CN207032011U - A kind of assembled steel tube constrains reinfored concrete line frame bridge pier - Google Patents

A kind of assembled steel tube constrains reinfored concrete line frame bridge pier Download PDF

Info

Publication number
CN207032011U
CN207032011U CN201621268132.3U CN201621268132U CN207032011U CN 207032011 U CN207032011 U CN 207032011U CN 201621268132 U CN201621268132 U CN 201621268132U CN 207032011 U CN207032011 U CN 207032011U
Authority
CN
China
Prior art keywords
sections
steel
post
steel tube
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621268132.3U
Other languages
Chinese (zh)
Inventor
刘界鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zhongke Construction Technology Co Ltd
Original Assignee
Chongqing Zhongke Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Zhongke Construction Technology Co Ltd filed Critical Chongqing Zhongke Construction Technology Co Ltd
Priority to CN201621268132.3U priority Critical patent/CN207032011U/en
Application granted granted Critical
Publication of CN207032011U publication Critical patent/CN207032011U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of assembled steel tube constraint reinfored concrete line frame bridge pier disclosed in the utility model is that bent cap, steel tube confinement reinforced column, corrugated web beam are prefabricated in the factory, and inside and outside ring flat-plate is welded with steel tube confinement reinforced column, bent cap is attached with steel tube confinement reinforced column and basis by way of grouting, and corrugated web beam can use solder design and bolt connection with post.Assembled steel tube constraint reinfored concrete line frame bridge pier in the utility model, which has, makes full use of the strength of materials, and fire-resistance anti-seismic performance is good, it is good in economic efficiency the advantages that.The utility model uses fabricated construction, have the advantages that speed of application is fast, construction quality is high, construction environment improvement, working condition improvement, energy resource saving, cost savings.

Description

A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
Technical field
The utility model belongs to a kind of bridge structure component, more particularly to assembled steel tube constraint reinfored concrete line frame bridge Pier and mounting process.
Background technology
Steel tube confinement armored concrete is the fill concrete in thin-wall steel tube, and steel pipe does not directly take on external loads, and A kind of combined member of effect of contraction is mainly played to core concrete.Steel tube confinement reinforced column high capacity, antidetonation and Fire resistance is superior, can make full use of the intensity of high-strength steel and concrete.When steel tube confinement reinforced concrete member Covered with Angles Manage for it is circular when, steel pipe constrains core concrete uniform, can make full use of the tensile strength of steel pipe, economic benefit is good.Mesh Preceding China just progressively promotes building industrialization, and industrialized building is not only with speed of application is fast, construction quality is high, construction environment changes The advantages that kind, and meet sustainable development requirement.Assembled steel tube constraint reinforcing bar is proposed according to industrialized building feature to mix Coagulate native framed bent bridge pier.
Utility model content
In order to promote novel fabricated steel tube confinement reinforced concrete structure in bridge structure, its structural mechanics is played Energy advantage, makes full use of material and reduces materials'use amount, improves economic performance, accelerating construction progress etc., the utility model carries A kind of assembled steel tube constraint reinfored concrete line frame bridge pier is supplied.
To realize that the technical scheme that the utility model purpose uses is such, a kind of assembled steel tube constraint reinforcing bar mixes Coagulate native framed bent bridge pier, it is characterised in that:Including the bent cap G, steel tube confinement reinforced concrete knoll D1 and D2 and ripple being prefabricated in the factory Line web beam L, and the foundation 12 of site operation.
The steel tube confinement reinforced concrete knoll D1 is identical with steel tube confinement reinforced concrete knoll D2 structures, from top to bottom according to It is secondary:A sections are pier bottom arrangement of reinforcement section, B sections are unreinforced section, C sections are pier top arrangement of reinforcement section.It includes:The A section concretes being prefabricated in the factory Post 1, B section concretes post 10 and C section concretes post 100.
The outsourcing A sections steel pipe 2 of A section concretes post 1.The lower surface of the A section concretes post 1 has the He of pier bottom groove 8 Grout sleeve 6.
When the pier bottom groove 8 is prefabricated A section concretes post 1, formed in the prefabricated lower surface of A section concretes post 1 center One centre bore.Several described grout sleeves 6 are embedded in prefabricated A section concretes post 1, and each grout sleeve 6 is opened Mouth is located at the lower surface of prefabricated A section concretes post 1.
The outer surface of the A sections steel pipe 2 has several holes 11.The outer surface of these holes 11 connection A sections steel pipe 2 with The side grout outlet of grout sleeve 6.
The foundation 12 is by concreting, its internal pre-buried some A sections longitudinal reinforcements 4 and shaped steel shear key 3.
Foundation is connected to below steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 The join domain of 12 upper surfaces.
The join domain of the upper surface of foundation 12 forms as follows:Expose foundation in the upper end of A sections longitudinal reinforcement 4 12 upper surface.The upper surface of foundation 12 is also exposed in the upper end of the shaped steel shear key 3, and is in the A sections longitudinal direction steel In the region that muscle 4 surrounds.Grout lines 10 are reserved in foundation 12.
When the steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete knoll D2 quilt of A section concretes post 1 When being lifted into the join domain of the foundation 12, the lower end and the upper surface of the foundation 12 of the A sections steel pipe 2 connect Touch.There is gap between the A section concretes post 1 and the upper surface of the foundation 12.The A sections longitudinal reinforcement 4 it is upper End is stretched into described grout sleeve 6.The upper end of the shaped steel shear key 3 is stretched into pier bottom groove 8.The grout lines 10 One end mouth of pipe is covered by A section concretes post 1, the other end mouth of pipe is not covered by A section concretes post 1.
A is poured into the space between A section concretes post 1 and foundation 12 by described hole 11 and grout lines 10 Section grouting material 7.The inside of A section concretes post 1 has muscle cage.
The outsourcing of B section concretes post 10 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 B sections steel pipe 20.The inside unreinforced of B section concretes post 10.The lower end outer surface of the B sections steel pipe 20 is welded with some otic placodes 14.The upper end outer surface of A sections steel pipe 2 is equally welded with some otic placodes 14.By junction steel plate 13, by A sections steel pipe 2 and B sections The otic placode 14 of steel pipe 20 links together.Gap between the B section concretes post 10 and A section concretes post 1 has the grouting of B sections Material 70.The B sections grouting material 70 is irrigated by the through hole on the tube wall of B sections steel pipe 20.
Outside the C section concretes post 100 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 Wrap C sections steel pipe 200.The upper surface of the C section concretes post 100 has pier top groove 800 and grout sleeve 600.
When the pier top groove 800 is prefabricated C section concretes post 100, in the prefabricated upper face center of C section concretes post 100 The centre bore formed.Several described grout sleeves 600 are embedded in prefabricated C section concretes post 100, and each is in the milk The opening of sleeve 600 is positioned at the upper surface of prefabricated C section concretes post 100.
The outer surface of the C sections steel pipe 200 has several holes 110.Outside these holes 110 connection C sections steel pipe 200 Surface and the side grout outlet of grout sleeve 600.
The bent cap G is by concreting, its internal pre-buried some C sections longitudinal reinforcements 400 and shaped steel shear key 300.
Bent cap G following tables are connected to above steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 The join domain in face.
The join domain of the bent cap G lower surfaces forms as follows:Expose bent cap G following table in C section longitudinal reinforcements G4 lower end Face.Bent cap G lower surface is also exposed in the lower end of the shaped steel shear key G3, and in the area that the C sections longitudinal reinforcement G4 surrounds In domain.Grout lines G10 is reserved in the bent cap G.
When the bent cap G is lifted into above steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete knoll D2 When, the upper end of the C sections steel pipe 200 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 with it is described Bent cap G join domain contact.There is gap between the C section concretes post 100 and the upper surface of the bent cap G.The C sections Longitudinal reinforcement G4 lower end is stretched into described grout sleeve 600.Pier top groove is stretched into the lower end of the shaped steel shear key 300 In 800.One end mouth of pipe of the grout lines G10 is covered by C section concretes post 100, the other end mouth of pipe is not by C section concretes Post 100 covers.
Poured into by described hole G11 and grout lines G10 to the space between C section concretes post 100 and bent cap G Slurry G7.
There is muscle cage in the C sections and A section concretes post 100.If the lower end outer surface of the C sections steel pipe 200 is welded with Dry otic placode 14.The upper end outer surface of B sections steel pipe 20 is equally welded with some otic placodes 14.By junction steel plate 13, by B section steel pipes The otic placode 14 of 20 and C sections steel pipe 200 links together.Gap between the C section concretes post 100 and B section concretes post 10 With C sections grouting material 700.The C sections grouting material 700 is irrigated by the through hole on the tube wall of C sections steel pipe 200.
The B section concretes post 10 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 is respective It is welded with two ring flat-plate groups.Each ring flat-plate group includes inner ring plate and outer ring plate.The inner ring plate is welded in B sections steel pipe 20 Portion, its outer shroud are connected with the inwall of B sections steel pipe 20.The outer ring plate is welded on outside B sections steel pipe 20, its outer shroud and B section steel The outer wall connection of pipe 20.The inner ring plate and outer ring plate of same ring flat-plate group are in same plane.
And lower flange.The top flange and lower flange are parallel to each other, and are connected by corrugated web therebetween.The ripple Web beam L is erected at the B section concrete posts of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 Between 10.Pass through high-strength bolt so that corrugated web beam L both ends are connected with the outer ring plate of B sections steel pipe 20.
Further, A sections steel pipe 2, B sections steel pipe 20 and C sections steel pipe 200 are welded by clod wash, using Q235 steel, Q345 Steel, Q390 steel or Q420 steel are made.
Further, the muscle cage of A sections and C sections uses HRB335, HRB400, RRB400 or HRB500 reinforcing bar
Further, shaped steel shear key 3 and shaped steel the shear key G3 using Q235 steel, Q345 steel, Q390 steel or Q420 steel are made.
Further, corrugated web beam L uses sine bellows or circular arc ripple, material using Q235 steel, Q345 steel, Q390 steel or Q420 steel.
Further, node bolt connecting structure includes gusset plate L5 and high-strength bolt L6, gusset plate L5 upper and lower side difference With two pieces of outer shroud plate welds in same B sections steel pipe 20, corrugated web beam L both ends and gusset plate L5 pass through high-strength bolt L6 connections.
Further, the high-strength bolt 6 uses 8.8 grades and 10.9 grades of High-strength Bolts In Bearing-type Connections.
To the effect that assembled steel tube of the present utility model constrains reinfored concrete line frame bridge pier, and its construction technology.
To the effect that assembled steel tube of the present utility model constrains reinfored concrete line frame bridge pier.
The utility model proposes assembled steel tube constraint reinfored concrete line frame bridge pier there are following advantages:
1. solid steel tube constrains reinforced concrete circular post, the strength of materials can be made full use of, fire-resistance anti-seismic performance is good, economical It is profitable etc..
2. fabricated construction, with speed of application is fast, construction quality is high, construction environment improves, working condition improves, resource The advantages that energy conservation, cost savings.
3. assembled steel tube constraint reinfored concrete line frame bridge pier is connected by corrugated web beam, corrugated web beam and common Beam, using corrugated web beam, can be such that web thickness reduces and nothing compared to having the advantages that high capacity, the good, convenient transportation of rigidity Ribbed stiffener is needed to prevent local buckling, high financial profit.
4. framed bent bridge pier can provide bigger bridge height and bridge floor area relative to common bridge pier, application is wider.
Brief description of the drawings
Fig. 1 assembled steel tubes constrain reinfored concrete line frame bridge pier elevation
Fig. 2 steel tube confinement reinforced concrete knolls D1/D2 elevation;
Fig. 3 is Fig. 2 2-2 sectional views;
Fig. 4 is Fig. 2 3-3 sectional views;
Fig. 5 is A sections and foundation connection diagram;
Fig. 6 is the schematic diagram that C sections are connected with bent cap;
Fig. 7 is the schematic diagram of A, B section connection;
Fig. 8 is the schematic diagram of B, C section connection.
Embodiment
With reference to embodiment, the utility model is described in further detail, but should not be construed the above-mentioned master of the utility model Topic scope is only limitted to following embodiments.It is common according to this area in the case where not departing from the above-mentioned technological thought of the utility model Technological know-how and customary means, various replacements and change are made, all should be included in the scope of protection of the utility model.
A kind of assembled steel tube constrains reinfored concrete line frame bridge pier, it is characterised in that:Including the bent cap being prefabricated in the factory G, steel tube confinement reinforced concrete knoll D1 and D2 and corrugated web beam L, and the foundation 12 of site operation.
The steel tube confinement reinforced concrete knoll D1 is identical with steel tube confinement reinforced concrete knoll D2 structures, from top to bottom according to It is secondary:A sections are pier bottom arrangement of reinforcement section, B sections are unreinforced section, C sections are pier top arrangement of reinforcement section.It includes:The A section concretes being prefabricated in the factory Post 1, B section concretes post 10 and C section concretes post 100.
The outsourcing A sections steel pipe 2 of A section concretes post 1.The lower surface of the A section concretes post 1 has the He of pier bottom groove 8 Grout sleeve 6.
When the pier bottom groove 8 is prefabricated A section concretes post 1, formed in the prefabricated lower surface of A section concretes post 1 center One centre bore.Several described grout sleeves 6 are embedded in prefabricated A section concretes post 1, and each grout sleeve 6 is opened Mouth is located at the lower surface of prefabricated A section concretes post 1.
The outer surface of the A sections steel pipe 2 has several holes 11.The outer surface of these holes 11 connection A sections steel pipe 2 with The side grout outlet of grout sleeve 6.
The foundation 12 is by concreting, its internal pre-buried some A sections longitudinal reinforcements 4 and shaped steel shear key 3.
Foundation is connected to below steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 The join domain of 12 upper surfaces.
The join domain of the upper surface of foundation 12 forms as follows:Expose foundation in the upper end of A sections longitudinal reinforcement 4 12 upper surface.The upper surface of foundation 12 is also exposed in the upper end of the shaped steel shear key 3, and is in the A sections longitudinal direction steel In the region that muscle 4 surrounds.Grout lines 10 are reserved in foundation 12.
When the steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete knoll D2 quilt of A section concretes post 1 When being lifted into the join domain of the foundation 12, the lower end and the upper surface of the foundation 12 of the A sections steel pipe 2 connect Touch.There is gap between the A section concretes post 1 and the upper surface of the foundation 12.The A sections longitudinal reinforcement 4 it is upper End is stretched into described grout sleeve 6.The upper end of the shaped steel shear key 3 is stretched into pier bottom groove 8.The grout lines 10 One end mouth of pipe is covered by A section concretes post 1, the other end mouth of pipe is not covered by A section concretes post 1.
A is poured into the space between A section concretes post 1 and foundation 12 by described hole 11 and grout lines 10 Section grouting material 7.The inside of A section concretes post 1 has muscle cage.
The outsourcing of B section concretes post 10 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 B sections steel pipe 20.The inside unreinforced of B section concretes post 10.The lower end outer surface of the B sections steel pipe 20 is welded with some otic placodes 14.The upper end outer surface of A sections steel pipe 2 is equally welded with some otic placodes 14.By junction steel plate 13, by A sections steel pipe 2 and B sections The otic placode 14 of steel pipe 20 links together.Gap between the B section concretes post 10 and A section concretes post 1 has the grouting of B sections Material 70.The B sections grouting material 70 is irrigated by the through hole on the tube wall of B sections steel pipe 20.
Outside the C section concretes post 100 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 Wrap C sections steel pipe 200.The upper surface of the C section concretes post 100 has pier top groove 800 and grout sleeve 600.
When the pier top groove 800 is prefabricated C section concretes post 100, in the prefabricated upper face center of C section concretes post 100 The centre bore formed.Several described grout sleeves 600 are embedded in prefabricated C section concretes post 100, and each is in the milk The opening of sleeve 600 is positioned at the upper surface of prefabricated C section concretes post 100.
The outer surface of the C sections steel pipe 200 has several holes 110.Outside these holes 110 connection C sections steel pipe 200 Surface and the side grout outlet of grout sleeve 600.
The bent cap G is by concreting, its internal pre-buried some C sections longitudinal reinforcements 400 and shaped steel shear key 300.
Bent cap G following tables are connected to above steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 The join domain in face.
The join domain of the bent cap G lower surfaces forms as follows:Expose bent cap G following table in C section longitudinal reinforcements G4 lower end Face.Bent cap G lower surface is also exposed in the lower end of the shaped steel shear key G3, and in the area that the C sections longitudinal reinforcement G4 surrounds In domain.Grout lines G10 is reserved in the bent cap G.
When the bent cap G is lifted into above steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete knoll D2 When, the upper end of the C sections steel pipe 200 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 with it is described Bent cap G join domain contact.There is gap between the C section concretes post 100 and the upper surface of the bent cap G.The C sections Longitudinal reinforcement G4 lower end is stretched into described grout sleeve 600.Pier top groove is stretched into the lower end of the shaped steel shear key 300 In 800.One end mouth of pipe of the grout lines G10 is covered by C section concretes post 100, the other end mouth of pipe is not by C section concretes Post 100 covers.
Poured into by described hole G11 and grout lines G10 to the space between C section concretes post 100 and bent cap G Slurry G7.
There is muscle cage in the C sections and A section concretes post 100.If the lower end outer surface of the C sections steel pipe 200 is welded with Dry otic placode 14.The upper end outer surface of B sections steel pipe 20 is equally welded with some otic placodes 14.By junction steel plate 13, by B section steel pipes The otic placode 14 of 20 and C sections steel pipe 200 links together.Gap between the C section concretes post 100 and B section concretes post 10 With C sections grouting material 700.The C sections grouting material 700 is irrigated by the through hole on the tube wall of C sections steel pipe 200.
The B section concretes post 10 of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 is respective It is welded with two ring flat-plate groups.Each ring flat-plate group includes inner ring plate and outer ring plate.The inner ring plate is welded in B sections steel pipe 20 Portion, its outer shroud are connected with the inwall of B sections steel pipe 20.The outer ring plate is welded on outside B sections steel pipe 20, its outer shroud and B section steel The outer wall connection of pipe 20.The inner ring plate and outer ring plate of same ring flat-plate group are in same plane.
And lower flange.The top flange and lower flange are parallel to each other, and are connected by corrugated web therebetween.The ripple Web beam L is erected at the B section concrete posts of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 Between 10.Pass through high-strength bolt so that corrugated web beam L both ends are connected with the outer ring plate of B sections steel pipe 20.

Claims (7)

1. a kind of assembled steel tube constrains reinfored concrete line frame bridge pier, it is characterised in that:Including be prefabricated in the factory bent cap G, Steel tube confinement reinforced concrete knoll D1 and D2 and corrugated web beam L, and the foundation (12) of site operation;
The steel tube confinement reinforced concrete knoll D1 is identical with steel tube confinement reinforced concrete knoll D2 structures, from top to bottom successively:A Section is pier bottom arrangement of reinforcement section, B sections are unreinforced section, C sections are pier top arrangement of reinforcement section;It includes:The A section concrete posts being prefabricated in the factory (1), B section concretes post (10) and C section concretes post (100);
A section concretes post (1) the outsourcing A sections steel pipe (2);The lower surface of the A section concretes post (1) has pier bottom groove And grout sleeve (6) (8);
When the pier bottom groove (8) is prefabricated A section concretes post (1), formed in prefabricated A section concretes post (1) lower surface center A centre bore;Several described grout sleeves (6) are embedded in prefabricated A section concretes post (1), and each grout sleeve (6) opening is located at the lower surface of prefabricated A section concretes post (1);
The outer surface of the A sections steel pipe (2) has several holes (11);The appearance of these holes (11) connection A sections steel pipe (2) Face and the side grout outlet of grout sleeve (6);
The foundation (12) is by concreting, its internal pre-buried some A sections longitudinal reinforcement (4) and shaped steel shear key I (3);
Foundation (12) is connected to below steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 The join domain of upper surface;
The join domain of foundation (12) upper surface forms as follows:Expose foundation in the upper end of A sections longitudinal reinforcement (4) (12) upper surface;The upper surface of foundation (12) is also exposed in the upper end of the shaped steel shear key I (3), and is in the A sections In the region that longitudinal reinforcement (4) surrounds;Grout lines (G10) are reserved in foundation (12);
When the steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete knoll D2 A section concretes post (1) are hung When being attached to the join domain of the foundation (12), the lower end of the A sections steel pipe (2) and the upper table of the foundation (12) Face contacts;There is gap between the upper surface of the A section concretes post (1) and the foundation (12);The A sections longitudinal direction steel The upper end of muscle (4) is stretched into described grout sleeve (6);The upper end of the shaped steel shear key I (3) is stretched into pier bottom groove (8); One end mouth of pipe of the grout lines (G10) is covered by A section concretes post (1), the other end mouth of pipe is not by A section concrete posts (1) cover;
By described hole (11) and grout lines (G10) to the space between A section concretes post (1) and foundation (12) Pour into A sections grouting material (7);There is muscle cage inside the A section concretes post (1);
B section concretes post (10) outsourcing B of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 Duan Gangguan (20);The internal unreinforced of the B section concretes post (10);The B sections steel pipe (20) if lower end outer surface be welded with Dry otic placode (14);A sections steel pipe (2) the upper end outer surface is equally welded with some otic placodes (14);, will by junction steel plate (13) The otic placode (14) of A sections steel pipe (2) and B sections steel pipe (20) links together;The B section concretes post (10) and A section concrete posts (1) gap between has B sections grouting material (70);The B sections grouting material (70) is by the through hole on B sections steel pipe (20) tube wall Perfusion;
C section concretes post (100) outsourcing C of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 Duan Gangguan (200);The upper surface of the C section concretes post (100) has pier top groove (800) and grout sleeve (600);
When the pier top groove (800) is prefabricated C section concretes post (100), in prefabricated C section concretes post (100) upper surface Entreat the centre bore formed;Several described grout sleeves (600) are embedded in prefabricated C section concretes post (100), and each The opening of individual grout sleeve (600) is located at the upper surface of prefabricated C section concretes post (100);
The outer surface of the C sections steel pipe (200) has several holes (110);These holes (110) connection C sections steel pipe (200) Outer surface and grout sleeve (600) side grout outlet;
The bent cap G is by concreting, its internal pre-buried some C sections longitudinal reinforcement (400) and shaped steel shear key (300);
Bent cap G lower surfaces are connected to above steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 Join domain;
The join domain of the bent cap G lower surfaces forms as follows:Expose bent cap G lower surface in the lower end of C sections longitudinal reinforcement (G4); Bent cap G lower surface is also exposed in the lower end of the shaped steel shear key II (G3), and surrounded in the C sections longitudinal reinforcement (G4) In region;Grout lines (G10) are reserved in the bent cap G;
When the bent cap G is lifted into steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete knoll D2 tops, The upper end of the C sections steel pipe (200) of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 with it is described Bent cap G join domain contact;There is gap between the C section concretes post (100) and the upper surface of the bent cap G;The C The lower end of section longitudinal reinforcement (G4) is stretched into described grout sleeve (600);Pier is stretched into the lower end of the shaped steel shear key (300) Push up in groove (800);One end mouth of pipe of the grout lines (G10) is covered by C section concretes post (100), the other end mouth of pipe Do not covered by C section concretes post (100);
Poured into by described hole (G11) and grout lines (G10) to the space between C section concretes post (100) and bent cap G Grouting material (G7);
There is muscle cage in the C sections and A section concretes post (1);The lower end outer surface of the C sections steel pipe (200) is welded with some Otic placode (14);B sections steel pipe (20) the upper end outer surface is equally welded with some otic placodes (14);By junction steel plate (13), by B The otic placode (14) of Duan Gangguan (20) and C sections steel pipe (200) links together;The C section concretes post (100) and B section concretes Gap between post (10) has C sections grouting material (700);The C sections grouting material (700) is by C sections steel pipe (200) tube wall Through hole perfusion;
B section concretes post (10) each self-brazing of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 It is connected to two ring flat-plate groups;Each ring flat-plate group includes inner ring plate and outer ring plate;The inner ring plate is welded in B sections steel pipe (20) Portion, its outer shroud are connected with the inwall of B sections steel pipe (20);The outer ring plate is welded on B sections steel pipe (20) outside, its outer shroud and B Duan Gangguan (20) outer wall connection;The inner ring plate and outer ring plate of same ring flat-plate group are in same plane;
Top flange and lower flange are parallel to each other, and are connected by corrugated web therebetween, composition corrugated web beam L;The ripple Web beam L is erected at the B section concrete posts of steel tube confinement reinforced concrete knoll D1 and steel tube confinement reinforced concrete the knoll D2 (10) between;Pass through high-strength bolt so that corrugated web beam L both ends are connected with the outer ring plate of B sections steel pipe (20).
A kind of 2. assembled steel tube constraint reinfored concrete line frame bridge pier according to claim 1, it is characterised in that:A sections Steel pipe (2), B sections steel pipe (20) and C sections steel pipe (200) are welded by clod wash, using Q235 steel, Q345 steel, Q390 steel Material or Q420 steel are made.
A kind of 3. assembled steel tube constraint reinfored concrete line frame bridge pier according to claim 1, it is characterised in that:A sections HRB335, HRB400, RRB400 or HRB500 reinforcing bar are used with the muscle cage of C sections.
A kind of 4. assembled steel tube constraint reinfored concrete line frame bridge pier according to claim 1, it is characterised in that:It is described Shaped steel shear key I (3) and shaped steel shear key II (G3) is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
5. assembled steel tube according to claim 1 constrains reinfored concrete line frame bridge pier, it is characterised in that:Corrugated web Beam L uses sine bellows or circular arc ripple, and material uses Q235 steel, Q345 steel, Q390 steel or Q420 steel.
6. assembled steel tube according to claim 1 constrains reinfored concrete line frame bridge pier, it is characterised in that:Node bolt Connecting structure includes gusset plate (L5) and high-strength bolt (L6), the upper and lower side of gusset plate (L5) respectively with same B sections steel Two pieces of outer shroud plate welds of (20) are managed, corrugated web beam L both ends are connected with gusset plate (L5) by high-strength bolt (L6).
7. assembled steel tube according to claim 6 constrains reinfored concrete line frame bridge pier, it is characterised in that:It is described high-strength Bolt (L6) uses 8.8 grades and 10.9 grades of High-strength Bolts In Bearing-type Connections.
CN201621268132.3U 2016-11-23 2016-11-23 A kind of assembled steel tube constrains reinfored concrete line frame bridge pier Withdrawn - After Issue CN207032011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621268132.3U CN207032011U (en) 2016-11-23 2016-11-23 A kind of assembled steel tube constrains reinfored concrete line frame bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621268132.3U CN207032011U (en) 2016-11-23 2016-11-23 A kind of assembled steel tube constrains reinfored concrete line frame bridge pier

Publications (1)

Publication Number Publication Date
CN207032011U true CN207032011U (en) 2018-02-23

Family

ID=61472126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621268132.3U Withdrawn - After Issue CN207032011U (en) 2016-11-23 2016-11-23 A kind of assembled steel tube constrains reinfored concrete line frame bridge pier

Country Status (1)

Country Link
CN (1) CN207032011U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086135A (en) * 2016-11-23 2018-05-29 重庆市中科大业建筑科技有限公司 A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
CN115110404A (en) * 2022-07-28 2022-09-27 西南交通大学 Bridge bent frame pier column-tie beam restorable node based on bent steel plate energy consumption

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086135A (en) * 2016-11-23 2018-05-29 重庆市中科大业建筑科技有限公司 A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
CN108086135B (en) * 2016-11-23 2023-10-13 重庆市中科大业建筑科技有限公司 Assembled steel pipe constraint reinforced concrete bent bridge pier
CN115110404A (en) * 2022-07-28 2022-09-27 西南交通大学 Bridge bent frame pier column-tie beam restorable node based on bent steel plate energy consumption
CN115110404B (en) * 2022-07-28 2023-04-25 西南交通大学 Bridge bent pier column-tie beam recoverable joint based on energy consumption of bent steel plates

Similar Documents

Publication Publication Date Title
CN108049633A (en) A kind of precast concrete concrete frame joint construction method
CN201991083U (en) Beam column node of composite structural system of steel and concrete
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN205529905U (en) Take prefabricated decking connection structure of U type muscle
CN203701296U (en) Y-shaped plane anti-buckling tubular joint of rectangular steel pipe structure
CN205242773U (en) Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection
CN206512590U (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN207846687U (en) Prefabricated assembled modularization frame node
CN108412128A (en) A kind of connection structure of steel core concrete column
CN2390933Y (en) Square steel pipe concrete beam and column jointing gusset
CN101818478A (en) Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN107905385A (en) The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure
CN106368348A (en) Overlapped combined shear wall with double-phase stress characteristic
CN105507426A (en) Half-through bracket haunching type compound steel pipe concrete column-steel beam joint
CN111456235A (en) Bolt connection joint of square steel tube concrete column-steel beam outer ring casing plate
CN108086135A (en) A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
CN207032011U (en) A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN108086134A (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN109057031A (en) Assembly concrete-filled steel tube superposed column-girder construction system of built-in more steel pipes
CN207846685U (en) Stiffened column and steel beam connecting joint with closing steel plate hoop
CN206521768U (en) A kind of shear connector in the double-deck box hat concrete combined structure of immersed tube tunnel
CN207032010U (en) A kind of assembled solid steel tube constrains armored concrete pillar height pier
CN206359881U (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180223

Effective date of abandoning: 20231013

AV01 Patent right actively abandoned

Granted publication date: 20180223

Effective date of abandoning: 20231013

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned