middle part section is inverted T-shaped, precast beam(1)Top arrangement There is top additional bar at bearing(2)With elongated reinforcing bar(4), wherein elongated reinforcing bar(4)It is evenly arranged in stirrup(6)Corner and Into pillar support, top additional bar at bearing(2)Between elongated reinforcing bar (4);
    Precast beam(1)Lower disposed have into bearing lower rebar(3)Bearing reinforcing bar is not entered(5), wherein not entering bearing reinforcing bar (5)It is evenly arranged in stirrup(6)Corner and centre position, enter bearing lower rebar(3)Positioned at precast beam(1)Bottom and two Arrangement is put.
  2. A kind of 2. prefabricated beam according to claim 1, it is characterised in that:The elongated reinforcing bar(4)Into Standoff length meets that the anchoring of reinforcing bar atlas bean column node requires.
  3. A kind of 3. prefabricated beam according to claim 1, it is characterised in that:Top adds steel at the bearing Muscle(2)Into pillar support length and in beam, length must meet the length legislations of reinforcing bar atlas beam support upper longitudinal bar.
  4. A kind of 4. prefabricated beam according to claim 1, it is characterised in that:It is described enter bearing lower rebar (3)It must meet that the anchoring of reinforcing bar atlas bean column node requires into pillar support length.
  5. A kind of 5. prefabricated beam according to any one of claims 1 to 4, it is characterised in that:Each cage bar water Square to clear spacing in more than 25mm, and more than reinforcing bar maximum gauge.
  6. A kind of 6. prefabricated beam according to any one of claims 1 to 4, it is characterised in that:In each cage bar During lower two layers of arrangement, the clear spacing between each layer reinforcing bar is in more than 25mm, and more than reinforcing bar maximum gauge.
CN201720805292.5U 2017-07-05 2017-07-05 A kind of prefabricated beam Expired - Fee Related CN207032662U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720805292.5U CN207032662U (en) 2017-07-05 2017-07-05 A kind of prefabricated beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720805292.5U CN207032662U (en) 2017-07-05 2017-07-05 A kind of prefabricated beam

Publications (1)

Publication Number Publication Date
CN207032662U true CN207032662U (en) 2018-02-23

Family

ID=61466566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720805292.5U Expired - Fee Related CN207032662U (en) 2017-07-05 2017-07-05 A kind of prefabricated beam

Country Status (1)

Country Link
CN (1) CN207032662U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144412A (en) * 2020-09-25 2020-12-29 四川交投建设工程股份有限公司 Construction method of prefabricated assembled intercolumnar tie beam
CN114423914A (en) * 2019-09-19 2022-04-29 霍伊斯勒创新有限责任公司 Method for reinforcing a reinforced concrete component

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114423914A (en) * 2019-09-19 2022-04-29 霍伊斯勒创新有限责任公司 Method for reinforcing a reinforced concrete component
CN114423914B (en) * 2019-09-19 2023-10-24 霍伊斯勒创新有限责任公司 Method for reinforcing a reinforced concrete component
CN112144412A (en) * 2020-09-25 2020-12-29 四川交投建设工程股份有限公司 Construction method of prefabricated assembled intercolumnar tie beam

Similar Documents

Publication Publication Date Title
CN109577534B (en) Tool-based hanging die assembly type composite floor slab and construction method
CN106906955B (en) Shear wall integral prefabricated reinforcement mesh structure and construction method thereof
CN101985856B (en) Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof
CN102561680A (en) Cast-in-place concrete external diagonal column mold plate system and construction method
CN105839836B (en) A kind of precast concrete shear wall component and its construction method
CN108035594A (en) The prefabricated decompression cone construction method of concrete silo structure
CN208884783U (en) Assembled architecture PCF plate and connection component
CN206267422U (en) A kind of assembly concrete superposed column
CN104594500A (en) Integrated beam-slab-column formwork structural system and construction method
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN207032662U (en) A kind of prefabricated beam
CN206174120U (en) Prefabricated constructional column and structure thereof
CN103410269A (en) Unbonded prestress cast-in-place reinforced concrete hollow slab construction structure and method
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN206917087U (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould
CN108867860A (en) A kind of precast reinforced concrete beam plate body system and prefabricated rod structure entirety assembling constructing method
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN105839784B (en) Assembled jacking type construction techniques
CN103938649B (en) A kind of construction method on high-rise building cavity basis
CN208280453U (en) Girder with rolled steel section en cased in concrete lacing wire constructing device
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN205804745U (en) A kind of precast concrete shear wall component
CN210421568U (en) Assembled beam and plate structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223