CN206888274U - Composite plate shear wall ring anchor connecting node - Google Patents

Composite plate shear wall ring anchor connecting node Download PDF

Info

Publication number
CN206888274U
CN206888274U CN201720843385.7U CN201720843385U CN206888274U CN 206888274 U CN206888274 U CN 206888274U CN 201720843385 U CN201720843385 U CN 201720843385U CN 206888274 U CN206888274 U CN 206888274U
Authority
CN
China
Prior art keywords
wall
described wall
ring
composite plate
connecting node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720843385.7U
Other languages
Chinese (zh)
Inventor
赵丽红
陈国秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Zhongsheng Green Building Industry Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720843385.7U priority Critical patent/CN206888274U/en
Application granted granted Critical
Publication of CN206888274U publication Critical patent/CN206888274U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

It the utility model is related to a kind of composite plate shear wall ring anchor connecting node.Traditional connected mode long construction period, influenceed greatly by weather, auxiliary material consumption is big, causes the wasting of resources, and environmental pollution is serious.The utility model composition includes:First wall(6), the second wall(7), the first described wall and the inside of the second described wall all poured concrete and formed integral structure, and the first described wall and the second described wall are all by framework of steel reinforcement(4)Front and rear sides difference casting concrete panel(5)The integral structure of formation, described framework of steel reinforcement are two groups of ring steel reinforced bars by being set respectively on horizontal and vertical(1)With lattice reinforcing bar(3)The structure being composed of a fixed connection.The utility model is used for composite plate shear wall ring anchor connecting node.

Description

Composite plate shear wall ring anchor connecting node
Technical field:
It the utility model is related to a kind of composite plate shear wall ring anchor connecting node.
Background technology:
At present, China is using live assembling reinforcement, supporting module and the traditional construction mode of casting concrete, this method Long construction period, being influenceed greatly by weather, auxiliary material consumption is big, causes the wasting of resources, and environmental pollution is serious, and artificial demand is big, This traditional construction mode gradually contradicts with the present situation of aging population, the waste phenomenon of recruitment, site operation environment easily occurs Difference, there is certain influence to builder's body, at this stage in prefabrication, wall typically uses solid wall, longitudinal direction The connection of connection generally use steel bushing or slurry anchor overlap joint connection of reinforcing bar, reinforcing bar device to hole complex process, required precision is high, process It is more, it is necessary to which process, the concealed work quality such as be in the milk are not easy to ensure and works to repeat amount greatly.
Utility model content:
The purpose of this utility model is that solve traditional construction cycle length, is influenceed greatly by weather, auxiliary material consumption is big, causes to provide The shortcomings of source wastes, and environmental pollution is serious, there is provided a kind of easy for construction, process is few, reduces installation work-hour, shortens the construction period, Save construction cost, a kind of environmentally friendly composite plate shear wall ring anchor connecting node.
Above-mentioned purpose is realized by following technical scheme:
A kind of composite plate shear wall ring anchor connecting node, its composition include:First wall, the second wall, described The inside of one wall and the second described wall has all poured concrete and has formed integral structure, the first described wall and described The second wall be all the integral structure that is formed of front and rear sides difference casting concrete panel by framework of steel reinforcement, described steel Tendons skeleton is the structure being composed of a fixed connection by the two groups of ring steel reinforced bars set respectively on horizontal and vertical with lattice reinforcing bar.
Described composite plate shear wall ring anchor connecting node, the ring steel reinforced bar in the first described wall extend into described The second wall inside, the inside of the first described wall and the second described wall has all poured concrete and has formed integral type knot Structure.
Described composite plate shear wall ring anchor connecting node, the ring steel reinforced bar in the first described wall do not extend into institute Inside the second wall stated, the ring steel reinforced bar in the second described wall is not extended into inside the first described wall, described Additional circular reinforcing bar is placed between first wall and the second described wall, one end of described additional circular reinforcing bar is positioned at described The first wall in, the other end of described additional circular reinforcing bar is located in the second described wall, the first described wall and The inside of the second described wall has all poured concrete and has formed integral structure.
Described composite plate shear wall ring anchor connecting node, the ring steel reinforced bar in the first described wall extend into described The second wall inside, the ring steel reinforced bar in the second described wall is extend into inside the first described wall, described first The inside of wall and the second described wall has all poured concrete and has formed integral structure.
Described composite plate shear wall ring anchor connecting node, the end of described ring steel reinforced bar for square or circular arc or Triangle is corrugated.
Described composite plate shear wall ring anchor connecting node, the end of described additional circular reinforcing bar is square or circular arc Shape or triangle are corrugated.
Beneficial effect:
1. provided by the utility model is a kind of composite plate shear wall ring anchor connecting node, without bar connecting, installation Extremely convenient, at this stage in prefabrication, wall typically uses solid wall, the connection generally use steel of longitudinal reinforcement Sleeve connection or slurry anchor overlap joint connection, reinforcing bar device to hole complex process, required precision is high, and process is more, it is necessary to which the process such as be in the milk, hidden Construction quality is not easy to ensure and worked to repeat to measure greatly, and the utility model simplifies procedure above and simultaneously disclosure satisfy that safety of structure will Ask, lift the construction speed of building.
The utility model is anchored mutually using steel hoop, is wrapped up using the ring steel reinforced bar in the first wall and the second wall Concrete, concrete is served as the pin-shaped structure of the mutual drawknot of reinforcing bar, give full play to the tensile property of reinforcing bar and resisting for concrete Press performance.
The utility model is anchored in concrete using ring steel reinforced bar substitution reinforcing bar with straight bar type, shortens Bar Anchorage length Degree.
After the connection of the utility model ring steel reinforced bar, without rear slotting reinforcing bar, easy for construction, process is few, reduces installation work-hour, contracting The short construction period, save construction cost.
It is cavity structure in the middle part of the utility model, prefabricated components are in light weight, and lifting machine is selectively larger, machine cost Low, without template, building is apparent good, and process is few, is connect in molding component installation both sides concrete surface production process for connection between component Touch platform, surfacing, without later stage plastering process, safety and environmental protection.
Both sides precast concrete facade panel thickness is smaller in the utility model production process, makes mould using angle steel, saves Material cost.Steam-cured panel concrete thickness is small, and intensity improves comparatively fast, and the steam-cured time is short, shortens Production Time.
Brief description of the drawings:
Accompanying drawing 1 is a kind of structural representation of framework of steel reinforcement of the present utility model.
Accompanying drawing 2 is a kind of structural representation of the first wall of the present utility model.
Accompanying drawing 3 is one of structural representation of the present utility model.
Accompanying drawing 4 is the two of structural representation of the present utility model.
Accompanying drawing 5 is the three of structural representation of the present utility model.
Accompanying drawing 6 is of the present utility model with the use of one of structural representation of laminated floor slab.
Accompanying drawing 7 is the two of the structural representation of the present utility model with the use of laminated floor slab.
Accompanying drawing 8 is the three of the structural representation of the present utility model with the use of laminated floor slab.
Accompanying drawing 9 is the structural representation of lattice reinforcing bar of the present utility model.
1, ring steel reinforced bar in figure, 3, lattice reinforcing bar, 4, framework of steel reinforcement, 5, concrete slab, the 6, first wall, the 7, second wall Body, 8, additional circular reinforcing bar, 9, laminated floor slab.
Embodiment:
Embodiment 1:
A kind of composite plate shear wall ring anchor connecting node, its composition include:First wall 6, the second wall 7, it is described The inside of first wall and the second described wall has all poured concrete and has formed integral structure, the first described wall and institute The second wall stated all is to distinguish the integral structure that casting concrete panel 5 formed by the front and rear sides of framework of steel reinforcement 4, described Framework of steel reinforcement be to be composed of a fixed connection by two groups of ring steel reinforced bars 1 being set respectively on horizontal and vertical with lattice reinforcing bar 3 Structure.
Embodiment 2:
Composite plate shear wall ring anchor connecting node according to embodiment 1, the ring-type steel in the first described wall Muscle is extend into inside the second described wall, and the inside of the first described wall and the second described wall has all poured concrete Form integral structure.
Embodiment 3:
Composite plate shear wall ring anchor connecting node according to embodiment 1, the ring-type steel in the first described wall Muscle is not extended into inside the second described wall, and the ring steel reinforced bar in the second described wall does not extend into the first described wall Inside, additional circular reinforcing bar 8 is placed between the first described wall and the second described wall, described additional circular reinforcing bar One end is located in the first described wall, and the other end of described additional circular reinforcing bar is located in the second described wall, described The first wall and the second described wall inside all poured concrete formed integral structure.
Embodiment 4:
Composite plate shear wall ring anchor connecting node according to embodiment 1, the ring-type steel in the first described wall Muscle is extend into inside the second described wall, and the ring steel reinforced bar in the second described wall is extend into the first described wall The inside of portion, the first described wall and the second described wall has all poured concrete and has formed integral structure.
Embodiment 5:
Composite plate shear wall ring anchor connecting node according to embodiment 1 or 2 or 3 or 4, described ring steel reinforced bar End is square or circular arc or triangle or corrugated.
Embodiment 6:
Composite plate shear wall ring anchor connecting node according to embodiment 3, the end of described additional circular reinforcing bar For square or circular arc or triangle or corrugated.
Embodiment 7:
If Fig. 6 is that ring steel reinforced bar in the first wall extend into described the second wall inside and is used cooperatively laminated floor slab Structural representation, in workshop, assembling reinforcement formed framework of steel reinforcement, supporting module, framework of steel reinforcement is put into template, if Put cushion block, casting concrete and vibrate, steam curing to intensity requirement is met, install opposite side and casting concrete, template will First layer concrete slab with framework of steel reinforcement overturns 180 ° and is pressed into the concrete newly poured and vibrates, and steam curing is to completely Sufficient intensity requirement, transport to and stack place, after complete first wall to be installed, superimposed sheet, superimposed sheet is arranged on the first wall and second Between wall, casting concrete, after concrete strength reaches requirement, the second wall of installation stretches the ring steel reinforced bar in the first wall Enter to inside the second wall, casting concrete links into an integrated entity.
As Fig. 7 be the first wall in ring steel reinforced bar do not extend into inside the second wall, the ring steel reinforced bar in the second wall Do not extend into inside the first wall and with the use of the structural representation of laminated floor slab, after complete first wall to be installed, superimposed sheet, Superimposed sheet is arranged between the first wall and the second wall, and insertion additional circular reinforcing bar and casting concrete, concrete strength reach To after requiring, between the second wall of installation makes the concrete slab for the both sides that additional circular reinforcing bar extend into the second wall, pour Concrete links into an integrated entity.
As Fig. 8 be the first wall in ring steel reinforced bar extend into inside the second wall, the ring steel reinforced bar in the second wall is stretched Enter to inside the first wall and with the use of the structural representation of laminated floor slab, after complete first wall to be installed, superimposed sheet, overlapping Plate is arranged between the first wall and the second wall, and the second wall of installation makes the ring steel reinforced bar in the first wall extend into the second wall Internal portion, the ring steel reinforced bar in the second wall are extend into inside the first wall, and casting concrete links into an integrated entity.

Claims (6)

1. a kind of composite plate shear wall ring anchor connecting node, its composition includes:First wall, the second wall, it is characterized in that:Institute The first wall stated and the inside of the second described wall have all poured concrete and have formed integral structure, the first described wall All it is the integral structure that is formed of front and rear sides difference casting concrete panel by framework of steel reinforcement with the second described wall, institute The framework of steel reinforcement stated is to be composed of a fixed connection by the two groups of ring steel reinforced bars set respectively on horizontal and vertical with lattice reinforcing bar Structure.
2. composite plate shear wall ring anchor connecting node according to claim 1, it is characterized in that:In the first described wall Ring steel reinforced bar extend into inside the second described wall, the inside of the first described wall and the second described wall all pours There is concrete to form integral structure.
3. composite plate shear wall ring anchor connecting node according to claim 1, it is characterized in that:In the first described wall Ring steel reinforced bar do not extend into inside the second described wall, the ring steel reinforced bar in the second described wall does not extend into described Inside first wall, additional circular reinforcing bar, described additional ring are placed between the first described wall and the second described wall One end of shape reinforcing bar is located in the first described wall, and the other end of described additional circular reinforcing bar is located at the second described wall Interior, the first described wall and the inside of the second described wall have all poured concrete and have formed integral structure.
4. composite plate shear wall ring anchor connecting node according to claim 1, it is characterized in that:In the first described wall Ring steel reinforced bar extend into inside the second described wall, the ring steel reinforced bar in the second described wall extend into described first Inside wall, the inside of the first described wall and the second described wall has all poured concrete and has formed integral structure.
5. the composite plate shear wall ring anchor connecting node according to claim 1 or 2 or 3 or 4, it is characterized in that:Described The end of ring steel reinforced bar is square or circular arc or triangle or corrugated.
6. composite plate shear wall ring anchor connecting node according to claim 3, it is characterized in that:Described additional circular steel The end of muscle is square or circular arc or triangle or corrugated.
CN201720843385.7U 2017-07-12 2017-07-12 Composite plate shear wall ring anchor connecting node Active CN206888274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720843385.7U CN206888274U (en) 2017-07-12 2017-07-12 Composite plate shear wall ring anchor connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720843385.7U CN206888274U (en) 2017-07-12 2017-07-12 Composite plate shear wall ring anchor connecting node

Publications (1)

Publication Number Publication Date
CN206888274U true CN206888274U (en) 2018-01-16

Family

ID=61297029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720843385.7U Active CN206888274U (en) 2017-07-12 2017-07-12 Composite plate shear wall ring anchor connecting node

Country Status (1)

Country Link
CN (1) CN206888274U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080455A (en) * 2019-06-06 2019-08-02 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of precast shear wall, connecting node and its construction method
CN110700485A (en) * 2019-09-20 2020-01-17 湖北宇辉新型建筑材料有限公司 Prefabricated laminated plate type edge member and production method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080455A (en) * 2019-06-06 2019-08-02 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of precast shear wall, connecting node and its construction method
CN110080455B (en) * 2019-06-06 2023-10-03 呼和浩特市中朵兴泰远大建筑工业有限公司 Prefabricated shear wall, connecting node and construction method thereof
CN110700485A (en) * 2019-09-20 2020-01-17 湖北宇辉新型建筑材料有限公司 Prefabricated laminated plate type edge member and production method thereof

Similar Documents

Publication Publication Date Title
CN103015565B (en) Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN106088330B (en) The connection structure and its construction method of assembling frame beam and frame column based on 3D printing
CN107299699A (en) Assembled cavity shear wall horizontal joint Alveolus type dry type attachment structure
CN105064555A (en) Structural wallboard for superimposed decorative layer and insulating layer and construction method
CN101565976A (en) Multi-ribbed composite wallboard outer insulation integrated technology and construction process thereof
CN108756061A (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam and construction method
CN206888274U (en) Composite plate shear wall ring anchor connecting node
CN105297905A (en) Method for connecting prefabricated floor and prefabricated vertical component
CN101446123A (en) Green concrete mould-locking linkage internal partition plate
CN205935383U (en) Precast concrete shear force wall
CN101318350A (en) Concrete cavity die component forming method
CN207032468U (en) Assembled architecture
CN1955391A (en) Form for steel reinforced concrete three-D load-carrying structure floor
CN208502067U (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam
CN204356896U (en) Based on the assembling Framed Structure with Special-Shaped Columns that 3D prints
CN203429847U (en) Square hole ribbed support prestressed concrete composite slab
CN101082241B (en) Formwork for reinforced bar concrete solid load-carrying structural storied building cover
CN211622269U (en) Hollow sandwich steel pipe concrete beam with eccentrically placed inner pipe
CN204876210U (en) Structure wallboard of coincide decorative layer and heat preservation
CN110284651B (en) Connecting method for prefabricated frame floor slab reinforcing steel bars
CN205444514U (en) Bearing light insulation intergral template
CN209975804U (en) Ecological composite wall
CN203834825U (en) Connection structure of prefabricated stair of overlapped wallboard room
CN203160513U (en) Floorboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191220

Address after: 150000 business service, no.6, building S3, wutongwan community, Shiji Road North, Tianjin Street West, Limin Development Zone, Harbin City, Heilongjiang Province

Patentee after: Zhonghong Shengyuan (Heilongjiang) Green Building Industry Co., Ltd

Address before: 150000 Yingbin District, Harbin, Heilongjiang Province, 301

Patentee before: Zhao Lihong

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 150000 business service, no.6, building S3, wutongwan community, Shiji Road North, Tianjin Street West, Limin Development Zone, Harbin City, Heilongjiang Province

Patentee after: Heilongjiang Zhongsheng Green Building Industry Development Co.,Ltd.

Address before: 150000 business service, no.6, building S3, wutongwan community, Shiji Road North, Tianjin Street West, Limin Development Zone, Harbin City, Heilongjiang Province

Patentee before: Zhonghong Shengyuan (Heilongjiang) Green Building Industry Co.,Ltd.

CP01 Change in the name or title of a patent holder