Utility model content
The utility model provides a kind of floor system, to solve at least one of above-mentioned technical problem.
According to one side of the present utility model, there is provided a kind of floor system, including multiple floors, floor are provided with two
In the second keel that the first keel and two cross sections of C fonts are in C fonts, the first keel and the second keel are first successively for cross section
Tail is connected, and the first keel and the second keel form cavity, and multiple floors are connected by the second keel stacked on top, the outside of cavity
It is provided with cement plate.
It is in C words because floor is provided with two cross sections in the first keel and two cross sections of C fonts in the utility model
Second keel of shape, and the first keel and the second keel join end to end successively, therefore, can change first according to using needing
Keel and bicarinate size, modular designs and can by factorial praluction, can according to the total size of floor come
Increase the quantity of floor, convenient installation.
And installation process need not utilize machine, it is only necessary to which 2-3 people can complete installment work, can solve open air
(such as:The special topography conditions such as Scenic Spot Area, mountain area, forest land can not use the problem of plant equipment).
The utility model dispatch from the factory complete after be complete product, it is not necessary to live processing and fabricating, solve existing
Field workload is big, will not produce a large amount of building wastes.
In some embodiments, in addition to multiple bending parts, one end of bending part are located on one of them second keel,
The other end is located on another second keel, and multiple bending members are in sustained height.Thus, multiple bending parts can play extension
The effect of bar-mat reinforcement is put, such as:Bending part can be fixed on the second keel by the way of welding simultaneously.
In some embodiments, in addition to bar-mat reinforcement, bar-mat reinforcement are located on the side of bending part, and bar-mat reinforcement divides cavity
Into the first cavity and the second cavity.Thus, bar-mat reinforcement can divide the cavity into the first cavity and the second cavity, and divide the cavity into
After first cavity and the second cavity, it can be set such as in the first cavity:Hard insulating material etc., the second cavity then can conveniently pacify
Dress, such as:The installation of screw.
In some embodiments, hard insulating material is provided with the first cavity, cement plate is located at hard insulating material one
Side.Thus, insulation material can play a part of insulation and sound insulation.
In some embodiments, in addition at least two girder steels, girder steel are located on outside floor, and girder steel side is set on side
There is angle steel, one end of floor is located on the angle steel of one of girder steel, and the other end is located on the angle steel of another girder steel.Thus,
Angle steel plays a part of that floor is made.
In some embodiments, two adjacent floors are fixedly connected by screw.Thus, can be by phase by screw
Two adjacent floors are fixed together.
In some embodiments, bending part is in C fonts.Thus, the bending part of C fonts can play and hang up bar-mat reinforcement
Effect.
In some embodiments, the width of floor is 0.6m or 1.2m.Thus, the width of floor using 0.6m or
1.2m can be installed conveniently.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1~Fig. 6 schematically illustrates a kind of structure of the floor system of embodiment of the utility model.
As shown in Fig. 1~Fig. 6, according to one side of the present utility model, there is provided a kind of floor system, the floor system
Including multiple floors (size and number of floor can be changed according to the size of building so that reach requirement).
In order to which concrete structure of the present utility model is described in detail, Fig. 1 is illustrated below, Fig. 1 is of the present utility model
A kind of front view of board wall system, it is necessary to which multiple wallboards are installed together during installation, then multiple wallboards are installed.Peace
Multiple wallboards in Fig. 1 after installing are horizontal positioned, i.e., the face of Fig. 1 wallboard is in horizontality.
With reference to Fig. 2 and if Fig. 3, floor are actually to have two the first keel 1 and two the second keel 2 to join end to end successively
Composition, vertical keel are the first keel 1 (each one of left and right) in Fig. 2, and horizontal keel are then (upper and lower for the second keel 2
Each one), Fig. 3 is due to being sectional views of the Fig. 2 along A-A directions (tangent line in A-A directions is centre position), therefore, left and right two
It is the first keel 1, and the second keel 2 following in Fig. 2 can not then be shown, the second keel 2 above Fig. 2 are then positioned at figure
In 3 plane.
With reference to Fig. 1 and Fig. 4, Fig. 4 is sectional views of the Fig. 1 along B-B directions, and the vertical direction in Fig. 4 is the second keel 2
(each one of left and right), and the first keel 1 are then hidden.
It is described in further detail with reference to Fig. 1,2,3 and 4 pairs of the utility model.
The length of the first keel 1 can be set as needed in the utility model, preferably 0.6m, and the second keel
2 length can also be modified as needed, generally can be set as 5m etc., the length of the second keel 2 is by house
Width or length determine.
The cross section of the first keel 1 in the utility model is in C fonts (C fonts are i.e. as indicated at 3), the horizontal stroke of the second keel 2
Section is also C fonts (C fonts are i.e. as indicated at 4), and as shown in Figures 2 and 3, the first keel 1 and the second keel 2 are used and joined end to end
Mode be attached, so as to form floor, end to end mode is specific as follows:In Fig. 1, first keel 1 on the left side it is upper
End is connected modes such as (can be attached) being integrally formed or weld with the left end of the second keel 2 above, lower end then with
The left end of the second following keel 2 is attached, and the upper end of first keel 1 on the right and the right-hand member of the second keel 2 above
It is connected modes such as (can be attached) being integrally formed or weld, the lower end then right-hand member progress with the second following keel 2
Connection.
In Fig. 1, multiple floors can together form floor system, be entered between adjacent two floors by the second keel 2
Row is connected, i.e. the second keel 2 of floor are attached with the second keel 2 of following floor above in Fig. 1.
As shown in Figures 2 and 3, floor needs to be horizontally mounted, and that is to say and is rotated by 90 ° the floor shown in Fig. 2 so that Fig. 2's
Floor is turned to shown in Fig. 3 so that Fig. 2 floor is horizontal.As shown in Figures 2 and 3, the first keel 1 and the second keel 2
Cavity is formed, and one layer of cement plate 3 is provided with the lateral surface of the upper end of cavity.The personnel of the second floor of building step in cement
On plate 3, the thickness of cement plate 3 can be preferably 15mm.
Bending part 4 is also provided with the cavity shown in Fig. 3, the front end of bending part 4 is (perpendicular to Fig. 3 direction
Front, the lower section shown in Fig. 2) it can be welded on the second keel 2 of front end, rear end is (perpendicular to the rear in Fig. 3 direction, Fig. 2
Shown top) it can be welded on the second keel 2 below.
Meanwhile having multiple bending parts 4 in Fig. 3, the lower section of multiple bending parts 4 is located in same level height, therefore, can be with
The lower section of bending part 4 shown in Fig. 3 is installed by multiple bar-mat reinforcements 5.
And bar-mat reinforcement 5 can separate cavity, turn into the first cavity and the second cavity, and can be set in the first cavity
Put substantial amounts of hard insulating material 8, you can so that the heat insulating material filling of hard is full of into whole first cavity, and the second cavity is then square
Continuous installation after an action of the bowels.The insulation material of hard can play a part of sound insulation and insulation so that Stall and second floor separate.
As shown in figure 3, in order to which floor can be fixed in building, it is also necessary to set (the one side one of at least two girder steel 6
Individual, the vertical range between two girder steels 6 is identical with the length of floor), girder steel 6 is strip, and the length of girder steel 6 is at least big
In or equal to all floors overall width sum, girder steel 6 is to be fixed on part on outside building, between girder steel 6 and floor
Insulation effect can be played with filling-foam insulation material.
And in order to which floor is fixed on girder steel 6, angle steel 7 can also be set on girder steel 6, and angle steel 7 is in L-shaped, only
Installation is needed to be installed as shown in Figure 3.Angle steel 7 can play a part of that floor is made.
Floor system of the present utility model can install following manner and be installed:As shown in fig. 6,
1. the floor being made is transported to need place to be mounted;
2. the floor shown in Fig. 2 is rotated into 90 °, the position shown in Fig. 3 is turned to, the left end of the floor shown in Fig. 3 is put
Put on the angle steel 7 of left side girder steel 6, right-hand member is placed on the angle steel 7 of the right girder steel 6;
3. according to the method described above, remaining floor is all placed;
4. after floor is placed, according to shown in Fig. 4, the second keel 2 of two adjacent floors are attached (logical
Crossing the second cavity can be attached);
5. whole floors are fixed on angle steel 7, the installation of floor is completed;
6. the thick cement plates 3 of 15mm are set in the top of floor system;
7. as shown in figure 3, after the installation is complete, furred ceiling is carried out, that is, lime plate is installed below.
The installation of above-mentioned various pieces, such as:Installation between two adjacent wallboards can be by screw or spiral shell
Bolt is carried out, and cement plate 3 can also be arranged on second keel 2 (as shown in Figure 5) by screw or bolt, and the first keel
1 by screw or can be bolted on angle steel 7.
It is in C because floor is provided with two cross sections in the first keel 1 and two cross sections of C fonts in the utility model
Second keel 2 of font, and the first keel 1 and the second keel 2 join end to end successively, therefore, can change according to using needing
Become the size of the first keel 1 and the second keel 2, modular designs and can be by factorial praluction while can be according to building
The total size of plate increases the quantity of floor, convenient installation.
And installation process need not utilize machine, it is only necessary to which 2-3 people can complete installment work, can solve open air
(such as:The special topography conditions such as Scenic Spot Area, mountain area, forest land can not use the problem of plant equipment).
The utility model dispatch from the factory complete after be complete product, it is not necessary to live processing and fabricating, solve existing
Field workload is big, will not produce a large amount of building wastes.
Above-described is only some embodiments of the present utility model.For the person of ordinary skill of the art,
On the premise of not departing from the utility model and creating design, various modifications and improvements can be made, these belong to this practicality
New protection domain.