CN206989751U - A kind of novel energy-conserving shower system - Google Patents

A kind of novel energy-conserving shower system Download PDF

Info

Publication number
CN206989751U
CN206989751U CN201720573370.3U CN201720573370U CN206989751U CN 206989751 U CN206989751 U CN 206989751U CN 201720573370 U CN201720573370 U CN 201720573370U CN 206989751 U CN206989751 U CN 206989751U
Authority
CN
China
Prior art keywords
cover plate
water
runner
shower
novel energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720573370.3U
Other languages
Chinese (zh)
Inventor
张平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720573370.3U priority Critical patent/CN206989751U/en
Application granted granted Critical
Publication of CN206989751U publication Critical patent/CN206989751U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bathtubs, Showers, And Their Attachments (AREA)

Abstract

A kind of novel energy-conserving shower system, includes heat exchanger, is made up of the first cover plate, sealing heat insulating mattress and the second cover plate;Flow passage chamber is formed on the inside of first cover plate, the runner formed by the isolation of multiple tracks waterproof strip is provided with flow passage chamber;Multiple connecting holes are provided with the first cover plate, connecting seat is provided with the inside of the second cover plate;The connecting hole is through to the first cover plate inside edge and its waterproof strip;Sealing heat insulating mattress is covered on inside edge and its waterproof strip of the first cover plate;The blasthole being connected with cold feed pipeline and the apopore being connected with mixed water outlet pipe are additionally provided with the side of the first cover plate, heat-insulated mozzle is connected on cold feed pipeline and mixed water outlet pipe, the heat-insulated mozzle is built in the runner of water intake end after blasthole is penetrated, and is built in after apopore is penetrated in the runner of water side.The utility model is rational in infrastructure, thermal resource is recycled utilization, reduces the energy consumption of water heater, and its overall tightness is good, and heat transference efficiency is high.

Description

A kind of novel energy-conserving shower system
【Technical field】
It the utility model is related to a kind of novel energy-conserving shower system.
【Technical background】
In the water heater water tap that we commonly use, water mixing valve is typically provided with, the cold water inlet of wherein water mixing valve is external Running water outlet valve, the external water outlet of water heater valve of hot water inlet, and the external showerhead of the delivery port of water mixing valve.
It is known that in winter colder weather, it would be desirable to temperature in use higher hot water takes a shower, so from The hot water that gondola water faucet comes out will be flowed into sewer mouth on the ground directly in shower room after shower, but from the water after shower Certain temperature is also carried, is so directly lost in, fully heat is not utilized once again, causes very big waste.
Occur shower heat energy recovery disc on the market at present, conduit pipeline has been spiraled in plastic casing, pipeline One end connects running water outlet valve, and the other end connects the cold water inlet of water mixing valve, from the hot water that showerhead flows out through shower Backward lower trickling is on the shower heat energy recovery disc kept flat on the ground, then the gully-hole through being opened on plastic casing is flowed into Inside plastic casing, the hot water after so taking a shower just carries out heat exchange with the cold water in the pipeline in plastic casing so that pipeline Interior water gradually heats up.But conduit pipeline is positioned in plastic casing by so shower heat energy recovery disc due to needing, and is caused Its thickness and volume are all very big, and it is very inconvenient in shower room to be positioned over, and need to open up gully-hole on plastic casing, Through after a period of time, very more debris will be entered in plastic casing through gully-hole, be both unfavorable for cleaning, and also result in hot friendship Change rate decline.
For the above situation, a solution is we provided.
【Utility model content】
The purpose of this utility model is to be overcome the deficiencies in the prior art, there is provided a kind of rational in infrastructure, recyclable profit With thermal resource, the energy consumption of water heater is reduced, overall tightness is good, the high novel energy-conserving shower water route heat exchange of heat transference efficiency Device.
In order to solve above-mentioned technical problem, the utility model takes following technical proposals:
A kind of novel energy-conserving shower system, include cold feed pipeline, hot water supply line, water mixing valve, and shower Water lines, it is characterised in that also include heat exchanger, described heat exchanger is made up of the first cover plate and the second cover plate, Sealing heat insulating mattress is provided between first cover plate and the second cover plate;First cover plate extends in its inner side shape up or down Into flow passage chamber, be provided with the flow passage chamber multiple tracks waterproof strip raised on the wooden partition on the inside of the first cover plate it is adjacent between isolate The runner formed, the water intake end of the runner and water side are located at the same side of flow passage chamber;It is provided with first cover plate more Individual connecting hole, connecting seat corresponding with connecting hole is provided with the inside of second cover plate;The connecting hole is by the first cover plate Lateral edges and its waterproof strip, which extend upward through, to be formed, connecting hole of the first described cover plate after covering on the second cover plate thereon with Connecting seat on the inside of second cover plate corresponds to be fixed with aligning installation;Described sealing heat insulating mattress is fitted in the first cover plate On lateral edges and its waterproof strip;Also being located on the side of runner water intake end and water side in first cover plate has blasthole And apopore, the blasthole are connected with cold feed pipeline, and mixed water outlet pipe is connected between the apopore and water mixing valve, Between the cold feed pipeline and blasthole, it is mixed heat-insulated mozzle is respectively equipped between water outlet pipe and apopore, it is described Heat-insulated mozzle is built in the runner of water intake end after blasthole is penetrated, and the runner of water side is built in after apopore is penetrated It is interior.
In further improvement project, heat absorbing fins are provided with the side wall between the neighboring track waterproof strip.
In further improvement project, described blasthole and apopore form by the first cover sidewall projection.
In further improvement project, located at the first ring-type waterproof rib and the outside the connecting hole on the inside of the first cover plate Two ring-type waterproof ribs.
In further improvement project, many places anti-slip massaging salient point is provided with the upper surface of first cover plate.
In further improvement project, described connecting hole includes the first vestibule for being close to connecting seat and is close to first Second vestibule of cover plate upper surface, the first described vestibule are used to be locked into connecting seat after penetrating for connector, and described the Two vestibules are used to place acupoint-physiotherapeutic magnetite.
In further improvement project, also include frost prevention switch, pressure relief device, purifier and magnetic water device, Described purifier and magnetic water device is arranged on cold feed pipeline or mixed water outlet pipe, described frost prevention switch and is let out Pressure device is arranged on cold feed pipeline.
In further improvement project, also include Shower screen, described water mixing valve, shower water pipeline and mixed water go out Mouth pipe may be contained within the cavity of Shower screen;Display screen is provided with the wall body of the Shower screen, in the cavity of the Shower screen It is interior provided with the display screen circuit being connected with display screen, water flow generator, described current hair are provided with the mixed water outlet pipe Motor is connected with display screen circuit, and described display screen is provided with temperature display module.
Compared with prior art, the beneficial effects of the utility model are:Practicality rational in infrastructure of the present utility model, make use of The fuel factor of the hot water rinsed, thermal resource is recycled utilization, reduce the energy consumption of water heater, and its overall tightness Well, heat transference efficiency is high, solves the problems, such as that the in the past similar energy saving disk thermal efficiency is low and incrustation is smelly, overall structure is by thickness It is thinning, save space.
The utility model is further illustrated with reference to the accompanying drawings and detailed description:
【Brief description of the drawings】
Fig. 1 is schematic perspective view of the present utility model;
Fig. 2 is front view of the present utility model;
Fig. 3 is the top view of the first cover plate in the utility model;
Fig. 4 is the inside structure figure of the first cover plate in the utility model embodiment one;
Fig. 5 is the enlarged drawing in A portions in Fig. 4;
Fig. 6 is the runner design figure of the first cover plate in the utility model embodiment two;
Fig. 7 is the runner design figure of the first cover plate in the utility model embodiment three;
Fig. 8 is the runner design figure of the first cover plate in the utility model embodiment four;
Connection diagrams of the Fig. 9 between the utility model and water heater, water mixing valve and showerhead;
Figure 10 is the schematic perspective view of the utility model and Shower screen.
【Embodiment】
A kind of novel energy-conserving shower system, as shown in Figures 1 to 9, include cold feed pipeline 50, hot water supply line 120th, water mixing valve 80, and shower water pipeline 140, the heat formed by the fast metal or alloy casting of heat transfer speed is also included Permutoid, described heat exchanger are made up of the first cover plate 10 and the second cover plate 20, in the cover plate of the first cover plate 10 and second Sealing heat insulating mattress is provided between 20;First cover plate 10 extends in its inner side and forms flow passage chamber up or down, in the stream The runner 40 that road intracavitary is isolated provided with raised multiple tracks waterproof strip 30 on the wooden partition of the inner side of the first cover plate 10 between adjacent, The water intake end of the runner 40 and water side are located at the same side of flow passage chamber;Multiple connections are provided with first cover plate 10 Hole, connecting seat corresponding with connecting hole is provided with the inner side of the second cover plate 20;The connecting hole by the first cover plate 10 inner side Edge and its waterproof strip 30 are extended upward through and formed, connection of the first described cover plate 10 after covering on the second cover plate 20 thereon Hole is corresponding with the connecting seat of the inner side of the second cover plate 20 to be fixed with aligning installation;Described sealing heat insulating mattress is fitted in the first lid On the inside edge of plate 10 and its waterproof strip 30;In first cover plate 10 on the side of the water intake end of runner 40 and water side Also located at having blasthole 13 and apopore 14, the blasthole 13 is connected with cold feed pipeline 50, in the apopore 14 and Mixed water outlet pipe 60 is connected between water mixing valve 80, between the cold feed pipeline 50 and blasthole 13, mixed water outlet pipe Be respectively equipped with heat-insulated mozzle 70 between 60 and apopore 14, the heat-insulated mozzle 70 be built in after blasthole 13 is penetrated into In the runner 40 of water end (W.E.), it is built in after apopore 14 is penetrated in the runner 40 of water side.
The utility model is connected with cold feed pipeline 50 when mounted, by its blasthole 13, by its apopore 14 with mixing Water outlet pipe 60 is connected, and such cold water is entered in the runner 40 in it by its blasthole 13, the water side through runner 40, its On apopore 14 after, flow on mixed water outlet pipe 60, enter in water mixing valve 80 and supply with hot water supply line 120 Hot water mixing, and mixing water is entered on shower water pipeline 140 upon mixing, enters finally into shower hole or gondola water faucet;Make During with Water-heating shower, the hot water that shower bath washing gets off can flow to the upper surface of the first cover plate 10, transfer heat to the first cover plate 10 Inner side, the so cold water in the runner 40 in the first cover plate 10 will start to warm up under heat exchange, the runner 40 after heating Through entering the cold water inlet of water mixing valve 80, the hot water with the output of water heater 90 in water mixing valve 80 is mixed interior water, is made The water that exports of water mixing valve 80 can be rapidly achieved ideal temperature in a short time, greatly make use of the hot water that flushing gets off Fuel factor, thermal resource is recycled utilization, reduce the energy consumption of water heater 90;Moreover, whole novel energy-conserving shower water route heat Switch is the sealing structure being made up of the first cover plate 10 and the second cover plate 20, is not required to clean;Waterproof strip 30 isolate and Into runner 40 ensure that glide path of the cold water in runner 40, make water flow stationary, heat transference efficiency is high;It is covered in the first lid Sealing heat insulating mattress on the inside edge of plate 10 and its waterproof strip 30 both ensure that this novel energy-conserving shower water circuit heat exchange device Sealing property, water is completely sealed in the runner 40 on the first cover plate 10, makes the water in runner 40 again after heating It is unlikely to heat transfer to the second cover plate 20, causes heat loss;On the inside edge of the first cover plate 10 and its waterproof strip 30 Connecting hole ensure that its neat connection tightness between the second cover plate 20;Heat-insulated mozzle 70 directly directs water into runner 40 water intake end and the water side of runner 40 is exported water, ensure that runner 40 and oral siphon road 50, outlet pipeline 60 it is suitable Profit linking.
Practicality rational in infrastructure of the present utility model, the fuel factor for the hot water that flushing gets off is make use of, is returned thermal resource Receive and utilize, reduce the energy consumption of water heater, and its overall tightness is good, and heat transference efficiency is high, solves in the past similar section Can the problem of disk thermal efficiency is low and incrustation is smelly, overall structure saves space by thick thinning.
In order to further improve the efficiency of heat transfer, heat absorption fins are provided with the side wall between the neighboring track waterproof strip 30 Piece.
In order to reduce the thickness of the first cover plate 10, as shown in Figure 1, 2, 3, described blasthole 13 and apopore 14 are by The projected side wall of one cover plate 10 forms.
In order to ensure integral sealing degree, as shown in Figure 4, Figure 5, the first ring is located at outside the connecting hole of the inner side of the first cover plate 10 Shape waterproof rib 15 and the second ring-type waterproof rib 16.
In the utility model, as shown in figure 3, being provided with many places anti-slip massaging salient point in the upper surface of first cover plate 10 17。
In order to improve the outward appearance of the upper surface of the first cover plate 10, as shown in figure 3, described connecting hole, which includes, is close to connecting seat The first vestibule 11 and be close to the second vestibule 12 of the upper surface of the first cover plate 10, the first described vestibule 11 is used to wear for connector It is locked into after entering on connecting seat, the second described vestibule 12 is used to place acupoint-physiotherapeutic magnetite, and connector is being penetrated into connection After in first vestibule 11 in hole, acupoint-physiotherapeutic magnetite is positioned in the second vestibule 12, such acupoint-physiotherapeutic magnetite just will connection Cover in hole.
In the utility model, as shown in figure 8, also include frost prevention switch 100, pressure relief device 110, purifier 120 and Magnetic water device 130, described purifier 120 and magnetic water device 130 are arranged at cold feed pipeline 50 or mixed water out On pipe 60, described frost prevention switch 100 and pressure relief device 110 are arranged on cold feed pipeline 50.
In the utility model, as shown in Figure 10, also include Shower screen, described water mixing valve 80, shower water pipeline 140 with And mixed water outlet pipe 60 is hidden in the cavity of Shower screen 150;Here, Shower screen 150 and heat exchanger are integrated into connection; The wall body of the Shower screen 150 is provided with display screen 160, is provided with the cavity of the Shower screen 150 and is connected with display screen 160 Display screen circuit, be provided with water flow generator on the mixed water outlet pipe 60(Not shown in figure), described water flow generator It is connected with display screen circuit, described display screen 160 is provided with temperature display module.
Although the utility model is illustrated with reference to embodiment, it should be understood that can be in the utility model structure A variety of improvement are carried out in the spirit and scope of think of.Therefore, the utility model is not limited to described embodiment, but by claim Four corner described in book.

Claims (8)

1. a kind of novel energy-conserving shower system, include cold feed pipeline, hot water supply line, water mixing valve, and shower water Pipeline, it is characterised in that also include heat exchanger, described heat exchanger is made up of the first cover plate and the second cover plate, in institute State and sealing heat insulating mattress is provided between the first cover plate and the second cover plate;First cover plate extends in its inner side and formed up or down Flow passage chamber, be provided with the flow passage chamber multiple tracks waterproof strip raised on wooden partition on the inside of the first cover plate it is adjacent between isolate and Into runner, the water intake end of the runner and water side are located at the same side of flow passage chamber;It is provided with first cover plate multiple Connecting hole, connecting seat corresponding with connecting hole is provided with the inside of second cover plate;The connecting hole by the first cover plate inner side Edge and its waterproof strip, which extend upward through, to be formed, connecting hole and of the first described cover plate after covering on the second cover plate thereon Connecting seat on the inside of two cover plates corresponds to be fixed with aligning installation;Described sealing heat insulating mattress is fitted in the inner side of the first cover plate On edge and its waterproof strip;First cover plate on the side of runner water intake end and water side also located at have blasthole and Apopore, the blasthole are connected with cold feed pipeline, and mixed water outlet pipe is connected between the apopore and water mixing valve, Between the cold feed pipeline and blasthole, it is mixed be respectively equipped with heat-insulated mozzle between water outlet pipe and apopore, it is described every Thermal conductivity flow tube is built in the runner of water intake end after blasthole is penetrated, and the runner of water side is built in after apopore is penetrated It is interior.
A kind of 2. novel energy-conserving shower system according to claim 1, it is characterised in that the neighboring track waterproof strip it Between side wall be provided with heat absorbing fins.
A kind of 3. novel energy-conserving shower system according to claim 2, it is characterised in that described blasthole and apopore Formed by the first cover sidewall projection.
A kind of 4. novel energy-conserving shower system according to claim 3, it is characterised in that the connection on the inside of the first cover plate The first ring-type waterproof rib and the second ring-type waterproof rib are located at outside hole.
5. a kind of novel energy-conserving shower system according to claim 4, it is characterised in that in the upper table of first cover plate Face is provided with many places anti-slip massaging salient point.
6. a kind of novel energy-conserving shower system according to claim 5, it is characterised in that described connecting hole, which includes, to be leaned on The first vestibule and the second vestibule for being close to the first cover plate upper surface to connecting seat, the first described vestibule for connector for wearing It is locked into after entering on connecting seat, the second described vestibule is used to place acupoint-physiotherapeutic magnetite.
7. a kind of novel energy-conserving shower system according to claim 6, it is characterised in that also include frost prevention switch, let out Pressure device, purifier and magnetic water device, described purifier and magnetic water device are arranged at cold feed pipeline or mixed On water outlet pipe, described frost prevention switch and pressure relief device are arranged on cold feed pipeline.
A kind of 8. novel energy-conserving shower system according to claim 7, it is characterised in that also include Shower screen, it is described Water mixing valve, shower water pipeline and mixed water outlet pipe may be contained within the cavity of Shower screen;On the wall body of the Shower screen Provided with display screen, the display screen circuit being connected with display screen is provided with the cavity of the Shower screen, in the mixed water outlet pipe Water flow generator is provided with, described water flow generator is connected with display screen circuit, and described display screen is provided with temperature display Module.
CN201720573370.3U 2017-05-23 2017-05-23 A kind of novel energy-conserving shower system Expired - Fee Related CN206989751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720573370.3U CN206989751U (en) 2017-05-23 2017-05-23 A kind of novel energy-conserving shower system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720573370.3U CN206989751U (en) 2017-05-23 2017-05-23 A kind of novel energy-conserving shower system

Publications (1)

Publication Number Publication Date
CN206989751U true CN206989751U (en) 2018-02-09

Family

ID=61389791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720573370.3U Expired - Fee Related CN206989751U (en) 2017-05-23 2017-05-23 A kind of novel energy-conserving shower system

Country Status (1)

Country Link
CN (1) CN206989751U (en)

Similar Documents

Publication Publication Date Title
CN202027484U (en) Shower room capable of recovering bath wastewater heat
CN104807212B (en) Solar water heater and the combined application system of electric heater and energy-saving control device thereof
CN100390464C (en) Energy saving bath room capable of self heating water
CN106854939A (en) A kind of new prefabricated integral vacuum toilet
CN206398983U (en) A kind of publilc baths efficient water-heating device
CN206989751U (en) A kind of novel energy-conserving shower system
CN205808191U (en) Full runner magnetization shower heat recovery plate
CN106400898A (en) Waste heat recovery shower head
CN201754045U (en) Heat exchange recycling device for bath wastewater
CN204483378U (en) A kind of heat pump is hair washing bed
CN103575136A (en) Heat exchanger for recovering heat energy contained in bathing waste water
CN2549384Y (en) Energy-saving preheating bath shower
CN206448560U (en) One kind energy-conservation integral vacuum toilet
CN213984008U (en) Green intelligent house water saving fixtures
CN201016593Y (en) Heat exchanger capable of utilizing waste water waste heat
CN207880923U (en) A multistage high position takes heat and efficient waste heat evaporation endothermic combined type heating hot water integrated machine
CN208253945U (en) A kind of dedicated shower heating system in sanitary shower room
CN206521790U (en) A kind of waste heat recovery showerhead
CN208152136U (en) Hot water circuit utilizes energy-saving bath device
CN206222718U (en) A kind of back flush type solar energy water storage device
CN201697504U (en) Heat regenerator
CN201180813Y (en) Novel water-saving type toilet and bathroom water tap valve core
CN201372698Y (en) Novel, energy-saving, hollow and recycled water-cooled glass window
CN201277735Y (en) Balcony type solar energy water heater for fresh water
CN201397063Y (en) Energy-saving shower platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

Termination date: 20210523

CF01 Termination of patent right due to non-payment of annual fee