CN206873953U - Construction discharging platform - Google Patents
Construction discharging platform Download PDFInfo
- Publication number
- CN206873953U CN206873953U CN201720779890.XU CN201720779890U CN206873953U CN 206873953 U CN206873953 U CN 206873953U CN 201720779890 U CN201720779890 U CN 201720779890U CN 206873953 U CN206873953 U CN 206873953U
- Authority
- CN
- China
- Prior art keywords
- support
- fixedly connected
- casing
- fix bar
- discharging platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses construction discharging platform, including bottom plate, right side at the top of the bottom plate is fixedly connected with the second guardrail, front side and rear side at the top of the bottom plate have been fixedly connected with the first guardrail, both sides at the top of first guardrail have been fixedly connected with casing, damping spring is fixedly connected with the center of the cabinet wall bottom, the both sides of the cabinet wall bottom slidably connect second support, connecting rod is connected with the surface of the second support.The utility model is by setting being used cooperatively for fix bar, baffle plate, casing, first support, connecting rod, damping spring, through hole, support bar and second support, solving existing construction discharging platform does not have protector, the problem of life security of user being threatened, the construction discharging platform, possesses the advantages of protection effect is good, the use of user is facilitated, it is simple in construction, it is worthy to be popularized.
Description
Technical field
It the utility model is related to technical field of building construction, specially construction discharging platform.
Background technology
In recent years, with the high speed development of urban construction, urban land resource is fewer and fewer, thereby produces a large amount of height
Layer building, skyscraper need to use construction with unloading in material transports such as template in construction process, steel pipe OR gate subracks
Expect platform, existing construction is poor with discharging platform protection effect, therefore user is unloaded in construction with discharging platform
During material, because the debris on building is more, the debris of high level can be caused to fall down unavoidably, so as to which the life of user can be threatened
Life safety.
Utility model content
The purpose of this utility model is to provide construction discharging platform possess the advantages of protection effect is good, solves
Existing construction discharging platform does not have protector, the problem of can be threatened to the life security of user.
To achieve the above object, the utility model provides following technical scheme:Construction discharging platform, including bottom
Plate, the right side at the top of the bottom plate are fixedly connected with the second guardrail, and the front side and rear side at the top of the bottom plate have been fixedly connected with
First guardrail, the both sides at the top of first guardrail have been fixedly connected with casing, fixed at the center of the cabinet wall bottom
Damping spring is connected with, the both sides of the cabinet wall bottom slidably connect second support, the surface of the second support
On be connected with connecting rod, the one end of the connecting rod away from second support is connected with first support, described first
Fix bar is fixedly connected with the top of frame, the top of the damping spring is fixedly connected with fix bar, the fix bar both sides
Bottom has been fixedly connected with support bar, and the inwall of the support bar one end and casing away from fix bar is slidably connected, described solid
The outside of casing is extended at the top of fixed pole, baffle plate is fixedly connected with the top of the fix bar.
Preferably, the front side on the left of the bottom plate and rear side have been fixedly connected with location-plate, and two at the top of the location-plate
Side offers positioning hole, and the through hole being used cooperatively with fix bar is offered at the top of the casing.
Preferably, the one end of the support bar away from fix bar is fixedly connected with the first sliding block, the cabinet wall both sides
Bottom offer the first chute being used cooperatively with the first sliding block.
Preferably, the bottom of the second support is fixedly connected with the second sliding block, and the both sides of the cabinet wall bottom are equal
Offer the second chute being used cooperatively with the second sliding block.
Preferably, it is flexibly connected on the surface of the first support by the first pivot pin with connecting rod, the connecting rod is remote
One end from first support is flexibly connected by the second pivot pin with second support.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting fix bar, baffle plate, casing, first support, connecting rod, damping spring, through hole, branch
Strut and second support are used cooperatively, and solving existing construction discharging platform does not have protector, can be to using
The problem of life security of person threatens, the construction discharging platform, possesses the advantages of protection effect is good, facilitating makes
The use of user, it is simple in construction, it is worthy to be popularized.
2nd, the utility model being used cooperatively by support bar, the first sliding block and the first chute, moves down fix bar
Shi Gengjia is stable, avoid because fix bar by external force when, cause fix bar move down can run-off the straight situation, so as to shadow
The stability of fix bar has been rung, by being used cooperatively for the second sliding block and the second chute, has slided second support more smooth,
Avoid because the frictional force between second support and cabinet wall is larger, cause second support to be in the presence of damaging, extend
The service life of second support, by being used cooperatively for location-plate and positioning hole, fixed effect can be played to bottom plate, is added
The stability of bottom plate, make the stablizing effect of bottom plate more preferable.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the top view of the utility model structure;
Fig. 3 is the sectional view of the utility model casing;
Fig. 4 is the utility model A partial enlarged drawing;
Fig. 5 is the utility model B partial enlarged drawing.
In figure:1 bottom plate, 2 first guardrails, 3 second guardrails, 4 fix bars, 5 baffle plates, 6 casings, 7 positioning holes, 8 location-plates, 9
First support, 10 connecting rods, 11 damping springs, 12 through holes, 13 support bars, 14 first sliding blocks, 15 first chutes, 16 second
Frame, 17 second sliding blocks, 18 second chutes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5, construction discharging platform, including bottom plate 1 are referred to, the front side in the left side of bottom plate 1 and rear side are fixed
Location-plate 8 is connected with, the both sides at the top of location-plate 8 offer positioning hole 7, made by the cooperation of location-plate 8 and positioning hole 7
With can play fixed effect to bottom plate 1, add the stability of bottom plate 1, make the stablizing effect of bottom plate 1 more preferable, bottom plate 1 pushes up
The second guardrail 3 is fixedly connected with the right side of portion, the front side at the top of bottom plate 1 and rear side have been fixedly connected with the first guardrail 2, the first shield
The both sides at the top of column 2 have been fixedly connected with casing 6, and the top of casing 6 offers the casing of through hole 12 being used cooperatively with fix bar 4
Damping spring 11 is fixedly connected with the center of 6 inwall bottoms, the both sides of the inwall bottom of casing 6 slidably connect second support
16, the bottom of second support 16 is fixedly connected with the second sliding block 17, and the both sides of the inwall bottom of casing 6 offer and the second sliding block
17 the second chutes 18 being used cooperatively, by being used cooperatively for the second sliding block 17 and the second chute 18, slide second support 16
It is more smooth, avoid because the frictional force between second support 16 and the inwall of casing 6 is larger, cause second support 16 to damage
Bad situation, the service life of second support 16 is extended, connecting rod 10 is connected with the surface of second support 16, connected
The one end of bar 10 away from second support 16 is connected with first support 9, passes through the first pivot pin and company on the surface of first support 9
Extension bar 10 is flexibly connected, and the one end of connecting rod 10 away from first support 9 is flexibly connected by the second pivot pin with second support 16, the
The top of one support 9 is fixedly connected with fix bar 4, and the top of damping spring 11 is fixedly connected with fix bar 4, the both sides of fix bar 4
Bottom be fixedly connected with support bar 13, the one end of support bar 13 away from fix bar 4 is fixedly connected with the first sliding block 14, casing
The bottom of 6 inwall both sides offers the first chute 15 being used cooperatively with the first sliding block 14, passes through support bar 13, the first sliding block
14 and first chute 15 be used cooperatively, make fix bar 4 more stable when moving down, avoid because fix bar 4 is by external force
When, cause fix bar 4 to move down the situation of meeting run-off the straight, so as to have impact on the stability of fix bar 4, support bar 13 is remote
One end of fix bar 4 and the inwall of casing 6 are slidably connected, and the top of fix bar 4 extends to the outside of casing 6, the top of fix bar 4
Portion is fixedly connected with baffle plate 5.
In use, when building that debris is pounded to baffle plate 5 under placement in height, baffle plate 5 starts to move down, and is driven by baffle plate 5
Fix bar 4, support bar 13 is driven by fix bar 4, by the first sliding blocks 14 of drive of support 13 in the first chute 15 to moving down
It is dynamic, first support 9 is driven by fix bar 4, connecting rod 10 is driven by first support 9, second is driven by connecting rod 10
Frame 16, drive the second sliding block 17 in the second chute 18 while slip by second support 16, fix bar 4 makes damping spring 11
Shrink, so that the stablizing effect of fix bar 4 is more preferable, reduces the extent of damage of baffle plate 5, add construction discharging platform pair
The protection effect of user.
In summary:The construction discharging platform, by set fix bar 4, baffle plate 5, casing 6, first support 9,
Connecting rod 10, damping spring 11, through hole 12, support bar 13 and second support 16 are used cooperatively, and are solved existing building and are applied
Work discharging platform does not have protector, the problem of being threatened to the life security of user.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. construction discharging platform, including bottom plate (1), it is characterised in that:Right side at the top of the bottom plate (1) is fixedly connected
There is the second guardrail (3), the front side and rear side at the top of the bottom plate (1) have been fixedly connected with the first guardrail (2), first guardrail
(2) both sides at the top of have been fixedly connected with casing (6), and damping bullet is fixedly connected with the center of casing (6) the inwall bottom
Spring (11), the both sides of casing (6) the inwall bottom slidably connect second support (16), the table of the second support (16)
Connecting rod (10) is connected with face, the one end of the connecting rod (10) away from second support (16) is connected with first
Frame (9), fix bar (4), the top of the damping spring (11) and fix bar are fixedly connected with the top of the first support (9)
(4) it is fixedly connected, the bottom of fix bar (4) both sides has been fixedly connected with support bar (13), and the support bar (13) is remote
One end of fix bar (4) and the inwall of casing (6) are slidably connected, and the outer of casing (6) is extended at the top of the fix bar (4)
Portion, baffle plate (5) is fixedly connected with the top of the fix bar (4).
2. construction discharging platform according to claim 1, it is characterised in that:Front side on the left of the bottom plate (1)
Location-plate (8) has been fixedly connected with rear side, and the both sides at the top of the location-plate (8) offer positioning hole (7), the casing
(6) through hole (12) being used cooperatively with fix bar (4) is offered at the top of.
3. construction discharging platform according to claim 1, it is characterised in that:The support bar (13) is away from fixed
One end of bar (4) is fixedly connected with the first sliding block (14), and the bottom of casing (6) the inwall both sides offers and the first sliding block
(14) the first chute (15) being used cooperatively.
4. construction discharging platform according to claim 1, it is characterised in that:The bottom of the second support (16)
The second sliding block (17) is fixedly connected with, the both sides of casing (6) the inwall bottom, which offer to coordinate with the second sliding block (17), to be made
Second chute (18).
5. construction discharging platform according to claim 1, it is characterised in that:The surface of the first support (9)
Upper to be flexibly connected by the first pivot pin with connecting rod (10), one end of the remote first support (9) of the connecting rod (10) passes through the
Two pivot pins are flexibly connected with second support (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720779890.XU CN206873953U (en) | 2017-06-30 | 2017-06-30 | Construction discharging platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720779890.XU CN206873953U (en) | 2017-06-30 | 2017-06-30 | Construction discharging platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206873953U true CN206873953U (en) | 2018-01-12 |
Family
ID=61332320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720779890.XU Expired - Fee Related CN206873953U (en) | 2017-06-30 | 2017-06-30 | Construction discharging platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206873953U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779271A (en) * | 2019-03-14 | 2019-05-21 | 安徽宏志建设工程有限责任公司 | A kind of building engineering construction steel platform for material unloading |
CN109914821A (en) * | 2019-04-05 | 2019-06-21 | 云南建投第二建设有限公司 | Discharging platform is used in a kind of construction of high-rise public building |
-
2017
- 2017-06-30 CN CN201720779890.XU patent/CN206873953U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779271A (en) * | 2019-03-14 | 2019-05-21 | 安徽宏志建设工程有限责任公司 | A kind of building engineering construction steel platform for material unloading |
CN109779271B (en) * | 2019-03-14 | 2024-01-19 | 安徽宏志建设集团有限公司 | Unloading steel platform for building engineering construction |
CN109914821A (en) * | 2019-04-05 | 2019-06-21 | 云南建投第二建设有限公司 | Discharging platform is used in a kind of construction of high-rise public building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107289240A (en) | A kind of mining machinery damping base | |
CN206873953U (en) | Construction discharging platform | |
CN212052812U (en) | Rolling stone device for safety protection high slope blasting | |
CN204784433U (en) | Shock pad foot for mechanical equipment | |
CN206308968U (en) | A kind of skyscraper vertical garbage transport channel | |
CN205637528U (en) | Scaffold frame that building engineering used | |
CN208499156U (en) | A kind of assembled architecture component shipping protector | |
CN203809982U (en) | Mine electromechanical equipment operating platform | |
CN206189429U (en) | Cofferdam for river channel revetment | |
CN207091926U (en) | A kind of science of bridge building protector | |
CN210031854U (en) | Side slope protection device | |
CN209075904U (en) | Steel tower climbs Defend, fall device guide rail fixing device for installing | |
CN207228326U (en) | A kind of strong antidetonation formed steel construction | |
CN207971743U (en) | A kind of Hardware fitting cutter device | |
CN209854661U (en) | Water conservancy construction slope protection structure | |
CN205834738U (en) | Liftable machine tool structure | |
CN214365084U (en) | Ground safety device for construction | |
CN207417845U (en) | A kind of building-supporting steel pipe recovery processing feeding device | |
CN207974831U (en) | Bamboo formula portal structure is cut in a kind of tunnel that blocking small-sized falling rocks | |
CN208248268U (en) | A kind of insulating board for building mobile device with shock-absorbing function | |
CN207211085U (en) | Concrete gravity dam arrangement before rock | |
CN207568153U (en) | Floor concrete casting operation platform is built in a kind of room | |
CN208152569U (en) | A kind of new type formwork support protecting apptss | |
CN206366149U (en) | A kind of height adjustable and the athletic training table tennis table with damping | |
CN215759982U (en) | Green building materials are with cavity building panel with antidetonation effect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180112 Termination date: 20200630 |
|
CF01 | Termination of patent right due to non-payment of annual fee |