CN207010346U - Applied to the active rapid switching device for shaking electric protection - Google Patents

Applied to the active rapid switching device for shaking electric protection Download PDF

Info

Publication number
CN207010346U
CN207010346U CN201720711935.XU CN201720711935U CN207010346U CN 207010346 U CN207010346 U CN 207010346U CN 201720711935 U CN201720711935 U CN 201720711935U CN 207010346 U CN207010346 U CN 207010346U
Authority
CN
China
Prior art keywords
switch
electrically connected
inverter
switching device
switched fast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720711935.XU
Other languages
Chinese (zh)
Inventor
李小滨
潘慕军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI TITANS TECHNOLOGY Co Ltd
Original Assignee
ZHUHAI TITANS TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI TITANS TECHNOLOGY Co Ltd filed Critical ZHUHAI TITANS TECHNOLOGY Co Ltd
Priority to CN201720711935.XU priority Critical patent/CN207010346U/en
Application granted granted Critical
Publication of CN207010346U publication Critical patent/CN207010346U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)

Abstract

The utility model discloses a kind of active rapid switching device for being applied to shake electric protection, it is desirable to provide a kind for the treatment of range is wide, switch speed is fast, energy consumption is low and cost is low, the active rapid switching device for being applied to shake electric protection of service life length.The utility model includes control unit KZQ, energy-storage units SU and with described control unit KZQ be electrically connected with inverter NB and be switched fast switch QS, the energy-storage units SU and inverter NB is electrically connected with, the AC ends of the inverter NB are electrically connected with by the first threephase switch K and the 3rd threephase switch K1 and the II interface for being switched fast switch QS, the DC ends of the inverter NB are electrically connected with by the second threephase switch K ' and public electric wire net, public electric wire net is electrically connected with by the 4th threephase switch K2 and the I interface for being switched fast switch QS, the switch QS that is switched fast is electrically connected with electricity consumption sensitive loads.The utility model is applied to administer the technical field that low pressure shakes electricity.

Description

Applied to the active rapid switching device for shaking electric protection
Technical field
It the utility model is related to and administer the electric solution of low pressure rolling, it is more particularly to a kind of to be applied to shake the active fast of electric protection Fast switching device.
Background technology
Electricity is shaken to refer to when transformation in the higher level of sensitive load supply network or associated peer or power supplied locally system The generation such as device, switch, arrester, bus, circuit, load single-phase earthing, two-phase phase fault, three-phase phase fault, two connect When the accidents such as ground or supply line switch in short-term, because existing relay protection and breaker actuation time are more than 50mS, it can cause Power supply voltage is dropped or had a power failure in short-term suddenly, and the accidents such as Switching Power Supply dead electricity, device damage can be caused by shaking electricity, causes to produce ripple Dynamic, operation confusion, personnel are panic.The lighter causes product quality accident, causes hundreds of thousands, millions of economic losses.Severe one is even Cause serious accident, huge economic loss and severe social influence are brought to enterprise and society.
Existing solution power network shakes electricity or the scheme of short trouble mainly uses on line type UPS and dynamic electric voltage recovery device DVR Two ways.
On line type UPS has stronger software function, can easily surf the Net, and carries out UPS remote control and intellectuality Management;Inversion while floating charge, investigate and switch without microcontroller circuit, 0 switching time;Multiple design defencive function is set Meter is greatly lowered fault rate.But there is also operation energy consumption is high, equipment cost is high, operation and maintenance cost on line type UPS The high, problem such as service life is low.
It is energy-storage travelling wave tube that dynamic electric voltage recovery device DVR, which employs super capacitor, has power density height, discharge and recharge time It is short, have extended cycle life, the advantages of operating temperature range is wide.But it is longer the time required to dynamic electric voltage recovery device DVR switchings, and And the scope for administering rolling electricity is smaller.
Utility model content
Technical problem to be solved in the utility model is overcome the deficiencies in the prior art, there is provided a kind for the treatment of range Extensively, switch speed is fast, energy consumption is low and cost is low, the active rapid switching device for being applied to shake electric protection of service life length.
Technical scheme is used by the utility model:The utility model includes control unit, energy-storage units and and institute State the inverter of control unit electric connection and be switched fast switch, the energy-storage units are electrically connected with the inverter, institute The AC ends for stating inverter are electrical by the first threephase switch and the 3rd threephase switch and the II interface for being switched fast switch Connection, the DC ends of the inverter are electrically connected with by the second threephase switch and public electric wire net, and public electric wire net passes through the 4th three-phase Switch is electrically connected with the I interface for being switched fast switch, and the switch that is switched fast electrically connects with electricity consumption sensitive loads Connect.
Further, the switch that is switched fast includes vacuum contactor and vortex drive mechanism, the vacuum contactor It is connected with the vortex drive mechanism.
Further, the vacuum contactor include insulator, the upper extraction copper bar installed in the insulator upper and lower ends and It is lower to draw copper bar, from top to bottom embedded static contact, moving contact and the bellows being arranged in the insulator, the static contact with The upper extraction copper bar is connected, and the moving contact is connected with the lower extraction copper bar, and the lower end of the static contact is also connected with There is connecting rod, link insulator is provided with the middle part of the connecting rod.
Further, the vacuum contactor is connected by the connecting rod with the vortex drive mechanism, the vortex Drive mechanism includes charge power supply, is connected in parallel on the combined floodgate storage capacitor and separating brake storage capacitor at the charge power supply both ends, described Switching-on controller and separating brake controller in parallel, the shutting-brake control are distinguished in combined floodgate storage capacitor and the separating brake storage capacitor both ends One end of device and the separating brake controller is connected with the closing coil and the switching winding, separating brake line by wire respectively Circle, closing coil, are provided with eddy-current disc, the eddy-current disc is fixed with the connecting rod between the switching winding and the closing coil Connection.
Further, the energy-storage units are composed in series by the carbon-based capacitor batteries of more piece.
Further, the switch that is switched fast carries out circuit switching connection under the control of described control unit, can be real Now following function:
Filled while a public electric wire nets provide AC power directly to electricity consumption sensitive loads by inverter to energy-storage units Electricity;
B energy-storage units provide AC power in short-term by inverter to electricity consumption sensitive loads.
The beneficial effects of the utility model are:Due to the utility model include control unit, energy-storage units and with it is described The inverter and be switched fast switch that control unit is electrically connected with, the energy-storage units are electrically connected with the inverter, described The AC ends of inverter are electrically connected by the first threephase switch and the 3rd threephase switch with the II interface for being switched fast switch Connect, the DC ends of the inverter are electrically connected with by the second threephase switch and public electric wire net, and public electric wire net is opened by the 4th three-phase Closing and be electrically connected with the I interface for being switched fast switch, the switch that is switched fast is electrically connected with electricity consumption sensitive loads, So the utility model when public electric wire net occurs to shake electric, can be incited somebody to action by the quick closing valve that is switched fast no more than in 20mS Electricity consumption sensitive loads, which disconnect from public electric wire net and enable energy-storage units, provides the AC power synchronous with public electric wire net, ensures electricity consumption Sensitive loads public electric wire net fluctuate during can normal work, to avoid causing great economic loss.
Brief description of the drawings
Fig. 1 is system principle line frame graph of the present utility model;
Fig. 2 is the structural representation that the utility model is switched fast switch.
Embodiment
As depicted in figs. 1 and 2, in the present embodiment, the utility model include control unit KZQ, energy-storage units SU and With the described control unit KZQ inverter NB being electrically connected with and being switched fast switch QS, the energy-storage units SU and the inversion Device NB is electrically connected with, and the AC ends of the inverter NB are quickly cut by the first threephase switch K and the 3rd threephase switch K1 with described The II interface for changing switch QS is electrically connected with, and the DC ends of the inverter NB are electrical by the second threephase switch K ' and public electric wire net Connection, public electric wire net is electrically connected with by the 4th threephase switch K2 and the I interface for being switched fast switch QS, described quick Switching switch QS is electrically connected with electricity consumption sensitive loads.The switch QS that is switched fast can be sensitive negative by electricity consumption within 5mS Carry and disconnected from public electric wire net, and be switched to energy-storage units SU power supply states;The inverter NB can store energy-storage units SU Energy inversion be the three-phase alternating current synchronous with public electric wire net, it is sensitive negative to electricity consumption in short-term when public electric wire net occurs to shake electric Power supply is carried, the inverter NB output frequencies are synchronous with public electric wire net, ensure that load is switched to present apparatus power supply by public electric wire net Or when by present apparatus power supply switching back to public electric wire net power supply, phase is consistent, and no surge produces, and according to the difference of applying working condition, Inverter output is optional with installation transformer.
In the present embodiment, the switch QS that is switched fast includes vacuum contactor 1 and vortex drive mechanism 2, described true Empty contactor 1 is connected with the vortex drive mechanism 2.The switch QS that is switched fast uses Quick eddy actuation techniques, holds Units select vacuum contactor, lossless during operation, tolerance is strong, compare solid-state switch(SSTS、SSB)Can with higher It is switching time≤20mS under described control unit KZQ control by property, meets that highest ranking is " tight in sensitive loads classification Lattice load:Supply voltage requirement of the terminal duration less than 20mS " in short-term.
In the present embodiment, the vacuum contactor 1 includes insulator 11, drawn in the upper and lower ends of insulator 11 Go out copper bar 12 and lower extraction copper bar 13, from top to bottom embedded static contact 14, moving contact 15 and ripple in the insulator 11 Line pipe 16, the static contact 14 are connected with the upper extraction copper bar 12, the moving contact 15 and the lower extraction phase of copper bar 13 Connection, the lower end of the moving contact 15 are also associated with connecting rod 17, and the middle part of the connecting rod 17 is provided with link insulator 18.It is described Vacuum contactor 1 has the advantages that arc-rupturing capacity is strong, and good pressure-resistant performance, operating frequency is higher, long lifespan, is sprayed outside no electric arc, and Small volume, in light weight, maintenance cycle is longer, is safeguarded beneficial to installation.
In the present embodiment, the vacuum contactor 1 is connected by the connecting rod 17 with the vortex drive mechanism 2, The vortex drive mechanism 2 includes charge power supply 21, is connected in parallel on the combined floodgate storage capacitor 22 and separating brake at the charge power supply both ends The He of combined floodgate power switch 24 in parallel is distinguished at storage capacitor 23, the combined floodgate storage capacitor 22 and the both ends of separating brake storage capacitor 23 One end of separating brake power switch 25, the combined floodgate power switch 24 and the separating brake power switch 25 is connected with by wire respectively The closing coil 26 and the switching winding 27, eddy-current disc is provided between the closing coil 26 and the switching winding 27 28, the eddy-current disc 28 is fixedly connected with the connecting rod 17.
In the present embodiment, the energy-storage units SU is composed in series by the carbon-based capacitor batteries of more piece.The energy-storage units SU It is made up of carbon-based capacitor batteries group, single battery capacity is 1.3AH, is connected using more piece series-parallel system, nothing between cell Need equilibrium, cycle life is up to more than ten thousand times and non-maintaining, service life length, output can direct short-circuit, good temp characteristic, can- Normal operation in 10 DEG C~+55 DEG C ambient temperature ranges, system 200Kw/25S short time, high magnification power reguirements can be met.
In the present embodiment, the switch QS that is switched fast carries out circuit switching under described control unit KZQ control Connection, following function can be achieved:
By inverter NB to energy-storage units while a public electric wire nets provide AC power directly to electricity consumption sensitive loads FZ SU charges;
B energy-storage units SU provides AC power in short-term by inverter NB to electricity consumption sensitive loads FZ.
Operation principle of the present utility model is:
Public electric wire net under normal circumstances, by public electric wire net powered by electricity consumption sensitive loads, and the present apparatus is by public electric wire net to institute Energy-storage units SU is stated to charge and keep, at the same the inverter NB inversion outputs exchange AC380V synchronous with public electric wire net or its The power supply of its voltage class.When electricity or short trouble occur to shake for public electric wire net, described control unit KZQ to failure by carrying out Quick diagnosis, failure judgement is in area or external area error.Voltage is caused to drop suddenly if failure is external area error, described control unit KZQ sends switching command immediately in 2mS, and the high-speed switch QS disconnects electricity consumption sensitive equipment from power network within 5mS, And switch to present apparatus power supply, it is ensured that electricity consumption sensitive loads power off time is no more than 20mS.Present apparatus power-on time lasts about 2S ~5S, if public electric wire net power off time is shut down, after public electric wire net recovers normal, electricity consumption sensitive loads are again more than 2S or 5S Switchback public electric wire net is powered;It is described to be switched fast the switch direct fast shut-off fault branches of QS if failure is troubles inside the sample space, no Failure can be introduced into the present apparatus.
The technical field that low pressure shakes electricity is administered in the utility model application.
Although embodiment of the present utility model is described with practical solution, do not form the utility model is contained The limitation of justice, for those skilled in the art, according to modification of this specification to its embodiment and the group with other schemes Conjunction will be apparent from.

Claims (5)

  1. A kind of 1. active rapid switching device for being applied to shake electric protection, it is characterised in that:It includes control unit(KZQ), storage Can unit(SU)And and described control unit(KZQ)The inverter of electric connection(NB)Switched with being switched fast(QS), it is described Energy-storage units(SU)With the inverter(NB)It is electrically connected with, the inverter(NB)AC ends pass through the first threephase switch(K) And the 3rd threephase switch(K1)Switch is switched fast with described(QS)II interface be electrically connected with, the inverter(NB)DC End passes through the second threephase switch(K’)It is electrically connected with public electric wire net, public electric wire net passes through the 4th threephase switch(K2)With it is described fast Speed switching switch(QS)I interface be electrically connected with, it is described to be switched fast switch(QS)It is electrically connected with electricity consumption sensitive loads.
  2. 2. the active rapid switching device according to claim 1 for being applied to shake electric protection, it is characterised in that:It is described quick Switching switch(QS)Including vacuum contactor(1)And vortex drive mechanism(2), the vacuum contactor(1)Driven with the vortex Motivation structure(2)It is connected.
  3. 3. the active rapid switching device according to claim 2 for being applied to shake electric protection, it is characterised in that:The vacuum Contactor(1)Including insulator(11), installed in the insulator(11)The upper extraction copper bar of upper and lower ends(12)And lower extraction copper bar (13), from top to bottom insertion be arranged on the insulator(11)Interior static contact(14), moving contact(15)And bellows(16), it is described Static contact(14)With the upper extraction copper bar(12)It is connected, the moving contact(15)With the lower extraction copper bar(13)It is connected Connect, the moving contact(15)Lower end be also associated with connecting rod(17), the connecting rod(17)Middle part be provided with link insulator (18).
  4. 4. the active rapid switching device according to claim 3 for being applied to shake electric protection, it is characterised in that:The vacuum Contactor(1)Pass through the connecting rod(17)With the vortex drive mechanism(2)It is connected, the vortex drive mechanism(2)Including Charge power supply(21), it is connected in parallel on the combined floodgate storage capacitor at the charge power supply both ends(22)With separating brake storage capacitor(23), it is described Combined floodgate storage capacitor(22)With the separating brake storage capacitor(23)Distinguish combined floodgate power switch in parallel in both ends(24)With separating brake electric power Switch(25), the combined floodgate power switch(24)With the separating brake power switch(25)One end conjunction is connected with by wire respectively Brake cable circle(26)And switching winding(27), the closing coil(26)With the switching winding(27)Between be provided with eddy-current disc (28), the eddy-current disc(28)With the connecting rod(17)It is fixedly connected.
  5. 5. the active rapid switching device according to claim 1 for being applied to shake electric protection, it is characterised in that:The energy storage Unit(SU)It is composed in series by the carbon-based capacitor batteries of more piece.
CN201720711935.XU 2017-06-19 2017-06-19 Applied to the active rapid switching device for shaking electric protection Active CN207010346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720711935.XU CN207010346U (en) 2017-06-19 2017-06-19 Applied to the active rapid switching device for shaking electric protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720711935.XU CN207010346U (en) 2017-06-19 2017-06-19 Applied to the active rapid switching device for shaking electric protection

Publications (1)

Publication Number Publication Date
CN207010346U true CN207010346U (en) 2018-02-13

Family

ID=61446479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720711935.XU Active CN207010346U (en) 2017-06-19 2017-06-19 Applied to the active rapid switching device for shaking electric protection

Country Status (1)

Country Link
CN (1) CN207010346U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107147208A (en) * 2017-06-19 2017-09-08 珠海泰坦科技股份有限公司 Applied to the active rapid switching device for shaking electric protection
CN112196739A (en) * 2020-10-10 2021-01-08 国电联合动力技术有限公司 Wind generating set uninterrupted power supply intelligent regulation and control system and method
CN114314189A (en) * 2021-12-30 2022-04-12 苏州盛虹纤维有限公司 Control system and control method for windows winding unit

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107147208A (en) * 2017-06-19 2017-09-08 珠海泰坦科技股份有限公司 Applied to the active rapid switching device for shaking electric protection
CN112196739A (en) * 2020-10-10 2021-01-08 国电联合动力技术有限公司 Wind generating set uninterrupted power supply intelligent regulation and control system and method
CN112196739B (en) * 2020-10-10 2022-04-26 国电联合动力技术有限公司 Wind generating set uninterrupted power supply intelligent regulation and control system and method
CN114314189A (en) * 2021-12-30 2022-04-12 苏州盛虹纤维有限公司 Control system and control method for windows winding unit
CN114314189B (en) * 2021-12-30 2023-11-03 苏州盛虹纤维有限公司 Control system and control method for windows winding unit

Similar Documents

Publication Publication Date Title
CN101673950B (en) Static var compensator (SVC) and DC ice melting device and realization method thereof
CN207010346U (en) Applied to the active rapid switching device for shaking electric protection
CN103986176B (en) Method for live access of converter station to multi-terminal flexible direct current transmission system
CN107834505B (en) The artificial zero passage high voltage DC breaker of current-limiting type self-charging type and its cutoff method
CN106972479A (en) The design method and high-low pressure dc circuit breaker of a kind of direct-current grid
CN105490392B (en) A kind of the black starting-up control system and method for energy-storage system
CN103035445A (en) Large current direct current switch arc-control device circuit
CN104901326A (en) Control rod drive mechanism static power supply system and energy storage system and power supply method thereof
CN103683328B (en) Automatic switching module and photovoltaic from net full-automatic power generation system
CN107147208A (en) Applied to the active rapid switching device for shaking electric protection
CN103023135A (en) Multi-level direct current transformation power supply device
CN204244099U (en) A kind of connection in series-parallel modular power supply converting means
CN205489519U (en) High -power direct current breaker of high voltage
CN201789459U (en) Large high-voltage motor capacitance energy-storage compensating starter
CN108899851B (en) Live ice melting topological system based on resonant circuit and ice melting method thereof
CN203671834U (en) Soft start charging circuit
CN103248015A (en) Rapid short-circuit protection system for direct current bus of energy storage converter
CN109412130B (en) Mechanical direct current breaker and charging circuit thereof
CN207124475U (en) Energy-storage system
CN105811442A (en) Method for realizing live-line access of mobile energy storage system to grid-connected 10kV line
CN204316118U (en) Charging/discharging apparatus
CN204290325U (en) Intelligent integrated dynamic power Electric capacity compensation device
CN111463747B (en) Direct-current circuit breaker and control method thereof
CN102420433A (en) Reactive power compensation system based on magnetic switch
CN208337180U (en) A kind of exchange side relay topological structure being applicable in hybrid energy-storing inverter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hengqin Financial Investment International Finance Leasing Co.,Ltd.

Assignor: ZHUHAI TITANS TECHNOLOGY Co.,Ltd.

Contract record no.: X2022980021491

Denomination of utility model: Active fast switching device for power swing protection

Granted publication date: 20180213

License type: Exclusive License

Record date: 20221115

EE01 Entry into force of recordation of patent licensing contract
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Active fast switching device for power swing protection

Effective date of registration: 20221118

Granted publication date: 20180213

Pledgee: Hengqin Financial Investment International Finance Leasing Co.,Ltd.

Pledgor: ZHUHAI TITANS TECHNOLOGY Co.,Ltd.

Registration number: Y2022980022396

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180213

Pledgee: Hengqin Financial Investment International Finance Leasing Co.,Ltd.

Pledgor: ZHUHAI TITANS TECHNOLOGY Co.,Ltd.

Registration number: Y2022980022396

PC01 Cancellation of the registration of the contract for pledge of patent right
EC01 Cancellation of recordation of patent licensing contract

Assignee: Hengqin Financial Investment International Finance Leasing Co.,Ltd.

Assignor: ZHUHAI TITANS TECHNOLOGY Co.,Ltd.

Contract record no.: X2022980021491

Date of cancellation: 20240426

EC01 Cancellation of recordation of patent licensing contract