CN206941780U - A kind of greasy dirt isolates well - Google Patents

A kind of greasy dirt isolates well Download PDF

Info

Publication number
CN206941780U
CN206941780U CN201720312868.4U CN201720312868U CN206941780U CN 206941780 U CN206941780 U CN 206941780U CN 201720312868 U CN201720312868 U CN 201720312868U CN 206941780 U CN206941780 U CN 206941780U
Authority
CN
China
Prior art keywords
fixed block
connecting tube
separation net
greasy dirt
boss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720312868.4U
Other languages
Chinese (zh)
Inventor
庞庆委
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Pangshi Plastic Industry Co Ltd
Original Assignee
Zhejiang Pangshi Plastic Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Pangshi Plastic Industry Co Ltd filed Critical Zhejiang Pangshi Plastic Industry Co Ltd
Priority to CN201720312868.4U priority Critical patent/CN206941780U/en
Application granted granted Critical
Publication of CN206941780U publication Critical patent/CN206941780U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of greasy dirt to isolate well, bonding strength is high between aiming to provide a kind of and separation net, stability is good, the greasy dirt isolation well that the install convenient of interception basket is firm and the structural strength of connecting tube is high, its drip irrigation device is that isolation well body includes pit shaft and is arranged at the first connecting tube and the second connecting tube in pit shaft side wall, first connecting tube is provided with separation net, separation net is provided with fixation kit, fixation kit is included in circular the first fixed block set on separation net, first fixed block includes connection end and the fixing end being connected with separation net, the end end of fixing end is provided with the second fixed block, formed with buckle area between second fixed block and the first fixed block, the tube wall of first connecting tube is provided with the first buckling groove being used for fixing end clamping, the utility model is applied to technical field of sewage treatment equipment.

Description

A kind of greasy dirt isolates well
Technical field
A kind of technical field of sewage treatment equipment is the utility model is related to, more specifically, it relates to which a kind of greasy dirt is isolated Well.
Background technology
Factory, the bilge well in living area are frequently occluded sewage well conduit due to OIH dirt, debris, mineral water bottle etc., make Not smooth into blowdown, roadside bilge well sewage overflow phenomenon occurs again and again, environment is polluted, while also bring substantial amounts of maintenance Workload.
At present, the greasy dirt isolation well of in the market, it includes greasy dirt isolation well body.Traditional greasy dirt isolation well can be in side Separation net is set in connecting tube, but because of the bonding strength and connective stability between separation net and the inside pipe wall of connecting tube It is poor, cause coming off for separation net, so as to pollute, and the interception basket being arranged in pit shaft is also because take out, or Lay inconvenient, influence practical function, and the structural strength for the connecting tube being arranged on pit shaft poor all presently, there are Problem.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is between providing a kind of and separation net that connection is strong Degree is high, stability is good, intercept basket install convenient is firm and greasy dirt isolation well that the structural strength of connecting tube is high.
To achieve the above object, the utility model provides following technical scheme:A kind of greasy dirt isolates well, including greasy dirt every From well body, it is characterized in that:Greasy dirt isolation well body include pit shaft and be arranged in pit shaft side wall the first connecting tube and Second connecting tube, the first connecting tube are provided with separation net, and separation net is provided with fixation kit, and fixation kit includes setting in annular shape The first fixed block on separation net is put, the cross section of the first fixed block is in " L " shape, and the first fixed block includes what is be connected with separation net Connection end and fixing end, the end end of fixing end are provided with the second fixed block, the cross-sectional triangle shape of the second fixed block, and second Formed with buckle area between fixed block and the first fixed block, the tube wall of first connecting tube, which is provided with, to be used for and fixing end clamping The first buckling groove, the side cell wall of the first buckling groove is provided with the second buckling groove being adapted with the second fixed block.
By using above-mentioned technical proposal, greasy dirt isolation well body includes pit shaft and is arranged at the first company in pit shaft side wall Adapter and the second connecting tube, the first connecting tube are provided with separation net, are connected by force between separation net and the first connecting tube to increase Degree and connective stability, separation net is provided with fixation kit, and fixation kit includes setting on separation net in circular First fixed block, the cross section of the first fixed block is in " L " shape, and the first fixed block includes the connection end being connected with separation net and consolidated Fixed end, the end end of fixing end are provided with the second fixed block, the cross-sectional triangle shape of the second fixed block, the tube wall of the first connecting tube The first buckling groove being used for fixing end clamping is provided with, the side cell wall of the first buckling groove is provided with mutually fits with the second fixed block The second buckling groove matched somebody with somebody, by the first fixed block in " L " shape, it ensure that the stable connection between separation net and the first connecting tube Property, the first fixed block includes connection end and the fixing end being connected with separation net, in order to further increase connection between the two Intensity, the end end of fixing end are provided with the second fixed block, the cross-sectional triangle shape of the second fixed block, are in triangle using cross section Second fixed block of shape, on the one hand, the second fixed block can facilitate the second fixed block to install into the first buckling groove and second In buckling groove, formed with buckle area, the second fixed block of cross section triangular shape between the second fixed block and the first fixed block Formed with the buckle area in a triangle straight side width, such as the buckle area of barb-like effect and the second card between the first fixed block Access slot is fitted close, so as to further ensure connective stability between the two.
The utility model is further arranged to:The distance between described first buckling groove and pit shaft madial wall and fixed block and The distance between separation net is adapted.
By using above-mentioned technical proposal, the distance between the first buckling groove and pit shaft madial wall and fixed block and separation net The distance between be adapted, by such as above-mentioned structure setting, add the bonding strength between separation net and the first connecting tube.
The utility model is further arranged to:Interception basket is additionally provided with the pit shaft, intercepting basket includes first end and second End, the bore for intercepting basket are gradually reduced from first end toward the second end, and connection frame is provided with handle.
By using above-mentioned technical proposal, interception basket is additionally provided with pit shaft, intercepting basket includes first end and the second end, intercepts The bore of basket is gradually reduced from first end toward the second end, by the way that the bore for intercepting basket is gradually reduced from first end toward the second end, On the one hand, will conveniently can connect in frame placement and pit shaft, on the other hand, even if can be during use because of current Flowing also can guarantee that the gradual fastening effect intercepted between basket and pit shaft, intercepts basket and is provided with handle, has further facilitated interception Basket is taken and laid.
The utility model is further arranged to:First is equipped with the outer tube wall of first connecting tube and the second connecting tube Boss and the second boss, the second boss are placed on the first boss, and the thickness of the second boss is thick for the first boss Twice of degree.
By using above-mentioned technical proposal, the first boss is equipped with the outer tube wall of the first connecting tube and the second connecting tube With the second boss, the second boss is placed on the first boss, and the thickness of the second boss is the two of the first boss thickness Times, by the outer tube wall of the first connecting tube and the second connecting tube the first boss and the second boss, the second boss put In on the first boss, because the first connecting tube and the second connecting tube need to be attached with other outer connecting pipes, and the One connecting tube and the second connecting tube are more bigger toward power suffered by outer end, would generally also have certain corrosion because of sewage, Cause it is larger to the corrosivity for connecting tube end, therefore by provided with the first boss and the second boss, ensure that pair The protection of connecting tube, and the thickness of the second boss is twice of the first boss thickness, and the utility model adds second Strong block is respectively placed in the end with the first connecting tube and the second connecting tube, so as to increase the first connecting tube and the second connecting tube Intensity.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram that a kind of greasy dirt of the utility model isolates well embodiment.
Fig. 2 is the separation net transverse direction cross section structure diagram that a kind of greasy dirt of the utility model isolates well embodiment.
Fig. 3 is the structural representation for the interception basket that a kind of greasy dirt of the utility model isolates well embodiment.
Reference in figure, 1- pit shafts, the connecting tubes of 10- first, the bosses of 101- first, the bosses of 102- second, 11- Two connecting tubes, 12- separation nets, the fixed blocks of 13- first, 130- connection ends, 131- fixing ends, the fixed blocks of 132- second, 133- cards Area is detained, 14- intercepts basket, 140- first ends, the ends of 141- second, 142- handles.
Embodiment
A kind of greasy dirt of the utility model isolation well embodiment is described further referring to figs. 1 to Fig. 3.
A kind of greasy dirt isolates well, including greasy dirt isolation well body, and greasy dirt isolation well body includes pit shaft 1 and is arranged at well First connecting tube 10 and the second connecting tube 11 in cylinder side wall, the first connecting tube 10 is provided with separation net 12, in order to increase separation net 1 Bonding strength and connective stability between the first connecting tube 10, separation net 12 are provided with fixation kit, and fixation kit Including being in " L " shape in the cross section of circular the first fixed block 13 set on separation net, the first fixed block 13, the first fixed block Including the connection end 130 being connected with separation net and fixing end 131, the end end of fixing end 131 is provided with the second fixed block 132, The cross-sectional triangle shape of second fixed block 132, the tube wall of the first connecting tube 10 are provided with the be used for the clamping of fixing end 131 One buckling groove, the side cell wall of the first buckling groove is provided with the second buckling groove being adapted with the second fixed block, by " L " shape The first fixed block 13, ensure that the connective stability between the connecting tube 10 of separation net 12 and first, the first fixed block 13 includes The connection end 130 being connected with separation net 12 and fixing end 131, it is fixed in order to further increase bonding strength between the two The end end at end 131 is provided with the second fixed block 132, the cross-sectional triangle shape of the second fixed block 132, is in triangle using cross section Second fixed block 132 of shape, on the one hand, the second fixed block 132 can facilitate the second fixed block 132 to install into the first buckling groove And second in buckling groove, formed with buckle area 133 between the second fixed block 132 and the first fixed block 13, cross section is in triangle Formed with the buckle area 133 in a triangle straight side width between the second fixed block 132 and the first fixed block 13 of shape, such as fall The buckling groove of buckle area 133 and second of hook-shaped effect is fitted close, so as to further ensure connective stability between the two.
The utility model is further arranged to, the distance between the first buckling groove and the madial wall of pit shaft 1 and fixed block 131 and The distance between separation net 12 is adapted, and by such as above-mentioned structure setting, is added between the connecting tube 10 of separation net 12 and first Bonding strength.
The utility model is further arranged to, and is additionally provided with pit shaft 1 and is intercepted basket 14, and intercepting basket 14 includes the He of first end 140 Second end 141, intercept basket 14 bore be gradually reduced from first end 140 toward the second end 141, by by intercept basket 14 bore from First end 140 is gradually reduced toward the second end 141, on the one hand, can facilitate will intercept frame 14 place with pit shaft, on the other hand, Can be during use even if because the flowing of current also can guarantee that intercepting the gradual fastening between basket 14 and pit shaft 1 imitates Fruit.
The utility model is further arranged to, and first is equipped with the outer tube wall of the first connecting tube 10 and the second connecting tube 11 The boss 102 of boss 101 and second, the second boss 102 are placed on the first boss 101, the thickness of the second boss 102 For twice of the thickness of the first boss 101, pass through first reinforcement on the outer tube wall of the first connecting tube 10 and the second connecting tube 11 The boss 102 of block 101 and second, the second boss 102 are placed on the first boss 101, because the first connecting tube 10 and Two connecting tubes 11 need to be attached with other outer connecting pipes, and the first connecting tube 10 and the second connecting tube 11 are more toward outer end Suffered power is bigger, would generally also have certain corrosion because of sewage, causes the corrosivity to connection tube end larger, because This by provided with the first boss 101 and the second boss 102, ensure that the protection to connecting tube, and second strengthens The thickness of block 102 is twice of the thickness of the first boss 101, and the second boss 102 is respectively placed in and the by the utility model The end of one connecting tube 10 and the second connecting tube 11, so as to increase the intensity of the first connecting tube 10 and the second connecting tube 11.
Preferred embodiment of the present utility model is the foregoing is only, not limiting the utility model, the skill of this area Art personnel carry out common variations and alternatives in the range of technical solutions of the utility model should all be included in guarantor of the present utility model In the range of shield.

Claims (5)

1. a kind of greasy dirt isolates well, including greasy dirt isolation well body, it is characterized in that:Greasy dirt isolation well body include pit shaft with And the first connecting tube and the second connecting tube in pit shaft side wall are arranged at, the first connecting tube is provided with separation net, and separation net is provided with Fixation kit, fixation kit are included in circular the first fixed block set on separation net, and the cross section of the first fixed block is in " L " Shape, the first fixed block includes the connection end being connected with separation net and fixing end, the end end of fixing end are provided with the second fixed block, The cross-sectional triangle shape of second fixed block, connect between the second fixed block and the first fixed block formed with buckle area, described first The tube wall of adapter is provided with the first buckling groove being used for fixing end clamping, and the side cell wall of the first buckling groove is provided with and second The second buckling groove that fixed block is adapted.
2. a kind of greasy dirt isolation well according to claim 1, it is characterized in that:First buckling groove and pit shaft madial wall it Between distance be adapted with the distance between fixed block and separation net.
3. a kind of greasy dirt isolation well according to claim 1, it is characterized in that:Interception basket is additionally provided with the pit shaft, is intercepted Basket includes first end and the second end, and the bore for intercepting basket is gradually reduced from first end toward the second end.
4. a kind of greasy dirt isolation well according to claim 1, it is characterized in that:First connecting tube and the second connecting tube The first boss and the second boss are equipped with outer tube wall, the second boss is placed on the first boss, the second boss Thickness is twice of the first boss thickness.
5. a kind of greasy dirt isolation well according to claim 3, it is characterized in that:The interception basket is provided with handle.
CN201720312868.4U 2017-03-28 2017-03-28 A kind of greasy dirt isolates well Active CN206941780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720312868.4U CN206941780U (en) 2017-03-28 2017-03-28 A kind of greasy dirt isolates well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720312868.4U CN206941780U (en) 2017-03-28 2017-03-28 A kind of greasy dirt isolates well

Publications (1)

Publication Number Publication Date
CN206941780U true CN206941780U (en) 2018-01-30

Family

ID=61357233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720312868.4U Active CN206941780U (en) 2017-03-28 2017-03-28 A kind of greasy dirt isolates well

Country Status (1)

Country Link
CN (1) CN206941780U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555216A (en) * 2019-01-23 2019-04-02 胡文臣 Clean drainage arrangement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555216A (en) * 2019-01-23 2019-04-02 胡文臣 Clean drainage arrangement
CN109555216B (en) * 2019-01-23 2024-04-05 胡文臣 Impurity-removing drainage device

Similar Documents

Publication Publication Date Title
CN206816962U (en) A kind of pipeline layout support for basement common trench gut line layout
CN207664545U (en) A kind of novel MPP power cable protecting pipes road
CN206846132U (en) A kind of hydraulic engineering pipeline protection cover
CN206941780U (en) A kind of greasy dirt isolates well
CN208656330U (en) A kind of multiduty PVC pipeline
CN210713247U (en) Building steel structure connecting device
CN206338506U (en) A kind of straight coupling
CN204691102U (en) Catchment and the agricultural greenhouse of sprinkle water function in one
CN204611202U (en) A kind of water pipe peep hole
CN204901125U (en) Conduit's adapter sleeve
CN207111331U (en) A kind of device for handling gas pipeline water blockoff
CN204901128U (en) Filtration type adapter sleeve
CN205350646U (en) Pipe joint
CN211232082U (en) Low temperature pipeline mounting structure
CN217307226U (en) Farmland hydraulic engineering construction pipe laying and line fixing device
CN218671006U (en) Drain pipe connecting structure
CN210291093U (en) Prefabricated direct-buried crossing tee joint connecting piece
CN207229165U (en) Cable tunnel is to road draining device
CN215681652U (en) Integral electric power tube convenient for multi-row connection
CN209130341U (en) A kind of cleaning equipment pipeline facilitating removal of impurities
CN214893519U (en) Buried water meter
CN213997078U (en) Air pipe cleaning machine for gas control cabinet
CN207846899U (en) A kind of pipe connecting device
CN209180536U (en) A kind of town road is easily assembled blow-off line
CN211113866U (en) Municipal water supply energy-saving protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant