CN207008047U - Campatible automatic calibration of electric energy meter system with double belt line - Google Patents

Campatible automatic calibration of electric energy meter system with double belt line Download PDF

Info

Publication number
CN207008047U
CN207008047U CN201720488706.6U CN201720488706U CN207008047U CN 207008047 U CN207008047 U CN 207008047U CN 201720488706 U CN201720488706 U CN 201720488706U CN 207008047 U CN207008047 U CN 207008047U
Authority
CN
China
Prior art keywords
electric energy
energy meter
watch
jack
belt line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720488706.6U
Other languages
Chinese (zh)
Inventor
***本
余义宙
陈正幸
吴培
皮国娟
王付松
王清克
孟蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Sanhui Mutual Inductor Co., Ltd.
Original Assignee
ZHENGZHOU SMS ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SMS ELECTRIC CO Ltd filed Critical ZHENGZHOU SMS ELECTRIC CO Ltd
Priority to CN201720488706.6U priority Critical patent/CN207008047U/en
Application granted granted Critical
Publication of CN207008047U publication Critical patent/CN207008047U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

A kind of Campatible automatic calibration of electric energy meter system with double belt line, including resistance test unit that is parallel to each other and setting gradually, first detection unit, second detection unit, outward appearance detection unit, nameplate installation unit, parameter set unit and artificial detection unit, said units are arranged at least 2 row, each column is connected with electric energy meter transmission line by the wire body mechanism that sets the watch, the electric energy meter transmission line includes upper layer transport belt line parallel to each other and lower floor's transmission belt line, wherein described first detection unit and the second detection unit are multiple identical electric energy meter calibrating apparatus compositions being disposed in parallel relation to one another.The utility model can realize automation transfer of the intelligent electric energy meter between electric energy meter calibrating apparatus and automatic calibration streamline, the connection box of electric energy meter mode of self application different types, and unqualified electric energy meter can be cached automatically, land area is greatly reduced, improves the calibrating yield of unit area.

Description

Campatible automatic calibration of electric energy meter system with double belt line
Technical field
Electrical measurement industry is the utility model is related to, and relates more specifically to a kind of three-phase intelligent accurate for state's net/southern network mark The double-deck Campatible automatic calibration of electric energy meter system of electric energy meter, compatible direct-type and mutual-inductor type electric energy meter.
Background technology
With information-based, intelligent automation development, automatic calibration technology achieves in measurement verification industry Considerable progress.At present, numerous enterprises both at home and abroad have been developed that the automatic calibration system of single-phase intelligent electric energy meter.These Automatic calibration system employs advanced Logistics conveying equipment mostly, forms electric power meter and tests, uniformly The new management mode of dispatching, new clothes and rotation electric energy meter quantity maintain higher level for a long time, and average annual electric energy meter calibration amount is equal More than 200,000.The management modernization development level more and more higher of electric power demand side simultaneously, for management of state-owned property network The requirement of change proposes higher requirement.Meanwhile the development of electric energy meter calibration technology makes automatic technology be examined and determine with power system Device can be combined fully, substantially increased the operating efficiency of the inspection table of electric energy meter, realized Automated Data Management and informationization Management.But under this background technology, automatic calibration of electric energy meter system still has the space for improving efficiency, according to inspection Determine the inspection table yield that the unit such as the needs of occasion, state's power network, ammeter factory still needs to further improve unit area, further reduce and account for Ground area.
Utility model content
For above-mentioned technical problem, it is automatic that the utility model provides a kind of Campatible electric energy meter with double belt line Change verification system, it is provided with double belt transmission line, and different types of electric energy meter can be transmitted, and using compatible The connection box of electric energy meter mode of formula electric energy meter calibrating apparatus self application different types, greatly reduces land area, improves unit The calibrating yield of area.
What the technical solution of the utility model was realized in:
A kind of Campatible automatic calibration of electric energy meter system with double belt line, including it is parallel to each other and set gradually Resistance test unit, the first detection unit, the second detection unit, outward appearance detection unit, nameplate installation unit, parameter setting list Member and artificial detection unit, first detection unit and the second detection unit are multiple identical electric energy being disposed in parallel relation to one another Table calibrating installation forms, and the resistance test unit, the first detection unit, the second detection unit, outward appearance detection unit, nameplate Installation unit, parameter set unit and artificial detection unit be arranged at least 2 row, each column by wire body set the watch mechanism connect There is electric energy meter transmission line, the electric energy meter transmission line includes upper layer transport belt line parallel to each other and lower floor's transmission belt line, And the upper layer transport line is located at the underface of lower floor's transmission line, the upper layer transport line includes distinguishing different station and is in The transition transmission belt line of swash plate shape, lower floor's transmission line include the electric energy meter pipeline being arranged side by side and unqualified electric energy meter Cache lines, and the electric energy meter pipeline is set against the electric energy meter calibrating apparatus.
As the further technical scheme of the utility model, the wire body set the watch mechanism including wire body set the watch bar, with it is described The set the watch wire body of bar connection of wire body is set the watch cylinder and plate.
As the further technical scheme of the utility model, the electric energy meter calibrating apparatus includes being arranged on the electric energy meter At the top of calibrating installation and the first belt line and the second belt line parallel to each other, first belt line are arranged on second skin Underface with line.
As the further technical scheme of the utility model, the electric energy meter calibrating apparatus also includes frame, is arranged on institute The lifting body in frame is stated, the first of the first belt line side is arranged on and sets the watch and mechanism and be arranged on second skin Second with line side sets the watch mechanism, wherein the lifting body includes raising plate and is arranged on the last multiple tables of the raising plate Bit location, to being provided with the automation wiring including multiple Campatible electric energy meter meter adapting-seats, dress of taking out stitches for the epitopic units Put, wherein being provided with raising plate on the lifting body, multiple epitopic units are set side by side with the raising plate, on the top A pair of jacking cylinders parallel to each other are additionally provided with below lift slab and the jacking cylinder parallel with the jacking cylinder is oriented to Axle.
As the further technical scheme of the utility model, described first sets the watch mechanism for quadrilateral structure and including mutually Parallel first set the watch support frame to, be arranged on described first set the watch between support frame pair first set the watch support base, set Set the watch described first between support frame pair and set the watch that support base is parallel first to set the watch and bar and be arranged on described first Described first support frame of setting the watch is set the watch cylinder to the first of lower section, and described second sets the watch mechanism for quadrilateral structure and including mutual Parallel second set the watch support frame to, be arranged on described second set the watch between support frame pair second set the watch support base, set Set the watch described second between support frame pair and set the watch that support base is parallel second to set the watch and bar and be arranged on described second Described second support frame of setting the watch is set the watch cylinder to the second of lower section.
As the further technical scheme of the utility model, the Campatible electric energy meter meter adapting-seat includes pedestal, the base Seat includes parallel leading screw, the first supporting plate for being arranged on the parallel leading screw both sides and the second supporting plate and is arranged on described the The first chute and the second chute between one supporting plate and the second supporting plate, the parallel leading screw bottom and described first support Rectangular shaped slider is provided between plate and the second supporting plate, the top of the parallel leading screw is provided with wiring units, wherein the square Shape sliding block is connected with propulsive mechanism, and 3 pairs of jacks parallel to each other are offered in the rectangular shaped slider, and the wiring units include The first indicator fixed seat, the second indicator fixed seat and the 3rd indicator fixed seat being set up in parallel, the first indicator fixed seat, One end of second indicator fixed seat and the 3rd indicator fixed seat is respectively arranged with voltage wiring terminal, current wiring terminal and auxiliary Adjuvant grafting line terminals, the bottom of the first indicator fixed seat, the second indicator fixed seat and the 3rd indicator fixed seat are provided with cunning Dynamic pin, the wiring units are slidably connected through the jack by the sliding pin and the rectangular shaped slider.
As the further technical scheme of the utility model, 3 pairs of jacks be set up in parallel the first jack, second insert Hole, the 3rd jack, the 4th jack, the 5th jack and the 6th jack, and the sliding pin is in first jack and the second jack Amount of movement be 5mm, amount of movement of the sliding pin in the 3rd jack and the 4th jack is 3.5mm, the sliding pin Amount of movement in the 5th jack and the 6th jack is 2mm.
As the further technical scheme of the utility model, first jack and the second jack and horizontal angle are big In equal to 64.43 °, the 3rd jack and the 4th jack are more than or equal to 70.71 ° with horizontal angle, the 5th jack It is more than or equal to 78.69 ° with the 6th jack and horizontal angle.
As the further technical scheme of the utility model, the stroke of the rectangular shaped slider is more than or equal to 10mm.
Positive beneficial effect:
The utility model is arranged to multiple row, and the first detection unit realizes the error adjustment to electric energy meter, the second detection unit Realize the elementary error to electric energy meter, start(Power method), shunt running(Power method), constant check, voltage detecting, current detecting, Error of time of day, parameter setting(Simultaneously operating during calibra tion), parameter copy back detection, outward appearance detection unit passes through to electricity Energy table, which take pictures, carries out image recognition, and then realizes and the outward appearance of electric energy meter is detected, and parameter set unit is realized according to client Need, self-service progress carrier test, switching on detection, infrared test, alarm detection, accessory power supply test, parameter setting, parameter Test is copied back, realizes the automatic detection to electric energy meter;
The first belt line and the second belt line are provided with the utility model, realizes electric energy meter calibrating apparatus and electric energy meter The slitless connection of automatic assembly line, it is easy to transfer and transport in batch is examined and determine, double-deck structure type greatly reduces use Ground area;
Gauge stand lifting body is provided with the utility model, can depart from or contact electric energy meter calibrating apparatus, i.e., when need When examining table, gauge stand is positioned on electric energy meter calibrating apparatus by gauge stand lifting body, realizes wiring or work of taking out stitches, when not examining table When, electric energy meter is departed from electric energy meter calibrating apparatus body by gauge stand lifting body;
The utility model is provided with the mechanism that sets the watch, and when carrying out inspection table to intelligent electric energy meter to be checked, first sets the watch mechanism will Intelligent electric energy meter is pushed on electric energy meter calibrating apparatus, and that realizes electric energy meter enters table, and when completing to examine table, second sets the watch mechanism by electricity Energy table is pushed in the second belt line, and that realizes electric energy meter goes out table;
The utility model is provided with Campatible electric energy meter meter adapting-seat, and three-phase electric energy is realized by Campatible electric energy meter meter adapting-seat Table direct access binding post and through the switching or conversion between transformer access type, is effectively prevented from repeating to change wiring list The inconvenience that member is brought, improve the verification efficiency of electric energy meter calibrating apparatus, the different phenotype of self application.
Brief description of the drawings
Fig. 1 is the utility model entirety wire body topology layout schematic diagram;
Fig. 2 is electric energy meter transmission line schematic perspective view in the utility model;
Fig. 3 is the schematic perspective view of wire body lever body in the utility model;
Fig. 4 is electric energy meter calibrating apparatus schematic perspective view in the utility model;
Fig. 5 is the belt line of electric energy meter calibrating apparatus first and the first schematic perspective view for setting the watch mechanism in the utility model;
Fig. 6 is the belt line of electric energy meter calibrating apparatus second and the second schematic perspective view for setting the watch mechanism in the utility model;
Fig. 7 is the schematic perspective view of electric energy meter calibrating apparatus lifting body in the utility model;
Fig. 8 is the pedestal schematic diagram of Campatible electric energy meter meter adapting-seat in the utility model;
Fig. 9 is the schematic perspective view that Campatible electric energy meter meter adapting-seat removes propulsive mechanism in the utility model;
Figure 10 is Tthe utility model system process flow diagram flow chart;
In figure, 1- resistance tests unit, the detection units of 2- first, the detection units of 3- second, 4- outward appearances detection unit, 5- inscriptions Under board installation unit, 6- parameter set units, 7- artificial detections unit, 8- electric energy meters transmission line, 801- upper layer transports line, 802- Layer transmission line, 8011- transition transmission belts line, 8021- electric energy meters pipeline, the unqualified electric energy meter cache lines of 8022-, 9- electric energy Table calibrating installation, the belt lines of 901- first, the belt lines of 902- second, 903- plates, 904- lifting bodies, 905- raising plates, 906- epitopic units, 907- Campatible electric energy meters meter adapting-seat, 908- automations wiring, ripping device, 909- jacking cylinders, 910- Support base, the 913- first that set the watch of support frame, 912- first that set the watch of the jacking cylinder axis of guide, 911- first sets the watch bar, 914- One support frame, the 918- second that set the watch of support frame, 917- second that set the watch of mechanism, 916- second that set the watch of cylinder, 915- second that set the watch is dialled The parallel leading screw of table bar, 919-, the supporting plates of 920- first, the supporting plates of 921- second, 922- rectangular shaped sliders, 923- wiring units, 924- propulsive mechanisms, the first indicators of 925- fixed seat, the second indicators of 926- fixed seat, the indicator fixed seats of 927- the 3rd, 928- electricity Line terminals, 929- current wiring terminals, 930- sliding pins, the jacks of 931- first, the jacks of 932- second, 933- the 3rd is crimped to insert Hole, the jacks of 934- the 4th, the jacks of 935- the 5th, the jacks of 936- the 6th, 937- first set the watch mechanism, 938- second set the watch cylinder, 939- pedestals, 940- rectangular shaped sliders, the chutes of 941- first, the chutes of 942- second, 10- electric energy meters, 11- wire bodies set the watch mechanism, Set the watch mechanism cylinder, 1102- wire bodies of 1101- wire bodies is set the watch mechanism driving lever, 1103- plates.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As Figure 1-Figure 2, a kind of Campatible automatic calibration of electric energy meter system with double belt line, including it is mutual Resistance test unit 1, the first detection unit 2, the second detection unit 3, outward appearance detection unit 4, nameplate parallel and set gradually Installation unit 5, parameter set unit 6 and artificial detection unit 7, the detection unit 3 of the first detection unit 2 and second is more The individual identical electric energy meter calibrating apparatus 9 being disposed in parallel relation to one another forms, and the resistance test unit 1, the first detection unit 2, Two detection units 3, outward appearance detection unit 4, nameplate installation unit 5, parameter set unit 6 and artificial detection unit 7 are arranged to At least 2 row, each column are connected with electric energy meter transmission line 8 by the wire body mechanism 11 that sets the watch, and the electric energy meter transmission line 8 includes mutual Parallel upper layer transport line 801 and lower floor's transmission line 802, and the upper layer transport line 801 is located at lower floor's transmission line 802 Underface, the upper layer transport line 801 includes the transition transmission belt line 8011 distinguished different station and be in swash plate shape, under described Layer transmission line 802 includes the electric energy meter pipeline 8021 being arranged side by side and unqualified electric energy meter cache lines 8022, and the electric energy Table pipeline 8021 is set against the electric energy meter calibrating apparatus 9.
As shown in figure 3, as the utility model further embodiment, the wire body mechanism 11 that sets the watch sets the watch including wire body Bar 1102, the wire body that bar 1102 is connected of setting the watch with the wire body are set the watch cylinder 1101 and plate 1103.Wire body is set the watch bar 1102 Electric energy meter 10 can be made from the transfer of electric energy meter transmission line 8 to electric energy meter calibrating apparatus 9 and its reverse transfer.
As shown in Fig. 2 as the utility model further embodiment, the electric energy meter calibrating apparatus 9 includes being arranged on The top of electric energy meter calibrating apparatus 9 and the first belt line 901 and the second belt line 902 parallel to each other, first belt Line 901 is arranged on the underface of second belt line 902.
As shown in figure 4, as the utility model further embodiment, the electric energy meter calibrating apparatus 9 also includes frame 903rd, the lifting body 904 that is arranged in the frame 903, it is arranged on the first of the side of the first belt line 901 and sets the watch machine Structure 937 and it is arranged on the second of the side of the second belt line 902 and sets the watch mechanism 915, wherein the lifting body 904 includes Raising plate 905 and the last multiple epitopic units 906 of the raising plate 905 are arranged on, to being provided with for the epitopic units 906 Automation wiring, ripping device 908 including multiple Campatible electric energy meter meter adapting-seats 907, wherein being set on the lifting body 904 Raising plate 905 is equipped with, multiple epitopic units 906 are set side by side with the raising plate 905, in the lower section of the raising plate 905 It is additionally provided with a pair of jacking cylinders 909 parallel to each other and the jacking cylinder axis of guide parallel with the jacking cylinder 909 910。
As shown in Fig. 5-Fig. 6, as the utility model further embodiment, described first mechanism 937 that sets the watch is four sides Shape structure and including parallel to each other first set the watch support frame 911 to, be arranged on described first and set the watch between 911 pairs of support frame First set the watch support base 912, be arranged on described first and set the watch between 911 pairs of support frame and set the watch support base with described first 912 parallel first, which set the watch, bar 913 and is arranged on the described first support frame 911 of setting the watch and is set the watch to the first of lower section cylinder 914, Described second set the watch mechanism 915 for quadrilateral structure and including parallel to each other second set the watch support frame 916 to, be arranged on described in Second set the watch between 916 pairs of support frame second set the watch support base 917, be arranged on described second and set the watch support frame 917 to it Between and set the watch with described second that support base 917 is parallel second to set the watch and bar 918 and be arranged on described second and set the watch support frame The second of 916 pairs of lower sections is set the watch cylinder 938.
As illustrated in figs. 8-9, as the utility model further embodiment, the Campatible electric energy meter meter adapting-seat 907 Including pedestal 939, the pedestal 939 includes parallel leading screw 919, is arranged on the first supporting plate of the both sides of parallel leading screw 919 920 and second supporting plate 921 and the first chute 941 for being arranged between the supporting plate 921 of the first supporting plate 920 and second With the second chute 942, it is characterised in that the parallel bottom of leading screw 919 and in the supporting plate of the first supporting plate 920 and second Rectangular shaped slider 922 is provided between 921, the top of the parallel leading screw 919 is provided with wiring units 923, wherein the rectangle Sliding block 922 is connected with propulsive mechanism 924, and 3 pairs of jacks parallel to each other, the wiring are offered in the rectangular shaped slider 940 Unit 923 includes the first indicator fixed seat 925, the second indicator fixed seat 926 and the 3rd indicator fixed seat being set up in parallel 927, one end of the first indicator fixed seat 925, the second indicator fixed seat 926 and the 3rd indicator fixed seat 927 is set respectively It is equipped with voltage wiring terminal 928, current wiring terminal 929 and auxiliary terminal block, the first indicator fixed seat 925, second The bottom of the indicator fixed seat 927 of indicator fixed seat 926 and the 3rd is provided with sliding pin 930, and the wiring units 923 pass through institute Jack is stated to be slidably connected by the sliding pin 930 and the rectangular shaped slider 940.
3 pairs of jacks are the first jack 931, the second jack 932, the 3rd jack 933, the 4th jack being set up in parallel 934th, the 5th jack 935 and the 6th jack 936, and the sliding pin 930 is in the jack 932 of the first jack 931 and second Amount of movement is 5mm, and amount of movement of the sliding pin 930 in the 3rd jack 933 and the 4th jack 934 is 3.5mm, institute It is 2mm to state amount of movement of the sliding pin 930 in the 5th jack 935 and the 6th jack 936.
The jack 932 of first jack 931 and second is more than or equal to 64.43 ° with horizontal angle, the 3rd jack 933 and the 4th jack 934 with horizontal angle be more than or equal to 70.71 °, the 5th jack 935 and the 6th jack 936 and water The angle of horizontal line is more than or equal to 78.69 °.
The stroke of the rectangular shaped slider 940 is more than or equal to 10mm.
As shown in Figure 10, the utility model is described further with reference to specific embodiment, the utility model leads to Often comprise the following steps:
(1)Resistance test unit 1 carries out voltage-withstand test to electric energy meter, and the utility model is not limited to resistance test unit 1 Number, in the present embodiment, using 2 resistance test units 1;
(2)Electric energy meter calibrating apparatus 9 carries out one-time detection to electric energy meter, in this step, mainly to the error of electric energy meter Adjustment is carried out, the utility model is not limited to the number of electric energy meter calibrating apparatus 9, in the present embodiment, using 6;
(3)Electric energy meter calibrating apparatus carries out secondary detection to electric energy meter, in this step, is substantially carried out following test item Mesh:Elementary error, starting(Power method), shunt running(Power method), constant check, voltage detecting, current detecting, error of time of day, Parameter setting(Simultaneously operating during calibra tion), parameter copy back, the utility model be not limited to electric energy meter calibrating apparatus 9 Number, in the present embodiment, using 28;
(4)GPRS tests, plug-in card are carried out to electric energy meter, this step is substantially carried out GPRS tests, plug-in card.
(5)Electric energy meter appearance delection device carries out outward appearance detection to electric energy meter, in this step by being taken pictures to electric energy meter, Then image recognition is carried out, the outward appearance of electric energy meter is assessed;
(6)Electric energy meter nameplate is installed, in this step, mainly grasped using manually operated alternative or mechanical automation Make method electric energy meter nameplate is installed;
(7)Parameters of electric energy meter is configured, in this step, is mainly needed to carry out setting for following items according to user Put:Carrier test, switching on detection, infrared test, alarm detection, accessory power supply test, parameter setting, parameter copy back;
(8)Finally detected in artificial detection unit, finally manually reaffirmed.
In above-mentioned steps, electric energy meter 10 is also embodied in from electric energy meter transmission line(8)To electric energy meter calibrating apparatus(9)Shifting Load process.
When electric energy meter flows into electric energy meter calibrating apparatus 9 from electric energy meter transmission line 8 carries out electric energy meter calibration, electric energy meter is defeated Electric energy meter is transported to detection station by line sending 8021, and wire body sets the watch mechanism 11 in the presence of wire body sets the watch mechanism cylinder 1101, Make with set the watch plate 1103 that mechanism driving lever 1102 is connected of wire body onto electric energy meter to be shifted to the first belt line of electric energy meter calibrating apparatus 9 On 901, the first belt line 901 is docked with electric energy meter pipeline 8021, so that electric energy meter to be checked 10 is transferred to electric energy meter calibration The transfer of device 9.First mechanism 937 that sets the watch sets the watch first and makes first group in the presence of cylinder 914 on electric energy meter calibrating apparatus 9 Table bar 913 is started working, and the first bar 913 of setting the watch is in the side of the first belt line 901 so that in the first belt line 901 Intelligent electric energy meter 10 and the first inner side for setting the watch bar 913 be in close contact, start first and set the watch bar 913, then first set the watch bar 913 Stretched to the direction of epitopic units 906 of electric energy meter calibrating apparatus 9, intelligent electric energy meter 10 is pushed on epitopic units 906, realized Transfer of the intelligent electric energy meter 10 from the first belt line 901 to electric energy meter calibrating apparatus.Then, intelligent electric energy meter 10 to be measured with it is automatic Change wiring, the Campatible electric energy meter meter adapting-seat 907 on ripping device 908 is docked, can be according to being actually needed after docking successfully Intelligent electric energy meter 10 is detected, after detection, if qualified electric energy meter, then next step operation is carried out, if not Then the wire body mechanism 11 that sets the watch is pushed unqualified electric energy meter cache lines 8022 and cached qualified electric energy meter.
After detection, intelligent electric energy meter 10 from electric energy meter calibrating apparatus 9 by wire body set the watch mechanism 11 push upper strata pass Defeated line 801, step is as follows:
After calibrating, automation wiring, ripping device 908 carry out automation and taken out stitches work, and Campatible electric energy meter connects table Seat 907 unclamps the binding post of intelligent electric energy meter 10, and lifting body 904 is started working, in the presence of jacking cylinder 909, top Lift slab 905 drives the intelligent electric energy meter 10 that finishes of detection to move upwards, untill concordant with the second belt line 902.Then push up Rise mechanism 904 transfixion, second mechanism 915 that sets the watch starts working, and second sets the watch, and be located at intelligence on raising plate 905 electric for bar 918 Can table 10 side, set the watch second in the presence of cylinder 938, second set the watch bar 918 by intelligent electric energy meter 10 from raising plate 905 Push in the second belt line 902, then lifting body 904 is retracted, concordant with upper layer transport line 801 in the second belt line 902, Wire body is set the watch in the presence of mechanism 11, and electric energy meter 10 is pushed into upper layer transport line 801 from the second belt line 902, realizes calibrating The transmission of electric energy meter afterwards, transition transmission belt line 8011 are used for electric energy meter from the transfer of upper layer transport line 801 to lower floor's transmission line 802, in this way, the intelligent electric energy meter 10 after detection has been transported to external electric energy table and examined by the second belt line 902 On constant current waterline, intelligent electric energy meter 10 is realized from the transfer of electric energy meter calibrating apparatus 9 to the purpose of outside calibrating streamline.
In the above-described embodiments, the Campatible electric energy meter meter adapting-seat 907 of use can realize that three-phase electric energy meter is directly accessed Formula binding post and through the switching or conversion between transformer access type, it is effectively prevented from repeating changing wiring units and brings not Just, the verification efficiency of electric energy meter calibrating apparatus, the different phenotype of self application are improved.
As illustrated in figs. 8-9, propulsive mechanism 924 drives rectangular shaped slider 922 to move downward, and sliding pin 930 is placed in into B ends, Then the process is the mode of connection through transformer access type, if propulsive mechanism 924 drives rectangular shaped slider 922 to up and down motion, Sliding pin 930 is placed in A ends, then the process is the mode of connection of direct access, and the present embodiment passes through in rectangular shaped slider 922 The jack of different types is offered, causes wiring units 923 to pass through sliding pin through jack in the presence of propulsive mechanism 924 930 slide movement in rectangular shaped slider 922, so as to adjust the first indicator fixed seat 925, the second indicator fixed seat 926 and the The distance between three indicator fixed seats 927, the movement of the distance cause binding post therebetween also to occur to change accordingly, so as to Realize three-phase electric energy meter direct access binding post and through the switching or conversion between transformer access type, be effectively prevented from weight The inconvenience that wiring units are brought is changed again, improves the verification efficiency of electric energy meter, the utility model is by controlling jack pitch-row to adjust The distance between pin fixed seat is adjusted with the distance with horizontal plane, positioning precision is high, and compatibility is strong.
The utility model has the characteristics of following prominent:
The utility model is arranged to multiple row, and the first detection unit 2 realizes the error adjustment to electric energy meter, the second detection unit 3 realize the elementary error to electric energy meter, start(Power method), shunt running(Power method), constant check, voltage detecting, current detecting, Error of time of day, parameter setting(Simultaneously operating during calibra tion), parameter copy back detection, outward appearance detection unit passes through to electricity Energy table, which take pictures, carries out image recognition, and then realizes and the outward appearance of electric energy meter is detected, and parameter set unit is realized according to client Need, self-service progress carrier test, switching on detection, infrared test, alarm detection, accessory power supply test, parameter setting, parameter Test is copied back, realizes the automatic detection to electric energy meter;
The first belt line 901 and the second belt line 902 are provided with the utility model electric energy meter calibrating apparatus 9, is realized The slitless connection of electric energy meter calibrating apparatus and electric energy meter automatic assembly line, it is easy to transfer and transport in batch is examined and determine, it is double-deck Structure type greatly reduce land area;
Lifting body 904 is provided with the utility model electric energy meter calibrating apparatus 9, can depart from or contact electric energy meter inspection Determine device, i.e., when needing inspection table, gauge stand is positioned on electric energy meter calibrating apparatus 9 by lifting body 904, is realized wiring or is taken out stitches Work, when not examining table, electric energy meter is departed from electric energy meter calibrating apparatus body by lifting body 904;
The mechanism that sets the watch is provided with the utility model electric energy meter calibrating apparatus 9, when carrying out inspection table to intelligent electric energy meter to be checked When, first mechanism 937 that sets the watch pushes intelligent electric energy meter 10 on electric energy meter calibrating apparatus 9, and that realizes electric energy meter enters table, works as completion When examining table, second mechanism 918 that sets the watch pushes electric energy meter in the second belt line 902, and that realizes electric energy meter goes out table;
The utility model is provided with Campatible electric energy meter meter adapting-seat 907, and three-phase is realized by Campatible electric energy meter meter adapting-seat Electric energy meter direct access binding post and through the switching or conversion between transformer access type, is effectively prevented from repeating more changing-over The inconvenience that line unit is brought, improve the verification efficiency of electric energy meter calibrating apparatus, the different phenotype of self application.
Above example is merely to illustrate preferred embodiment of the present utility model, but the utility model be not limited to it is above-mentioned Embodiment, in the field those of ordinary skill possessed knowledge, within the spirit and principles of the utility model Any modification, equivalent substitute and improvement for being made etc., it all should cover in the claimed technical scheme scope of the utility model Within.

Claims (9)

1. a kind of Campatible automatic calibration of electric energy meter system with double belt line, it is characterised in that including parallel to each other And the resistance test unit set gradually(1), the first detection unit(2), the second detection unit(3), outward appearance detection unit(4)、 Nameplate installation unit(5), parameter set unit(6)And artificial detection unit(7), first detection unit(2)With second Detection unit(3)For multiple identical electric energy meter calibrating apparatus being disposed in parallel relation to one another(9)Composition, and the resistance test unit (1), the first detection unit(2), the second detection unit(3), outward appearance detection unit(4), nameplate installation unit(5), parameter setting Unit(6)And artificial detection unit(7)It is arranged at least 2 row, each column is set the watch mechanism by wire body(11)It is connected with electric energy Table transmission line(8), the electric energy meter transmission line(8)Including upper layer transport line parallel to each other(801)With lower floor's transmission line (802), and the upper layer transport line(801)Positioned at lower floor's transmission line(802)Underface, the upper layer transport line (801)Including distinguishing different station and in the transition transmission belt line of swash plate shape(8011), lower floor's transmission line(802)Including The electric energy meter pipeline being arranged side by side(8021)With unqualified electric energy meter cache lines(8022), and the electric energy meter pipeline (8021)Against the electric energy meter calibrating apparatus(9)And set.
2. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 1, it is special Sign is, the wire body is set the watch mechanism(11)Set the watch bar including wire body(1102), set the watch bar with the wire body(1102)Connection Wire body is set the watch cylinder(1101)And plate(1103).
3. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 1, it is special Sign is, the electric energy meter calibrating apparatus(9)Including being arranged on the electric energy meter calibrating apparatus(9)Top and parallel to each other One belt line(901)With the second belt line(902), first belt line(901)It is arranged on second belt line(902)'s Underface.
4. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 3, it is special Sign is, the electric energy meter calibrating apparatus(9)Also include frame(903), be arranged on the frame(903)Interior lifting body (904), be arranged on first belt line(901)The first of side is set the watch mechanism(937)And it is arranged on second belt Line(902)The second of side is set the watch mechanism(915), wherein the lifting body(904)Including raising plate(905)Be arranged on institute State raising plate(905)Last multiple epitopic units(906), to for the epitopic units(906)It is provided with including multiple compatibilities Formula electric energy meter meter adapting-seat(907)Automation wiring, ripping device(908), wherein the lifting body(904)On be provided with top Lift slab(905), the raising plate(905)On be set side by side with multiple epitopic units(906), in the raising plate(905)Under Side is additionally provided with a pair of jacking cylinders parallel to each other(909)And with the jacking cylinder(909)Parallel jacking cylinder is led To axle(910).
5. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 4, it is special Sign is, described first sets the watch mechanism(937)Set the watch support frame for quadrilateral structure and including parallel to each other first(911) To, be arranged on described first and set the watch support frame(911)First between sets the watch support base(912), be arranged on described first Set the watch support frame(911)Set the watch support base between and with described first(912)Parallel first is set the watch bar(913)And set Put and set the watch support frame described first(911)Set the watch to the first of lower section cylinder(914), described second sets the watch mechanism(915)For Quadrilateral structure and set the watch support frame including parallel to each other second(916)To, be arranged on described second and set the watch support frame(916) Second between sets the watch support frame(917), be arranged on described second and set the watch support frame(917)To between and with described second group Table support frame(917)Parallel second is set the watch bar(918)And it is arranged on described second and sets the watch support frame(916)To the of lower section Two set the watch cylinder(938).
6. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 4, it is special Sign is, the Campatible electric energy meter meter adapting-seat(907)Including pedestal(939), the pedestal(939)Including parallel leading screw (919), be arranged on the parallel leading screw(919)First supporting plate of both sides(920)With the second supporting plate(921)And it is arranged on First supporting plate(920)With the second supporting plate(921)Between the first chute(941)With the second chute(942), it is described flat Row leading screw(919)Bottom and in first supporting plate(920)With the second supporting plate(921)Between be provided with rectangular shaped slider (922), the parallel leading screw(919)Top be provided with wiring units(923), wherein the rectangular shaped slider(922)It is connected with Propulsive mechanism(924), and the rectangular shaped slider(940)On offer 3 pairs of jacks parallel to each other, the wiring units(923) Including the first indicator fixed seat being set up in parallel(925), the second indicator fixed seat(926)And the 3rd indicator fixed seat(927), The first indicator fixed seat(925), the second indicator fixed seat(926)And the 3rd indicator fixed seat(927)One end difference It is provided with voltage wiring terminal(928), current wiring terminal(929)And auxiliary terminal block, the first indicator fixed seat (925), the second indicator fixed seat(926)And the 3rd indicator fixed seat(927)Bottom be provided with sliding pin(930), it is described Wiring units(923)Pass through the sliding pin through the jack(930)With the rectangular shaped slider(940)It is slidably connected.
7. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 6, it is special Sign is that 3 pairs of jacks are the first jack being set up in parallel(931), the second jack(932), the 3rd jack (933), the 4th Jack(934), the 5th jack(935)With the 6th jack(936), and the sliding pin(930)In first jack(931)With Second jack(932)Amount of movement be 5mm, the sliding pin(930)In the 3rd jack (933) and the 4th jack(934) Interior amount of movement is 3.5mm, the sliding pin(930)In the 5th jack(935)With the 6th jack(936)Interior movement Measure as 2mm.
8. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 7, it is special Sign is, first jack(931)With the second jack(932)With horizontal angle more than or equal to 64.43 °, the described 3rd Jack (933) and the 4th jack(934)It is more than or equal to 70.71 ° with horizontal angle, the 5th jack(935)With the 6th Jack(936)It is more than or equal to 78.69 ° with horizontal angle.
9. a kind of Campatible automatic calibration of electric energy meter system with double belt line according to claim 6, it is special Sign is, the rectangular shaped slider(940)Stroke be more than or equal to 10mm.
CN201720488706.6U 2017-05-04 2017-05-04 Campatible automatic calibration of electric energy meter system with double belt line Active CN207008047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720488706.6U CN207008047U (en) 2017-05-04 2017-05-04 Campatible automatic calibration of electric energy meter system with double belt line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720488706.6U CN207008047U (en) 2017-05-04 2017-05-04 Campatible automatic calibration of electric energy meter system with double belt line

Publications (1)

Publication Number Publication Date
CN207008047U true CN207008047U (en) 2018-02-13

Family

ID=61443287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720488706.6U Active CN207008047U (en) 2017-05-04 2017-05-04 Campatible automatic calibration of electric energy meter system with double belt line

Country Status (1)

Country Link
CN (1) CN207008047U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108802662A (en) * 2017-05-04 2018-11-13 郑州三晖电气股份有限公司 Campatible automatic calibration of electric energy meter system with double belt line
CN111208322A (en) * 2018-11-22 2020-05-29 国网新疆综合能源服务有限公司 Automatic positioning and crimping device for intelligent electric energy meter wiring terminal

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108802662A (en) * 2017-05-04 2018-11-13 郑州三晖电气股份有限公司 Campatible automatic calibration of electric energy meter system with double belt line
CN108802662B (en) * 2017-05-04 2023-12-26 郑州三晖电气股份有限公司 Automatic verification system of compatible electric energy meter with double-layer belt lines
CN111208322A (en) * 2018-11-22 2020-05-29 国网新疆综合能源服务有限公司 Automatic positioning and crimping device for intelligent electric energy meter wiring terminal

Similar Documents

Publication Publication Date Title
CN107830804A (en) Battery core appearance and size detecting system and its battery core OCV test equipments
CN206863202U (en) Campatible watt-hour meter automatic verification device with belt line
CN207008047U (en) Campatible automatic calibration of electric energy meter system with double belt line
CN107883907A (en) Thickness of workpiece detecting system and its battery core OCV test equipments
CN108802661A (en) Campatible watt-hour meter automatic verification device with belt line and method
CN103018273A (en) Device and method for testing hot-shrinkage rate of chemical fiber filaments
CN108043740A (en) Battery core OCV test equipments and its test method
CN208018984U (en) A kind of small-sized lithium cell detects screening installation automatically
CN103885023B (en) A kind of electric energy meter calibrating system and method
CN105842541A (en) Rapid testing apparatus and testing method for large scale transformer's direct current resistance
CN108069238A (en) Battery core transfer assembly line, battery core transferring system, battery core OCV test equipments
CN206756908U (en) A kind of Campatible electric energy meter meter adapting-seat
CN204536449U (en) A kind of low-voltage current mutual inductor comprehensive test device
CN207502853U (en) A kind of double switching scratch detection equipment of liquid crystal display
CN212160007U (en) Automatic chip testing device
CN205506941U (en) Quick testing arrangement of large -scale transformer direct current resistance
CN108802662A (en) Campatible automatic calibration of electric energy meter system with double belt line
CN214669552U (en) Ammeter complete machine testing arrangement
CN108761379A (en) A kind of universal electric energy gauge pressure table tooling
CN207649582U (en) Thickness of workpiece detecting system and its battery core OCV test equipments
CN107462862A (en) A kind of ammeter detection device
CN208721782U (en) A kind of universal electric energy gauge pressure table tooling
CN209460300U (en) A kind of controlled silicon detection apparatus
CN203748112U (en) Charger circuit board detection and labeling combined device
CN207479018U (en) The test device that a kind of electrical core of power battery is weighed automatically

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180711

Address after: 450016 No. 85 Fifth Avenue, Zhengzhou economic and Technological Development Zone, Henan

Patentee after: Zhengzhou Sanhui Mutual Inductor Co., Ltd.

Address before: 460016 85, Fifth Avenue, Zhengzhou economic and Technological Development Zone, Zhengzhou, Henan

Patentee before: Zhengzhou SMS Electric Co., Ltd.