CN207017267U - Engineering pile guider in piling construction - Google Patents
Engineering pile guider in piling construction Download PDFInfo
- Publication number
- CN207017267U CN207017267U CN201720604521.7U CN201720604521U CN207017267U CN 207017267 U CN207017267 U CN 207017267U CN 201720604521 U CN201720604521 U CN 201720604521U CN 207017267 U CN207017267 U CN 207017267U
- Authority
- CN
- China
- Prior art keywords
- hole
- engineering pile
- mounting plate
- upper mounting
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (8)
- A kind of 1. engineering pile guider in piling construction, it is characterised in that including:Upper mounting plate (1), the upper mounting plate (1) are provided with through hole (11), and the upper through hole (11) connects with the edge of upper mounting plate (1) Opening (12) is formed, the opening (12) can allow engineering pile by the way that the upper through hole (11) is circumferentially with regulation engineering pile The first governor motion (13) of position;Lower platform (2), the lower platform (2) open lower through-hole (21), and the lower platform (2) is provided with least three vertical columns (3), the column (3) is located on upper mounting plate (1), and position of the upper mounting plate (1) on column (3) is adjustable, one of them Column (3) is provided with the first CMM (41);The lower through-hole (21) is being circumferentially with the second of regulation engineering pile position Governor motion (22), the lower platform (2) are provided with the second CMM (42) and wireless localization apparatus (5);Positioning tube (6), the positioning tube (6) are vertically provided on the bottom surface of lower platform (2), the upper through hole (11), lower through-hole (21) it is corresponding with the pore location of positioning tube (6).
- 2. the engineering pile guider in piling construction according to claim 1, it is characterised in that:The first regulation machine Structure (13) include at least three along upper through hole (11) circumferentially disposed the first oil cylinder (131), first oil cylinder (131) Piston rod is equipped with the first roller (132) towards the center of upper through hole (11), the piston rod of first oil cylinder (131).
- 3. the engineering pile guider in piling construction according to claim 1, it is characterised in that:The second regulation machine Structure (22) include at least three along lower through-hole (21) circumferentially disposed the second oil cylinder (221), second oil cylinder (221) Piston rod is equipped with the second roller (222) towards the center of lower through-hole (21), the piston rod of second oil cylinder (221).
- 4. the engineering pile guider in piling construction according to claim 1, it is characterised in that:Column (3) edge Length direction has multiple positioning holes (31), and the top surface of the upper mounting plate (1) is distinguished in the correspondence position of each column (3) Provided with fixed frame (14), the latch (15) coordinated with positioning hole (31) is provided with fixed frame (14).
- 5. the engineering pile guider in piling construction according to claim 1, it is characterised in that:The column (3) exists The circumference of lower through-hole (21) is uniformly provided with four.
- 6. the engineering pile guider in piling construction according to claim 1, it is characterised in that:The upper mounting plate (1) On opening (12) width be less than upper through hole (11) diameter.
- 7. the engineering pile guider in piling construction according to claim 1, it is characterised in that:The upper mounting plate (1) Guardrail (7) is respectively equipped with the top surface of lower platform (2).
- 8. the engineering pile guider in piling construction according to claim 1, it is characterised in that:The wireless location is set Standby (5) include the different gps antenna in three positions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720604521.7U CN207017267U (en) | 2017-05-26 | 2017-05-26 | Engineering pile guider in piling construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720604521.7U CN207017267U (en) | 2017-05-26 | 2017-05-26 | Engineering pile guider in piling construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207017267U true CN207017267U (en) | 2018-02-16 |
Family
ID=61476761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720604521.7U Active CN207017267U (en) | 2017-05-26 | 2017-05-26 | Engineering pile guider in piling construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207017267U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930271A (en) * | 2017-05-26 | 2018-12-04 | 上海雄程船舶工程有限公司 | Engineering pile guiding device in piling construction |
CN111456009A (en) * | 2020-04-23 | 2020-07-28 | 中国十七冶集团有限公司 | Engineering pile guiding device in piling construction and using method thereof |
CN111501754A (en) * | 2020-04-16 | 2020-08-07 | 江苏长风海洋装备制造有限公司 | Steel-pipe pile construction positioner |
CN112832221A (en) * | 2021-01-15 | 2021-05-25 | 江苏佳美海洋工程装备有限公司 | Double-layer pile stabilizing platform with GPS |
-
2017
- 2017-05-26 CN CN201720604521.7U patent/CN207017267U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930271A (en) * | 2017-05-26 | 2018-12-04 | 上海雄程船舶工程有限公司 | Engineering pile guiding device in piling construction |
CN108930271B (en) * | 2017-05-26 | 2023-10-31 | 上海雄程船舶工程有限公司 | Engineering pile guiding device in piling construction |
CN111501754A (en) * | 2020-04-16 | 2020-08-07 | 江苏长风海洋装备制造有限公司 | Steel-pipe pile construction positioner |
CN111456009A (en) * | 2020-04-23 | 2020-07-28 | 中国十七冶集团有限公司 | Engineering pile guiding device in piling construction and using method thereof |
CN112832221A (en) * | 2021-01-15 | 2021-05-25 | 江苏佳美海洋工程装备有限公司 | Double-layer pile stabilizing platform with GPS |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207017267U (en) | Engineering pile guider in piling construction | |
EP3011113B1 (en) | Pile driving machine | |
CN105417197B (en) | Bucket wheel machine automatic material taking method | |
CN104631459B (en) | Pile body perpendicularity and the high control method of stake top mark in static press piling construction | |
CN110158634B (en) | Construction system and construction method for pile sinking of offshore wind power steel pipe pile with hammer | |
CN102587374B (en) | Perpendicularity control process for single-tubular-pile foundation of offshore intertidal wind farm | |
CN215064491U (en) | A earth's surface subsides mark for vacuum preloading monitoring | |
CN114319356A (en) | Offshore wind power single-pile foundation construction method and special ship | |
CN110083151A (en) | A kind of pile driving barge position control method and system | |
CN108930271A (en) | Engineering pile guiding device in piling construction | |
CN206428698U (en) | A kind of basic fine positioning of jacket and temporary locking device | |
CN208953534U (en) | A kind of collapsed gully erosion dynamic monitoring system based on laser scanning | |
CN107255473A (en) | A kind of measuring method for setting up dynamic benchmark plane | |
CN218724219U (en) | Tower perpendicularity detection device | |
CN208792357U (en) | A kind of control platform for the construction of marine jacket-type blower foundation | |
CN216615834U (en) | Marine wind-power single-pile foundation construction special-purpose ship | |
CN211740219U (en) | Pay-off device for measuring fan-shaped structure by matching CAD software with theodolite | |
CN210140844U (en) | Construction system for pile sinking of vertical pile with hammer for offshore wind power steel pipe pile | |
CN203687926U (en) | Sea cliff retrogression size measuring device | |
CN212670570U (en) | Pile stabilizing platform for offshore pile driving construction | |
CN110528570B (en) | Overwater construction method for photovoltaic support foundation pile | |
CN206635736U (en) | Offshore construction platform lifts positioner | |
CN206695870U (en) | A kind of water level metering device of storage station | |
CN201598623U (en) | Leveling structure of tower foundation ring in offshore wind turbine foundation construction | |
CN110986796A (en) | Floating type offshore wind power generation displacement monitoring device and monitoring method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Engineering pile guiding device in pile driving construction Effective date of registration: 20220107 Granted publication date: 20180216 Pledgee: Industrial Bank Co.,Ltd. Shanghai pilot Free Trade Zone Lingang New District sub branch Pledgor: SHANGHAI XIONGCHENG MARINE ENGINEERING CO.,LTD.|SHANGHAI XIONGCHENG SHIP ENGINEERING Co.,Ltd. Registration number: Y2022980000225 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230128 Granted publication date: 20180216 Pledgee: Industrial Bank Co.,Ltd. Shanghai pilot Free Trade Zone Lingang New District sub branch Pledgor: SHANGHAI XIONGCHENG MARINE ENGINEERING CO.,LTD.|SHANGHAI XIONGCHENG SHIP ENGINEERING Co.,Ltd. Registration number: Y2022980000225 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Engineering pile guide device in pile driving construction Effective date of registration: 20230201 Granted publication date: 20180216 Pledgee: Industrial Bank Co.,Ltd. Shanghai pilot Free Trade Zone Lingang New District sub branch Pledgor: SHANGHAI XIONGCHENG MARINE ENGINEERING CO.,LTD.|SHANGHAI XIONGCHENG SHIP ENGINEERING Co.,Ltd. Registration number: Y2023310000019 |
|