CN206973157U - A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection - Google Patents

A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection Download PDF

Info

Publication number
CN206973157U
CN206973157U CN201720785306.1U CN201720785306U CN206973157U CN 206973157 U CN206973157 U CN 206973157U CN 201720785306 U CN201720785306 U CN 201720785306U CN 206973157 U CN206973157 U CN 206973157U
Authority
CN
China
Prior art keywords
push rod
short tube
unit
pipeline
well room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720785306.1U
Other languages
Chinese (zh)
Inventor
李韶山
李得兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kin Guan (xiamen) Environmental Technology Co Ltd
Original Assignee
Kin Guan (xiamen) Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kin Guan (xiamen) Environmental Technology Co Ltd filed Critical Kin Guan (xiamen) Environmental Technology Co Ltd
Priority to CN201720785306.1U priority Critical patent/CN206973157U/en
Application granted granted Critical
Publication of CN206973157U publication Critical patent/CN206973157U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses the Non-excavation pipeline restoration device and renovation technique of a kind of short tube connection, including push rod and short tube unit, the push rod is fixedly connected by multiple push rod units by screw thread head and the tail, the push rod is located inside former pipeline to be repaired, the short tube unit of reparation is cased with the push rod, reamer and bottom plate are additionally provided with the push rod, the former pipe ends connect with upstream well room and downstream well room respectively, and the upstream well room and downstream is separately installed with hydraulic jack in well room.The pipeline rehabilitation device and its renovation technique are reasonable in design, using existing well room, without excavating working pit and ground, can both realize the integral replacing of the drainage pipeline between two well rooms, and greatly improve the replacing efficiency of pipeline, environmental protection.

Description

A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection
Technical field
The present invention relates to a kind of prosthetic device, and in particular to a kind of Non-excavation pipeline restoration device of short tube connection and reparation Technique.Meanwhile the invention further relates to a kind of Non-excavation pipeline restoration device of short tube connection and the renovation technique of renovation technique.
Background technology
Drainpipe Dow Jones index collects the system formed with the pipe duct of sewage effluent, waste water and rainwater and its affiliated facility.Bag Include main, branch pipe and the pipeline towards treatment plant, no matter be built on street or it is other Anywhere, as long as rise draining make Pipeline, it all should be used as drainage pipeline statistics.Drainage pipeline length presses all main sewers, main, branch pipe and inspection shaft, even Well inlet and outlet equal length and calculating are connect, not including inlet for stom water to the connecting tube between drainage pipeline, home-in-pipe and open channel.
When buried pipe say it is existing it is damaged, collapse, the defect of pipeline such as deform when, it is necessary to be repaired, existing pipeline rehabilitation The mode that method generally use excavates working pit carries out integral replacing to former pipeline, due to being excavated to ground, causes environment It is affected with normal pass, construction cost is high, and efficiency of construction is slow.
The content of the invention
It is an object of the invention to provide a kind of Non-excavation pipeline restoration device of short tube connection and renovation technique and its repair Return to work skill, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides following technical scheme:A kind of no-dig technique pipeline rehabilitation dress of short tube connection Put and renovation technique, including push rod and short tube unit, the push rod are fixedly connected by multiple push rod units by screw thread head and the tail, institute State push rod to be located inside former pipeline to be repaired, the short tube unit of reparation is cased with the push rod, is additionally provided with the push rod Reamer and bottom plate, the former pipe ends connect with upstream well room and downstream well room respectively, the upstream well room and downstream well Interior is separately installed with hydraulic jack.
Preferably, one end of the push rod unit is fixedly connected with threaded post, is set inside the other end of the push rod unit There is the thread bush matched with threaded post, the push rod unit is provided with positioning hole.
Preferably, one end of the short tube unit is provided with sealing ring, and passes through grafting between adjacent two short tube units It is fixed.
Preferably, the short tube unit is formed by the cutting of HDPE polyethylene from high pressure processes long tube, and the overlapping part of short tube unit Thickness be pipe thickness half.
Preferably, outside is fixedly connected with cutter at the maximum gauge of the reamer, and the reamer passes through steady pin It is fixed on push rod unit and push rod unit is fixed on by steady pin positioned at the front of short tube unit direction of advance, the bottom plate Go up and be located at the rear of short tube unit direction of advance.
Present invention also offers a kind of Non-excavation pipeline restoration device of short tube connection and the renovation technique of renovation technique, tool Body comprises the following steps:
S1, upstream water source are blocked up, and the personnel of tripping in upstream well room wear waterproof garment, and air bag is filled in into upstream line, passes through gas Pump, up to upstream water source is completely isolated, by reamer sewage pump, is managed upstream well room, original using rotary hose to airbag aeration Ponding in road and downstream well room pumps to downstream municipal pipeline;
S2, pipe dredging, rinse former pipeline repeatedly using high-pressure sewer flushing vehicle, debris, sludge are pulled to bilge well, work of going into the well Debris is transported in the dredging vehicle of ground with bucket, the mud in bilge well pumped with environmental sanitation suction-type sewer scavenger;
S3, the prospecting of former pipeline, with pipe endoscopic sem observation original pipeline content broken situation;
S4, hydraulic jack platform is built, led on the upstream well room for the former pipe ends being repaired and downstream well chamber interior walls Pressure-bearing steel plate installation fixed hydraulic oil cylinder is crossed, and the specification of hydraulic jack is 150T;
S5, bar, every push rod unit is swum well room gradually downward using the hydraulic jack in S4 and promoted, often promotes one Push rod unit, another push rod unit is accessed again after hydraulic jack reset, until push rod enters downstream well room, the brill of pilot hole Enter present ground and extrapolate height measuring relief along drilling direction, be oriented to according still further to the drilling track with plinking in DCI Crept under survey meter monitoring, guide probe instrument tracking measurement often creeps into the drill bit after the distance of a height measuring relief Physical location, if find that drilling track is not inconsistent with planned course, correct at once, ensure the accuracy of drilling, and make a record, The control gradient measures depth, inclination angle using guide probe instrument, must not exceed 0.1% towards angle equivalence, the error of above-mentioned data, with Ensure the gradient, axis, the accuracy of elevation,;
S6, broken reaming, after downstream well room is delivered in push rod promotion, reamer is installed by steady pin, passes through upstream well room Interior hydraulic jack is pulled back to push rod, and the process of pulling back need to close closely wipes prexxure of the hydraulic pump change, to determine that cutter is managed with former The tube wall in road keeps vertical, is pushed open laterally after being isolated by reamer to former pipeline and by former pipeline;
S7, push pipe reparation, while step S6 is carried out, add push rod unit and short tube list in the afterbody of push rod successively Member, there can not be gap between the bell and spigot between short tube unit, and sealing ring is preset between short tube unit interface, in short tube unit The rear of advance is fixed by bottom plate, prevents from misplacing between short tube, until short tube unit is entered in the well room of upstream, And stretch out 15-25cm;
S8, fixed short tube unit, the short tube unit nozzle base electricity consumption in upstream well room and downstream well room beat out one Wide 10cm, deep 10 sides, long 20cm hole, then it is close to inject three root long 20cm round bar at the mouth of pipe to prevent short tube list Member is moved outward, and is reinforced by accelerated cement line up periphery, and 3-5h is stood after floating troweling;
S9, well room is repaired, gutter channel is puzzled with common brick, water-setting, according to the former gradient, and recovery floating with accelerated cement to well The original state in room, stand 3-5h;
S10, water flowing, examination, sweep on-site sanitation, and dregs, refuse collection is clean, and the personnel of going into the well wear waterproof garment, reduce After air bag pressure, closure air bag is taken out, water flowing is carried out, is checked and accepted after qualified.
Preferably, the length of the short tube unit in the push rod unit and step S7 in step S5 is identical, each push rod list Member and the length of short tube unit are 40-60cm.
Preferably, the sealing ring in step S7 uses 4.0mm, anti-strong acid, anti-highly basic, corrosion-resistant, polyurethane material system Into being single mold customized, anti-strong acid, alkali fluid liquid glue, the hardening cementation time is 3h.
Preferably, the spacing of the height measuring relief in step S5 is 1m-2m.
The Non-excavation pipeline restoration device and renovation technique and its renovation technique of a kind of short tube connection provided by the invention, with Prior art is compared, and many short tube units can be fitted together to the pipeline to form an entirety in narrow and small well room, is led to Cross and former pipeline is isolated and outwards pushed so that new internal diameter of the pipeline can be identical with former pipeline, using existing well room, without opening Working pit and ground are dug, the integral replacing of the drainage pipeline between two well rooms can have both been realized, and greatly improve pipeline Change efficiency, environmental protection.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the push rod cellular construction schematic diagram of the present invention;
Fig. 3 is the short tube cellular construction schematic diagram of the present invention;
Fig. 4 is the reamer structural representation of the present invention.
In figure:1 upstream well room, 2 former pipelines, 3 downstream well rooms, 4 push rods, 5 reamers, 501 cutteves, 6 short tube units, 601 Sealing ring, 7 bottom plates, 8 hydraulic jacks, 9 push rod units, 901 positioning holes, 902 threaded posts.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Embodiment 1
The invention provides the Non-excavation pipeline restoration device and renovation technique of a kind of short tube connection, including push rod 4 and short Pipe unit 6, the push rod 4 are fixedly connected by multiple push rod units 9 by screw thread head and the tail, and the push rod 4 is located at original to be repaired Inside pipeline 2, the short tube unit 6 of reparation is cased with the push rod 4, reamer 5 and bottom plate 7, institute are additionally provided with the push rod 4 State the former both ends of pipeline 2 to connect with upstream well room 1 and downstream well room 3 respectively, pacify respectively in the upstream well room 1 and downstream well room 3 Equipped with hydraulic jack 8, one end of the push rod unit 9 is fixedly connected with threaded post 902, in the other end of the push rod unit 9 Portion is provided with the thread bush that is matched with threaded post 902, and the push rod unit 9 is provided with positioning hole 901, and the one of the short tube unit 6 End is provided with sealing ring 601, and by plugged and fixed between adjacent two short tube units 6, the short tube unit 6 is by HDPE high pressures The cutting of polyethylene long tube forms, and the thickness of the overlapping part of short tube unit 6 is the half of pipe thickness, the reamer 5 Outside is fixedly connected with cutter 501 at maximum gauge, and the reamer 5 is fixed on push rod unit 9 and is located at by steady pin The front of the direction of advance of short tube unit 6, the bottom plate 7 are fixed on push rod unit 9 by steady pin and before short tube units 6 Enter the rear in direction.
Present invention also offers a kind of Non-excavation pipeline restoration device of short tube connection and the renovation technique of renovation technique, tool Body comprises the following steps:
S1, upstream water source are blocked up, and the personnel of tripping in upstream well room wear waterproof garment, and air bag is filled in into upstream line, passes through gas Pump, up to upstream water source is completely isolated, by reamer sewage pump, is managed upstream well room, original using rotary hose to airbag aeration Ponding in road and downstream well room pumps to downstream municipal pipeline;
S2, pipe dredging, rinse former pipeline repeatedly using high-pressure sewer flushing vehicle, debris, sludge are pulled to bilge well, work of going into the well Debris is transported in the dredging vehicle of ground with bucket, the mud in bilge well pumped with environmental sanitation suction-type sewer scavenger;
S3, the prospecting of former pipeline, with pipe endoscopic sem observation original pipeline content broken situation;
S4, hydraulic jack platform is built, led on the upstream well room for the former pipe ends being repaired and downstream well chamber interior walls Pressure-bearing steel plate installation fixed hydraulic oil cylinder is crossed, and the specification of hydraulic jack is 150T;
S5, bar, every push rod unit is swum well room gradually downward using the hydraulic jack in S4 and promoted, often promotes one Push rod unit, another push rod unit is accessed again after hydraulic jack reset, until push rod enters downstream well room, the brill of pilot hole Enter present ground and extrapolate height measuring relief along drilling direction, be oriented to according still further to the drilling track with plinking in DCI Crept under survey meter monitoring, guide probe instrument tracking measurement often creeps into the drill bit after the distance of a height measuring relief Physical location, if find that drilling track is not inconsistent with planned course, correct at once, ensure the accuracy of drilling, and make a record, The control gradient measures depth, inclination angle using guide probe instrument, must not exceed 0.1% towards angle equivalence, the error of above-mentioned data, with Ensure the gradient, axis, the accuracy of elevation,;
S6, broken reaming, after downstream well room is delivered in push rod promotion, reamer is installed by steady pin, passes through upstream well room Interior hydraulic jack is pulled back to push rod, and the process of pulling back need to close closely wipes prexxure of the hydraulic pump change, to determine that cutter is managed with former The tube wall in road keeps vertical, is pushed open laterally after being isolated by reamer to former pipeline and by former pipeline;
S7, push pipe reparation, while step S6 is carried out, add push rod unit and short tube list in the afterbody of push rod successively Member, there can not be gap between the bell and spigot between short tube unit, and sealing ring is preset between short tube unit interface, in short tube unit The rear of advance is fixed by bottom plate, prevents from misplacing between short tube, until short tube unit is entered in the well room of upstream, And stretch out 15-25cm;
S8, fixed short tube unit, the short tube unit nozzle base electricity consumption in upstream well room and downstream well room beat out one Wide 10cm, deep 10 sides, long 20cm hole, then it is close to inject three root long 20cm round bar at the mouth of pipe to prevent short tube list Member is moved outward, and is reinforced by accelerated cement line up periphery, and 3h is stood after floating troweling;
S9, well room is repaired, gutter channel is puzzled with common brick, water-setting, according to the former gradient, and recovery floating with accelerated cement to well The original state in room, stand 3h;
S10, water flowing, examination, sweep on-site sanitation, and dregs, refuse collection is clean, and the personnel of going into the well wear waterproof garment, reduce After air bag pressure, closure air bag is taken out, water flowing is carried out, is checked and accepted after qualified.
The length of the short tube unit in push rod unit and step S7 in step S5 is identical, each push rod unit and short tube The length of unit is 40cm.
Sealing ring in step S7 uses 4.0mm, and anti-strong acid, anti-highly basic, corrosion-resistant, polyurethane material are made, for list Mold is customized, anti-strong acid, alkali fluid liquid glue, and the hardening cementation time is 3h.
The spacing of height measuring relief in step S5 is 1m.
Embodiment 2
The invention provides the Non-excavation pipeline restoration device and renovation technique of a kind of short tube connection, including push rod 4 and short Pipe unit 6, the push rod 4 are fixedly connected by multiple push rod units 9 by screw thread head and the tail, and the push rod 4 is located at original to be repaired Inside pipeline 2, the short tube unit 6 of reparation is cased with the push rod 4, reamer 5 and bottom plate 7, institute are additionally provided with the push rod 4 State the former both ends of pipeline 2 to connect with upstream well room 1 and downstream well room 3 respectively, pacify respectively in the upstream well room 1 and downstream well room 3 Equipped with hydraulic jack 8, one end of the push rod unit 9 is fixedly connected with threaded post 902, in the other end of the push rod unit 9 Portion is provided with the thread bush that is matched with threaded post 902, and the push rod unit 9 is provided with positioning hole 901, and the one of the short tube unit 6 End is provided with sealing ring 601, and by plugged and fixed between adjacent two short tube units 6, the short tube unit 6 is by HDPE high pressures The cutting of polyethylene long tube forms, and the thickness of the overlapping part of short tube unit 6 is the half of pipe thickness, the reamer 5 Outside is fixedly connected with cutter 501 at maximum gauge, and the reamer 5 is fixed on push rod unit 9 and is located at by steady pin The front of the direction of advance of short tube unit 6, the bottom plate 7 are fixed on push rod unit 9 by steady pin and before short tube units 6 Enter the rear in direction.
Present invention also offers a kind of Non-excavation pipeline restoration device of short tube connection and the renovation technique of renovation technique, tool Body comprises the following steps:
S1, upstream water source are blocked up, and the personnel of tripping in upstream well room wear waterproof garment, and air bag is filled in into upstream line, passes through gas Pump, up to upstream water source is completely isolated, by reamer sewage pump, is managed upstream well room, original using rotary hose to airbag aeration Ponding in road and downstream well room pumps to downstream municipal pipeline;
S2, pipe dredging, rinse former pipeline repeatedly using high-pressure sewer flushing vehicle, debris, sludge are pulled to bilge well, work of going into the well Debris is transported in the dredging vehicle of ground with bucket, the mud in bilge well pumped with environmental sanitation suction-type sewer scavenger;
S3, the prospecting of former pipeline, with pipe endoscopic sem observation original pipeline content broken situation;
S4, hydraulic jack platform is built, led on the upstream well room for the former pipe ends being repaired and downstream well chamber interior walls Pressure-bearing steel plate installation fixed hydraulic oil cylinder is crossed, and the specification of hydraulic jack is 150T;
S5, bar, every push rod unit is swum well room gradually downward using the hydraulic jack in S4 and promoted, often promotes one Push rod unit, another push rod unit is accessed again after hydraulic jack reset, until push rod enters downstream well room, the brill of pilot hole Enter present ground and extrapolate height measuring relief along drilling direction, be oriented to according still further to the drilling track with plinking in DCI Crept under survey meter monitoring, guide probe instrument tracking measurement often creeps into the drill bit after the distance of a height measuring relief Physical location, if find that drilling track is not inconsistent with planned course, correct at once, ensure the accuracy of drilling, and make a record, The control gradient measures depth, inclination angle using guide probe instrument, must not exceed 0.1% towards angle equivalence, the error of above-mentioned data, with Ensure the gradient, axis, the accuracy of elevation,;
S6, broken reaming, after downstream well room is delivered in push rod promotion, reamer is installed by steady pin, passes through upstream well room Interior hydraulic jack is pulled back to push rod, and the process of pulling back need to close closely wipes prexxure of the hydraulic pump change, to determine that cutter is managed with former The tube wall in road keeps vertical, is pushed open laterally after being isolated by reamer to former pipeline and by former pipeline;
S7, push pipe reparation, while step S6 is carried out, add push rod unit and short tube list in the afterbody of push rod successively Member, there can not be gap between the bell and spigot between short tube unit, and sealing ring is preset between short tube unit interface, in short tube unit The rear of advance is fixed by bottom plate, prevents from misplacing between short tube, until short tube unit is entered in the well room of upstream, And stretch out 20cm;
S8, fixed short tube unit, the short tube unit nozzle base electricity consumption in upstream well room and downstream well room beat out one Wide 10cm, deep 10 sides, long 20cm hole, then it is close to inject three root long 20cm round bar at the mouth of pipe to prevent short tube list Member is moved outward, and is reinforced by accelerated cement line up periphery, and 4h is stood after floating troweling;
S9, well room is repaired, gutter channel is puzzled with common brick, water-setting, according to the former gradient, and recovery floating with accelerated cement to well The original state in room, stand 4h;
S10, water flowing, examination, sweep on-site sanitation, and dregs, refuse collection is clean, and the personnel of going into the well wear waterproof garment, reduce After air bag pressure, closure air bag is taken out, water flowing is carried out, is checked and accepted after qualified.
The length of the short tube unit in push rod unit and step S7 in step S5 is identical, each push rod unit and short tube The length of unit is 50cm.
Sealing ring in step S7 uses 4.0mm, and anti-strong acid, anti-highly basic, corrosion-resistant, polyurethane material are made, for list Mold is customized, anti-strong acid, alkali fluid liquid glue, and the hardening cementation time is 3h.
The spacing of height measuring relief in step S5 is 1.5m
Embodiment 3
The invention provides the Non-excavation pipeline restoration device and renovation technique of a kind of short tube connection, including push rod 4 and short Pipe unit 6, the push rod 4 are fixedly connected by multiple push rod units 9 by screw thread head and the tail, and the push rod 4 is located at original to be repaired Inside pipeline 2, the short tube unit 6 of reparation is cased with the push rod 4, reamer 5 and bottom plate 7, institute are additionally provided with the push rod 4 State the former both ends of pipeline 2 to connect with upstream well room 1 and downstream well room 3 respectively, pacify respectively in the upstream well room 1 and downstream well room 3 Equipped with hydraulic jack 8, one end of the push rod unit 9 is fixedly connected with threaded post 902, in the other end of the push rod unit 9 Portion is provided with the thread bush that is matched with threaded post 902, and the push rod unit 9 is provided with positioning hole 901, and the one of the short tube unit 6 End is provided with sealing ring 601, and by plugged and fixed between adjacent two short tube units 6, the short tube unit 6 is by HDPE high pressures The cutting of polyethylene long tube forms, and the thickness of the overlapping part of short tube unit 6 is the half of pipe thickness, the reamer 5 Outside is fixedly connected with cutter 501 at maximum gauge, and the reamer 5 is fixed on push rod unit 9 and is located at by steady pin The front of the direction of advance of short tube unit 6, the bottom plate 7 are fixed on push rod unit 9 by steady pin and before short tube units 6 Enter the rear in direction.
Present invention also offers a kind of Non-excavation pipeline restoration device of short tube connection and the renovation technique of renovation technique, tool Body comprises the following steps:
S1, upstream water source are blocked up, and the personnel of tripping in upstream well room wear waterproof garment, and air bag is filled in into upstream line, passes through gas Pump, up to upstream water source is completely isolated, by reamer sewage pump, is managed upstream well room, original using rotary hose to airbag aeration Ponding in road and downstream well room pumps to downstream municipal pipeline;
S2, pipe dredging, rinse former pipeline repeatedly using high-pressure sewer flushing vehicle, debris, sludge are pulled to bilge well, work of going into the well Debris is transported in the dredging vehicle of ground with bucket, the mud in bilge well pumped with environmental sanitation suction-type sewer scavenger;
S3, the prospecting of former pipeline, with pipe endoscopic sem observation original pipeline content broken situation;
S4, hydraulic jack platform is built, led on the upstream well room for the former pipe ends being repaired and downstream well chamber interior walls Pressure-bearing steel plate installation fixed hydraulic oil cylinder is crossed, and the specification of hydraulic jack is 150T;
S5, bar, every push rod unit is swum well room gradually downward using the hydraulic jack in S4 and promoted, often promotes one Push rod unit, another push rod unit is accessed again after hydraulic jack reset, until push rod enters downstream well room, the brill of pilot hole Enter present ground and extrapolate height measuring relief along drilling direction, be oriented to according still further to the drilling track with plinking in DCI Crept under survey meter monitoring, guide probe instrument tracking measurement often creeps into the drill bit after the distance of a height measuring relief Physical location, if find that drilling track is not inconsistent with planned course, correct at once, ensure the accuracy of drilling, and make a record, The control gradient measures depth, inclination angle using guide probe instrument, must not exceed 0.1% towards angle equivalence, the error of above-mentioned data, with Ensure the gradient, axis, the accuracy of elevation,;
S6, broken reaming, after downstream well room is delivered in push rod promotion, reamer is installed by steady pin, passes through upstream well room Interior hydraulic jack is pulled back to push rod, and the process of pulling back need to close closely wipes prexxure of the hydraulic pump change, to determine that cutter is managed with former The tube wall in road keeps vertical, is pushed open laterally after being isolated by reamer to former pipeline and by former pipeline;
S7, push pipe reparation, while step S6 is carried out, add push rod unit and short tube list in the afterbody of push rod successively Member, there can not be gap between the bell and spigot between short tube unit, and sealing ring is preset between short tube unit interface, in short tube unit The rear of advance is fixed by bottom plate, prevents from misplacing between short tube, until short tube unit is entered in the well room of upstream, And stretch out 25cm;
S8, fixed short tube unit, the short tube unit nozzle base electricity consumption in upstream well room and downstream well room beat out one Wide 10cm, deep 10 sides, long 20cm hole, then it is close to inject three root long 20cm round bar at the mouth of pipe to prevent short tube list Member is moved outward, and is reinforced by accelerated cement line up periphery, and 5h is stood after floating troweling;
S9, well room is repaired, gutter channel is puzzled with common brick, water-setting, according to the former gradient, and recovery floating with accelerated cement to well The original state in room, stand 5h;
S10, water flowing, examination, sweep on-site sanitation, and dregs, refuse collection is clean, and the personnel of going into the well wear waterproof garment, reduce After air bag pressure, closure air bag is taken out, water flowing is carried out, is checked and accepted after qualified.
The length of the short tube unit in push rod unit and step S7 in step S5 is identical, each push rod unit and short tube The length of unit is 60cm.
Sealing ring in step S7 uses 4.0mm, and anti-strong acid, anti-highly basic, corrosion-resistant, polyurethane material are made, for list Mold is customized, anti-strong acid, alkali fluid liquid glue, and the hardening cementation time is 3h.
The spacing of height measuring relief in step S5 is 2m
In summary, compared with prior art, it is an advantage of the invention that:Can be in narrow and small well room by many short tube lists Member 6 fits together the pipeline to form an entirety, by isolating former pipe 2 and outwards pushing so that new internal diameter of the pipeline can With identical with former pipeline 2, using existing well room, without excavating working pit and ground, can both realize between two well rooms The integral replacing of drainage pipeline, greatly improve the replacing efficiency of pipeline, environmental protection.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic, Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., it should be included in the present invention's Within protection domain.

Claims (5)

1. a kind of Non-excavation pipeline restoration device and renovation technique of short tube connection, including push rod (4) and short tube unit (6), its It is characterised by:The push rod (4) is fixedly connected by multiple push rod units (9) by screw thread head and the tail, and the push rod (4) is positioned to be repaired Multiple former pipeline (2) is internal, and the short tube unit (6) of reparation is cased with the push rod (4), expansion is additionally provided with the push rod (4) Hole device (5) and bottom plate (7), former pipeline (2) both ends connect with upstream well room (1) and downstream well room (3) respectively, the upstream Hydraulic jack (8) is separately installed with well room (1) and downstream well room (3).
2. the Non-excavation pipeline restoration device and renovation technique, its feature of a kind of short tube connection according to claim 1 exist In:One end of the push rod unit (9) is fixedly connected with threaded post (902), is provided with inside the other end of the push rod unit (9) The thread bush matched with threaded post (902), the push rod unit (9) are provided with positioning hole (901).
3. the Non-excavation pipeline restoration device and renovation technique, its feature of a kind of short tube connection according to claim 1 exist In:One end of the short tube unit (6) is provided with sealing ring (601), and is consolidated between adjacent two short tube units (6) by grafting It is fixed.
4. the Non-excavation pipeline restoration device and renovation technique, its feature of a kind of short tube connection according to claim 3 exist In:The short tube unit (6) is formed by the cutting of HDPE polyethylene from high pressure processes long tube, and the thickness of the overlapping part of short tube unit (6) For the half of pipe thickness.
5. the Non-excavation pipeline restoration device and renovation technique, its feature of a kind of short tube connection according to claim 1 exist In:Outside is fixedly connected with cutter (501) at the maximum gauge of the reamer (5), and the reamer (5) is consolidated by steady pin It is scheduled on push rod unit (9) and is fixed on positioned at the front of short tube unit (6) direction of advance, the bottom plate (7) by steady pin On push rod unit (9) and positioned at the rear of short tube unit (6) direction of advance.
CN201720785306.1U 2017-07-01 2017-07-01 A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection Expired - Fee Related CN206973157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720785306.1U CN206973157U (en) 2017-07-01 2017-07-01 A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720785306.1U CN206973157U (en) 2017-07-01 2017-07-01 A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection

Publications (1)

Publication Number Publication Date
CN206973157U true CN206973157U (en) 2018-02-06

Family

ID=61406079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720785306.1U Expired - Fee Related CN206973157U (en) 2017-07-01 2017-07-01 A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection

Country Status (1)

Country Link
CN (1) CN206973157U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108953759A (en) * 2018-06-27 2018-12-07 广东管博管道技术科技有限公司 Self-balancing is two-way to eat pipe replacement restorative procedure and device
CN109210315A (en) * 2017-07-01 2019-01-15 健管(厦门)环境科技有限公司 A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection
CN110565779A (en) * 2019-09-03 2019-12-13 苏州市平海排水服务有限公司 method for trenchless replacement and repair of sewage pipeline
CN110593978A (en) * 2018-06-12 2019-12-20 伊希欧1控股有限公司 Camshaft unit and method for producing a camshaft unit
CN111810715A (en) * 2020-06-18 2020-10-23 中铁工程装备集团有限公司 Trenchless pipeline updating method and construction system
CN114250846A (en) * 2021-12-29 2022-03-29 上海辉拓市政工程有限公司 Short pipe replacement repairing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109210315A (en) * 2017-07-01 2019-01-15 健管(厦门)环境科技有限公司 A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection
CN110593978A (en) * 2018-06-12 2019-12-20 伊希欧1控股有限公司 Camshaft unit and method for producing a camshaft unit
CN110593978B (en) * 2018-06-12 2021-10-22 伊希欧1控股有限公司 Camshaft unit and method for producing a camshaft unit
CN108953759A (en) * 2018-06-27 2018-12-07 广东管博管道技术科技有限公司 Self-balancing is two-way to eat pipe replacement restorative procedure and device
CN110565779A (en) * 2019-09-03 2019-12-13 苏州市平海排水服务有限公司 method for trenchless replacement and repair of sewage pipeline
CN111810715A (en) * 2020-06-18 2020-10-23 中铁工程装备集团有限公司 Trenchless pipeline updating method and construction system
CN111810715B (en) * 2020-06-18 2021-09-24 中铁工程装备集团有限公司 Trenchless pipeline updating method and construction system
CN114250846A (en) * 2021-12-29 2022-03-29 上海辉拓市政工程有限公司 Short pipe replacement repairing method
CN114250846B (en) * 2021-12-29 2024-04-26 上海辉拓市政工程有限公司 Repairing method for short tube replacement

Similar Documents

Publication Publication Date Title
CN206973157U (en) A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection
CN109210315A (en) A kind of Non-excavation pipeline restoration device and renovation technique of short tube connection
CN205261132U (en) Non - excavation repair system of method of inserting expands
CN110735992A (en) CIPP ultraviolet curing repair construction method
CN110747965B (en) Expansion-draw pipe construction process for reconstruction and expansion of drainage pipe network
CN206845146U (en) A kind of water-stop and antipriming to be drawn water for Geology Drilling layering
CN101798939A (en) Maintainable tunnel drainage system
CN106939595A (en) A kind of rotary digging bottom-enlarging filling pile construction technology
CN113898817A (en) Trenchless crack embedding repair method for large-diameter drainage pipeline
CN109440863A (en) Environment-friendly type rainwater recycling system
EP2456926B1 (en) A collecting system and method for unclogging and repairing a clogged drain
CN206873610U (en) The unattended duct type unit combination pumping plant in underground
CN206289663U (en) A kind of body and pipe gallery
CN214363571U (en) Underground cavern dewatering system free of influence of obstacles
Reyna et al. Construction technologies for sewer rehabilitation
CN114136558A (en) Sonar seepage detection method for underground diaphragm wall of deep foundation pit near subway
CN114250846A (en) Short pipe replacement repairing method
CN202913497U (en) Planomural winding pipeline plate-strip used for repairing rainy sewer pipeline
CN105401634A (en) Pipeline plugging construction method based on data simulation
CN205348220U (en) Double -barrelled and plastics well leak hunting facility of collapsible loess area plastics
CN110560467B (en) Harmless treatment method for waste and old pipelines
CN106638695A (en) Leakage detection ditch for building protection in large-thickness collapsible loess area
CN220433885U (en) Desilting device
CN214363618U (en) Construction structure of concrete inverted hanging well suitable for mucky soil
CN214460945U (en) Civil engineering road drainage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20190701

CF01 Termination of patent right due to non-payment of annual fee