CN206888999U - A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot - Google Patents

A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot Download PDF

Info

Publication number
CN206888999U
CN206888999U CN201720719230.2U CN201720719230U CN206888999U CN 206888999 U CN206888999 U CN 206888999U CN 201720719230 U CN201720719230 U CN 201720719230U CN 206888999 U CN206888999 U CN 206888999U
Authority
CN
China
Prior art keywords
template
support
vault
longeron
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720719230.2U
Other languages
Chinese (zh)
Inventor
程伟
张政武
何勇
王保民
张国海
张金誉
蔡舒廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi University of Technology
Original Assignee
Shaanxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi University of Technology filed Critical Shaanxi University of Technology
Priority to CN201720719230.2U priority Critical patent/CN206888999U/en
Application granted granted Critical
Publication of CN206888999U publication Critical patent/CN206888999U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is more particularly to a kind of curved section type variable telescoping steel form vault template and its adjustable arch beam supporting construction that disclosure satisfy that variable cross-section bend cave depot construction demand.The purpose of this utility model is the general and interchangeability of curved section type variable telescoping steel form vault template to be improved.The specific splicing for employing the vault modular unit section being made up of the standard form and special template of minimum specification, efficiently solve the vault template adaptability problem of Varied section bend cave depot construction, simultaneously, by supporting very heavy sliding support and its adjustable arch beam supporting construction with the compositions such as longeron are put, solves the problems, such as the support of the template, pass through method of the present utility model, when carrying out the construction of bend cave depot, only need to increase and decrease standard form and change special template, greatly reduce hand labor intensity and engineering cost.

Description

A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot
Technical field
The utility model belongs to underground cavern construction of concrete lining equipment technology field, and in particular to one kind is applied to song The adjustable arch beam supporting construction of line segment type variable telescoping steel form vault template.
Background technology
In the construction of more section bend cave depot engineerings, it is frequently encountered due to the change of cave depot span and causes its section to be joined Several changes, the section of change prevents the vault template using a certain set specification of tradition from meeting construction demand, and needs to match somebody with somebody The more set vault templates of standby and replacing are constructed.So, the expenses such as mould input, production management, transition transport are not only increased, And in practice of construction, change a whole set of template, it is also necessary to the process such as the artificial formwork erection of repetitive cycling, form removal, carrying, formwork, Considerably increase hand labor intensity and engineering cost.On the other hand, due to the vault section configuration and straightway of bend cave depot Cave depot is compared to complex, it is impossible to by simply increasing or decreasing the vault template of part different size on the basis of former span Unit section come adapt to change section, otherwise can not meet by the concrete-lined required precision of multiple cave depot, or need outfit tens The tailored template of the even more more specifications of kind.So, how to be spliced by the modular unit section of minimum specification, to approach different spans Vault theory camber line be a technical barrier in current engineering construction.
In addition, be generally also equipped with traditional telescoping steel form for improve the arched girder connected firmly with vault template by The supporting construction of power situation, this class formation upper end is connected often through support member with arched girder, lower end and telescoping steel form framework system The a certain component of system connects firmly, to transmit vertical load and its stiffness of increase that arched girder is born.Conventional fixed-type support knot Although structure force-bearing situation is preferable, bend cave depot can not be adjusted and caused because of the change of span along cave depot axis direction and bend The alignment error of radial direction, on the contrary, it is larger also make it that arch structure is born due to the presence of alignment error in both direction Torque.
In order to solve the above technical problems, inventor providing a kind of curved section type variable telescoping steel form vault template and its can Arched girder supporting construction is adjusted, the set template can meet one by the standard form of minimum specification and the splicing of special template It is fixed to become across scope inner curve cave depot construction demand;Simultaneously, there is provided a kind of adjustable branch of the arched girder connected firmly with the vault template Support structure, the alignment error of cave depot axis direction and bend radial direction caused by conventional fixed-type structure is effectively eliminated, improved The force-bearing situation of arched girder.
Utility model content
The purpose of this utility model is to provide a kind of suitable for the adjustable of curved section type variable telescoping steel form vault template Arched girder supporting construction, the vault template described in structure of the present utility model refer to the vault mould using ad hoc approach design Plate, the vault template can meet necessarily to become in the range of by the standard form of minimum specification and the splicing of special template Bend cave depot construction demand.
Specifically, the utility model is achieved using following technical scheme.One kind is applied suitable for variable cross-section bend cave depot The supporting construction of the vault template of work, including longeron, the very heavy sliding support fastening bolt of support, vault template, arch on outside Beam, arched girder support are very heavy, the very heavy sliding support of support, longeron and column on inner side.Because being used for bend, thus on outside longeron with Longeron is arc on inner side, and be separately positioned on along cave depot section direction it is symmetrical inside and outside column upper end.
One of point of the present utility model of creating is to employ movably to support very heavy sliding support.The very heavy cunning of support Dynamic bearing is an active plate, and both sides are respectively equipped with fixing hole, and in order to ensure stability, the quantity of the fixing hole per side is two It is individual.Both sides are additionally provided with the lug with holes that confession " people " font arched girder supports the be hinged installation in very heavy lower end above active plate.Arch Ellbeam supports very heavy upper end to be hinged with arched girder.
For convenience of description, longeron on longeron on outside and inner side is referred to as upper longeron.Upper longeron is in the utility model Box-structure, main member are outer panels, wainscot, top panel and lower panel, and wherein outer panels and wainscot are the same of thin-walled Heart circular arc panel;Top panel and lower panel are fan-shaped distribution;It is uniformly arranged on top panel both sides along bend RADIAL multigroup Inward flange and outward flange, are provided with chute at inward flange and at outward flange, the chute is circular arc and same with track curve circular arc The center of circle;Very heavy sliding support is supported to enter by the chute, the fixing hole of itself using very heavy sliding support fastening bolt is supported Row is fixed.When needing the regulation very heavy sliding support position of support, very heavy sliding support fastening bolt is supported as long as loosening.
Arched girder described in the utility model is the adjustable arched girder of arch of multistage connection.Along bend cave depot axis Direction is uniformly arranged some groups and is distributed in bend RADIAL.Connect firmly and support above arched girder and spliced by several modular unit sections The vault template formed.
The ad hoc approach that vault template described in the utility model uses is designed to comprise the following steps
First, draw a width of 1200mm of a standard unit section vault template expanded view.
1.1 respectively with R,(wherein R is turning radius, LiFor span, i is span sequence number) be radius draw respectively across Outside, inner side and the middle circular arc of degree;
1.2 in outer arc, and it is wide to intercept the standard that arc length is 1200mm, by the center of circle respectively with circular arc two-end-point phase Even;
1.3 lines meet at other 2 points with inner arc respectively, then 4 points of planar graphs formed are a unit Save vault template expanded view, the inside and outside both sides of the expanded view are respectively on theoretical circular arc inside and outside each span, and in addition two Edge radial distribution.
Second, the chord length of circular arc replaces corresponding arc length inside and outside, point of a vault modular unit section expanded view is obtained Analyse model.
2.1 vault templates rely on the adaptive arc special construction of its own, telescoping steel form arched girder curved support and Under mounting process, plastic deformation is brought it about, polylith template splicing is into space curved surface, but the panel blanking stage during fabrication, The panel of arc length 1200mm unit section templates need to be launched into plane geometric figure;
2.2 generally, and because the radius of curvature of elbow curve is larger, the arc length inside and outside template is corresponding Chord length difference is very small, can be ignored completely not for architectural engineering instead of error caused by corresponding arc length respectively using chord length Meter, therefore, the analysis model of a vault modular unit section expanded view can then be reduced to an isosceles trapezoid, wherein two waists are distinguished On the RADIAL of theoretical circle under different spans, upper and lower two base is respectively the string of a musical instrument of corresponding circular arc.
Third, according to the throwing between the analysis model of each unit section expanded view and the template vault circular arc distribution map of each span Shadow corresponding relation, divide template specification.
3.1 according to arch, span, mistake is high, encircles the vault circular parameters such as radius, home position, draws the theory of each span Template vault circular arc;
The 3.2 theoretical templates for dividing each span successively from top to bottom or from bottom to top with a length of 1000mm of standard arc length are encircleed Tip circle arc;
3.3 utilize the throwing between the analysis model of theoretical template vault circular arc and vault the modular unit section expanded view of division Shadow corresponding relation, the unit section template of each span is divided into several pre-standard templates and a pre- special template successively, its Template corresponding to middle 1000mm arc length is pre-standard template, the template corresponding to less than 1000mm arc length finally divided For pre- special template;
3.4 pairs of each pre-standard templates and pre- special template are numbered, and wherein pre-standard template is designated as " marki,n", it is pre- special Template is designated as " speciali,1", wherein i is span sequence number.
Fourth, the profile size of a kind of modular unit section of span and remaining several span modular unit section is contrasted Analyze, unit section on the basis of the minimum one kind of step-up error, and utilize reference cell section optimisation criteria template specification.
4.1 is relevant with span according to the standard form specification quantity of step 3 division, generally has tens kinds, standard Template specification quantity is excessive, it is necessary to optimize;
4.2 each span unit section profiles of analysis, by the modular unit section of one of which span and the mould of remaining several span The profile size of Slab element section is analyzed, unit section on the basis of the minimum one kind of step-up error;
The pre-standard template-setup of the reference cell section divided in step 3 is ultimate criterion template by 4.3, and is designated as " markN", N is standard form sequence number.
Fifth, manufacture and mounting process with reference to template, optimize special template specification.
5.1 should be greater than 500mm for ease of manufacture and installation form, all template lengths of division, therefore, special setting During template, the coupled standard form of curtailment 500mm special template should be merged, and be arranged to a special mould Plate, while reduce the standard form quantity under the span;
Special template after optimization is designated as " spy by 5.2i", i is span sequence number.
Sixth, according to each template number, template specification size table is drawn.According to Step 4: standard form and the spy of five divisions Different template, the structure and technical parameter of binding curve section type variable telescoping steel form, draw the template specification size table of each span.
Seventh, according to template specification size table, each span template outfit table and expanded view are drawn.
The vault template designed according to method described in the utility model is a set of standard form and spy by some specifications The vault template of different template composition.When carrying out the construction of bend cave depot using the vault template, it is only necessary to increase and decrease standard form and Special template is changed, greatly reduces hand labor intensity and engineering cost.
Adjustable arch beam support structure designs of the present utility model are applicable not only to according to ad hoc approach design Vault template, it also can be used in the vault template of existing traditional specification.
Compared with prior art, the beneficial effects of the utility model are:
By the splicing of several vault modular unit sections being made up of the standard form and special template of minimum specification, have Effect solve cause under certain turning radius, due to the change of span cave depot section parameter change after vault template fit Sex chromosome mosaicism is answered, has accomplished one module multiple usages, and construction precision is higher.
The utility model is by supporting very heavy sliding support and its being supported with the adjustable arch beam for putting the compositions such as longeron The design of structure, curved section type variable telescoping steel form vault template is set to be applied to actual production.Using turning radius as Exemplified by 50000mm, 1/4 arch, it is only necessary to which a kind of ten standard forms and special template can meet to become across scope 4000mm-6000mm The construction demand of interior all spans, theoretical cumulative errors are less than 10mm.
Telescoping steel form of the present utility model is reduced compared with using conventional fixed-type telescoping steel form arched girder supporting construction Alignment error, hence it is evident that improve the force-bearing situation of arched girder.On " arc " shape medial and lateral on the interior outward flange of longeron top panel, Be uniformly arranged external chute in some groups along bend RADIAL, be provided with every group in external chute several be used for it is fixed support it is very heavy The very heavy sliding support fastening bolt of support of sliding support, overcomes and very heavy sliding support is supported under different spans along cave depot axis Deviate the positively and negatively error of its theoretical installation site to the left or to the right in direction;The branch connected firmly with the very heavy lower end of arched girder support Support very heavy sliding support and use spherical steel support, the rotation of its big corner can overcome peace of each span along bend radial direction Fill error.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the utility model device front view;
Fig. 2 is the attached view of the utility model device (expansion);
Fig. 3 be in the utility model installation drawing 1 A-A to partial sectional view;
Fig. 4 is upper longeron front view on the outside of the utility model device;
Fig. 5 is B-B direction sectional view in the utility model installation drawing 4;
Fig. 6 is enlarged drawing at I in the utility model installation drawing 4;
Fig. 7 is across the vault template expanded views of the utility model device 4000mm;
Fig. 8 is across the vault template expanded views of the utility model device 4500mm;
Fig. 9 is across the vault template expanded views of the utility model device 5000mm;
Figure 10 is across the vault template expanded views of the utility model device 5500mm;
Figure 11 is across the vault template expanded views of the utility model device 6000mm;
The vault cross-module plate space arrangement figure that Figure 12 is the utility model device 4000mm to be cut across, length 3600mm mono-.
In figure:Longeron on 1- outsides;101- outer panels;102- wainscots;103 top panels;104 lower panels;2- supports thousand Jin sliding support fastening bolt;3- vault templates;4- arched girders;The support of 5- arched girders is very heavy;6- supports very heavy sliding support;7- Longeron on inner side;8- columns;C- external chutes;D- internal chutes.
Embodiment
The following examples can make those skilled in the art that the utility model be more fully understood, but not in any way Limit the utility model.
The utility model turning radius common in being constructed using actual cave depot is 50000mm, 1/4 arch, change across scope 4000mm-6000mm, change stride away from exemplified by 500mm, with reference to legend, illustrate one kind and are applied to curved section type variable punching block platform Car (it is made up of three sections of frame systems, every section of axial length about 3600mm, is always about 10800mm, each section both can be used alone, Can be combined use) on vault template and its adjustable arch beam supporting construction embodiment.
As shown in figures 1 to 6, a kind of vault template and its supporting construction suitable for the construction of variable cross-section bend cave depot, including it is outer Longeron 1, the very heavy sliding support fastening bolt 2 of support, vault template 3, arched girder 4, arched girder support very heavy 5, support thousand on side Longeron 7 and column 8 on jin sliding support 6, inner side;
Column 8 has multiple and inside and outside being symmetricly set in along cave depot section direction, and longeron 1 is arranged on outside on outside The upper end of column 8, longeron 7 is arranged on the upper end of column 8 of inner side on inner side.
In longeron 1 on the outside of " arc " shape it is a box-structure along cave depot bend axis direction, " arc " shape centerline Radius is equal to turning radius, and thin-walled outer panels 101 and wainscot 102 are isocentric circular arc panel;Top panel 103 and lower panel 104 It is distributed in sector, the distribution of both sides edge 50000mm track curve circular arcs RADIAL;Uniformly set along bend RADIAL on top panel 103 Outward flange in 11 groups, inward flange inner arc and outward flange outer arc and track curve circular arc concentric are put, is set at interior outward flange Put external chute C, D in 11 groups.Chute C, D also with track curve circular arc concentric.
Be provided with every group in external chute C, D four be used for fixation support very heavy slide of the support of very heavy sliding support 6 to prop up Seat fastening bolt 2, trough width are slightly larger than slightly larger than the nominal diameter for supporting very heavy sliding support fastening bolt 2, length Along twice of cave depot axis direction maximum alignment error in five kinds of spans of 4000mm-6000mm, it is therefore an objective to overcome under different spans Very heavy sliding support 6 is supported to deviate the positive error and negative sense error of its theoretical installation site to the left or to the right.
The very heavy sliding support 6 of support for supporting very heavy 5 lower end to connect firmly with arched girder is spherical steel support, and its big corner turns Dynamic performance enough overcomes alignment error of each span along bend radial direction between 4000mm-6000mm.
The very heavy both sides of sliding support 6 of support are each provided with two fixing holes, support very heavy sliding support fastening bolt 2 Through two side chutes and fixing hole very heavy sliding support 6 will be supported to be fixed on the upper longeron 1 in outside or inner side on longeron 7;
Lug of two legs of arched girder support very heavy 5 respectively with supporting the very heavy both ends of sliding support 6 is hinged, arched girder branch The upper end and arched girder 4 for supportting very heavy 5 are hinged;The vault template 3 is arranged on arched girder 4.
Installation example
Be in comprising ten one kind altogether across scope 4000mm-6000mm vault template 3 according to the change that ad hoc approach is designed etc. The trapezoidal standard form of waist and special template, wherein six kinds of standard form, upper bottom length range is 1079mm-1200mm, and The bottom of flanking sequence specification template is equal with upper bottom, is highly 1000mm;Five kinds of special template, upper bottom length range are 1064mm-1118mm, altitude range 636mm-1375mm.Each template specification size is as shown in table 1.
As illustrated in figures 7-11, the vault template of every kind of span by nine in bend RADIAL distribution unit sections splicing and Into each unit section forms (each span template outfits of 4000mm-6000mm by four to six standard forms and a special template As shown in table 2), wherein, standard form is arranged on the outside of bend, and special template is arranged at curve inner side.
As shown in figure 12, by 4000mm exemplified by, 3600mm mono- cuts vault cross-module plate, in actual installation, along bend footpath To line direction, from bend on the outside of to inner side, install successively each unit section " 4 " four mark 1, mark 2, mark 3, mark standard forms, Unit section most inner side installation " special 1 " template;Along bend cave depot axis direction, from left to right, unit section is coupled successively, and Connected firmly with arched girder 4.The installation of other span templates is similar with its.
The 4000mm-6000mm of table 1 is across each template specification size table
Each span templates of the 4000mm-6000mm of table 2 are equipped with table
It will be understood by those skilled in the art that above example is only exemplary embodiment, without departing substantially from of the present utility model In the case of spirit and scope, it is changed, replaces and changes and also should be considered to be encompassed in the scope of protection of the utility model It is interior.

Claims (3)

1. a kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot, it is characterised in that including being indulged on outside Beam(1), the very heavy sliding support fastening bolt of support(2), vault template(3), arched girder(4), arched girder support it is very heavy(5), branch Support very heavy sliding support(6), longeron on inner side(7)And column(8);
Column(8)There is multiple and inside and outside being symmetricly set in along cave depot section direction, longeron on outside(1)It is arranged on outside Column(8)Upper end, longeron on inner side(7)It is arranged on the column of inner side(8)Upper end;
Longeron on outside(1)With longeron on inner side(7)Structure composition is identical, only because being located at respectively inside and outside bend and radian half Footpath and length are otherwise varied;
Longeron on outside(1)For by outer panels(101), wainscot(102), top panel(103)And lower panel(104)The case of composition Type structure, wherein outer panels(101)And wainscot(102)For isocentric circular arc panel;Top panel(103)And lower panel(104) It is distributed for sector;In top panel(103)Multigroup inward flange and outward flange are uniformly arranged along bend RADIAL, on both sides at inward flange Be provided with chute at outward flange, the chute be circular arc and with track curve circular arc concentric;
The very heavy sliding support of support(6)Both sides are provided with fixing hole, support very heavy sliding support fastening bolt(2)Through two Side chute will support very heavy sliding support with fixing hole(6)It is fixed on the upper longeron in outside(1)Or longeron on inner side(7)On;
Arched girder support is very heavy(5)Two legs respectively with supporting very heavy sliding support(6)The lug at both ends is hinged, arched girder branch Support very heavy(5)Upper end and arched girder(4)It is be hinged;
The vault template(3)It is arranged on arched girder(4)On.
2. a kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot according to claim 1, it is special Sign is that the quantity of the fixing hole is side two.
3. a kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot according to claim 1, it is special Sign is, the inward flange inner arc and outward flange outer arc and track curve circular arc concentric.
CN201720719230.2U 2017-06-20 2017-06-20 A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot Expired - Fee Related CN206888999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720719230.2U CN206888999U (en) 2017-06-20 2017-06-20 A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720719230.2U CN206888999U (en) 2017-06-20 2017-06-20 A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot

Publications (1)

Publication Number Publication Date
CN206888999U true CN206888999U (en) 2018-01-16

Family

ID=61315883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720719230.2U Expired - Fee Related CN206888999U (en) 2017-06-20 2017-06-20 A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot

Country Status (1)

Country Link
CN (1) CN206888999U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060832A (en) * 2017-06-20 2017-08-18 陕西理工大学 A kind of vault template and its supporting construction constructed suitable for variable cross-section bend cave depot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060832A (en) * 2017-06-20 2017-08-18 陕西理工大学 A kind of vault template and its supporting construction constructed suitable for variable cross-section bend cave depot
CN107060832B (en) * 2017-06-20 2019-03-26 陕西理工大学 A kind of vault template and its support construction suitable for the construction of variable cross-section bend cave depot

Similar Documents

Publication Publication Date Title
CN107060832B (en) A kind of vault template and its support construction suitable for the construction of variable cross-section bend cave depot
CN206888999U (en) A kind of vault formwork support structure suitable for the construction of variable cross-section bend cave depot
CN105971289A (en) High-altitude sliding construction method for long-span curved-surface reticulated shell
CN106884541A (en) The positioning component of reserved joint bar, positioner and localization method in shear wall
CN114016383A (en) Pipeline suspension protection device and construction method
CN111636303B (en) Cross baseline control method for block assembly manufacturing of curve steel box structure
CN107574929A (en) Girder with rolled steel section en cased in concrete spinous process of the seventh cervical vertebra frame node and joint construction method
CN108755952B (en) Vertical energy-consuming beam eccentric support
CN114961282A (en) Construction method of single-layer latticed shell structure streamer with middle cylinder column
CN103741830B (en) Staggered cross bucking of plate constraint supports
CN109551176B (en) Manufacturing method of steel runner automobile wind tunnel nozzle segment
CN104563495B (en) Special-shaped beam column node template and engineering template equipping method thereof
CN210395849U (en) Large-span high-section steel truss
CN103806924A (en) Steel form carrier variable camber gear for concrete lining for cave depot
CN110453602B (en) Catenary arch bridge arch rib construction lofting system
CN104759814B (en) Processing platform of bearing ground rail beam and preparation method thereof
CN106320701A (en) Method of high formwork support construction
CN212835438U (en) Simple angle steel inner supporting member of combined steel die
US20210254337A1 (en) Extended roof truss with outboard purlins having load supporting k-trusses at extensions
CN206289750U (en) A kind of crab-bolt fixed mount
KR200337899Y1 (en) truss member and temporary truss structure using the same
US20240200321A1 (en) Long-Span Corridor Comprising Two Sets Of Floor Cantilevered Inclined Trusses Combined With Suspension Cable Bearing And Assembly Method Thereof
CN213925803U (en) Special-shaped component and tied arch bridge adopting same
CN204960308U (en) Exempt from hollow post template of scaffold construction
CN218580877U (en) Connecting node of box column and H-shaped steel beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116

Termination date: 20180620

CF01 Termination of patent right due to non-payment of annual fee