CN207004058U - A kind of assembled steel tubing string welding procedure operating platform - Google Patents

A kind of assembled steel tubing string welding procedure operating platform Download PDF

Info

Publication number
CN207004058U
CN207004058U CN201720572652.1U CN201720572652U CN207004058U CN 207004058 U CN207004058 U CN 207004058U CN 201720572652 U CN201720572652 U CN 201720572652U CN 207004058 U CN207004058 U CN 207004058U
Authority
CN
China
Prior art keywords
holes
steel
guard
harvard
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720572652.1U
Other languages
Chinese (zh)
Inventor
张海堂
王客科
靳亚北
吴砀砀
陈明
张琼琼
冯昊
杨志恒
沈赛
张鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Nanjing Construction Co Ltd
Original Assignee
Shanghai Baoye Group Nanjing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Nanjing Construction Co Ltd filed Critical Shanghai Baoye Group Nanjing Construction Co Ltd
Priority to CN201720572652.1U priority Critical patent/CN207004058U/en
Application granted granted Critical
Publication of CN207004058U publication Critical patent/CN207004058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A kind of assembled steel tubing string welding procedure operating platform, the application semicircle Harvard piece, which has, to be symmetrical arranged end a pair and is fixed by locking nut, there are a pair of Harvard connecting rods with holes on the outside of each semicircle Harvard piece, square tube support frame end is inserted into corresponding Harvard connecting rod with holes and is fixed by double nut bolt, it is connected above two square tube support frame ends on the outside of each semicircle Harvard piece by steel springboard with holes, the steel springboard end with holes of side is connected by connecting plate with holes, it is connected between square tube support frame and connecting plate with holes and steel springboard with holes by connecting bolt, it is fitted with above square tube support frame outer end and goes along with sb. to guard him railing, railing upper end is gone along with sb. to guard him by going along with sb. to guard him steel wire rope to be connected.The application proposes a kind of assembled steel tubing string welding procedure operating platform, the operating platform:Securely and reliably, bearing capacity is big, stability is high, simple to operate, is convenient to mount and dismount, repeats utilization, reduces labor intensity and danger, cost-effective, improves work efficiency.

Description

A kind of assembled steel tubing string welding procedure operating platform
Technical field
It the utility model is related to installation technology of steel structure field, more particularly to steel construction steel pipe column overhead welding constructing operation A kind of situation of platform, there is provided assembled steel tubing string welding procedure operating platform.
Background technology
With the quickening of Urbanization in China, the building construction technology in China has also obtained development at full speed, various new Technology new technology is constantly applied in architectural engineering, and following skyscraper and high-rise building are during urban development Continue to bring out.Because pure reinforced concrete structure deadweight is too heavy, discomfort is fit to do Super High or does Super High cost Greatly promote and because Core Walls Structure etc. takes usable floor area, and pure steel construction, deadweight are that comparison is light, but steel construction is resistance to Fire is poor, considers the characteristic of concrete structure and steel construction, in present high level or high-rise building, according to building Itself is got over using the requirement in function or technique, structure stress, steel construction with the structural system that concrete structure is used cooperatively Come it is more, more and more extensively.
At present, in steel structures in construction works installing engineering, commonly using to Large-diameter Steel tubing string, poured in steel pipe column mixed Solidifying soil, and the docking construction between steel pipe column up and down, it is main at present to use Site Welding, need during weld job to set up welding and apply Work operating platform.Most of existing temporary operating platform is directly welded on steel pipe column using angle steel or channel-section steel, then angle again Steel springboard, welding procedure personnel station welding on steel springboard are laid on steel or channel-section steel.Because steel pipe column is made in factory It is good, apply and brush what paint dispatched from the factory again, be that angle steel or channel-section steel are directly welded on steel pipe column the defects of these temporary operating platforms, break Be broken the paint of steel pipe column, construction, which finishes, will also cut off angle steel or channel-section steel and steel pipe column weld, steel pipe column finished product is destroyed compared with Greatly!And operating platform can not reuse, to be welded again in high-altitude every time, make, set up, waste of materials and manpower, and And this operating platform is set up in high-altitude there is also great potential safety hazard to workmen.
Therefore, in high-altitude steel pipe column butt welding construction, scene needs are a kind of safely, effectively, simple in construction, easy to operate Operating platform solve this problem.
Utility model content
In order to solve above-mentioned problem, it is flat that the utility model provides a kind of assembled steel tubing string welding procedure operation Platform, for steel pipe column butt welding construction operation platform in existing high-building construction potential safety hazard it is big, destroy steel pipe column into The shortcomings of product paint and deficiency, propose a kind of assembled steel tubing string welding procedure operating platform, the operating platform:Securely and reliably, Bearing capacity is big, stability is high, simple to operate, is convenient to mount and dismount, repeats utilization, reduces labor intensity and danger, cost-effective, Work efficiency is improved, for up to this purpose, the utility model provides a kind of assembled steel tubing string welding procedure operating platform, including square tube branch Support, connecting plate with holes, steel springboard with holes, go along with sb. to guard him railing, go along with sb. to guard him steel wire rope and semicircle Harvard piece, semicircle Harvard piece have one It is fixed to being symmetrical arranged end by locking nut, there are a pair of Harvard connecting rods with holes on the outside of each semicircle Harvard piece, it is described Square tube support frame end is inserted into corresponding Harvard connecting rod with holes and is fixed by double nut bolt, outside each semicircle Harvard piece It is connected above two square tube support frame ends of side by steel springboard with holes, the steel springboard end with holes of side passes through connection with holes Plate is connected, and is connected between the square tube support frame and connecting plate with holes and steel springboard with holes by connecting bolt, the square tube branch It is fitted with above support outer end and goes along with sb. to guard him railing, the railing upper end of going along with sb. to guard him is connected by going along with sb. to guard him steel wire rope.
Further improvement of the utility model, corresponding a pair of the steel springboards with holes of each semicircle Harvard piece, in order to fix safety 4 steel springboards with holes need to be used.
Further improvement of the utility model, the steel wire rope of going along with sb. to guard him go along with sb. to guard him fire safety net, in order to prevent that fire can be with Go along with sb. to guard him fire safety net.
Further improvement of the utility model, it is described to go along with sb. to guard him the high 1.2m of railing, it is general to consider that constructor goes along with sb. to guard him safely railing High 1.2m.
A kind of assembled steel tubing string welding procedure operating platform of the utility model, beneficial effect is such as compared with prior art Under:
1st, the utility model steel pipe column welding procedure operating platform is assembled in ground burst and made, simple structure, from heavy and light, Reliable and stable, all parts are detachable, be may be reused.Operating platform steel springboard is ridden upon in square steel support frame, Square steel support frame is fixed in semicircle Harvard, avoids the welding bracing frame on steel pipe column, destroys finished product paint;
2nd, the utility model operating platform by going along with sb. to guard him railing, going along with sb. to guard him steel wire rope, steel springboard, go along with sb. to guard him fire safety net row One safety of journey, complete, closing integrated operation platform, form safe building enclosure well, securely and reliably;
3rd, the installation of the utility model operating platform and fixed speed are quick, convenient, it is only necessary to which that practical tower crane is hung to steel pipe Post welding procedure position is fixed by bolt between Harvard piece.After installation, operating personnel can be paved with scaffolding board Platform on arbitrarily walk about, prevented the danger coefficient of overhead welding operation, improved efficiency of construction, added security, and Cost is cheap and may be reused, and saves material consumption expense, improves economic benefit.
Brief description of the drawings
Fig. 1 is the utility model structure diagram one.
Fig. 2 is the utility model structure diagram two.
Illustrate:
1st, square tube support frame;2nd, connecting plate with holes;3rd, connecting bolt;4th, steel springboard with holes;5th, railing is gone along with sb. to guard him;6th, steel is gone along with sb. to guard him Cord;7th, semicircle Harvard piece;8th, locking nut;9th, double nut bolt.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
The utility model provides a kind of assembled steel tubing string welding procedure operating platform, by conventional high-building construction, The form of construction work of steel springboard scaffold is welded, sets up operating platform and laid in the construction of steel pipe column overhead welding on the steel pipe column of high-altitude Change into, in ground assembled formation, reusable finished tool formula scaffold construction, by highly difficult, high-risk high-altitude Operation is reduced to console mode construction, ensure that construction speed, improves the safety coefficient of work high above the ground.The operating platform, safety Reliably, bearing capacity is big, stability is high, simple to operate, is convenient to mount and dismount, repeats utilization, reduces labor intensity, cost-effective, carries High efficiency.
As a kind of embodiment of the utility model, it is flat that the utility model provides a kind of assembled steel tubing string welding procedure operation Platform, including square tube support frame 1, connecting plate with holes 2, steel springboard 4 with holes, go along with sb. to guard him railing 5, go along with sb. to guard him steel wire rope 6 and semicircle Harvard piece 7, semicircle Harvard piece 7, which has, to be symmetrical arranged end a pair and is fixed by locking nut 8, the outside of each semicircle Harvard piece 7 There are a pair of Harvard connecting rods with holes, the end of square tube support frame 1 is inserted into corresponding Harvard connecting rod with holes by double nut bolt 9 It is fixed, is connected above two ends of square tube support frame 1 in the outside of each semicircle Harvard piece 7 by steel springboard 4 with holes, side The end of steel springboard 4 with holes be connected by connecting plate 2 with holes, the square tube support frame 1 and connecting plate 2 with holes and steel springboard with holes It is connected between 4 by connecting bolt 3, is fitted with above the outer end of square tube support frame 1 and goes along with sb. to guard him railing 5, it is described to go along with sb. to guard him on railing 5 End is connected by going along with sb. to guard him steel wire rope 6.
As a kind of specific embodiment of the utility model, the utility model provides a kind of assembled steel as shown in Figure 1-2 Tubing string welding procedure operating platform, including square tube support frame 1, connecting plate with holes 2, steel springboard 4 with holes, go along with sb. to guard him railing 5, go along with sb. to guard him steel Cord 6 and semicircle Harvard piece 7, semicircle Harvard piece 7, which has, to be symmetrical arranged end a pair and is fixed by locking nut 8, often There are a pair of Harvard connecting rods with holes in the outside of individual semicircle Harvard piece 7, and the end of square tube support frame 1 is inserted into corresponding Harvard connecting rod with holes It is interior to be fixed by double nut bolt 9, pass through band above two ends of square tube support frame 1 in the outside of each semicircle Harvard piece 7 Hole steel springboard 4 is connected, and corresponding a pair of the steel springboards 4 with holes of each semicircle Harvard piece 7,4 steel with holes need to be used in order to fix safety Springboard, the end of steel springboard 4 with holes of side are connected by connecting plate 2 with holes, the square tube support frame 1 and connecting plate 2 with holes and It is connected between steel springboard 4 with holes by connecting bolt 3, is fitted with above the outer end of square tube support frame 1 and goes along with sb. to guard him railing 5, it is described 5 high 1.2m of railing is gone along with sb. to guard him, considers that constructor goes along with sb. to guard him safely the typically high 1.2m of railing, the upper end of railing 5 of going along with sb. to guard him is by going along with sb. to guard him steel Cord 6 is connected, and the steel wire rope 6 of going along with sb. to guard him goes along with sb. to guard him fire safety net, in order to prevent fire from can go along with sb. to guard him fire safety net.
The utility model construction procedure is as follows:
The first step, assembled on ground, 4 square tube support frames inserted in four Harvard connecting rods with holes, square tube support frame with After three connecting hole alignment of connecting rod with holes, connected by double nut bolt, fastening bolt;
Second step, steel springboard bolt hole with holes align with square steel support frame upper bolt hole, insert connecting bolt, and nut is tight Gu;
3rd step:Guardrail rod end headband internal thread one end is connected with the external screw thread connector in square steel support frame, fastened;
4th step:Four 1.2m height, which are gone along with sb. to guard him railing top-portion apertures and worn, safeguards steel wire rope, and steel wire rope is locked with lock;
5th step:Tower crane coordinates, and the welding procedure operating platform that ground assembling is tentatively finished, two panels segmentation is hung to steel pipe At post butt welding, two panels semicircle Harvard piece passes through Harvard locking nut connection fastening;
6th step:On lower floor's steel springboard, upper strata steel springboard is laid, bolt hole aligns between steel springboard, is fastened with bolt;
7th step:Between going along with sb. to guard him railing and going along with sb. to guard him steel wire rope, fire safety net is gone along with sb. to guard him in installation, and operating platform has been set up Finish.
With the quickening of Urbanization in China, skyscraper and high-rise building continue to bring out the utility model, and In such building, answering building, the structural system that steel pipe rod structure uses is got over using the demand in function or structure stress Come it is more, more and more extensively.The structure type has given full play to steel and concrete advantage, has complied with the trend of construction industry development, Popularization is very swift and violent with the speed of development, and the construction of steel pipe column component be unable to do without welding for steel structure construction operation platform.It is a kind of Assembled steel tubing string welding procedure operating platform is cheap as a kind of cost, makes simply, fast, safety coefficient easy for construction is done Tool-type operating platform, sufficient checking has been obtained in Anhui science and technology center engineering, therefore its construction industry in future has Wide application prospect.
It is described above, only it is preferred embodiment of the present utility model, is not that any other is made to the utility model The limitation of form, and any modification made according to the technical essence of the utility model or equivalent variations, it is new to still fall within this practicality Type scope claimed.

Claims (4)

1. a kind of assembled steel tubing string welding procedure operating platform, including square tube support frame(1), connecting plate with holes(2), steel with holes Springboard(4), go along with sb. to guard him railing(5), go along with sb. to guard him steel wire rope(6)With semicircle Harvard piece(7), it is characterised in that:Semicircle Harvard piece(7) Have and be symmetrical arranged end a pair and pass through locking nut(8)It is fixed, each semicircle Harvard piece(7)There are a pair of Harvards with holes in outside Connecting rod, the square tube support frame(1)End, which is inserted into corresponding Harvard connecting rod with holes, passes through double nut bolt(9)It is fixed, Each semicircle Harvard piece(7)Two square tube support frames in outside(1)Pass through steel springboard with holes above end(4)It is connected, side Steel springboard with holes(4)End passes through connecting plate with holes(2)It is connected, the square tube support frame(1)With connecting plate with holes(2)With it is with holes Steel springboard(4)Between pass through connecting bolt(3)It is connected, the square tube support frame(1)It is fitted with above outer end and goes along with sb. to guard him railing(5), It is described to go along with sb. to guard him railing(5)Upper end is by going along with sb. to guard him steel wire rope(6)It is connected.
A kind of 2. assembled steel tubing string welding procedure operating platform according to claim 1, it is characterised in that:Each semicircle Harvard piece(7)Corresponding a pair of steel springboards with holes(4).
A kind of 3. assembled steel tubing string welding procedure operating platform according to claim 1, it is characterised in that:It is described to go along with sb. to guard him Steel wire rope(6)Go along with sb. to guard him fire safety net.
A kind of 4. assembled steel tubing string welding procedure operating platform according to claim 1, it is characterised in that:It is described to go along with sb. to guard him Railing(5)High 1.2m.
CN201720572652.1U 2017-05-22 2017-05-22 A kind of assembled steel tubing string welding procedure operating platform Active CN207004058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720572652.1U CN207004058U (en) 2017-05-22 2017-05-22 A kind of assembled steel tubing string welding procedure operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720572652.1U CN207004058U (en) 2017-05-22 2017-05-22 A kind of assembled steel tubing string welding procedure operating platform

Publications (1)

Publication Number Publication Date
CN207004058U true CN207004058U (en) 2018-02-13

Family

ID=61444843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720572652.1U Active CN207004058U (en) 2017-05-22 2017-05-22 A kind of assembled steel tubing string welding procedure operating platform

Country Status (1)

Country Link
CN (1) CN207004058U (en)

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN105908960A (en) Construction rack for construction of high and large space
CN106930531A (en) A kind of pull-up manomelia is encorbelmented the construction method of heavy frame
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN103362297A (en) Construction scheme of inserted lift scaffold
CN205116768U (en) Superelevation layer instrument formula protection platform of encorbelmenting
CN103114754A (en) Alternative hoisting method for conjoined coal bunker top truss girder pre-placing
CN207728025U (en) A kind of safety climbing ladder for bridge construction
CN206722378U (en) A kind of pull-up manomelia is encorbelmented heavy frame
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN203514789U (en) Steel platform for concrete pouring construction in ultra-high-rise steel pipe column
CN203487767U (en) Cross plate scaffold
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN202055502U (en) Basket-type operating platform for construction of high-rise building construction
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN207004058U (en) A kind of assembled steel tubing string welding procedure operating platform
CN209798542U (en) safety construction assembled bent cap operation platform
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN207846427U (en) A kind of upper and lower walkway of assembled foundation pit
CN203499259U (en) Tool type cantilevered unloading platform
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN210369827U (en) Scaffold for building external wall construction
CN111608377B (en) Comprehensive construction method for building overhanging scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant