CN206987415U - Folding is gone along with sb. to guard him temporarily - Google Patents

Folding is gone along with sb. to guard him temporarily Download PDF

Info

Publication number
CN206987415U
CN206987415U CN201720777305.2U CN201720777305U CN206987415U CN 206987415 U CN206987415 U CN 206987415U CN 201720777305 U CN201720777305 U CN 201720777305U CN 206987415 U CN206987415 U CN 206987415U
Authority
CN
China
Prior art keywords
guard
temporarily
gone along
folding
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720777305.2U
Other languages
Chinese (zh)
Inventor
王吉庆
汪廷安
夏爱华
潘宇华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201720777305.2U priority Critical patent/CN206987415U/en
Application granted granted Critical
Publication of CN206987415U publication Critical patent/CN206987415U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

Folding of the present utility model is gone along with sb. to guard him temporarily, is related to construction safeguard technical field.Gone along with sb. to guard him for existing conventional steel and the problem of construction inconvenience, useless work waste material be present, it includes at least two guard rails and some connection components;The guard rail includes the rectangular outer frame being made up of a pair of cross bars and a pair of montants, the expanded metal lath being fixed in the outer framework, and is fixed in the leg of the montant bottom;The connection component includes two pairs of sleeve pipes being individually fixed on the two neighboring outer framework montant, and some alignment pins, each pair described sleeve pipe is arranged at intervals and has the consistent insertion core bore in axle center, and the sleeve pipe on the two neighboring guard rail is staggered and is flexibly connected by the alignment pin through the core bore.

Description

Folding is gone along with sb. to guard him temporarily
Technical field
Construction safeguard technical field is the utility model is related to, more particularly to a kind of folding is gone along with sb. to guard him temporarily.
Background technology
Facility is not gone along with sb. to guard him at the aloft job site of operation, the edge of working face, though or go along with sb. to guard him facility it is high When degree is less than 80cm, this kind of operation is referred to as facing side operation.Such as deep foundation periphery, floor periphery, bench side, platform or balcony side Deng belonging to and face side operation.
To prevent security incident, face side operation and must be provided with safeguard procedures, wherein, stairs port, the ladder of construction in layer Duan Bian, escalator hole side must be provided with high 1.2m guard rail.Traditional guard rail generally use steel pipe is made, and deposits Construction inconvenience, give up work waste material the problems such as.
The content of the invention
Gone along with sb. to guard him for existing conventional steel and the problem of construction inconvenience, useless work waste material be present, the purpose of this utility model is to carry Supply a kind of folding to go along with sb. to guard him temporarily, pass through the sleeve pipe being staggered and the positioning through sleeve pipe between two neighboring guard rail Pin, which is realized, to be flexibly connected, it is ensured that the safety of side operation is faced in live stair lifting, is dismounted simple and high recycling rate, is saved Material and manpower consumption.
Technical scheme is used by the utility model solves its technical problem:Folding is gone along with sb. to guard him including at least two temporarily Individual guard rail and some connection components;It is rectangular outer frame that the guard rail includes being made up of a pair of cross bars and a pair of montants, solid Expanded metal lath in the outer framework, and it is fixed in the leg of the montant bottom;The connection component includes fixing respectively Two pairs of sleeve pipes on the two neighboring outer framework montant, and some alignment pins, each pair described sleeve pipe are arranged at intervals and had There is an insertion core bore that axle center is consistent, the sleeve pipe on the two neighboring guard rail is staggered and by determining through the core bore Position pin is flexibly connected.
Preferably, the alignment pin is made up of the inserted link and handle to fix as one, and the inserted link is staggeredly set through two Duis The core bore for the described sleeve pipe put realizes the flexible connection of the two neighboring guard rail, has between the inserted link and the handle One angle ɑ, and 0 °<ɑ<180°.
Preferably, described sleeve pipe is made up of nut of the internal diameter more than the inserted link external diameter, and the nut and the housing The montant of frame is welded to connect.
Preferably, the leg is the steel plate for being vertically fixed in the montant bottom, and the leg passes through expansion bolt It is temporarily fixed on horizontal plane.
Preferably, the outer framework is assembled by shaped steel and is welded, the cross bar of the expanded metal lath and the outer framework and Montant is welded to connect.
Preferably, two connection components, two connection components point are set between the two neighboring guard rail Not Wei Yu the guard rail top and bottom.
Effect of the present utility model is:Folding of the present utility model is gone along with sb. to guard him temporarily, between two neighboring guard rail Flexible connection is realized by the sleeve pipe being staggered and through the alignment pin of sleeve pipe;Before precast stair lifting, folding is faced When go along with sb. to guard him and be vertically fixed on construction location, go along with sb. to guard him form compared to conventional steel, it is lighter to be provided with the guard rail of expanded metal lath, and It is and safe and reliable, it is ensured that the safety of side operation is faced in live stair lifting;The folding is gone along with sb. to guard him dismounting simply and repeated temporarily Utilization rate is high, saves material and manpower consumption;Live directly it can process and use, operate in addition, folding is gone along with sb. to guard him temporarily It is more convenient, fast.
Brief description of the drawings
Fig. 1 is the structural representation for the guard rail that the folding of the embodiment of the utility model one is gone along with sb. to guard him temporarily;
Fig. 2 is the structural representation that the folding of the embodiment of the utility model one is gone along with sb. to guard him temporarily.
Label is as follows in figure:
Guard rail 10;Montant 11;Cross bar 12;Expanded metal lath 14;Leg 15;Sleeve pipe 16;Alignment pin 17;Inserted link 17a;Handle 17b。
Embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes folding temporarily go along with sb. to guard him work further it is detailed Describe in detail bright.According to following explanation and claims, advantages and features of the present utility model will become apparent from.Below will be by listed For embodiment combination accompanying drawing, describe technology contents of the present utility model and feature in detail.It need to illustrate in addition, accompanying drawing is adopted Non- accurately ratio is used with very simplified form and, only to convenient, lucidly aid illustration the utility model implementation The purpose of example.
Illustrate that folding of the present utility model is gone along with sb. to guard him temporarily with reference to Fig. 1 and Fig. 2, it include at least two guard rails 10 and Some connection components;Guard rail 10 include be made up of a pair of cross bars 12 and a pair of montants 11 rectangular outer frame, be fixed on housing Expanded metal lath 14 in frame, and it is fixed in the leg 15 of the bottom of montant 11;Connection component includes being individually fixed in two neighboring housing Two pairs of sleeve pipes 16 on frame montant 11, and some alignment pins 17, each pair sleeve pipe 16 are arranged at intervals and have axle center is consistent to pass through Obturator hole, the sleeve pipe 16 on two neighboring guard rail 10 are staggered and are flexibly connected by the alignment pin 17 through core bore.
Folding of the present utility model is gone along with sb. to guard him temporarily, the sleeve pipe 16 between two neighboring guard rail 10 by being staggered And realize flexible connection through the alignment pin 17 of sleeve pipe 16;Before precast stair lifting, folding is gone along with sb. to guard him to vertical fixation temporarily In construction location, form is gone along with sb. to guard him compared to conventional steel, it is lighter to be provided with the guard rail 10 of expanded metal lath 14, and safety can Lean on, it is ensured that the safety of side operation is faced in live stair lifting;The folding goes along with sb. to guard him dismounting temporarily simply and high recycling rate, Save material and manpower consumption;In addition, folding go along with sb. to guard him temporarily can scene directly process and use, operation more facilitate, Fast.
Please continue to refer to Fig. 2, above-mentioned alignment pin 17 is made up of the inserted link 17a and handle 17b to fix as one, inserted link 17a The flexible connection of two neighboring guard rail 10 is realized through the core bore of two pairs of sleeve pipes being staggered 16, and then is assembled into foldable The interim of formula is gone along with sb. to guard him, and the connected mode of bolt-type is easy to fold and deploys this to be gone along with sb. to guard him temporarily, flexible to operation, inserted link 17a and There is an angle ɑ, and 0 ° between handle 17b<ɑ<180 °, handle 17b setting can avoid inserted link 17a from skidding off the core of sleeve pipe 16 Hole, spacing effect is played, moreover, handle 17b also allows for plugging and unplugging alignment pin 17, improve efficiency of construction, the present embodiment is above-mentioned Preferably 90 ° of angle ɑ.
Above-mentioned leg 15 is the steel plate for being vertically fixed in the bottom of montant 11, and leg 15 is temporarily fixed on by expansion bolt Horizontal plane, horizontal plane can be flooring etc. where ground, construction.Folding is gone along with sb. to guard him temporarily is fixed on level by the bolt of leg 15 Face, stable connection is reliable, has ensured construction safety.Preferred 50mm × the 100mm of the present embodiment × 4mm (length × width x thickness) steel plate Leg 15 is made, and leg 15 is fixed with horizontal plane using M12 expansion bolts.
In the present embodiment, the nut that sleeve pipe 16 is more than inserted link 17a external diameters by internal diameter is made, and the montant of nut and outer framework 11 are welded to connect, and nut structure is simple, convenient material drawing, can reduce the cost of manufacture gone along with sb. to guard him temporarily.
Above-mentioned outer framework is assembled by shaped steel such as angle steel and is welded, and angle steel convenient material drawing is easy to process.The present embodiment is excellent 40mm × 40mm × 4mm (length × width x thickness) angle steel is selected to weld outer framework.To ensure that outer framework is connected firmly with expanded metal lath 14, The cross bar 12 and montant 11 of expanded metal lath 14 and outer framework are welded to connect.
Preferably, setting two connection components between two neighboring guard rail 10, two connection components are respectively positioned at protection The top and bottom on column 10, connection component are located at the top and bottom of guard rail 10 respectively so that the connection between guard rail 10 It is more reliable and more stable.
Illustrate the installation process that folding of the present utility model goes along with sb. to guard him temporarily with reference to Fig. 1 and Fig. 2, step is as follows: Before precast stair lifting, determination folding is gone along with sb. to guard him temporarily after need to being calculated according to engineering practice making material and system Make size, some guard rails 10 are flexibly connected by connection component folding is made and gone along with sb. to guard him temporarily, and be vertically placed on regulation Construction location, and flooring is fixed in by expansion bolt.The folding is installed before hoisting prefabricated stair to go along with sb. to guard him temporarily, Ensure that in-situ precast stair faces side safety, and folding goes along with sb. to guard him storage temporarily and expansion is more flexible, improves construction Efficiency.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model Calmly, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content, belonging to right will Seek the protection domain of book.

Claims (6)

1. folding is gone along with sb. to guard him temporarily, it is characterised in that including:
At least two guard rails and some connection components;
The guard rail includes the rectangular outer frame being made up of a pair of cross bars and a pair of montants, the steel being fixed in the outer framework Expanded metals, and it is fixed in the leg of the montant bottom;
The connection component includes two pairs of sleeve pipes being individually fixed on the two neighboring outer framework montant, and some positioning Pin, each pair described sleeve pipe are arranged at intervals and have the consistent insertion core bore in axle center, and the sleeve pipe on the two neighboring guard rail is handed over Mistake sets and is flexibly connected by the alignment pin through the core bore.
2. folding according to claim 1 is gone along with sb. to guard him temporarily, it is characterised in that:The alignment pin is by fixing as one Inserted link and handle are formed, and the inserted link realizes the two neighboring guard rail through the core bore of two pairs of described sleeve pipes being staggered Flexible connection, there is an angle ɑ, and 0 ° between the inserted link and the handle<ɑ<180°.
3. folding according to claim 2 is gone along with sb. to guard him temporarily, it is characterised in that:Described sleeve pipe is more than described insert by internal diameter The nut of bar external diameter is made, and the montant of the nut and the outer framework is welded to connect.
4. folding according to claim 1 is gone along with sb. to guard him temporarily, it is characterised in that:The leg is described in vertical is fixed in The steel plate of montant bottom, and the leg is temporarily fixed on horizontal plane by expansion bolt.
5. folding according to claim 1 is gone along with sb. to guard him temporarily, it is characterised in that:The outer framework is assembled by shaped steel and welds Connect and form, the cross bar and montant of the expanded metal lath and the outer framework are welded to connect.
6. the folding according to any one of claim 1 to 5 is gone along with sb. to guard him temporarily, it is characterised in that:It is two neighboring described anti- Two connection components are set between guardrail, and two connection components are located at the top and bottom of the guard rail respectively.
CN201720777305.2U 2017-06-30 2017-06-30 Folding is gone along with sb. to guard him temporarily Active CN206987415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720777305.2U CN206987415U (en) 2017-06-30 2017-06-30 Folding is gone along with sb. to guard him temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720777305.2U CN206987415U (en) 2017-06-30 2017-06-30 Folding is gone along with sb. to guard him temporarily

Publications (1)

Publication Number Publication Date
CN206987415U true CN206987415U (en) 2018-02-09

Family

ID=61400177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720777305.2U Active CN206987415U (en) 2017-06-30 2017-06-30 Folding is gone along with sb. to guard him temporarily

Country Status (1)

Country Link
CN (1) CN206987415U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914839A (en) * 2019-04-18 2019-06-21 北京顺鑫天宇建设工程有限公司 Light door-window opening roller shutter, which encloses, blocks means of defence

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914839A (en) * 2019-04-18 2019-06-21 北京顺鑫天宇建设工程有限公司 Light door-window opening roller shutter, which encloses, blocks means of defence

Similar Documents

Publication Publication Date Title
CN206859719U (en) A kind of efficient assembled safety barrier for edge protection
CN206987415U (en) Folding is gone along with sb. to guard him temporarily
CN104179362A (en) Building site guardrail fast to mount and demount
CN203271096U (en) Operating platform
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN204139631U (en) The guard rail of building site fast demountable
CN204940861U (en) Adjustable case beam side steel bracket
CN204001802U (en) A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms
CN110578405A (en) Protection method for standard floor outer wall edge opening
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN104060832A (en) Method and device for improving safety of unloading platform
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN105569328A (en) Concealed tie member for external scaffold of curtain wall engineering and construction technology of concealed tie member
CN206376517U (en) A kind of scaffold wall connecting piece
CN103590839A (en) Subway station cast-in-situ concrete structure door-like scaffold construction process
CN203961296U (en) A kind of device that improves discharging platform safety
CN205369967U (en) Modularization elevartor shaft protective structure
CN204626265U (en) A kind of detection platform across railroad bridge
CN204920171U (en) Elevartor shaft is platform for safety protection
CN205421978U (en) Elevartor shaft protection module
CN205259574U (en) Quick assembly and disassembly safety protection screen
CN203558672U (en) Connecting structure for reinforced concrete wall and construction elevator attachment rack
CN203113820U (en) Vertical connection part of adjacent edge protecting railing
CN203822330U (en) Supporting system for subway station underground third floor middle plate pouring
CN103397779A (en) Method of supporting large-height shear wall form

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant