CN206888302U - Floor system - Google Patents

Floor system Download PDF

Info

Publication number
CN206888302U
CN206888302U CN201720808515.3U CN201720808515U CN206888302U CN 206888302 U CN206888302 U CN 206888302U CN 201720808515 U CN201720808515 U CN 201720808515U CN 206888302 U CN206888302 U CN 206888302U
Authority
CN
China
Prior art keywords
keel
floor
cavity
fonts
floor system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720808515.3U
Other languages
Chinese (zh)
Inventor
盛雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Tai (Guangde) intelligent assembly building Limited by Share Ltd
Original Assignee
Chen Tai (guangde) Intelligent Technology Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chen Tai (guangde) Intelligent Technology Construction Co Ltd filed Critical Chen Tai (guangde) Intelligent Technology Construction Co Ltd
Priority to CN201720808515.3U priority Critical patent/CN206888302U/en
Application granted granted Critical
Publication of CN206888302U publication Critical patent/CN206888302U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a kind of floor system, including multiple floors, floor is provided with the first keel that two cross sections are in C fonts and two cross sections are in the second keel of C fonts, first keel and the second keel join end to end successively, first keel and the second keel form cavity, multiple floors are connected by the second keel stacked on top, and the outside of cavity is provided with cement plate.In the utility model, because floor is provided with the second keel of the first keel that two cross sections are in C fonts and two cross sections in C fonts, and first keel and the second keel join end to end successively, therefore, the first keel and bicarinate size can be changed according to using needing, modular designs and can be by factorial praluction, while the quantity of floor can be increased according to the total size of floor, convenient installation.The utility model dispatch from the factory complete after be complete product, it is not necessary to live processing and fabricating, it is big to solve work on the spot amount, will not produce a large amount of building wastes.

Description

Floor system
Technical field
It the utility model is related to a kind of floor system.
Background technology
Some interim buildings that outdoor is built need to set floor between being usually constructed with two layers, two layers, so as to by two buildings Layer separates.
At present, for floor mainly based on the component floor of lightweight steel construction and steel and concrete structure, lightweight steel construction is lightgage steel joist Build between floor, in upper and lower part shrouding, central filler insulation material forms floor, it is necessary to site operation, and Many building wastes can be produced, and keel are more, installation is complicated, workload is big, but stability is general and soundproof effect one As.
And the floor of steel and concrete structure, although stability and structural strength are bigger, own wt is heavier, it is necessary to which large-scale hang Machine is installed, and is not applied to for the conditional region of pavement conditions, higher to field erected technical requirements, common laborer can not grasp Make, and this kind of floor is after installation is complete, it is non-disconnectable remove after reuse, do not meet the requirement of green building, soundproof effect It is poorer than other insulation materials.
Utility model content
The utility model provides a kind of floor system, to solve at least one of above-mentioned technical problem.
According to one side of the present utility model, there is provided a kind of floor system, including multiple floors, floor are provided with two In the second keel that the first keel and two cross sections of C fonts are in C fonts, the first keel and the second keel are first successively for cross section Tail is connected, and the first keel and the second keel form cavity, and multiple floors are connected by the second keel stacked on top, the outside of cavity It is provided with cement plate.
It is in C words because floor is provided with two cross sections in the first keel and two cross sections of C fonts in the utility model Second keel of shape, and the first keel and the second keel join end to end successively, therefore, can change first according to using needing Keel and bicarinate size, modular designs and can by factorial praluction, can according to the total size of floor come Increase the quantity of floor, convenient installation.
And installation process need not utilize machine, it is only necessary to which 2-3 people can complete installment work, can solve open air (such as:The special topography conditions such as Scenic Spot Area, mountain area, forest land can not use the problem of plant equipment).
The utility model dispatch from the factory complete after be complete product, it is not necessary to live processing and fabricating, solve existing Field workload is big, will not produce a large amount of building wastes.
In some embodiments, in addition to multiple bending parts, one end of bending part are located on one of them second keel, The other end is located on another second keel, and multiple bending members are in sustained height.Thus, multiple bending parts can play extension The effect of bar-mat reinforcement is put, such as:Bending part can be fixed on the second keel by the way of welding simultaneously.
In some embodiments, in addition to bar-mat reinforcement, bar-mat reinforcement are located on the side of bending part, and bar-mat reinforcement divides cavity Into the first cavity and the second cavity.Thus, bar-mat reinforcement can divide the cavity into the first cavity and the second cavity, and divide the cavity into After first cavity and the second cavity, it can be set such as in the first cavity:Hard insulating material etc., the second cavity then can conveniently pacify Dress, such as:The installation of screw.
In some embodiments, hard insulating material is provided with the first cavity, cement plate is located at hard insulating material one Side.Thus, insulation material can play a part of insulation and sound insulation.
In some embodiments, in addition at least two girder steels, girder steel are located on outside floor, and girder steel side is set on side There is angle steel, one end of floor is located on the angle steel of one of girder steel, and the other end is located on the angle steel of another girder steel.Thus, Angle steel plays a part of that floor is made.
In some embodiments, two adjacent floors are fixedly connected by screw.Thus, can be by phase by screw Two adjacent floors are fixed together.
In some embodiments, bending part is in C fonts.Thus, the bending part of C fonts can play and hang up bar-mat reinforcement Effect.
In some embodiments, the width of floor is 0.6m or 1.2m.Thus, the width of floor using 0.6m or 1.2m can be installed conveniently.
Brief description of the drawings
Fig. 1 is a kind of structural representation (front view) of floor system of embodiment of the utility model;
Fig. 2 is the structural representation (front view) of single floor in floor system shown in Fig. 1;
Fig. 3 is structural representation of the floor along A-A directions shown in Fig. 2;
Fig. 4 is structural representation of the floor system along B-B directions shown in Fig. 1;
Fig. 5 is the partial enlargement structural representation of floor system shown in Fig. 4;
Fig. 6 is the mounting structure schematic diagram of floor shown in Fig. 3.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1~Fig. 6 schematically illustrates a kind of structure of the floor system of embodiment of the utility model.
As shown in Fig. 1~Fig. 6, according to one side of the present utility model, there is provided a kind of floor system, the floor system Including multiple floors (size and number of floor can be changed according to the size of building so that reach requirement).
In order to which concrete structure of the present utility model is described in detail, Fig. 1 is illustrated below, Fig. 1 is of the present utility model A kind of front view of board wall system, it is necessary to which multiple wallboards are installed together during installation, then multiple wallboards are installed.Peace Multiple wallboards in Fig. 1 after installing are horizontal positioned, i.e., the face of Fig. 1 wallboard is in horizontality.
With reference to Fig. 2 and if Fig. 3, floor are actually to have two the first keel 1 and two the second keel 2 to join end to end successively Composition, vertical keel are the first keel 1 (each one of left and right) in Fig. 2, and horizontal keel are then (upper and lower for the second keel 2 Each one), Fig. 3 is due to being sectional views of the Fig. 2 along A-A directions (tangent line in A-A directions is centre position), therefore, left and right two It is the first keel 1, and the second keel 2 following in Fig. 2 can not then be shown, the second keel 2 above Fig. 2 are then positioned at figure In 3 plane.
With reference to Fig. 1 and Fig. 4, Fig. 4 is sectional views of the Fig. 1 along B-B directions, and the vertical direction in Fig. 4 is the second keel 2 (each one of left and right), and the first keel 1 are then hidden.
It is described in further detail with reference to Fig. 1,2,3 and 4 pairs of the utility model.
The length of the first keel 1 can be set as needed in the utility model, preferably 0.6m, and the second keel 2 length can also be modified as needed, generally can be set as 5m etc., the length of the second keel 2 is by house Width or length determine.
The cross section of the first keel 1 in the utility model is in C fonts (C fonts are i.e. as indicated at 3), the horizontal stroke of the second keel 2 Section is also C fonts (C fonts are i.e. as indicated at 4), and as shown in Figures 2 and 3, the first keel 1 and the second keel 2 are used and joined end to end Mode be attached, so as to form floor, end to end mode is specific as follows:In Fig. 1, first keel 1 on the left side it is upper End is connected modes such as (can be attached) being integrally formed or weld with the left end of the second keel 2 above, lower end then with The left end of the second following keel 2 is attached, and the upper end of first keel 1 on the right and the right-hand member of the second keel 2 above It is connected modes such as (can be attached) being integrally formed or weld, the lower end then right-hand member progress with the second following keel 2 Connection.
In Fig. 1, multiple floors can together form floor system, be entered between adjacent two floors by the second keel 2 Row is connected, i.e. the second keel 2 of floor are attached with the second keel 2 of following floor above in Fig. 1.
As shown in Figures 2 and 3, floor needs to be horizontally mounted, and that is to say and is rotated by 90 ° the floor shown in Fig. 2 so that Fig. 2's Floor is turned to shown in Fig. 3 so that Fig. 2 floor is horizontal.As shown in Figures 2 and 3, the first keel 1 and the second keel 2 Cavity is formed, and one layer of cement plate 3 is provided with the lateral surface of the upper end of cavity.The personnel of the second floor of building step in cement On plate 3, the thickness of cement plate 3 can be preferably 15mm.
Bending part 4 is also provided with the cavity shown in Fig. 3, the front end of bending part 4 is (perpendicular to Fig. 3 direction Front, the lower section shown in Fig. 2) it can be welded on the second keel 2 of front end, rear end is (perpendicular to the rear in Fig. 3 direction, Fig. 2 Shown top) it can be welded on the second keel 2 below.
Meanwhile having multiple bending parts 4 in Fig. 3, the lower section of multiple bending parts 4 is located in same level height, therefore, can be with The lower section of bending part 4 shown in Fig. 3 is installed by multiple bar-mat reinforcements 5.
And bar-mat reinforcement 5 can separate cavity, turn into the first cavity and the second cavity, and can be set in the first cavity Put substantial amounts of hard insulating material 8, you can so that the heat insulating material filling of hard is full of into whole first cavity, and the second cavity is then square Continuous installation after an action of the bowels.The insulation material of hard can play a part of sound insulation and insulation so that Stall and second floor separate.
As shown in figure 3, in order to which floor can be fixed in building, it is also necessary to set (the one side one of at least two girder steel 6 Individual, the vertical range between two girder steels 6 is identical with the length of floor), girder steel 6 is strip, and the length of girder steel 6 is at least big In or equal to all floors overall width sum, girder steel 6 is to be fixed on part on outside building, between girder steel 6 and floor Insulation effect can be played with filling-foam insulation material.
And in order to which floor is fixed on girder steel 6, angle steel 7 can also be set on girder steel 6, and angle steel 7 is in L-shaped, only Installation is needed to be installed as shown in Figure 3.Angle steel 7 can play a part of that floor is made.
Floor system of the present utility model can install following manner and be installed:As shown in fig. 6,
1. the floor being made is transported to need place to be mounted;
2. the floor shown in Fig. 2 is rotated into 90 °, the position shown in Fig. 3 is turned to, the left end of the floor shown in Fig. 3 is put Put on the angle steel 7 of left side girder steel 6, right-hand member is placed on the angle steel 7 of the right girder steel 6;
3. according to the method described above, remaining floor is all placed;
4. after floor is placed, according to shown in Fig. 4, the second keel 2 of two adjacent floors are attached (logical Crossing the second cavity can be attached);
5. whole floors are fixed on angle steel 7, the installation of floor is completed;
6. the thick cement plates 3 of 15mm are set in the top of floor system;
7. as shown in figure 3, after the installation is complete, furred ceiling is carried out, that is, lime plate is installed below.
The installation of above-mentioned various pieces, such as:Installation between two adjacent wallboards can be by screw or spiral shell Bolt is carried out, and cement plate 3 can also be arranged on second keel 2 (as shown in Figure 5) by screw or bolt, and the first keel 1 by screw or can be bolted on angle steel 7.
It is in C because floor is provided with two cross sections in the first keel 1 and two cross sections of C fonts in the utility model Second keel 2 of font, and the first keel 1 and the second keel 2 join end to end successively, therefore, can change according to using needing Become the size of the first keel 1 and the second keel 2, modular designs and can be by factorial praluction while can be according to building The total size of plate increases the quantity of floor, convenient installation.
And installation process need not utilize machine, it is only necessary to which 2-3 people can complete installment work, can solve open air (such as:The special topography conditions such as Scenic Spot Area, mountain area, forest land can not use the problem of plant equipment).
The utility model dispatch from the factory complete after be complete product, it is not necessary to live processing and fabricating, solve existing Field workload is big, will not produce a large amount of building wastes.
Above-described is only some embodiments of the present utility model.For the person of ordinary skill of the art, On the premise of not departing from the utility model and creating design, various modifications and improvements can be made, these belong to this practicality New protection domain.

Claims (8)

1. floor system, it is characterised in that including multiple floors, the floor is provided with first dragon of two cross sections in C fonts Bone (1) and two cross sections are in the second keel (2) of C fonts, and the first keel (1) and the second keel (2) join end to end successively, the One keel (1) and the second keel (2) form cavity, and multiple floors are connected by the second keel (2) stacked on top, the sky The outside of chamber is provided with cement plate (3).
2. floor system according to claim 1, it is characterised in that also including multiple bending parts (4), the bending part (4) one end is located on one of them second keel (2), and the other end is located on another second keel (2), and multiple bending members are equal In sustained height.
3. floor system according to claim 2, it is characterised in that also set including bar-mat reinforcement (5), the bar-mat reinforcement (5) On the side of the bending part (4), the cavity is divided into the first cavity and the second cavity by the bar-mat reinforcement (5).
4. floor system according to claim 3, it is characterised in that hard insulating material is provided with first cavity (8), the cement plate (3) is located at the hard insulating material (8) side.
5. floor system according to claim 4, it is characterised in that also including at least two girder steels (6), the girder steel (6) it is located on outside floor, girder steel (6) the side side is provided with angle steel (7), and one end of the floor is located at one of steel On the angle steel (7) of beam (6), the other end is located on the angle steel (7) of another girder steel (6).
6. floor system according to claim 5, it is characterised in that two adjacent floors are fixedly connected by screw.
7. floor system according to claim 6, it is characterised in that the bending part (4) is in C fonts.
8. according to floor system according to any one of claims 1 to 7, it is characterised in that the width of the floor is 0.6m Or 1.2m.
CN201720808515.3U 2017-07-05 2017-07-05 Floor system Active CN206888302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720808515.3U CN206888302U (en) 2017-07-05 2017-07-05 Floor system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720808515.3U CN206888302U (en) 2017-07-05 2017-07-05 Floor system

Publications (1)

Publication Number Publication Date
CN206888302U true CN206888302U (en) 2018-01-16

Family

ID=61299440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720808515.3U Active CN206888302U (en) 2017-07-05 2017-07-05 Floor system

Country Status (1)

Country Link
CN (1) CN206888302U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019007229A1 (en) * 2017-07-05 2019-01-10 辰泰(广德)智能科技建筑有限公司 Floor slab system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019007229A1 (en) * 2017-07-05 2019-01-10 辰泰(广德)智能科技建筑有限公司 Floor slab system

Similar Documents

Publication Publication Date Title
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN108222262A (en) A kind of assembling structure of assembling type steel structure building
CN107780576A (en) A kind of assembled architecture bottom composite floor and its connected mode
CN107143064A (en) One kind interval steel pipe and combined concrete shear wall system
CN105951991B (en) A kind of assembling type steel structure frame system
CN209397804U (en) A kind of assembled steel frame-composite slim floor
CN203514570U (en) Square bar keel partition wall
CN206971471U (en) One kind interval steel pipe and combined concrete shear wall system
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN106088480B (en) Girder truss, the combination beam using girder truss and the compound superstructure using girder truss
CN207794290U (en) A kind of multilayer light gauge cold-formed steel shape-concrete composite structure building construction system
CN110748077A (en) Prestressed truss wallboard, wall body manufactured by using wallboard and manufacturing method of wall body
CN105155846B (en) Arc-shaped armored concrete grandstand construction method
CN103993683B (en) Industrial factory building outer wall and mounting process thereof
CN202125104U (en) Residential building system formed by cast-in-place beam columns and prefabricated sandwich concrete wall slabs
CN106894504A (en) A kind of light-duty assembling type steel structure house and its method of construction
CN206888302U (en) Floor system
CN108086535A (en) A kind of assembled square steel tube steel plate concrete combined shear wall
CN107130719B (en) Floor system
CN112411844A (en) Assembled modularization coincide floor structural system
CN110130555B (en) Fireproof floor structure and production method
CN208023722U (en) A kind of assembling structure of assembling type steel structure building
CN105275121B (en) Three layers of T-steel laced beam and preparation method thereof
CN206859469U (en) A kind of superelevation light steel keel gypsum board wall body structure
CN106351466A (en) Housing assembled by light steel space framework structure composite plate module and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 242000 39 Peng Peng Road, Guangde Economic Development Zone, Anhui

Patentee after: Chen Tai (Guangde) Intelligent Technology Construction Co. Ltd.

Address before: 242000 Guangde Economic Development Zone, Xuancheng, Anhui

Patentee before: Chen Tai (Guangde) Intelligent Technology Construction Co. Ltd.

CP02 Change in the address of a patent holder
CP03 Change of name, title or address

Address after: No. 39, Pengju Road, Guangde Economic Development Zone, Xuancheng City, Anhui Province

Patentee after: Chen Tai (Guangde) intelligent assembly building Limited by Share Ltd

Address before: 242000 39 Peng Peng Road, Guangde Economic Development Zone, Anhui

Patentee before: Chen Tai (Guangde) Intelligent Technology Construction Co. Ltd.

CP03 Change of name, title or address