CN206917400U - A kind of construction guardrail - Google Patents

A kind of construction guardrail Download PDF

Info

Publication number
CN206917400U
CN206917400U CN201720662625.3U CN201720662625U CN206917400U CN 206917400 U CN206917400 U CN 206917400U CN 201720662625 U CN201720662625 U CN 201720662625U CN 206917400 U CN206917400 U CN 206917400U
Authority
CN
China
Prior art keywords
support bar
bar
construction
groups
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720662625.3U
Other languages
Chinese (zh)
Inventor
张凤臣
郑瑞领
孟令旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720662625.3U priority Critical patent/CN206917400U/en
Application granted granted Critical
Publication of CN206917400U publication Critical patent/CN206917400U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of construction guardrail of construction equipment technical field, including two groups of support bars be arrangeding in parallel and the mounting seat for being fixed on support bar bottom, cross bar is connected between support bar described in two groups, the outer wall of the cross bar is socketed with sliding sleeve, the bottom of the sliding sleeve is provided with vertically disposed pull bar, telescopic connection is connected between the left side support bar and pull bar, the top of the support bar is connected with connecting rod by mounting assembly, the utility model is simple in construction, it is easy to operate, two groups of guardrails are connected using easy-to-mount mode, traditional guard rail connected mode is avoided spread all over connection fastener on construction site the drawbacks of, save the set-up time, the expansion increase pretective acreage of telescopic connection is utilized simultaneously, mode of operation is simple and convenient, with very strong practical value.

Description

A kind of construction guardrail
Technical field
Construction equipment technical field is the utility model is related to, specially a kind of construction guardrail.
Background technology
In building construction process, construction enterprises inevitably run into the protection question in construction, in order to strengthen pacifying Easy guard rail is built using scaffolding steel pipe and fastener by most of full measure, construction enterprises, and the guard rail does not only take up greatly The scaffolding steel pipe of amount, and job site is connection fastener everywhere, and the stability of this guard rail is poor, is not easy to simultaneously Storage, or even the substantial amounts of engineering time can be sometimes taken, the waste of resource is caused, many inconvenience is brought to construction.For This, we have proposed a kind of construction guardrail to come into operation, to solve the above problems.
Utility model content
The purpose of this utility model is to provide a kind of construction guardrail, showed with solve to propose in above-mentioned background technology Some guard rails do not only take up substantial amounts of scaffolding steel pipe, and job site is connection fastener, and this guard rail everywhere Stability it is poor, while be not easy to store, or even can sometimes take the substantial amounts of engineering time, cause the waste of resource, to applying Work brings the problem of many inconvenience.
To achieve the above object, the utility model provides following technical scheme:A kind of construction guardrail, including two groups put down The support bar of row setting is connected with cross bar, the horizontal stroke with the mounting seat for being fixed on support bar bottom between support bar described in two groups The outer wall of bar is socketed with sliding sleeve, and the bottom of the sliding sleeve is provided with vertically disposed pull bar, between the left side support bar and pull bar Telescopic connection is connected with, the top of the support bar is connected with connecting rod by mounting assembly.
Preferably, the telescopic connection is hinged by multigroup X-type expansion link and formed, the left and right of the telescopic connection Both ends are flexibly connected by mounting ear with the side wall of support bar and pull bar.
Preferably, the side wall of the right side support bar is provided with the locking device being adapted with pull bar.
Preferably, the mounting assembly includes installation portion, and the bottom of the installation portion is fixedly connected with base, the installation The mounting hole being adapted with connecting rod is provided with the top of portion, the side wall of the installation portion is additionally provided with lock-screw.
Compared with prior art, the beneficial effects of the utility model are:The utility model is simple in construction, easy to operate, adopts Two groups of guardrails are connected with easy-to-mount mode, avoid traditional guard rail connected mode from spreading all over junction button on construction site The drawbacks of part, the set-up time to be saved, while increase pretective acreage using the expansion of telescopic connection, mode of operation is simple and convenient, With very strong practical value.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model mounting assembly structural representation.
In figure:1 support bar, 2 mounting seats, 3 cross bars, 4 pull bars, 5 sliding sleeves, 6 telescopic connections, 7 mounting assemblies, 71 installations Portion, 72 bases, 73 mounting holes, 74 lock-screws, 8 connecting rods.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of construction guardrail, including two groups parallel The support bar 1 of setting and the mounting seat 2 for being fixed on the bottom of support bar 1, cross bar 3 is connected between support bar 1 described in two groups, it is described The outer wall of cross bar 3 is socketed with sliding sleeve 5, and the bottom of the sliding sleeve 5 is provided with vertically disposed pull bar 4, the left side support bar 1 and drawing Telescopic connection 6 is connected between bar 4, the top of the support bar 1 is connected with connecting rod 8 by mounting assembly 7.
Wherein, the telescopic connection 6 is hinged by multigroup X-type expansion link and formed, the left and right of the telescopic connection 6 Both ends are flexibly connected by mounting ear with the side wall of support bar 1 and pull bar 4, the side wall of the right side support bar 1 be provided with The locking device that pull bar 4 is adapted, the mounting assembly 7 include installation portion 71, and the bottom of the installation portion 71 is fixedly connected with Base 72, the top of the installation portion 71 are provided with the mounting hole 73 being adapted with connecting rod 8, and the side wall of the installation portion 71 is also set There is lock-screw 74.
Operation principle:When in use, will be flexible by pull bar 4 after mounting seat 2 is fixed by foundation bolt and ground Connecting portion 6 pulls to the right, and is fixed using the locking device on support bar 1 and support bar 1, passes through the expansion of retractor device 6 Increase the area of guard rail protection, while connecting rod 8 is plugged into mounting hole 73, and be fixed by lock-screw 74 Afterwards, realize the regulation of guard rail height, in the not used time, reversely rotate lock-screw 74, connecting rod 8 is removed, and by pull bar 4 to Move left, reduce the area of guard rail, be easy to store, the utility model is simple in construction, reasonable in design, and practical value is strong.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of construction guardrail, including two groups of support bars (1) be arrangeding in parallel and the installation that is fixed on support bar (1) bottom Seat (2), it is characterised in that:Cross bar (3) is connected between support bar (1) described in two groups, the outer wall of the cross bar (3) is socketed with cunning Cover (5), the bottom of the sliding sleeve (5) is provided with vertically disposed pull bar (4), connected between the left side support bar (1) and pull bar (4) Telescopic connection (6) is connected to, the top of the support bar (1) is connected with connecting rod (8) by mounting assembly (7).
A kind of 2. construction guardrail according to claim 1, it is characterised in that:The telescopic connection (6) is by multigroup X Type expansion link, which is hinged, to be formed, and the left and right ends of the telescopic connection (6) pass through mounting ear and support bar (1) and pull bar (4) side wall is flexibly connected.
A kind of 3. construction guardrail according to claim 1, it is characterised in that:The side wall of the right side support bar (1) The locking device being adapted with pull bar (4) is installed.
A kind of 4. construction guardrail according to claim 1, it is characterised in that:The mounting assembly (7) includes installation Portion (71), the bottom of the installation portion (71) are fixedly connected with base (72), are provided with and connect at the top of the installation portion (71) The mounting hole (73) that bar (8) is adapted, the side wall of the installation portion (71) are additionally provided with lock-screw (74).
CN201720662625.3U 2017-06-08 2017-06-08 A kind of construction guardrail Expired - Fee Related CN206917400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720662625.3U CN206917400U (en) 2017-06-08 2017-06-08 A kind of construction guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720662625.3U CN206917400U (en) 2017-06-08 2017-06-08 A kind of construction guardrail

Publications (1)

Publication Number Publication Date
CN206917400U true CN206917400U (en) 2018-01-23

Family

ID=61314880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720662625.3U Expired - Fee Related CN206917400U (en) 2017-06-08 2017-06-08 A kind of construction guardrail

Country Status (1)

Country Link
CN (1) CN206917400U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847696A (en) * 2019-11-14 2020-02-28 徐州市铜山区汉王镇农业服务发展有限公司 Tourist attraction guardrail

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847696A (en) * 2019-11-14 2020-02-28 徐州市铜山区汉王镇农业服务发展有限公司 Tourist attraction guardrail

Similar Documents

Publication Publication Date Title
CN204126230U (en) Assembly scaffold unit
CN206458903U (en) A kind of limiting shock resistant support for being easy to adjust
CN206917400U (en) A kind of construction guardrail
CN212866793U (en) Assembled construction elevator stops layer platform
CN202227276U (en) Mobile platform applied on bridge pier template
CN202577960U (en) Suspension outer bearing type combination steel formwork applied in roller compacted concrete (RCC) construction
CN208604924U (en) A kind of bracket assembly
CN207453461U (en) A kind of supporting rack
CN205976397U (en) Portable handling frame
CN213953502U (en) Connecting structure of high pier people climbing ladder and pier column
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN207032480U (en) A kind of Rod Bracing connecting node for steel building
CN202882373U (en) Improved scaffold
CN207919454U (en) A kind of suspended type hydraulic support assembly
CN207277373U (en) A kind of riding track being used in foundation pit construction
CN110821135A (en) Attached lifting scaffold
CN206971679U (en) A kind of safe anti-falling scaffold
CN220686836U (en) Protective net for building safety engineering
CN104264957A (en) Scaffold system adjustable in height and width
CN204370826U (en) A kind of building operations safety barrier
CN219431332U (en) Safety enclosure net structure of cantilever frame
CN203867167U (en) Attached lifting scaffold bottom truss
CN220620961U (en) Building construction has building construction frame of anti falling structure
CN204825952U (en) Tower machine steel platform basis fixed leg
CN219906796U (en) Tower crane overhanging attachment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123

Termination date: 20180608