CN206863092U - A kind of Campatible single-phase electric energy meter meter adapting-seat - Google Patents

A kind of Campatible single-phase electric energy meter meter adapting-seat Download PDF

Info

Publication number
CN206863092U
CN206863092U CN201720745933.2U CN201720745933U CN206863092U CN 206863092 U CN206863092 U CN 206863092U CN 201720745933 U CN201720745933 U CN 201720745933U CN 206863092 U CN206863092 U CN 206863092U
Authority
CN
China
Prior art keywords
electric energy
energy meter
campatible
pin holes
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720745933.2U
Other languages
Chinese (zh)
Inventor
夏存岳
李长宣
孔喜乐
***本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Sanhui Mutual Inductor Co., Ltd.
Original Assignee
ZHENGZHOU SMS ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SMS ELECTRIC CO Ltd filed Critical ZHENGZHOU SMS ELECTRIC CO Ltd
Priority to CN201720745933.2U priority Critical patent/CN206863092U/en
Application granted granted Critical
Publication of CN206863092U publication Critical patent/CN206863092U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

A kind of Campatible single-phase electric energy meter meter adapting-seat, including gauge stand cover body and the pedestal being installed on the gauge stand cover body, gauge stand upper shell is provided with the pedestal, wherein described pedestal one end is provided with current wiring terminal, Campatible contact pin mounting seat is provided with the pedestal, installation through-hole is provided with the top of the Campatible contact pin mounting seat, two rows the first pin holes and the second pin holes parallel to each other are provided with the Campatible contact pin mounting seat, it is used to intert southern net connection box of electric energy meter terminal in first pin holes, intert state's net connection box of electric energy meter terminal in second pin holes, first voltage division board is provided between first pin holes, second voltage division board is provided between second pin holes.The utility model can meet the needs of two kinds of different type calibrations simultaneously, avoid repetition and change the inconvenience that meter adapting-seat is brought, improve the verification efficiency of electric energy meter.

Description

A kind of Campatible single-phase electric energy meter meter adapting-seat
Technical field
The utility model belongs to Application of Power Metering Instruments verification field, and relates more specifically to one kind and be used for state's net/southern network mark Accurate single-phase electric energy meter meter adapting-seat.
Background technology
In electrical measurement industry, generally electric energy meter is detected, need to carry out electric energy meter wiring in detection with tearing open Line, the single-phase electric energy meter terminal quantity of various models and position dimension are identicals in national grid standard.China's electric power at present Conveying is mainly undertaken by State Grid Corporation of China, Southern Power Grid Company, and the electric energy meter used is both needed to according to ordered by two grid companies Vertical standard production, two kinds of standards are incompatible, and the distance between two row's connection jaws are inconsistent on two kinds of electric energy meters, to normal school Test and bring inconvenience.Electric energy meter meter adapting-seat in existing electrical energy meter calibration system can not meet above two electric energy meter simultaneously Verification need, different meter adapting-seat is installed according to the specification of electric energy meter in use, be made troubles to normal verification, Verification efficiency is have impact on, particularly current large area is using automatic assembly line verification electric energy meter, if a streamline can only be simultaneous Hold a kind of specification electric energy meter, it will bring in cost, economy, efficiency and in maintenance huge waste in the future, research and development one kind can be used for The meter adapting-seat of streamline while compatible two kinds of specification electric energy meters is exactly current urgent problem.
Utility model content
For above-mentioned technical problem, the utility model provides a kind of Campatible electric energy meter meter adapting-seat, there is provided a kind of energy is same When meet the electric energy meter meter adapting-seats of southern net electric energy meter and state's net electrical energy meter calibration needs.
What the technical solution of the utility model was realized in:
A kind of Campatible single-phase electric energy meter meter adapting-seat, including gauge stand cover body and the pedestal that is installed on the gauge stand cover body, Gauge stand upper shell is provided with the pedestal, wherein described pedestal one end is provided with current wiring terminal, is set on the pedestal There is Campatible contact pin mounting seat, installation through-hole, the Campatible contact pin installation are provided with the top of the Campatible contact pin mounting seat Two rows the first pin holes and the second pin holes parallel to each other are provided with seat, are used to intert Nan Wang electricity in first pin holes Can table binding post, state's net connection box of electric energy meter terminal is interted in second pin holes, is provided between first pin holes First voltage division board, second voltage division board is provided between second pin holes.
As the utility model further embodiment, described installation through-hole one end is provided with state's online article mark, separately One end is provided with southern online article mark.
As the utility model further embodiment, the pedestal is configured to receive state's net single-phase electric energy meter and southern net Single-phase electric energy meter.
Positive beneficial effect:
The beneficial effects of the utility model are:It is parallel to each other and full respectively by being set in Campatible contact pin mounting seat The first of the binding post of the electric energy meter of two kinds of different sizes of sufficient national grid single-phase electric energy meter and south electric network single-phase electric energy meter Pin holes and the second pin holes, while the needs of two kinds of different type calibrations are met, avoid repetition replacing meter adapting-seat and bring Inconvenience, improve the verification efficiency of electric energy meter.
Brief description of the drawings
Fig. 1 is the utility model contact pin mounting seat dimensional structure diagram;
Fig. 2 is the dimensional structure diagram that the utility model Campatible contact pin mounting seat installs state's net single-phase electric energy meter;
Fig. 3 is the dimensional structure diagram that the utility model Campatible contact pin mounting seat installs southern net single-phase electric energy meter;
Fig. 4 is front view of the present utility model;
Fig. 5 is left view of the present utility model;
Fig. 6 is top view of the present utility model;
In figure, 1- gauge stand cover bodies, 2- pedestals, 3- gauge stand upper shells, 4- Campatible contact pin mounting seats, 5- south net single-phase electric energy Table binding post, 6- electric current binding posts, 7- states net single-phase electric energy meter binding post, the pin holes of 8- first, the pin holes of 9- second, 10- second voltage division boards, 11- first voltage division boards, 12- installation through-holes, 13- states online article mark, 14- south online article mark Know.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in figure 1, a kind of Campatible single-phase electric energy meter meter adapting-seat, including gauge stand cover body 1 and it is installed on the gauge stand cover Pedestal 2 on body 1, gauge stand upper shell 3 is provided with the pedestal 2, it is characterised in that described one end of pedestal 2 is provided with electric current Binding post 6, Campatible contact pin mounting seat 4 is provided with the pedestal 2, and the top of Campatible contact pin mounting seat 4 is provided with Installation through-hole 12, two rows the first pin holes 8 and the second pin holes parallel to each other are provided with the Campatible contact pin mounting seat 4 9, it is used in first pin holes 8 intert southern net connection box of electric energy meter terminal 7, interts state's net electric energy in second pin holes 9 Table binding post 5, first voltage division board 11 is provided between first pin holes 8, is set between second pin holes 9 There is second voltage division board 10.
As shown in Figures 2 and 3, described one end of installation through-hole 12 is provided with state's online article mark 13, and the other end is provided with south Online article mark 14.
Further in embodiment, the pedestal 2 is configured to receive state's net single-phase electric energy meter and southern net single-phase electric energy meter.
In order to more fully understand the utility model, as Figure 4-Figure 6, Fig. 4-Fig. 6 is respectively main view of the present utility model Figure, left view and top view.
When accessing state's net single-phase electric energy meter, the first pin holes 8, southern net connection box of electric energy meter terminal 7 are in idle state, the Two pin holes 9, state's net connection box of electric energy meter terminal 5 are in running order, as shown in Fig. 2 second voltage division board 10 plays isolation The effect of high current, first voltage division board 11 are idle, and state's net connection box of electric energy meter terminal 5 and state's net single-phase electric energy meter are carried out pair Connecing, installation through-hole 12 is fixed on the base 2, and the second pin holes 9 design according to the size of state's net connection box of electric energy meter terminal 5, because This can be docked with state's net single-phase electric energy meter phenotype.
As shown in figure 3, the Campatible contact pin mounting seat 4 in Fig. 2 is overturn into 180 °, the second pin holes 9, state's net electric energy meter connect Line terminals 5 are idle, and the first pin holes 8, southern net connection box of electric energy meter terminal 7 are in running order, and first voltage division board 11 plays Isolate the effect of high current, second voltage division board 10 is idle, and southern net connection box of electric energy meter terminal 7 is carried out with southern net single-phase electric energy meter Docking, installation through-hole 12 are fixed on the base 2, and the first pin holes 8 design according to the size of southern net connection box of electric energy meter terminal 7, Therefore can be docked with southern net single-phase electric energy meter phenotype.
Therefore, by being set in Campatible contact pin mounting seat 4 parallel to each other and meeting national grid single-phase electric energy respectively The first pin holes 8 and the second pin holes of the binding post of the electric energy meter of two kinds of different sizes of table and south electric network single-phase electric energy meter 9, while the needs of two kinds of different type calibrations are met, avoid repetition and change the inconvenience that meter adapting-seat is brought, improve electric energy The verification efficiency of table.
Above example is merely to illustrate preferred embodiment of the present utility model, but the utility model be not limited to it is above-mentioned Embodiment, in the field those of ordinary skill possessed knowledge, within the spirit and principles of the utility model Any modification, equivalent substitute and improvement for being made etc., it all should cover in the claimed technical scheme scope of the utility model Within.

Claims (3)

1. a kind of Campatible single-phase electric energy meter meter adapting-seat, including gauge stand cover body(1)Be installed on the gauge stand cover body(1)On base Seat(2), the pedestal(2)On be provided with gauge stand upper shell(3), it is characterised in that the pedestal(2)One end is provided with electric current and connect Line terminals(6), the pedestal(2)On be provided with Campatible contact pin mounting seat(4), the Campatible contact pin mounting seat(4)Top It is provided with installation through-hole(12), the Campatible contact pin mounting seat(4)On be provided with two rows the first pin holes parallel to each other(8) With the second pin holes(9), first pin holes(8)In be used for intert southern net connection box of electric energy meter terminal(7), second contact pin Hole(9)In intert state net connection box of electric energy meter terminal(5), first pin holes(8)Between be provided with first voltage division board (11), second pin holes(9)Between be provided with second voltage division board(10).
A kind of 2. Campatible single-phase electric energy meter meter adapting-seat according to claim 1, it is characterised in that the installation through-hole (12)One end is provided with state's online article mark(13), the other end is provided with southern online article mark(14).
A kind of 3. Campatible single-phase electric energy meter meter adapting-seat according to claim 1, it is characterised in that the pedestal(2)If It is set to and accommodates state's net single-phase electric energy meter and southern net single-phase electric energy meter.
CN201720745933.2U 2017-06-26 2017-06-26 A kind of Campatible single-phase electric energy meter meter adapting-seat Active CN206863092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720745933.2U CN206863092U (en) 2017-06-26 2017-06-26 A kind of Campatible single-phase electric energy meter meter adapting-seat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720745933.2U CN206863092U (en) 2017-06-26 2017-06-26 A kind of Campatible single-phase electric energy meter meter adapting-seat

Publications (1)

Publication Number Publication Date
CN206863092U true CN206863092U (en) 2018-01-09

Family

ID=60827120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720745933.2U Active CN206863092U (en) 2017-06-26 2017-06-26 A kind of Campatible single-phase electric energy meter meter adapting-seat

Country Status (1)

Country Link
CN (1) CN206863092U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109342992A (en) * 2018-12-13 2019-02-15 烟台东方威思顿电气有限公司 A kind of complete compatible assembly line electricity consumption energy table detection device
CN110068786A (en) * 2018-01-24 2019-07-30 郑州三晖电气股份有限公司 A kind of multi-functional gauge stand bin device and implementation method
CN110068714A (en) * 2018-01-24 2019-07-30 郑州三晖电气股份有限公司 A kind of electric energy meter multi-epitope meter adapting-seat
CN110208728A (en) * 2019-06-21 2019-09-06 国网福建省电力有限公司 Assembly line examines and determine general meter adapting-seat and its application method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110068786A (en) * 2018-01-24 2019-07-30 郑州三晖电气股份有限公司 A kind of multi-functional gauge stand bin device and implementation method
CN110068714A (en) * 2018-01-24 2019-07-30 郑州三晖电气股份有限公司 A kind of electric energy meter multi-epitope meter adapting-seat
CN110068786B (en) * 2018-01-24 2024-04-09 郑州三晖电气股份有限公司 Multifunctional meter calibrating device and implementation method
CN109342992A (en) * 2018-12-13 2019-02-15 烟台东方威思顿电气有限公司 A kind of complete compatible assembly line electricity consumption energy table detection device
CN109342992B (en) * 2018-12-13 2024-01-19 烟台东方威思顿电气有限公司 Electric energy meter detection device for full-compatible assembly line
CN110208728A (en) * 2019-06-21 2019-09-06 国网福建省电力有限公司 Assembly line examines and determine general meter adapting-seat and its application method
CN110208728B (en) * 2019-06-21 2024-02-09 国网福建省电力有限公司 General meter receiving seat for assembly line verification and use method thereof

Similar Documents

Publication Publication Date Title
CN206863092U (en) A kind of Campatible single-phase electric energy meter meter adapting-seat
CN202649448U (en) Large user information collection terminal detection apparatus completely simulating scene
CN203166149U (en) Simple wiring connection apparatus
CN206863093U (en) A kind of electromechanical integration Campatible electric energy meter gauge stand
CN202650245U (en) Resident low-voltage centralized meter-reading terminal detecting device completely simulating spots
CN204719198U (en) A kind of multi-functional adjustable detection fixture for electro-magnetic circuit breaker
CN201348640Y (en) Auxiliary device for cable insulation detection
CN212111482U (en) Conversion operation box
CN202534251U (en) Instrument hanging box
CN208504328U (en) A kind of intake board of tape light
CN204761391U (en) Photovoltaic collector shoe gear
CN212965151U (en) Bluetooth communication detection support device for IR46 intelligent electric energy meter
CN207752060U (en) A kind of electric energy meter multi-epitope meter adapting-seat
CN209590214U (en) It is a kind of for testing the test device of different size chip
CN209417170U (en) A kind of omnipotent detection station of power equipment quality based on modularized design
CN202267708U (en) Device for testing power of solar-cell panel
CN207007881U (en) A kind of plug-in technique module performance detects fixture
CN206258498U (en) Low-voltage intelligent ammeter box
CN204287353U (en) Charger performance parameter testing system and tool
CN104459404B (en) Charger performance parameter testing system and tool
CN204012053U (en) PLC control system fast-wiring panel assembly
CN215812925U (en) Flip integral type bluetooth communication detection support device
CN204761392U (en) Junction box
CN202119857U (en) Line inspection device of measurement meter
CN202995025U (en) Composite type intelligent terminal junction box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180713

Address after: 450016 No. 85 Fifth Avenue, Zhengzhou economic and Technological Development Zone, Henan

Patentee after: Zhengzhou Sanhui Mutual Inductor Co., Ltd.

Address before: 450016 85, Fifth Avenue, Zhengzhou economic and Technological Development Zone, Zhengzhou, Henan

Patentee before: Zhengzhou SMS Electric Co., Ltd.