CN206945356U - Oil pipeline on-line period device - Google Patents

Oil pipeline on-line period device Download PDF

Info

Publication number
CN206945356U
CN206945356U CN201720171666.2U CN201720171666U CN206945356U CN 206945356 U CN206945356 U CN 206945356U CN 201720171666 U CN201720171666 U CN 201720171666U CN 206945356 U CN206945356 U CN 206945356U
Authority
CN
China
Prior art keywords
valve
branch road
pipeline
sampling
process valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720171666.2U
Other languages
Chinese (zh)
Inventor
张博春
聂中文
陈子赓
闫晖
柯琳
王大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Design Branch Of China Petroleum Pipeline Engineering Corp
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Engineering Corp Design Branch filed Critical China National Petroleum Corp
Priority to CN201720171666.2U priority Critical patent/CN206945356U/en
Application granted granted Critical
Publication of CN206945356U publication Critical patent/CN206945356U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

A kind of oil pipeline on-line period device is the utility model is related to, a segment process pipeline is provided with main pipeline, the arrival end of the process pipelines connects sampling probe, the outlet terminating nozzles of the process pipelines, and the sampling probe and nozzle access main pipeline;The process pipelines are other after sampling pump to access sample return line, substitutes table sample on the sampling loop pipeline, remaining liq finally also imports main pipeline.The utility model can realize that reliable, real-time continuous, sample size is accurate, flow control in loop is accurate, be finally reached and obtain representative sample, sampling process automation, the requirement of system control precision.

Description

Oil pipeline on-line period device
Technical field
A kind of oil pipeline on-line period device is the utility model is related to, belongs to detection and the pipeline sampling system skill of quality Art field.
Background technology
For oil pipeline on-line period technology, conventional process is manual manual sampling or on oil transportation main pipeline Bypass is drawn, and sampling pump and sampling equipment are set in bypass, then the mode for leading back injection main pipeline will be bypassed.
The shortcomings that such a sampler is:1st, mixing arrangement is not provided with, can not ensure that liquid is sufficiently mixed in pipeline, is obtained Sample may be under-represented;2nd, be not provided with sampling control system, can not realize to sampling system equipment state, power conditions, The monitoring of sampling loop flow velocity, sampling frequency;3rd, flow measurement is not carried out to sampling loop, to liquid stream in sampling loop whether just Chang Wufa judges;4th, because pipeline medium cleannes are not high, the impurity that the inside is contained is frequently occluded sampling pump, causes sampling pump Failure damage, it can not thus realize that on-line period is carried out continuously;5th, pump discharge pipeline easily produces backflow;6th, it is not provided with manually Sampler, the system failure can not sample;7th, back-up circuit is not provided with, system easily produces failure;8th, it is not provided with sampling container Facility is protected, sample is easily produced and overflows peril;9th, it is not provided with cleaning interface, is unfavorable for system maintenance, easily pollutes sample Product;10th, temperature, pressure instrumentation are not provided with, lacks the monitoring to loop process parameter;11st, flow control is not implemented, can not Realize that sampling loop flow follows main pipeline changes in flow rate;12nd, be not implemented in sampling rate and sample size and main pipeline flow into Ratio.
Utility model content
To solve the above problems, the purpose of this utility model is that providing one kind makes the operation of oil pipeline on-line period more become In standardization, facilitation, scientific, automation, on-line period systematic sampling representativeness, accuracy, continuity, reliably are improved Property and security, facilitate operation maintenance, monitoring management, the oil pipeline on-line period device of installation and transportation.
The purpose of this utility model is achieved through the following technical solutions:
A kind of oil pipeline on-line period device, a segment process pipeline is provided with main pipeline, the process pipelines Arrival end connects sampling probe, the outlet terminating nozzles of the process pipelines, and the sampling probe and nozzle access main pipeline;
Wherein, sampling probe is sequentially connected in series process valve A and process valve B, the process valve B connection branch road A and branch Road B entrance, the branch road A is identical with branch road B settings, wherein branch road A from entrance be sequentially connected in series process valve C, pressure gauge A, Filter A, sampling pump A, pressure gauge B, process valve D and check valve A, branch road A and branch road B outlet merge into a pipeline, And process valve G and process valve H are sequentially connected in series after joint, most access main pipeline through the nozzle afterwards;
The branch road A, branch road B joint and process valve G between it is other access sample return line, wherein, the sampling Return line is sequentially connected in series process valve I, on-line densimeter and process valve K, the process valve K connection branch roads C from entrance With branch road D entrance;The branch road C is identical with branch road D setting, and wherein branch road C is sequentially connected in series process valve L from entrance, taken Sample control valve A and process valve M, branch road D are sequentially connected in series process valve N, sampling control valve B and process valve O from entrance;It is described Branch road C and branch road D outlet merge into a pipeline, and be sequentially connected in series after joint pressure transmitter, temperature transmitter, Flowmeter, purge valve B, process valve Q and process valve R, finally import main pipeline;
Sampled control valve A and sampling control valve B's branch road C and branch road D are connected together as pipeline E respectively, the pipeline E's Entrance connects liquid separation triple valve, connects sample reception tank A and sample reception tank B, the sample respectively after the liquid separation triple valve Product receiving tank A and sample reception tank B are respectively placed on weighing instrument A and weighing instrument B.
Further, sampling pump A, on-line densimeter, weighing instrument A, weighing instrument B, sampling control valve A, sampling control valve B, Liquid separation triple valve, pressure transmitter, temperature transmitter, flowmeter are by instrument cable access controller, and the controller is through instrument Table cable accesses master control system.
Further, the sampling probe stretches into main pipeline center to main pipeline central lower 0.1D position, wherein, D For the diameter of main pipeline.
Further, the nozzle is hollow straight tube, the bottom lock of the nozzle and is combined with main pipeline bottom, described It is empty that the outer wall of hollow straight tube is uniformly provided with several sprays.
Further, the other dynamic sampling valve of catcher between sampling probe and process valve A;
It is other between the entrance and liquid separation triple valve of the pipeline E to connect relief valve.
Further,
It is other between process valve B and branch road A, branch road B inlet connections to meet purge valve A;
It is other between the entrance and process valve I of sampling loop pipeline to connect sewage draining valve.
Further,
Filter A both sides parallel connection differential pressure switches A, the differential pressure switch A is through instrument cable access controller;
Pipeline F parallel connection technology the valves J, the process valve J that process valve I, on-line densimeter and process valve K are formed With connecing emptying valve by the junction of pipeline F outlets;
Branch road C and branch road D both sides are parallel with one section of bypass line, and the bypass line is provided with process valve P.
Further, it is single between process valve A and process valve B, process valve B and branch road A, branch road B inlet connections To valve A and branch road A, branch road B outlet joint between, branch road A, branch road B outlet joint and process valve G between, work Between skill valve G and process valve H, between the entrance and process valve I of sampling loop pipeline, process valve K and branch road C, branch Between road D inlet connection, between branch road C, branch road D outlet joint and pressure transmitter, purge valve B and process valve Q Between, electric tracing thermal insulation part is equipped between process valve Q and process valve R.
Further, the sampling pump B on the sampling pump A and branch road B uses frequency conversion centrifugal pump.
Further, the metal screen in the filter B on the filter A and branch road B is provided with magnetic absorption device.
The beneficial effects of the utility model are:
It can realize that oil pipeline on-line period is carried out continuously using on-line period device described in the utility model, there is sampling Representativeness, quantity accuracy, operation stability, simple operation, beneficial to many-sided advantage such as maintenance in the future and maintenance, realize Also superior system remote detection and control are subjected to while sampling system independent control.Pipe-line construction and operational management is set more to become In standardization, modularization, high efficiency, hommization, shortcut.
Oil pipeline is reliable, easy for installation, real using that can be realized after on-line period device described in the utility model Shi Lianxu, sample size are accurate, flow control in loop is accurate, and reach obtain representative sample, sampling process automation, System control precision requirement, ensure that sampling system it is continuous, obtain representational sample stably, automatically, in proportion. The device is provided with dynamic mixed function, the stream being fitted into using pump discharge in the nozzle jet-action mixed charge road in main pipeline Body, it is ensured that liquid stream can be well mixed under any flow velocity in main pipeline so that fully represented into the liquid stream in sampling loop The property of liquid in main pipeline, avoid sampling from only representing local feature and do not possess representativeness.The device can be real provided with controller Now to equipment in sampling loop (pump, sampling control valve, liquid separation triple valve) and operational factor (pressure, temperature, flow, sampling amount, Density, liquid level of sample reception tank etc.) real-time monitoring;And the instruction of higher level's master control system can be received at any time;According to supervisor Flow velocity in road improves or reduced sampling frequency;Ensure steady sampling system, safety, controlled operation.The device sampling loop is set There is a flowmeter, the flow velocity of liquid in real-time measure loop, using the flow velocity of liquid in loop as controlled parameter, pass through and sample control system The rotating speed of system control variable frequency pump realizes in sampling loop flow rate of liquid in flow velocity real-time tracking main pipeline.The device is provided with redundancy Sampling pump, sample reception tank, sampling control valve, filter, ensure the continuously available of system.The device is connected with main pipeline Place sets manual sampling valve also to carry out manual sampling operation to ensure that even if system can not work.
The device fills outdoor design (controller is mounted remotely from the non-anti-explosion area at scene) by sledge, and its degree of protection is IP65, explosive-proof grade EXdIIBT4, fully meet open-air atmosphere and live requirement of explosion proof;Sample treatment and the sampling pump of conveying are adopted With frequency conversion centrifugal pump, realize to bypass and the flow velocity of sampling loop and the control of pressure, it is met the requirement of standard;In device Porch sampling pump before be provided with redundant filter, it is ensured that the stability and reliability of the continuous operation of sampling pump;Taking Sample pump discharge sets check valve to prevent that liquid level flows back in bypass duct;Butterworth Hatch is respectively provided with the inlet and outlet of device, Cleaning uses external medium cleaning way, and structure arrangement is easy to handle and cleaned, and can be achieved not turning off and safeguards in the case of main pipeline; Equipped with related emptying, blowdown pipeline and valve in sampling loop, blowdown, shut-off can be carried out to the pipeline in device and equipment And emission treatment, it is easy to daily maintenance and maintenance;Temperature transmitter, pressure transmitter, flowmeter are provided with sampling loop, it is real When monitor the temperature of sampling loop, pressure, flow, it is ensured that sampling is carried out under reasonable conditions;It is provided with sample reception tank Weighing-appliance, whether for being alarmed when the liquid level superelevation in device, while it is accurate to monitor sample size acquirement in tank;Provided with safety Bleeder valve, when superpressure reach safety valve release value when, safety valve action, to sample reception loop and connect sample reception tank implement Safeguard protection;Pipeline and equipment in device are provided with constant temperature electrical heating and Insulation, it is ensured that the stream in on-line period device Body is not protected from environmental, enables the device in outdoor stable operation.Differential pressure switch is set to be used for sample train before and after filter The running status of system detection filter, judges whether filter blocks.
The utility model is applied to oil pipeline on-line period.This automatic sampling system is used for domestic project first, mainly Technical indicator exceedes domestic best level, has reached international same period advanced level.Pumped (conveying) medium sample is inherently improved to take The representativeness obtained, reduce trade dispute;Do not influenceed by Oil Production technique and transport oil condition change;It is not affected by human factors; Reduce the labor intensity of operating personnel.The technique of use, equipment, material and structure technology are advanced, design document component content and Depth meets the requirements.With it is with high content of technology, processing performance is advanced, technological process is reasonable, do not produce the pressure loss, be applicable difference Caliber and any range of flow.Good environmental benefit, economic benefit and social benefit are generated after the system self-operating, very The requirement that good satisfaction is built, produces and use, overall economic efficiency are significantly improved than built same type project, and transport Row is reliably, stably, efficient, safe.
Brief description of the drawings
Fig. 1 is the structural representation of oil pipeline on-line period device described in the utility model;
Wherein, 1- sampling probes, the manual sampling valves of 2-, 3- process valves A, 4,7,17,26,29,34,40,53,58, 60- electric tracing thermal insulation parts, 5- process valves B, 6- purge valve A, 8- process pipelines, 9- process valves C, 10- pressure gauge A, 11- Filter A, 12- differential pressure switch A, 13- sampling pump A, 14- pressure gauge B, 15- process valve D, 16- check valve A, 18- technique valve Door E, 19- pressure gauge C 20- filter Bs, 21- differential pressure switches B, 22- sampling pump B, 23- pressure gauge D, 24- process valve F 25- Check valve B, 27- purge valve B, 28- process valve G, 30- process valve H, 31- nozzle 32- sampling loop pipelines, 33- blowdowns Valve, 35- process valves I, 36- on-line densimeter, 37- process valves J, 38- process valve K, 39- emptying valve, 41- techniques Valve L, 42- sampling control valve A, 43- process valve M, 44- process valve N, 45- sampling control valve B, 46- process valve O, 47- liquid separation triple valves, 48- relief valves, 49- sample reception tank A, 50- sample reception tank B, 51- weighing instruments A, 52- weigh Instrument B, 54- process valve P, 55- pressure transmitter, 56- temperature transmitters, 57- flowmeters, 59- process valves Q, 61- technique Valve R, 62,63,64,65,66,67,68,69,70,71,72,73,76- instrument cables, 74- controllers, 75- main controls system System.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining this Utility model, it is not used to limit the utility model.
A kind of oil pipeline on-line period device, as shown in figure 1, a segment process pipeline 8 is provided with main pipeline, it is described The arrival end of process pipelines 8 connects sampling probe 1, the outlet terminating nozzles 31 of the process pipelines 8, the sampling probe 1 and spray Mouth 31 accesses main pipeline.
Wherein, sampling probe 1 is sequentially connected in series process valve A3 and process valve B5, sampling probe 1 and process valve A3 it Between the other dynamic sampling valve 2 of catcher, the entrance of the process valve B5 connection branch road A and branch road B, the branch road A and branch road B settings It is identical, it is mutually redundant, wherein branch road A is sequentially connected in series process valve C9, pressure gauge A10, filter A11, sampling pump from entrance A13, pressure gauge B14, process valve D15 and check valve A16, branch road B are sequentially connected in series process valve E18, pressure gauge from entrance C19, filter B 20, sampling pump B22, pressure gauge D23, process valve F24 and check valve B25, filter A11 both sides are in parallel poor Compress switch A12, and filter B 20 both sides parallel connection differential pressure switch B21, the differential pressure switch A12, differential pressure switch B21 are through instrument electricity Cable access controller 74.It is other between process valve B5 and branch road A, branch road B inlet connections to meet purge valve A6.Branch road A and branch road B Outlet merge into a pipeline, and process valve G28 and process valve H30 are sequentially connected in series after joint, most afterwards through described Nozzle 31 accesses main pipeline.
The branch road A, branch road B joint and process valve G28 between it is other access sample return line 32, wherein, it is described Sampling loop pipeline 32 is sequentially connected in series process valve I35, on-line densimeter 36 and process valve K38, the technique valve from entrance Door K38 connection branch road C and branch road D entrance.Wherein, it is other between the entrance of sampling loop pipeline 32 and process valve I35 to run in Dirty valve 33.The pipeline F parallel connection technology valves J37 that process valve I35, on-line densimeter 36 and process valve K38 are formed, it is described Emptying valve 39 is connect by the junction of process valve J37 and pipeline F outlets.The branch road C is identical with branch road D setting, each other Redundancy, wherein branch road C are sequentially connected in series process valve L41 from entrance, sample control valve A42 and process valve M43, and branch road D enters certainly Mouth is sequentially connected in series process valve N44, sampling control valve B45 and process valve O46;The branch road C and branch road D outlet merges into One pipeline, and pressure transmitter 55, temperature transmitter 56, flowmeter 57, purge valve B27, work are sequentially connected in series after joint Skill valve Q59 and process valve R61, finally imports main pipeline.Branch road C and branch road D both sides are parallel with one section of bypass line, The bypass line is provided with process valve P54.
Sampled control valve A42 and sampling control valve B45's branch road C and branch road D are connected together as pipeline E, the pipe respectively Line E entrance connection liquid separation triple valve 47, sample reception tank A49 and sample reception are connected after the liquid separation triple valve 47 respectively Tank B50, sample reception tank A49 and sample reception the tank B50 are respectively placed on weighing instrument A51 and weighing instrument B52.Sampling Control valve A42 and sampling control valve B45 extracts medium the equipment that juxtaposition changed in sample receiver, full-bore design, complete Taken in section, variable frequency control, high-frequency action (30 times/min), it is ensured that meet that frequency is proportional to flow, unit sample Quantity obtains accurate.Sample reception tank A49 and sample reception tank B50 use full-closed structure, with fast connecting joint, safety Bleeder valve, the pressure vessel that material is stainless steel.It is other between the entrance and liquid separation triple valve 47 of the pipeline E to connect relief valve 48。
Sampling pump A13, on-line densimeter 36, weighing instrument A51, weighing instrument B52, sampling control valve A42, sampling control valve B45, liquid separation triple valve 47, pressure transmitter 55, temperature transmitter 56, flowmeter 57 by instrument cable access controller 74, The controller 74 accesses master control system through instrument cable.Flowmeter 57 selects mass flowmenter, and the degree of accuracy is high, and inside can not Dynamic component reduces maintenance workload, long lifespan, and can realize real-time dynamic by the pressure transmitter 55 in sampling loop pipeline Pressure compensation.Controller 74 is on-line period device " brain ", has multiple function:Cryptoguard;Monitor sampling loop pipe The parameters such as line temperature, pressure, flow, sample reception tank liquid level;Control sampling frequency, it is ensured that proportional to main pipeline flow;Control Frequency conversion processed centrifuges revolution speed, reaches control sampling loop line flow, the purpose of pressure;Control the flow direction of liquid separatnig valve;Equipment And power supply status monitoring, fault alarm;Communicated with higher level's master control system, receive higher level's master control system order and open, stop sampling Device, receive and monitor the flow status of main pipeline;And sampler parameter is uploaded into higher level's master control system.
The sampling probe 1 stretches into main pipeline center to main pipeline central lower 0.1D section position, wherein, based on D The diameter of pipeline, can so avoid influence of the tube wall to flow velocity and moisture content, and the sample of extraction is most representative.
The nozzle 31 is the hollow high intensity straight tube of bottom lock, is uniformly provided with along the outer wall of the hollow straight tube some Individual spray is empty, the straight tube straight cutting main pipeline bottom, makes whole pipeline beneficial to by the effect by pumping out liquid such as bottom deposit water Section, which reaches, to be sufficiently mixed, it is ensured that it is in office why not the flow velocity of profit, viscosity, unaffected under density;The bottom of the nozzle 31 Combined closely with main pipeline bottom, to resist moment of flexure caused by main pipeline internal cause Peak Flow Rate, and bear to trigger because of vortex Vibrations.
Between process valve A3 and process valve B5, process valve B5 and branch road A, branch road B inlet connections, check valve A16 and branch road A, branch road B outlet joint between, branch road A, branch road B outlet joint and process valve G28 between, work Between skill valve G28 and process valve H30, between the entrance and process valve I35 of sampling loop pipeline 32, process valve K38 With branch road C, branch road D inlet connection between, branch road C, branch road D outlet joint and pressure transmitter 55 between, purge valve Between B27 and process valve Q59, electric tracing thermal insulation part is equipped between process valve Q59 and process valve R61.
Sampling pump B22 on the sampling pump A13 and branch road B uses frequency conversion centrifugal pump, by controller control frequency conversion from The rotating speed of heart pump, reach the purpose of control sampling loop pipeline flow velocity and injection power.
Before the filter A11 and the redundancy of filter B 20 are arranged on sampling pump, it is provided with the metal screen in filter Magnetic absorption device, metallic residue and particle in institute's pumped (conveying) medium can be adsorbed well, ensure that the steady of filter and sampling pump Run calmly and extend its service life.
All pipelines of oil pipeline on-line period device described in the utility model and all devices of installation are integrated in Sledge is loaded onto, and pressure rating meets the requirement of design pressure.
Process valve I35, process valve J37, process valve K38, process valve L41, process valve M43, process valve N44, process valve O46, process valve P54 select 1 " 300#ANSI RF ball valves;
Process valve D15 and process valve F24 selects 3 " 300#ANSI RF ball valves;
Process valve C9, process valve E18, process valve G28 and process valve H30 select 4 " 300#ANSI RF balls Valve;
Process valve A3 and process valve B5 selects 6 " 300#ANSI RF ball valves;
Check valve A16 and check valve B25 selects 3 " 300#ANSI RF swing type check valves;
Process valve R61 selects 1 " 300#ANSI RF stop valves;
Sampling pump A13 and sampling pump B22 selects frequency conversion centrifugal pump, and entrance " 300#ANSI RF, is exported as 3 " 300# for 4 ANSI RF, maximum stream flow 400GPM, 380/3/60HZ;
" 300#ANSI RF basket filters, swing type bolt are fast from 4 " × 8 " × 4 for filter A11 and filter B 20 Speed opens closure;
Flowmeter 57 selects Rosement 1 " 300#ANSI RF mass flowmenters;
Sample control valve A42 and sampling control valve A45 select 1 " the electro-hydraulic bypass sampling control valves of 300#ANSI RF 210;
Relief valve 48 is from SS-4R3A types 1/4, and " pipe connects angle-style bleeder valve;
Sample reception tank A49 and sample reception tank A50 selects portable example receiving tank, maximum size: 5GAL;
Liquid separation triple valve 47 is made up of following sections:Changing Direction Type valve ferrule fitting SS-43- GXF4-51-SR, threeway Ball valve, spring return actuator and Changing Direction Type magnetic valve;
What on-line densimeter 36 was selected is " the 300#ANSI RF liquid densimeters of type 1 of Solartron 7845;
Pressure gauge A9, pressure gauge B15, pressure gauge C18, pressure gauge D24 selected ranges are 0-50Bar, and 1/2 " internal thread connects The pressure display unit connect;
Differential pressure switch A12 and differential pressure switch B21 selects the differential pressure switch with display function;
Pressure transmitter 55 and temperature transmitter 56 select Rosement product;
Control computer of the controller 74 from the models of OMNI 6000.After whole sampler sledge dress production and processing Anti-corrosion, the antirust treatment of correlation need be made, all process pipelines and equipment do electric tracing and isothermal holding.
In the present embodiment, using the method for on-line period device on-line period described in the utility model in flood-pot experiment process After be sampled calibrating, it is as follows:
Water filling
A) connection valve, filter, pressure gauge, pipeline, pump, stream are passed through in the upstream of sampler before Autosampler operation The equipment such as gauge, the water of dose known amounts is injected into main pipeline.
B) element of the water decanting point away from sampling system upstream, at the same need to be Jing Guo sampling system mixing equipment.
C) water injection rate generally accounts for the 1-5% of main pipeline rate-of flow at the appointed time, because this project system is being done The injection rate of the big needs of output oil amount is with regard to big during experiment, and can not be separated after injecting water, passed through on the premise of technical feasibility with customs, Commodity inspection is consulted, and injected water volume is adjusted to as 0.6% or so of pipe throughput rate.
D) water injection time is no less than 1 hour, to gather the water filling sample of abundance.
E) water is injected from pipeline bottom with certain speed, can not be produced other mix in injection process to product and be made With.The speed of medium and direction are identicals in the velocity attitude and main pipeline of water filling.
F the flowmeter accuracy for) measuring water volume is better than ± 2%.
Calibrating
Sampling calibrating carried out under conditions of worst, respectively before testing, test in, test after collect 3 samples. The sample that sampler collects 1 hour before water filling is operated, then regathers the sample of 1 hour in the injecting process, when all water fillings are situated between After matter is by sampler, then the sample that sampler receives 1 hour is operated, it is determined that containing before testing with the water in sample after test Amount, test between two moisture content values of gained no more than 0.1%.Water content in the sample obtained eventually through analytical sampling Judge the performance of whole sampling system with injecting the uniformity of water content, this is a percentage value, and the value exists It is the highest level of the degree of accuracy generally acknowledged in the world within 0.05%.This item purpose automatic sampling system degree of accuracy is examined through water filling This rank is reached.
The automatic sampling system of this Project design is as follows through flood-pot experiment verification result:Water content is through analysis in crude oil 0.0504% (sampling analysis), one hour water injection rate percentage of water filling (water for being measured according to flowmeter and defeated that is 0.6267% Oil mass is calculated), water content is obtained as 0.6684% by sampling analysis in test process, final sampling analysis and reality The deviation of water injection rate be -0.0087% (0.6684-0.6267-0.0504), this meets the requirement of international standard highest level.Should System is by the use more than 8 years, and stable, since putting into operation, sampling 10L or so, operates more than 10000 daily daily It is secondary, often act primary sample 1mL.
This example improves credibility, accuracy, repeatability, the stability of on-line period system through on probation, beneficial in the future Safeguard, many-sided advantage such as maintenance, and it is compact-sized, installation is simple, convenient transportation, it is possible to achieve outdoor sledge installing is put, and is saved Space and operation operation room are saved.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.

Claims (8)

1. a kind of oil pipeline on-line period device, it is characterised in that a segment process pipeline (8), institute are provided with main pipeline The arrival end for stating process pipelines (8) connects sampling probe (1), the outlet terminating nozzles (31) of the process pipelines (8), the sampling Probe (1) and nozzle (31) access main pipeline;
Wherein, sampling probe (1) is sequentially connected in series process valve A (3) and process valve B (5), process valve B (5) the connection branch Road A and branch road B entrance, the branch road A is identical with branch road B settings, and wherein branch road A is sequentially connected in series process valve C from entrance (9), pressure gauge A (10), filter A (11), sampling pump A (13), pressure gauge B (14), process valve D (15) and check valve A (16), branch road A and branch road B outlet merge into a pipeline, and process valve G (28) and technique are sequentially connected in series after joint Valve H (30), most access main pipeline through the nozzle (31) afterwards;
It is other between the branch road A, branch road B joint and process valve G (28) to access sample return line (32), wherein, it is described Sampling loop pipeline (32) is sequentially connected in series process valve I (35), on-line densimeter (36) and process valve K (38), institute from entrance State process valve K (38) connections branch road C and branch road D entrance;The branch road C is identical with branch road D setting, and wherein branch road C is certainly Entrance is sequentially connected in series process valve L (41), sampling control valve A (42) and process valve M (43), branch road D and is sequentially connected in series from entrance Process valve N (44), sampling control valve B (45) and process valve O (46);The branch road C and branch road D outlet merges into one Pipeline, and pressure transmitter (55), temperature transmitter (56), flowmeter (57), purge valve B are sequentially connected in series after joint (27), process valve Q (59) and process valve R (61), finally imports main pipeline;
Branch road C and branch road D distinguishes sampled control valve A (42) and sampling control valve B (45) is connected together as pipeline E, the pipe Line E entrance connection liquid separation triple valve (47), sample reception tank A (49) and sample are connected after the liquid separation triple valve (47) respectively Product receiving tank B (50), the sample reception tank A (49) and sample reception tank B (50) are respectively placed in weighing instrument A (51) and weighed On instrument B (52).
2. oil pipeline on-line period device according to claim 1, it is characterised in that the nozzle (31) is hollow straight Pipe, the bottom lock of the nozzle (31) and is combined with main pipeline bottom, and the outer wall of the hollow straight tube is uniformly provided with several Spray is empty.
3. oil pipeline on-line period device according to claim 1, it is characterised in that sampling probe (1) and technique valve The other dynamic sampling valve (2) of catcher between door A (3);
It is other between the entrance and liquid separation triple valve (47) of the pipeline E to connect relief valve (48).
4. oil pipeline on-line period device according to claim 1, it is characterised in that
It is other between process valve B (5) and branch road A, branch road B inlet connections to meet purge valve A (6);
It is other between the entrance and process valve I (35) of sampling loop pipeline (32) to connect sewage draining valve (33).
5. oil pipeline on-line period device according to claim 1, it is characterised in that
Filter A (11) both sides parallel connection differential pressure switch A (12), the differential pressure switch A (12) is through instrument cable access controller (74);
The pipeline F parallel connection technology valve J (37) that process valve I (35), on-line densimeter (36) and process valve K (38) are formed, The process valve J (37) by the junction of pipeline F outlets with connecing emptying valve (39);
Branch road C and branch road D both sides are parallel with one section of bypass line, and the bypass line is provided with process valve P (54).
6. oil pipeline on-line period device according to claim 1, it is characterised in that process valve A (3) and technique valve Door B (5), between process valve B (5) and branch road A, branch road B inlet connections, check valve A (16) and branch road A, branch road B outlet Between joint, between branch road A, branch road B outlet joint and process valve G (28), process valve G (28) and process valve Between H (30), between the entrance and process valve I (35) of sampling loop pipeline (32), process valve K (38) and branch road C, branch road Between D inlet connection, between branch road C, branch road D outlet joint and pressure transmitter (55), purge valve B (27) and technique Between valve Q (59), electric tracing thermal insulation part is equipped between process valve Q (59) and process valve R (61).
7. oil pipeline on-line period device according to claim 1, it is characterised in that the sampling pump A (13) and branch Sampling pump B (22) on the B of road uses frequency conversion centrifugal pump.
8. oil pipeline on-line period device according to claim 1, it is characterised in that the filter A (11) and branch The metal screen in filter B (20) on the B of road is provided with magnetic absorption device.
CN201720171666.2U 2017-02-24 2017-02-24 Oil pipeline on-line period device Active CN206945356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720171666.2U CN206945356U (en) 2017-02-24 2017-02-24 Oil pipeline on-line period device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720171666.2U CN206945356U (en) 2017-02-24 2017-02-24 Oil pipeline on-line period device

Publications (1)

Publication Number Publication Date
CN206945356U true CN206945356U (en) 2018-01-30

Family

ID=61357763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720171666.2U Active CN206945356U (en) 2017-02-24 2017-02-24 Oil pipeline on-line period device

Country Status (1)

Country Link
CN (1) CN206945356U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106840769A (en) * 2017-02-24 2017-06-13 中国石油天然气集团公司 Oil pipeline on-line period device
CN110180820A (en) * 2019-06-17 2019-08-30 江苏仁康蛋业有限公司 A kind of automatic operating and the on-line cleaning device of control

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106840769A (en) * 2017-02-24 2017-06-13 中国石油天然气集团公司 Oil pipeline on-line period device
CN110180820A (en) * 2019-06-17 2019-08-30 江苏仁康蛋业有限公司 A kind of automatic operating and the on-line cleaning device of control

Similar Documents

Publication Publication Date Title
CN106908276A (en) A kind of oil pipeline on-line period method
CN104976518B (en) A kind of submerged pipeline leakage monitoring system
CN106769219A (en) A kind of oil pipeline on-line period detection means
CN116026992B (en) Device and method for measuring element content in ore pulp
CN206945356U (en) Oil pipeline on-line period device
CN106908275A (en) Oil pipeline on-line period apparatus and method
CN102401235A (en) LNG (Liquefied Natural Gas) dispenser calibrating device
CN108507834A (en) A kind of pulp density on-line real-time measuremen device and method
CN202349591U (en) Calibration device of liquefied natural gas (LNG) dispenser
CN106840769A (en) Oil pipeline on-line period device
CN208588686U (en) Online nytron water content of matter and pure oil density analyze skid system
CN107796794B (en) Online oily sewage detection method based on ultraviolet fluorescence method
CN206670974U (en) A kind of oil pipeline on-line period detection means
CN107748149B (en) Online oily sewage detection device and detection method based on ultraviolet fluorescence method
CN102012255A (en) Automatic control system for oil well tipping bucket measurement
CN206246115U (en) A kind of High water cut low yield gas oil well liquid-producing three-phase metering mechanism
CN206945357U (en) A kind of oil pipeline on-line period device
CN207163748U (en) Liquid product intermittent sampling device
CN108709613A (en) A kind of system and method that achievable multithread gauge is calibrated simultaneously
CN207866395U (en) Flow control system for heat meter calibration
CN107101852B (en) Gas pipeline automatic sampling system integration skid-mounted unit
CN110491532A (en) Nuclear power station main pump abnormal leakage processing system and method
CN107589101A (en) Online oil-polluted water detection means based on ultraviolet fluorescence method
CN201443392U (en) Oil well passive positive displacement liquid meter
CN209210378U (en) A kind of Mobile automatic charging action of chemicals tank car

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Beijing Xicheng District six laying Kang

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: China National Petroleum Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190920

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.