CN207016871U - A kind of heavy metal recovery electrolysis unit - Google Patents
A kind of heavy metal recovery electrolysis unit Download PDFInfo
- Publication number
- CN207016871U CN207016871U CN201720712273.8U CN201720712273U CN207016871U CN 207016871 U CN207016871 U CN 207016871U CN 201720712273 U CN201720712273 U CN 201720712273U CN 207016871 U CN207016871 U CN 207016871U
- Authority
- CN
- China
- Prior art keywords
- heavy metal
- electrolytic cell
- electrolysis unit
- metal recovery
- rotating machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electrolytic Production Of Metals (AREA)
Abstract
The utility model discloses a kind of heavy metal recovery electrolysis unit, including electrolytic cell and it is fixedly mounted on the distribution box of the electrolytic cell side, the electrolytic cell front is provided with processor, the processor front is inlaid with display screen, current regulator and controlling switch, the electrolytic cell upper end is provided with column, the column upper end is provided with brush and electric rotating machine, and the electric rotating machine lower end is provided with installing plate.Beneficial effect is:The heavy metal recovery electrolysis unit adds the electric heater and the filter membrane, the electric heater can lift the temperature of electrolyte, accelerate electrolysis, the filter membrane can prevent heavy metal mud from being spread into the electrolytic cell, so that the heavy metal mud for needing to reclaim all is blocked in the filter membrane, after electrolysis, it is only necessary to remove the filter membrane and wash metal mud, time saving and energy saving, practicality is good.
Description
Technical field
Heavy metal recovery electrolysis unit field is the utility model is related to, is electrolysed and fills more particularly to a kind of heavy metal recovery
Put.
Background technology
At present, the common heavy metal recovery electrolysis unit of in the market is electrolysed caused metal mud one in actual use
As mixed with electrolyte, therefore collect metal mud need by electrolyte all filtering one time, because electrolytic cell volume is larger,
Therefore electrolyte is filtered completely and required a great deal of time, waste time and energy, for the above situation, a heavy metal species can be designed
Electrolysis unit is reclaimed to solve the above problems.
Utility model content
The purpose of this utility model is that to solve the above problems and provides a kind of heavy metal recovery electrolysis unit.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of heavy metal recovery electrolysis unit, including electrolytic cell and the distribution for being fixedly mounted on the electrolytic cell side
Case, the electrolytic cell front are provided with processor, and the processor front is inlaid with display screen, current regulator and control and opened
Close, the electrolytic cell upper end is provided with column, and the column upper end is provided with brush and electric rotating machine, the electric rotating machine lower end
Installing plate is provided with, the installing plate lower end is provided with the string bag, temperature sensor, the net are provided with the electrolytic cell inwall
Filter membrane is also arranged with outside pocket, the electrolytic cell bottom of pond is then provided with electric heater.
In order to further improve the practicality of heavy metal recovery electrolysis unit, the display location is in processor front
Upper center, the current regulator and the controlling switch are located at processor front lower end both sides respectively.
In order to further improve the practicality of heavy metal recovery electrolysis unit, the column quantity has two, is located at respectively
Electrolytic cell upper surface both ends, the electric rotating machine are fixedly mounted on column side upper end, and the brush is fixedly mounted
In the stud sides Middle face, the installing plate upper surface is fixedly connected with the electric rotating machine output shaft, lower surface with it is described
The string bag is fixedly connected, side is then slidably connected with the brush.
In order to further improve the practicality of heavy metal recovery electrolysis unit, the string bag and the installing plate are conduction material
Matter makes, and the installing plate upper surface is also coated with insulated paint with the electric rotating machine junction.
In order to further improve the practicality of heavy metal recovery electrolysis unit, the string bag, the installing plate, the electricity
Brush, the electric rotating machine quantity are two, respectively positioned at the side of two columns.
In order to further improve the practicality of heavy metal recovery electrolysis unit, the filter membrane is fixedly mounted on the electrolysis
In pond and the outside of one of them string bag is set in, the filter membrane quantity has one.
In order to further improve the practicality of heavy metal recovery electrolysis unit, the temperature sensor quantity at least one
It is individual, it is evenly distributed on the electrolytic cell inwall.
In order to further improve the practicality of heavy metal recovery electrolysis unit, the processor and the temperature sensor,
Display screen electrical connection, the current regulator electrically connect with the electric heater, the distribution box, the controlling switch and
The brush, distribution box electrical connection.
Beneficial effect is:The heavy metal recovery electrolysis unit adds the electric heater and the filter membrane, described
Electric heater can lift the temperature of electrolyte, accelerate electrolysis, and the filter membrane can prevent heavy metal mud from expanding into the electrolytic cell
Dissipate, so that the heavy metal mud for needing to reclaim all is blocked in the filter membrane, after electrolysis, it is only necessary to by the mistake
Filter membrane, which is removed, washes metal mud, and time saving and energy saving, practicality is good.
Brief description of the drawings
Fig. 1 is a kind of structural representation of heavy metal recovery electrolysis unit described in the utility model.
Fig. 2 is the utility model internal structure schematic diagram.
Description of reference numerals is as follows:
1st, electrolytic cell;2nd, distribution box;3rd, processor;4th, display screen;5th, current regulator;6th, controlling switch;7th, column;8、
Brush;9th, installing plate;10th, electric rotating machine;11st, the string bag;12nd, temperature sensor;13rd, filter membrane;14th, electric heater.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
As Figure 1-Figure 2, a kind of heavy metal recovery electrolysis unit, including electrolytic cell 1 and it is fixedly mounted on electrolytic cell 1
The distribution box 2 of side, the front of electrolytic cell 1 are provided with processor 3, and processor 3 is used for the data that temperature sensor 12 is transmitted
Information simultaneously shows the data message after processing on the display screen 4 the front of processor 3 is inlaid with display screen 4, current regulator 5
With controlling switch 6, current regulator 5 is used to adjust the electric current for flowing through electric heater 14, and controlling switch 6 is logical for control brush 8
Power-off, the upper end of electrolytic cell 1 are provided with column 7, and the upper end of column 7 is provided with brush 8 and electric rotating machine 10, and electric rotating machine 10 is used for band
Dynamic installing plate 9 and the string bag 11 of the lower end of installing plate 9 rotate, and the lower end of electric rotating machine 10 is provided with installing plate 9, and installing plate 9 is used for
The fixed string bag 11 of installation, the lower end of installing plate 9 are provided with the string bag 11, and the string bag 11 is used to contain the heavy metal for needing electrolytic recovery, electricity
Temperature sensor 12 is provided with the solution inwall of pond 1, temperature sensor 12 is used for the temperature for detecting electrolyte, and the outside of the string bag 11 is also
It is arranged with filter membrane 13, filter membrane 13 can make ion by and stopping heavy metal simple substance by therefore being placed in the string bag 11
Metal ion can pass through filter membrane 13 after heavy metal electrolysis, and heavy metal mud is then completely blocked in filter membrane 13, works as electricity
After solution, it is only necessary to filter membrane 13 to be taken out and collects heavy metal, the bottom of pond of electrolytic cell 1 is then provided with electric heater 14,
Electric heater 14 is used to heat electrolyte, increases electrolytic speed.
In order to further improve the practicality of heavy metal recovery electrolysis unit, display screen 4 is located in the front upper portion of processor 3
Portion, current regulator 5 and controlling switch 6 are located at the positive lower end both sides of processor 3 respectively, and the quantity of column 7 has two, is located at respectively
The upper surface both ends of electrolytic cell 1, electric rotating machine 10 are fixedly mounted on the side upper end of column 7, and brush 8 is fixedly mounted on the side of column 7
Middle part, the upper surface of installing plate 9 is fixedly connected with the output shaft of electric rotating machine 10, lower surface is fixedly connected with the string bag 11, side then with
Brush 8 is slidably connected, and the string bag 11 and installing plate 9 make for conductive material, and the upper surface of installing plate 9 and the junction of electric rotating machine 10 are also
Coated with insulated paint, the string bag 11, installing plate 9, brush 8, the quantity of electric rotating machine 10 are two, respectively positioned at two columns 7
Side, filter membrane 13 are fixedly mounted in electrolytic cell 1 and are set in the outside of one of string bag 11, and the quantity of filter membrane 13 has
One, the quantity of temperature sensor 12 at least one, be evenly distributed on the inwall of electrolytic cell 1, processor 3 and temperature sensor
12nd, display screen 4 electrically connects, and current regulator 5 electrically connects with electric heater 14, distribution box 2, controlling switch 6 and brush 8, distribution
Case 2 electrically connects.
General principle, principal character and advantage of the present utility model has been shown and described above.The technical staff of the industry
It should be appreciated that the utility model is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification is originally
The principle of utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model also has various change
And improvement, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model requires protection scope
Defined by appended claims and its effect thing.
Claims (8)
1. a kind of heavy metal recovery electrolysis unit, including electrolytic cell and the distribution box for being fixedly mounted on the electrolytic cell side,
It is characterized in that:The electrolytic cell front is provided with processor, the processor front be inlaid with display screen, current regulator and
Controlling switch, the electrolytic cell upper end are provided with column, and the column upper end is provided with brush and electric rotating machine, the electric rotating
Machine lower end is provided with installing plate, and the installing plate lower end is provided with the string bag, temperature sensor is provided with the electrolytic cell inwall,
Filter membrane is also arranged with outside the string bag, the electrolytic cell bottom of pond is then provided with electric heater.
A kind of 2. heavy metal recovery electrolysis unit according to claim 1, it is characterised in that:The display location is in described
In the middle part of processor front upper portion, the current regulator and the controlling switch are located at processor front lower end two respectively
Side.
A kind of 3. heavy metal recovery electrolysis unit according to claim 1, it is characterised in that:The column quantity has two
Individual, respectively positioned at electrolytic cell upper surface both ends, the electric rotating machine is fixedly mounted on column side upper end, the electricity
Brush is fixedly mounted on the stud sides Middle face, the installing plate upper surface is fixedly connected with the electric rotating machine output shaft, under
Surface is fixedly connected with the string bag, side is then slidably connected with the brush.
A kind of 4. heavy metal recovery electrolysis unit according to claim 1, it is characterised in that:The string bag and the installation
Plate makes for conductive material, and the installing plate upper surface is also coated with insulated paint with the electric rotating machine junction.
A kind of 5. heavy metal recovery electrolysis unit according to claim 1, it is characterised in that:The string bag, the installation
Plate, the brush, the electric rotating machine quantity are two, respectively positioned at the side of two columns.
A kind of 6. heavy metal recovery electrolysis unit according to claim 1, it is characterised in that:The filter membrane is fixedly mounted
In the electrolytic cell and the outside of one of them string bag is set in, the filter membrane quantity has one.
A kind of 7. heavy metal recovery electrolysis unit according to claim 1, it is characterised in that:The temperature sensor quantity
At least one, is evenly distributed on the electrolytic cell inwall.
A kind of 8. heavy metal recovery electrolysis unit according to claim 1, it is characterised in that:The processor and the temperature
Sensor, display screen electrical connection are spent, the current regulator electrically connects with the electric heater, the distribution box, described
Controlling switch electrically connects with the brush, the distribution box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720712273.8U CN207016871U (en) | 2017-06-19 | 2017-06-19 | A kind of heavy metal recovery electrolysis unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720712273.8U CN207016871U (en) | 2017-06-19 | 2017-06-19 | A kind of heavy metal recovery electrolysis unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207016871U true CN207016871U (en) | 2018-02-16 |
Family
ID=61485280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720712273.8U Expired - Fee Related CN207016871U (en) | 2017-06-19 | 2017-06-19 | A kind of heavy metal recovery electrolysis unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207016871U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116375145A (en) * | 2022-12-30 | 2023-07-04 | 南京雄凯过滤设备有限公司 | Multistage metal recovery device comprising a metal filter |
-
2017
- 2017-06-19 CN CN201720712273.8U patent/CN207016871U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116375145A (en) * | 2022-12-30 | 2023-07-04 | 南京雄凯过滤设备有限公司 | Multistage metal recovery device comprising a metal filter |
CN116375145B (en) * | 2022-12-30 | 2023-11-17 | 南京雄凯过滤设备有限公司 | Multistage metal recovery device comprising a metal filter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206122242U (en) | Panel drilling back belt cleaning device | |
CN207016871U (en) | A kind of heavy metal recovery electrolysis unit | |
CN208690350U (en) | A kind of li battery shell of the tour bus with heat sinking function | |
CN206057465U (en) | A kind of network load detector | |
CN205808106U (en) | A kind of intelligent waste and old lead acid accumulator recovery lead melting furnace | |
CN207760820U (en) | A kind of water conservancy and hydropower open-close type gate | |
CN207164995U (en) | A kind of collection O&M auxiliary equipment for the detection of concentrator carrier module | |
CN205081194U (en) | Empty battery system of aluminium | |
CN204625727U (en) | Nonferrous metal mine hydrometallurgy system | |
CN209702877U (en) | A kind of aluminium cell stops busbar shiplap joint device when slot | |
CN207133382U (en) | A kind of overhead transmission line fault comprehensive detection means is with collecting unit | |
CN208689118U (en) | A kind of good outdoor smart grid signal pickup assembly of rainproof effect | |
CN206590937U (en) | A kind of river acid blue algae cleaning equipment | |
CN207525080U (en) | A kind of buried integrated industrial wastewater treatment device containing aluminium | |
CN207133381U (en) | A kind of overhead transmission line fault comprehensive detection means intelligent acquisition indicating member | |
CN205880171U (en) | Lead acid battery detection device | |
CN207719362U (en) | A kind of lithium battery collector recycling separator | |
CN206460561U (en) | A kind of Parking Meter charging pile integral system | |
CN207138109U (en) | A kind of wet method for lithium battery production removes magnetic device | |
CN206258513U (en) | A kind of distribution line on-Line Monitor Device | |
CN202183386U (en) | Pattern of two gate electrodes of solar cell | |
CN205740368U (en) | A kind of carbon nanomaterial purification devices | |
CN203569216U (en) | Anode plate sealing cover | |
CN205846154U (en) | A kind of environment-friendly type early warning lead-acid accumulator | |
CN207762855U (en) | A kind of LED power that water resistance is good |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |