CN206971462U CN201720616971.8U CN201720616971U CN206971462U CN 206971462 U CN206971462 U CN 206971462U CN 201720616971 U CN201720616971 U CN 201720616971U CN 206971462 U CN206971462 U CN 206971462U
Authority
CN
China
Prior art keywords
masonry
connecting pole
concrete
filling wall
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720616971.8U
Other languages
Chinese (zh)
Inventor
杨洋
侯海萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201720616971.8U priority Critical patent/CN206971462U/en
Application granted granted Critical
Publication of CN206971462U publication Critical patent/CN206971462U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a kind of connecting pole for filling wall, filling wall includes the first masonry and the second masonry being oppositely arranged, formed with reserved casting space between first masonry and second masonry, sole plate is connected between the bottom of first masonry and second masonry, top plate is connected between the top of first masonry and the second masonry, the connecting pole includes:Bar construction, in the reserved casting space, the top of the bar construction is connected to the top plate by the first anchor rib, and the bottom of the bar construction is connected to the sole plate by the second anchor rib;Tension rib, the bar construction is connected to, the first end of the tension rib is embedded in first masonry in advance, and the second end of the tension rib is embedded in second masonry in advance;And concrete, it is filled in the reserved casting space.The utility model solve frame structure filling wall length it is longer when, the problem of filling the globality and fastness difference of wall.

Description

Fill the connecting pole of wall
Technical field
It the utility model is related to technical field of building construction, and in particular to a kind of connecting pole for filling wall.
Background technology
The wall of frame structure is filling wall, and filling wall is gone along with sb. to guard him and compartmentation, weight are undertaken by beam column, and filling wall is not Load-bearing.When the length for filling wall is longer, due to building block itself drying shrinkage that filling wall uses, Yi Jicai during practice of construction Material differential deformation make it that the globality for filling wall and fastness are poor.
Utility model content
The defects of to overcome present in prior art, a kind of connecting pole for filling wall is now provided, with solution framework structure Fill wall length it is longer when, the problem of filling the globality and fastness difference of wall.
To achieve the above object, there is provided a kind of connecting pole for filling wall, filling wall include the first masonry for being oppositely arranged and Second masonry, formed with reserved casting space between first masonry and second masonry, first masonry and described Sole plate is connected between the bottom of second masonry, top plate is connected between the top of first masonry and the second masonry, The connecting pole includes:
Bar construction, in the reserved casting space, the top of the bar construction is connected by the first anchor rib In the top plate, the bottom of the bar construction is connected to the sole plate by the second anchor rib;
Tension rib, the bar construction is connected to, the first end of the tension rib is embedded in first masonry in advance, described Second end of tension rib is embedded in second masonry in advance;And
Concrete, it is filled in the reserved casting space.
Further, the connecting pole also includes the first cracking resistance piece being connected between the first masonry and the concrete.
Further, the connecting pole also includes the second cracking resistance piece being connected between the second masonry and the concrete.
Further, the concrete is fiber concrete.
Further, formed between the first end face of first masonry and the first end face of second masonry described pre- Stay casting space, the first end face of the first end face of first masonry and second masonry is roughened surface.
Further, waterproof layer is provided between the top plate and the concrete.
Further, the waterproof layer is Bituminous hemp fiber.
The beneficial effects of the utility model are that the utility model fills the connecting pole of wall, by the first of filling wall Connecting pole is set between masonry and the second masonry, and one side connecting pole connects the first masonry and the second masonry of horizontal direction, carried The high fastness and shear resistance of filling wall;On the other hand, vertical reserved casting space vibrates in concreting process Work can smoothly be carried out, and can improve the compaction rate of concrete.The real connecting pole of puddling also causes between connecting pole and wall With reference to more firmly, and then cause connecting pole to play antidetonation, cracking resistance effect, improve the construction quality of masonry.
Brief description of the drawings
Fig. 1 is the schematic diagram for the connecting pole that the utility model fills wall.
Fig. 2 is the sectional view at A-A in Fig. 1.
Fig. 3 is the view for not installing cracking resistance piece for the connecting pole that the utility model fills wall.
Embodiment
Illustrate embodiment of the present utility model below by way of specific instantiation, those skilled in the art can be by this theory Content disclosed by bright book understands other advantages and effect of the present utility model easily.The utility model can also be by addition Different embodiments are embodied or practiced, and the various details in this specification can also be based on different viewpoints with answering With, without departing from it is of the present utility model spirit under carry out various modifications or alterations.
Fig. 1 is that schematic diagram, Fig. 2 of the connecting pole of the utility model filling wall are that sectional view, Fig. 3 in Fig. 1 A-A at is The view for not installing cracking resistance piece of the connecting pole of utility model filling wall.
Referring to figs. 1 to shown in Fig. 3, filling wall includes the first masonry 11 and the second masonry 12 being oppositely arranged.First masonry 11 and second between masonry 12 formed with reserved casting space.Base is connected between the bottom of first masonry 11 and the second masonry 12 Plinth bottom plate 2.Top plate 3 is connected between the top of first masonry 11 and the second masonry 12.
The utility model provides a kind of connecting pole for filling wall, and connecting pole includes:Bar construction 41, tension rib 42, mix The 43, second cracking resistance piece 44 of solidifying soil, the second cracking resistance piece 45 and waterproof layer 46.
Bar construction 41 is located in the reserved casting space.The top of bar construction 41 is connected by the first anchor rib 411 Top plate 3 is connected to, the bottom of bar construction is connected to sole plate 2 by the second anchor rib 412.
Tension rib 42 is connected to bar construction 41, and the first end of tension rib 42 is embedded in the first masonry 11 in advance, tension rib 42 The second end be embedded in advance in the second masonry 12.
Concrete 43 is filled in the reserved casting space.Further, concrete 43 is fiber concrete.
As a kind of preferable embodiment, between the first end face of the first masonry 11 and the first end face of the second masonry 12 Form the reserved casting space, the first end face of the first end face of the first masonry 11 and the second masonry 12 is roughened surface, to carry High connecting pole and the first masonry 11, the associativity of the second masonry 12.
First cracking resistance piece 44 is connected between the first masonry 11 and concrete 43.
Second cracking resistance piece 45 is connected between the second masonry 12 and concrete 43.
First cracking resistance piece 44, the second cracking resistance piece 45 are cracking resistance steel wire or cracking resistance grid cloth.
, can be the after the first cracking resistance piece 44, the installation of the second cracking resistance piece 45 in order to improve the aesthetics of filling wall Primary antibody sliver 44, the outside of the second cracking resistance piece 45 are by plastering so that the side of filling wall and connecting pole is more smooth.
The junction of the masonry 11 of concrete 43 and first is provided with the first cracking resistance piece 44.The friendship of the masonry 12 of concrete 43 and second Meet place and be provided with the second cracking resistance piece 45.The first end of first cracking resistance piece 44 is followed closely on the first masonry 11, the first cracking resistance piece with cement nail Followed closely with cement nail on the concrete 43 of connecting pole at 44 the second end.
First cracking resistance piece 44, the second cracking resistance piece 45 are mainly used in preventing from producing between connecting pole and the first masonry, the second masonry Raw crack.
Lateral length >=300mm of first cracking resistance piece 44, the second cracking resistance piece 45.
In the present embodiment, for water proofing property, waterproof layer 46 is provided between top plate 3 and concrete 43.Waterproof layer 46 is Bituminous hemp fiber.
The utility model fills the connecting pole of wall, is connected by being set between the first masonry and the second masonry of filling wall Post, one side connecting pole connect the first masonry and the second masonry of horizontal direction, improve the fastness and shear resistance of filling wall; On the other hand, vertical reserved casting space work of being vibrated in concreting process can smoothly be carried out, and can improve mixed Coagulate the compaction rate of soil.The real connecting pole of puddling also to combine more firmly between connecting pole and wall, and then causes connecting pole Antidetonation, cracking resistance effect are played, improves the construction quality of masonry.
In addition, in traditional filling walling Structural Engineering construction, according to the needs of engineering design in masonry structure Constructing structure post.Filling walling and the masonry of constructional column adjacent regions should be built into gingival cyst of mucous gland in the newborn stranding, and gingival cyst of mucous gland in the newborn is rubbed with the hands and should first stepped back into each Gingival cyst of mucous gland in the newborn stranding is preferably 60mm no more than 300mm, concavo-convex size along the size of short transverse.Then in the filling walling of both sides Pour constructional column.The constructional column of this horse tooth trough formula, work of being vibrated in actual casting process are greatly limited, and stretch into masonry Part concrete in structure can not fully be vibrated so that the compaction rate of constructional column is poor, cause constructional column antidetonation and Tectonism is substantially reduced and fallen flat, and has had a strong impact on the construction quality of filling walling.
It is computed, the volume of the part stretched into masonry structure of horse tooth trough formula constructional column accounts for whole horse tooth trough formula constructional column The 37.5% of volume.
Compared with traditional horse tooth trough formula constructional column, the connecting pole of wall is filled using the utility model, first, eliminates biography The part that system horse tooth trough formula constructional column is stretched into filling walling, can save engineering cost;Secondly because on filling walling Horse tooth trough is not formed, so in connecting pole casting process, concrete, which can be realized, fully to vibrate, so that connecting pole is more encrypted It is real, it on the one hand can effectively strengthen the construction quality of connecting pole, on the other hand so that between connecting pole and filling walling With reference to more firmly, further, make connecting pole that there is preferable tectonism and anti-seismic performance.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only coordinating Content disclosed in bright book, so that those skilled in the art understands and reads, being not limited to the utility model can implement Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, In the case where not influenceing the effect of the utility model can be generated and the purpose that can reach, all should still fall disclosed in the utility model Technology contents obtain and can cover in the range of.Meanwhile in this specification it is cited as " on ", " under ", "left", "right", " in Between " and " one " etc. term, be merely convenient to understanding for narration, and be not used to limit the enforceable scope of the utility model, its Relativeness is altered or modified, in the case where changing technology contents without essence, when being also considered as the enforceable category of the utility model.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality New restriction, the utility model will be used as protection domain using the scope that appended claims define.

Claims (7)

1. a kind of connecting pole for filling wall, it is characterised in that filling wall includes the first masonry and the second masonry being oppositely arranged, institute State between the first masonry and second masonry formed with reserved casting space, the bottom of first masonry and second masonry Sole plate is connected between portion, top plate, the connecting pole bag are connected between the top of first masonry and the second masonry Include:
Bar construction, in the reserved casting space, the top of the bar construction is connected to institute by the first anchor rib Top plate is stated, the bottom of the bar construction is connected to the sole plate by the second anchor rib;
Tension rib, the bar construction is connected to, the first end of the tension rib is embedded in first masonry in advance, the drawknot Second end of muscle is embedded in second masonry in advance;And
Concrete, it is filled in the reserved casting space.
2. the connecting pole of filling wall according to claim 1, it is characterised in that the connecting pole also includes being connected to first The first cracking resistance piece between masonry and the concrete.
3. the connecting pole of filling wall according to claim 2, it is characterised in that the connecting pole also includes being connected to second The second cracking resistance piece between masonry and the concrete.
4. the connecting pole of filling wall according to claim 3, it is characterised in that the concrete is fiber concrete.
5. the connecting pole of filling wall according to claim 1, it is characterised in that the first end face of first masonry and institute State and form the reserved casting space, the first end face of first masonry and described second between the first end face of the second masonry The first end face of masonry is roughened surface.
6. the connecting pole of filling wall according to claim 1, it is characterised in that set between the top plate and the concrete There is waterproof layer.
7. the connecting pole of filling wall according to claim 6, it is characterised in that the waterproof layer is Bituminous hemp fiber.
CN201720616971.8U 2017-05-31 2017-05-31 Fill the connecting pole of wall Expired - Fee Related CN206971462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720616971.8U CN206971462U (en) 2017-05-31 2017-05-31 Fill the connecting pole of wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720616971.8U CN206971462U (en) 2017-05-31 2017-05-31 Fill the connecting pole of wall

Publications (1)

Publication Number Publication Date
CN206971462U true CN206971462U (en) 2018-02-06

Family

ID=61410635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720616971.8U Expired - Fee Related CN206971462U (en) 2017-05-31 2017-05-31 Fill the connecting pole of wall

Country Status (1)

Country Link
CN (1) CN206971462U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685373A (en) * 2019-09-16 2020-01-14 浙江绿筑集成科技有限公司 Construction method of integrated exterior wall masonry system
CN112282123A (en) * 2020-10-16 2021-01-29 合力建设有限公司 Masonry filler wall constructional column and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685373A (en) * 2019-09-16 2020-01-14 浙江绿筑集成科技有限公司 Construction method of integrated exterior wall masonry system
CN112282123A (en) * 2020-10-16 2021-01-29 合力建设有限公司 Masonry filler wall constructional column and construction method thereof

Similar Documents

Publication Publication Date Title
CN206143951U (en) Connected node of rammed earth wall and blockwork
CN105155724B (en) A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall
CN101629423A (en) Method for rigidly plugging overlength and ultra-thick block concrete foundation and board post poured band
CN206971462U (en) Fill the connecting pole of wall
CN106592810A (en) Construction method of wrapping fair brick masonry for concrete structure of historic building
CN105756377B (en) A kind of swimming pool and its construction method
CN206625449U (en) A kind of Zipper-type wall component, made wall and used zip key
CN207553505U (en) Assembled wall anchoring assembly
CN208777557U (en) Exposed inversion reinforcing bar grout sleeve precast concrete column
CN206267179U (en) A kind of flexible cladding soil nail wall protective slope structure
CN211114261U (en) Precast concrete shear force wall panel structure
CN108193815A (en) The float Structure and its construction method of a kind of cast-in-place concrete hollow building roof
CN209429263U (en) A kind of prefabricated column connected node fixing templates
CN207469550U (en) A kind of across wall balcony slab of assembled
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN207829483U (en) Slab thickness controller
CN207144237U (en) Assembled heat insulation concrete walls structural connection and attachment structure
CN207469433U (en) A kind of assembled arthitecutral structure system
CN206309023U (en) Fast easy-to-closing in net stencil
CN109098307A (en) Brick output enters the wall body structure and wall building method of stone
CN109057101A (en) The method of construction and exterior wall of support construction and exterior wall
CN209686743U (en) Precast stair connecting node
CN205557839U (en) Brickwork infilled wall and main body frame's flexible connection mean
CN207775725U (en) A kind of special disposable light filling composite core mould of bridge
CN109505422B (en) Reinforcing method for ancient building wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206