CN206969945U - A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle - Google Patents

A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle Download PDF

Info

Publication number
CN206969945U
CN206969945U CN201720072125.4U CN201720072125U CN206969945U CN 206969945 U CN206969945 U CN 206969945U CN 201720072125 U CN201720072125 U CN 201720072125U CN 206969945 U CN206969945 U CN 206969945U
Authority
CN
China
Prior art keywords
base
web
guiding trestle
tensioning apparatus
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720072125.4U
Other languages
Chinese (zh)
Inventor
贺敏鹏
李飞
高起鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XJ Schindler Xuchang Elevator Co Ltd
XJ Elevator Co Ltd
Original Assignee
XJ Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XJ Elevator Co Ltd filed Critical XJ Elevator Co Ltd
Priority to CN201720072125.4U priority Critical patent/CN206969945U/en
Application granted granted Critical
Publication of CN206969945U publication Critical patent/CN206969945U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

It the utility model is related to a kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle.Guiding trestle includes being used for the base that is directly anchored to the pit of elevator hoistways on relatively independent with main orbit, base has two, the guide rail for being fixed with T-shaped is erected on each base, the web of two guide rails is arranged in opposite directions, and the upper tie-beam in top and the lower tie-beam in bottom are connected between the web of two guide rails, lower tie-beam is in the top of base.During tensioning apparatus works, tensioning apparatus will not interfere with main orbit, caused vibration in tensioning wheel group would not be also transferred on main orbit, ensure that the reliability service of lift car.

Description

A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle
Technical field
It the utility model is related to a kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle.
Background technology
At present, as the development of elevator technology and the raising of living standards of the people, the application of elevator in daily life are got over Come more extensive, have become the indispensable part of daily life China, ride quality of the elevator user to elevator It is required that also more and more higher.It is existing compensation rope tensioning apparatus in use exist compensation rope the hitch point of car and counterweight can and Respective center of gravity produces larger skew, so as to cause elevator the phenomenon of unbalance loading when running to be present, easily causes abnormal elevator to vibrate With lead boots unbalance stress lifetime.It is comparatively laborious during the guidance system installation of tensioning apparatus to have multiple Auxiliary supports and and elevator Main orbit link together, the abnormal vibrations of tensioning apparatus can be delivered to the backbone of elevator by Auxiliary support when elevator is run The operational effect of elevator is influenceed on road.
When the speed of service of elevator is more than 3m/s, the weight compensating system of elevator dragging wire rope will use steel wire rope to mend The form repaid, the compensation of elevator one end of restricting are fixed on sedan-chair frame, and other end is fixed on counterweight system and run with compensating elevator During traction machine both sides steel wire rope weight change, ensureing that the pulling force difference of elevator traction machine both sides steel wire rope is relatively stable makes Elevator is more smoothly run.The reliable and stable operation in order that compensation is restricted, generally it can be provided with compensation rope in elevator pit Tight device, compensation rope is tensed by the deadweight for compensating tensioning apparatus of restricting, because compensation rope has elongation or contracting in use It is short, so a rope sheave is a device that can vertically fluctuate, while in order to ensure elevator stable operation rope sheave Relative position in the horizontal direction will keep constant, in order to realize function above, it is necessary to compensate the guiding branch of rope tensioning apparatus Frame can limit the free degree of the free degree of the horizontal direction of a rope sheave without limiting vertical direction.Super high speed elevator is transported in high speed During row, the pulley set for compensating rope is rotated at a high speed with the motion of compensation rope, due to mismachining tolerance rigging error and The presence of many factors such as abrasion is all solid when traditional guiding trestle is fixed so a rope sheave can vibrate when rotating It is scheduled on guide rail, thus the vibration of a rope sheave can pass to the T-shaped guide rail of elevator by guiding trestle, the pressing plate of T-shaped guide rail exists Certain loosening and movement can occur so that T-shaped guide rail position changes under the influence of vibrating for a long time, cause elevator The running quality of the installation accuracy variation influence elevator of guide rail.The brand-new structure design that the type guiding trestle uses, guiding Support is fixed on pit mattess, and a rope sheave conducts after caused vibration is delivered to guiding trestle in the process of running On band ground, the isolation of whole the compensation rope tensioning apparatus and guide rail of realization, avoid bad caused by a rope sheave vibration meeting Consequence.
The content of the invention
The utility model aims to provide a kind of guiding trestle for the main orbit for not influenceing elevator, while additionally provides one kind and make With the compensation rope tensioning apparatus of the guiding trestle and the super high speed elevator system using the compensation rope tensioning apparatus.
In order to solve the above technical problems, the technical scheme of guiding trestle is as follows in the utility model:
Guiding trestle, including for the base that is directly anchored to the pit of elevator hoistways on relatively independent with main orbit, Base has two, and the guide rail for being fixed with T-shaped is erected on each base, and the web of two guide rails is arranged in opposite directions, and in the abdomen of two guide rails The upper tie-beam in top and the lower tie-beam in bottom are connected between plate, lower tie-beam is in the top of base.
Offer the bolt penetration hole installed for heavy crab-bolt on base, the bolt penetration hole on each base have it is multiple and It is spaced apart on base.
The lower end of guide rail is provided with the mounting seat that cooperation is affixed with base top surface, and mounting seat, which is bolted, is fixed on base On.
Upper and lower tie-beam includes two connecting plates for being overlapped on web both sides respectively, and web is between two connecting plates, And two connecting plates are connected on web by same group of bolt.
The bottom of upper tie-beam and the top of lower tie-beam are provided with the bumper being fixed between two connecting plates, bumper tool There is the connecting portion that is bolted between two connecting plates on two connecting plates and an anticollision portion that the side from connecting plate is exposed.
The technical scheme of super high speed elevator compensation rope tensioning apparatus is as follows in the utility model:
Super high speed elevator compensation rope tensioning apparatus, including guiding trestle and thereon vertically guiding movement assembling tensioning wheel Group, guiding trestle include being used for the base that is directly anchored to the pit of elevator hoistways on relatively independent with main orbit, and base has Two, the guide rail for being fixed with T-shaped is erected on each base, the web of two guide rails is arranged in opposite directions, and between the web of two guide rails The upper tie-beam in top and the lower tie-beam in bottom are connected with, lower tie-beam is in the top of base.
Offer the bolt penetration hole installed for heavy crab-bolt on base, the bolt penetration hole on each base have it is multiple and It is spaced apart on base.
The lower end of guide rail is provided with the mounting seat that cooperation is affixed with base top surface, and mounting seat, which is bolted, is fixed on base On.
Upper and lower tie-beam includes two connecting plates for being overlapped on web both sides respectively, and web is between two connecting plates, And two connecting plates are connected on web by same group of bolt.
The bottom of upper tie-beam and the top of lower tie-beam are provided with the bumper being fixed between two connecting plates, bumper tool There is the connecting portion that is bolted between two connecting plates on two connecting plates and an anticollision portion that the side from connecting plate is exposed.
The technical scheme of super high speed elevator system is as follows in the utility model:
Super high speed elevator system, including elevator hoistways, compensation rope tensioning apparatus, compensation are installed on the pit of elevator hoistways Tensioning apparatus of restricting includes guiding trestle and vertically the tensioning wheel group of guiding movement assembling, guiding trestle include being used for and master thereon The relatively independent base being directly anchored on the pit of elevator hoistways of track, base have two, fixation are erected on each base There is the guide rail of T-shaped, the web of two guide rails is arranged in opposite directions, and the upper tie-beam in top is connected between the web of two guide rails With the lower tie-beam in bottom, lower tie-beam is in the top of base.
Offer the bolt penetration hole installed for heavy crab-bolt on base, the bolt penetration hole on each base have it is multiple and It is spaced apart on base.
The lower end of guide rail is provided with the mounting seat that cooperation is affixed with base top surface, and mounting seat, which is bolted, is fixed on base On.
Upper and lower tie-beam includes two connecting plates for being overlapped on web both sides respectively, and web is between two connecting plates, And two connecting plates are connected on web by same group of bolt.
The bottom of upper tie-beam and the top of lower tie-beam are provided with the bumper being fixed between two connecting plates, bumper tool There is the connecting portion that is bolted between two connecting plates on two connecting plates and an anticollision portion that the side from connecting plate is exposed.
Guiding trestle is to be directly anchored to by two separate bases on pit in the utility model, and just It is relatively independent with elevator main orbit, so during tensioning apparatus works, tensioning apparatus is not for fixed position It can be interfered with main orbit, caused vibration in tensioning wheel group would not be also transferred on main orbit, ensure that elevator The reliability service of car.Meanwhile two relatively independent base for Integral pedestal, on the one hand cause avoid base The material part of upper nonuseable part wastes, and on the other hand when a base damages, does not influence another base, also allows for whole The service life of individual guiding trestle extends, and further ensures reliable, the stable operation of elevator.
Brief description of the drawings
Fig. 1 is the structural representation of super high speed elevator system in the utility model;
Fig. 2 is the structural representation of tensioning apparatus in Fig. 1;
Fig. 3 is the structural representation of guiding trestle in Fig. 2.
Embodiment
Describe the utility model in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that do not rushing In the case of prominent, the feature in embodiment and embodiment in the utility model can be mutually combined.
The embodiment of super high speed elevator system in the utility model:As shown in figure 1, super high speed elevator system is mainly by elevator Hoistway and its lift appliance of interior setting composition.
Elevator hoistways are according to building body gauge lattice entity design, and the master that roof is extended to from pit is provided with elevator hoistways Track, the main orbit can be single or more piece docking forms.
Lift appliance includes car 1, tensioning apparatus 2 and counterweight 3, and pile warp is connected between car 1 and counterweight 3 The compensation rope 4 of tensioning apparatus 2.As shown in Fig. 2 mainly vertically guiding movement fills tensioning apparatus 2 by guiding trestle 21 and thereon The tensioning wheel group 22 matched somebody with somebody is formed.
Tensioning wheel group 22 realizes the commutation of compensation rope 4.
As shown in figure 3, guiding trestle 21 includes and main orbit is relatively independent is directly anchored on the pit of elevator hoistways Base 211, base 211 has two, the guide rail 212 for being fixed with T-shaped, the web phase of two guide rails 212 erected on each base 211 To arrangement, and the upper tie-beam in top and the lower tie-beam in bottom are connected between the web of two guide rails 212, under Tie-beam is in the top of base 211.The bolt penetration hole installed for heavy crab-bolt is offered on base 211, on each base 211 Bolt penetration hole have multiple and be spaced apart on base 211.
The lower end of guide rail 212 is provided with the mounting seat 213 that cooperation is affixed with the top surface of base 211, and mounting seat 213 is connected by bolt Connect and be fixed on base 211.Upper and lower tie-beam includes two connecting plates 214 for being overlapped on web both sides respectively, and web is in Between two connecting plates 214, and two connecting plates 214 are connected on web by same group of bolt.The bottom of upper tie-beam is with The top of tie-beam is provided with the bumper 215 being fixed between two connecting plates 214, and bumper 215, which has, is located at two connecting plates 214 Between and the connecting portion being bolted on two connecting plates 214 and the anticollision portion exposed from the side of connecting plate 214.
The present embodiment middle guide 212 is connected by upper tie-beam, lower tie-beam and forms a door frame shaped structure.Two lead The structure of rail 212 is full symmetric, welded by a T-shaped oblique reinforcement of 212, one, guide rail and a rectangular mounting seat 213 and Into four circular holes of processing are used in mounting seat 213 and base 211 is fixed by bolts to ground;The work of T-shaped guide rail 212 The both ends in face are respectively machined with two circular holes and upper tie-beam, the circular hole of lower tie-beam are bolted together.Upper tie-beam, Lower tie-beam is respectively provided with two pieces bumper 215 close to middle part, prevents that unexpectedly impact damages a pulley set;This is led To support 21, overall package is delivered before dispatching from the factory, and scene uses and its conveniently without secondary dismounting.Guiding trestle 21 it is T-shaped Guide rail 212 is the function executive component of guidance system, is coordinated by leading boots with four sets of a rope sheave over-assemble, T-shaped guide rail 212 Working face, which snaps onto, leads inside the shoe guide of boots, from its that can guarantee that a rope sheave can only slide up and down and limit along T-shaped guide rail 212 The free degree in its direction.
When mounted, the base 211 of first handle is firmly fixed on the ground with eight sets of heavy crab-bolts, then again guiding branch The mounting seat 213 of frame 21 is fixed on base 211 with high-strength bolt and realizes that guiding trestle 21 is installed, due to the quilt of guiding trestle 21 It is fixed on pit ground, and other systems of elevator are completely isolated, avoid the vibration of a rope sheave from passing to other systems and make Into adverse consequences.
The structure design of guiding trestle 21 for super high speed elevator compensation 4 pulley sets of rope that the present embodiment is related to is simple, assembling It is convenient, required function is realized by less parts, greatly the structure of simplified guiding trestle 21, so the portion The cost of part substantially reduces, it is possible to increase the profit margin of lift product.The part realizes one integral piece assembling delivery, and scene need not be torn open Dress, lifting is convenient during in-site installation, is easy to position, installation effectiveness is improved so installing and saving labor;The type is oriented to branch Frame 21 is reliably fixed on the mattess of pit by heavy crab-bolt and high-strength bolt, and other systems of elevator Completely isolated, a rope sheave rotates at a high speed caused vibration and is all transmitted on ground, will not be to other subsystems of elevator Have undesirable effect.
The embodiment of compensation rope tensioning apparatus in the utility model:The structure of the present embodiment compensation rope tensioning apparatus with it is upper It is identical to state the structure of tensioning apparatus in embodiment, therefore repeats no more.
The embodiment of guiding trestle in the utility model:Led in the present embodiment in the structure of guiding trestle and above-described embodiment It is identical to the structure of support, therefore repeat no more.

Claims (5)

1. guiding trestle, it is characterised in that including for the pit that is directly anchored to elevator hoistways relatively independent with main orbit On base, base has two, the guide rail for being fixed with T-shaped erected on each base, and the web of two guide rails is arranged in opposite directions, and two The upper tie-beam in top and the lower tie-beam in bottom are connected between the web of guide rail, lower tie-beam is in base Top;Upper and lower tie-beam includes two connecting plates for being overlapped on web both sides respectively, and web is between two connecting plates, and And two connecting plate be connected in by same group of bolt on web;The bottom of upper tie-beam and the top of lower tie-beam, which are provided with, to be fixed on Bumper between two connecting plates, bumper has is bolted to the connecting portion on two connecting plates between two connecting plates The anticollision portion exposed with the side from connecting plate.
2. guiding trestle according to claim 1, it is characterised in that the bolt installed for heavy crab-bolt is offered on base Perforate, the bolt penetration hole on each base has multiple and is spaced apart on base.
3. guiding trestle according to claim 2, it is characterised in that the lower end of guide rail is provided with is affixed cooperation with base top surface Mounting seat, mounting seat, which is bolted, to be fixed on base.
4. compensation rope tensioning apparatus, it is characterised in that including the guiding branch as described in any one in above-mentioned claims 1 to 3 Frame and the tensioning wheel group that vertically guiding movement assembles thereon.
5. super high speed elevator system, including elevator hoistways, it is characterised in that compensation rope tensioning is installed on the pit of elevator hoistways Device, compensation rope tensioning apparatus include guiding trestle as described in any one in above-mentioned claims 1 to 3 and thereon vertically The tensioning wheel group of guiding movement assembling.
CN201720072125.4U 2017-01-20 2017-01-20 A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle Expired - Fee Related CN206969945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720072125.4U CN206969945U (en) 2017-01-20 2017-01-20 A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720072125.4U CN206969945U (en) 2017-01-20 2017-01-20 A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle

Publications (1)

Publication Number Publication Date
CN206969945U true CN206969945U (en) 2018-02-06

Family

ID=61414663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720072125.4U Expired - Fee Related CN206969945U (en) 2017-01-20 2017-01-20 A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle

Country Status (1)

Country Link
CN (1) CN206969945U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502676A (en) * 2018-06-27 2018-09-07 苏州莱茵电梯股份有限公司 High-speed elevator compensation rope tension device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502676A (en) * 2018-06-27 2018-09-07 苏州莱茵电梯股份有限公司 High-speed elevator compensation rope tension device

Similar Documents

Publication Publication Date Title
US11365095B2 (en) Method and an arrangement for installing elevator guide rails into an elevator shaft
CN1882495B (en) Method for mounting elevator steering pulley, elevator and use of quick connector
US9676596B2 (en) Elevator refurbishing method
EP3231757B1 (en) Guide rail support
AU2005200039A1 (en) Drive for a lift installation and method of converting a drive in a lift installation
US8407876B2 (en) Modernization method for elevator installations
US9382094B2 (en) Elevator refurbishment method
CN104321268A (en) Method of installing a machine in an elevator system
US11845638B2 (en) Method for installing an elevator system
CN206969945U (en) A kind of super high speed elevator system and its compensation rope tensioning apparatus, guiding trestle
CN102837705B (en) Traveling bogie in steel box
EP1771374B1 (en) Mounting base for an elevator machine
US20170008733A1 (en) Combined guide rail for an elevator system
CN104291192A (en) Traction machine rack device of home elevator
CN206705446U (en) A kind of super high speed elevator compensation rope tensioning apparatus and its tensioning wheel group
CN205662206U (en) 4 than 1 no computer lab elevator traction device
EP4039632A1 (en) Method for expanding a rise of an elevator hoistway
CN109607357A (en) The machine-roomless lift of damping noise reduction traction machine
CN105236248B (en) New machine-roomless lift load-carrying members
CN208980118U (en) A kind of machine-roomless lift rope head fixing device
CN209685095U (en) The fixed device of the traction machine of elevator without engine room being easily installed
WO2021070362A1 (en) Hoist adjustment device and hoist installation method for machine-room-less elevator
CN207330042U (en) A kind of lift compensation chain guiding device structure
CN218520852U (en) Traction system of freight elevator
EP4056514A1 (en) Method for mounting an elevator drive

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20190120

CF01 Termination of patent right due to non-payment of annual fee