CN206859227U - Civil engineering roofbolt construction arrangement - Google Patents

Civil engineering roofbolt construction arrangement Download PDF

Info

Publication number
CN206859227U
CN206859227U CN201720578448.0U CN201720578448U CN206859227U CN 206859227 U CN206859227 U CN 206859227U CN 201720578448 U CN201720578448 U CN 201720578448U CN 206859227 U CN206859227 U CN 206859227U
Authority
CN
China
Prior art keywords
grouting pipe
groove
drive link
civil engineering
pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720578448.0U
Other languages
Chinese (zh)
Inventor
袁宏发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational College of Transportation
Original Assignee
Chongqing Vocational College of Transportation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational College of Transportation filed Critical Chongqing Vocational College of Transportation
Priority to CN201720578448.0U priority Critical patent/CN206859227U/en
Application granted granted Critical
Publication of CN206859227U publication Critical patent/CN206859227U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of civil engineering roofbolt construction arrangement, belong to anchor bolt construction field, for solving to be easily accessible the debris such as gravel during drilling, in slurry outlet, cause to accumulate debris in hollow anchor rod body and block, influence to be in the milk;Simultaneously as drive link of the anchor rod body as anchor bit, its surface opens up some slurry outlets, and slurry outlet will influence its structural strength, the problem of being easily deformed of being obstructed in boring procedure.It includes drill bit, Grouting Pipe, and the drill bit lower end is provided with the first groove, and the Grouting Pipe upper end is embedded in the first groove and is connected by screw thread, and the Grouting Pipe entire body is uniformly distributed some injected holes;First bottom portion of groove is provided with the second groove, and drive link is inserted with the Grouting Pipe, and the drive link upper end is embedded in the second groove and is detachably connected, and the drive link lower end is provided with connection-peg.The technical program is simple and reasonable, effectively prevents accumulation debris in Grouting Pipe and prevents Grouting Pipe from being deformed in boring procedure.

Description

Civil engineering roofbolt construction arrangement
Technical field
The utility model belongs to anchor bolt construction field, is a kind of civil engineering roofbolt construction arrangement specifically.
Background technology
At present, anchor pole is the most basic part of roadway support among contemporary colliery, and he is by the surrounding rock consolidation in tunnel Together, country rock itself supporting itself is made.Present anchor pole is applied not only to mine, is also used in engineering technology, side slope, tunnel, Dam body carries out main body reinforcing;The quality of anchor bolt construction quality is related to the stability of Tunnel;But conventional anchor is applied Work is all that this construction method has many limitations, pretension often occurs by beating anchor hole-be put into anchor pole-plug Anchor Agent Power deficiency or the situation of pretightning force loss, monitor the deformation procedure complexity of country rock, and cement mortar perfusion is uneven And cement mortar is combined untight situation with anchor rod body and often occurred, asked in addition, anchor pole corrosion is also very serious one Topic.
For above-mentioned technical deficiency, 201620181760.1 applying date of application number 2016.03.10 patent document It is middle to propose a kind of coal mine support anchor pole.The utility model includes anchor rod body, and grout hole is provided with the middle part of one end of anchor rod body;Anchor One end of club shaft is welded with anchor bit;The top of anchor bit is provided with centrum;The outer surface of anchor bit is provided with outer Screw thread;The middle part uniform welding of anchor rod body has multiple fins;The middle part of anchor rod body is uniformly provided with multiple slurry outlets;Anchor pole bar The other end of body is socketed with cambered surface pallet;The side of cambered surface pallet is provided with ceramic awl column sleeve;Cambered surface pallet and ceramic awl column sleeve Between be provided with packing ring;The side of ceramic awl column sleeve is evenly arranged with multiple bearing pins;The utility model is using the outer of anchor bit Surface is provided with external screw thread, by rotating anchor rod body, be advantageous to realize under given conditions anchor rod body from precession;Using Grout hole and the multiple slurry outlets being uniformly arranged, are advantageous to from the inside of anchor rod body to uniform priming petock around anchor rod body Cement mortar.
Pass through above-mentioned technical proposal effectively solves the deficiencies in the prior art;But during drilling, slurry outlet The debris such as gravel are inside easily accessible, causes to accumulate debris in hollow anchor rod body and block, influences to be in the milk;Simultaneously as anchor Drive link of the club shaft as anchor bit, its surface open up some slurry outlets, and slurry outlet will influence its structural strength, bore It is obstructed and is easily deformed during hole.
Utility model content
The utility model purpose be intended to provide it is a kind of it is simple and reasonable, effectively prevent in Grouting Pipe accumulation debris and Prevent the civil engineering roofbolt construction arrangement that Grouting Pipe deforms in boring procedure.
To realize above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
A kind of civil engineering roofbolt construction arrangement, including drill bit, Grouting Pipe, the drill bit lower end are provided with the first groove, The Grouting Pipe upper end is embedded in the first groove and is connected by screw thread, and the Grouting Pipe entire body is uniformly distributed some slip castings Hole;
First bottom portion of groove is provided with the second groove, and drive link is inserted with the Grouting Pipe, and the drive link upper end is embedding Enter and be detachably connected in the second groove, the drive link lower end is provided with connection-peg.
Further limit, the slip casting pipe outer wall is additionally provided with blade, and fixation is around in outside Grouting Pipe the blade in the shape of a spiral Wall.
Further limit, the Grouting Pipe lower end is cased with pallet, and rubber cushion blocks, the rubber cushion blocks are provided with the pallet On be equipped with asbestos washer;The rubber cushion blocks, asbestos washer are placed in Grouting Pipe;Fastening spiral shell is additionally provided with below the pallet Mother, the clamp nut are placed on outside Grouting Pipe.
Further limit, the clamp nut is tapered cup nut, and the pallet lower end and clamp nut junction are taper Hole.
Further limit, the injected hole medial aperture is less than outside aperture.
Using the utility model of above-mentioned technical proposal, drive link upper end coordinates clamping with the second groove and is connected with drill bit, Second groove and drive link upper end can be arranged to the polygon or ellipsoidal structure to cooperate, realize that power transmits;Transmission Bar lower end is provided with connection-peg, and connection-peg can be connected with rig and realize power output;Grouting Pipe is placed on outside drive link and Grouting Pipe Upper end is connected with the first groove by screw thread, and Grouting Pipe can move with drill bit;In use, connection-peg and rig are connected Connect, start rig, drilled in predetermined boring point, because drive link is by side seal in the injected hole opened up in Grouting Pipe Close, when can effectively prevent drilling, debris enters in Grouting Pipe, prevents debris accumulation from blocking Grouting Pipe;Meanwhile by drive link Directly will rig output power and drill bit between be transmitted, effectively reduce Grouting Pipe drilling when stress, prevent its because Stress deforms;After drilling is completed, extract drive link out, Grouting Pipe lower end is connected with slip casting machine, to being noted in Grouting Pipe Slurry, the cement mortar of injection will appear out of injected hole, realize and the hole wall of drilling be reinforced and bonded Grouting Pipe;Slip casting pipe outer wall is set There is a spiral blade, the soil that spiral blade can loosen with drill bit in boring procedure interfix, so as to reinforce note Bonding strength between slurry pipe and drilling;After cement mortar is injected, the mixture solidification of soil and cement mortar, coordinate spiral Blade will further enhance the bonding strength between Grouting Pipe and drilling;Pallet is spacing by clamp nut, clamp nut and slip casting Pipe is connected by screw thread, and clamp nut can move radially in Grouting Pipe, can be by pallet when moving up Push up, due to being provided with rubber cushion blocks in pallet, rubber cushion blocks will be also pushed upwardly, while also push up asbestos washer It is dynamic, the aperture of drilling is gone out to cover, in advance turned clamp nut upwards before slip casting, by pallet, rubber cushion blocks, asbestos pad Circle and the aperture of drilling compress, and are carrying out slip casting, and cement mortar sprays during preventing slip casting;Clamp nut coordinates for tapered cup nut Bellmouth on pallet, in fastener cycle, pallet automatic horizontal can be pushed up upwards, conveniently ensure that and bore while operation The aperture water outlet concora crush in hole is real, improves sealing.
The utility model is compared with prior art, simple and reasonable, effective to prevent accumulation debris in Grouting Pipe and prevent from noting Slurry pipe deforms in boring procedure.
Brief description of the drawings
The utility model can be further illustrated by the nonlimiting examples that accompanying drawing provides;
Fig. 1 is the structural representation of the utility model civil engineering roofbolt construction arrangement;
Main element symbol description is as follows:
Drill bit 1, Grouting Pipe 2, the first groove 3, the second groove 4, drive link 5, connection-peg 6, blade 7, pallet 8, rubber blanket Block 9, asbestos washer 10, clamp nut 11, injected hole 12.
Embodiment
In order that the utility model may be better understood in those skilled in the art, it is right with reference to the accompanying drawings and examples Technical solutions of the utility model further illustrate.
As shown in figure 1, a kind of civil engineering roofbolt construction arrangement, including drill bit 1, Grouting Pipe 2, the lower end of drill bit 1 are provided with First groove 3, the first groove of the upper end of Grouting Pipe 2 insertion 3 is interior and is connected by screw thread, if the entire body of Grouting Pipe 2 is uniformly distributed Dry injected hole 12;
The bottom of first groove 3 is provided with the second groove 4, and drive link 5 is inserted with Grouting Pipe 2, and the insertion second of the upper end of drive link 5 is recessed It is detachably connected in groove 4, the lower end of drive link 5 is provided with connection-peg 6.
Preferably, the outer wall of Grouting Pipe 2 is additionally provided with blade 7, and fixation is around in the outer wall of Grouting Pipe 2 to blade 7 in the shape of a spiral.
Preferably, the lower end of Grouting Pipe 2 is cased with pallet 8, is provided with rubber cushion blocks 9 in pallet 8, stone is equipped with rubber cushion blocks 9 Cotton pad circle 10;Rubber cushion blocks 9, asbestos washer 10 are placed in Grouting Pipe 2;The lower section of pallet 8 is additionally provided with clamp nut 11, fastens spiral shell Mother 11 is placed on outside Grouting Pipe 2.
Preferably, clamp nut 11 is tapered cup nut, and the lower end of pallet 8 and the junction of clamp nut 11 are bellmouth.
Preferably, the medial aperture of injected hole 12 is less than outside aperture.
Civil engineering provided by the utility model is described in detail with roofbolt construction arrangement above.Specific embodiment Explanation be only intended to help and understand method and its core concept of the present utility model.It should be pointed out that for the art For those of ordinary skill, on the premise of the utility model principle is not departed from, some change can also be carried out to the utility model Enter and modify, these are improved and modification is also fallen into the protection domain of the utility model claims.

Claims (5)

1. a kind of civil engineering roofbolt construction arrangement, including drill bit, Grouting Pipe, it is characterised in that:The drill bit lower end is provided with First groove, the Grouting Pipe upper end are embedded in the first groove and are connected by screw thread, and the Grouting Pipe entire body is uniformly divided Some injected holes of cloth;
First bottom portion of groove is provided with the second groove, is inserted with drive link in the Grouting Pipe, the drive link upper end insertion the It is detachably connected in two grooves, the drive link lower end is provided with connection-peg.
2. civil engineering roofbolt construction arrangement according to claim 1, it is characterised in that:The slip casting pipe outer wall is also set There is blade, fixation is around in slip casting pipe outer wall to the blade in the shape of a spiral.
3. civil engineering roofbolt construction arrangement according to claim 2, it is characterised in that:The Grouting Pipe lower end is cased with Pallet, the pallet is interior to be provided with rubber cushion blocks, and asbestos washer is equipped with the rubber cushion blocks;The rubber cushion blocks, asbestos pad Circle is placed in Grouting Pipe;Clamp nut is additionally provided with below the pallet, the clamp nut is placed on outside Grouting Pipe.
4. civil engineering roofbolt construction arrangement according to claim 3, it is characterised in that:The clamp nut is taper Nut, the pallet lower end and clamp nut junction are bellmouth.
5. civil engineering roofbolt construction arrangement according to claim 4, it is characterised in that:The injected hole medial aperture Less than outside aperture.
CN201720578448.0U 2017-05-23 2017-05-23 Civil engineering roofbolt construction arrangement Active CN206859227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720578448.0U CN206859227U (en) 2017-05-23 2017-05-23 Civil engineering roofbolt construction arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720578448.0U CN206859227U (en) 2017-05-23 2017-05-23 Civil engineering roofbolt construction arrangement

Publications (1)

Publication Number Publication Date
CN206859227U true CN206859227U (en) 2018-01-09

Family

ID=60825287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720578448.0U Active CN206859227U (en) 2017-05-23 2017-05-23 Civil engineering roofbolt construction arrangement

Country Status (1)

Country Link
CN (1) CN206859227U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827150A (en) * 2020-09-04 2020-10-27 保利长大工程有限公司 Reinforcing method for additionally arranging new arch ring under main arch ring of old stone arch bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827150A (en) * 2020-09-04 2020-10-27 保利长大工程有限公司 Reinforcing method for additionally arranging new arch ring under main arch ring of old stone arch bridge
CN111827150B (en) * 2020-09-04 2021-05-14 保利长大工程有限公司 Reinforcing method for additionally arranging new arch ring under main arch ring of old stone arch bridge

Similar Documents

Publication Publication Date Title
CN107035387B (en) A kind of roadway surrounding rock control method under the influence of strong dynamic pressure
CN102561992B (en) Grouting plugging process adopting deformation water stopper
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN203248178U (en) Downward-hole self-drilling grouting anchor rod
CN104747216B (en) Ultra-soft cracked coal and rock mass drill and grouting integrated fractional grouting method
CN204959746U (en) Expand integral type stock soon
CN101173517A (en) Pile-pulling construction method
CN107366298B (en) A kind of conversion method for supporting connected for reinforcing blower foundation
CN205918368U (en) Bore notes an organic whole and retreat formula slip casting drilling rod
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN112360534A (en) Full-anchor grouting anchor rod and anchoring method thereof
CN205422773U (en) Novel hollow grouting anchor bolt
CN206448830U (en) A kind of self-advancing type Hollow non-metallic screw thread reinforced resin anchor pole
CN206859227U (en) Civil engineering roofbolt construction arrangement
CN208441096U (en) Soil nailing port closing device
CN201448488U (en) Back valve and steel tube equipped with the same
CN206581960U (en) The solid anchoring integral hydraulic expansion anchor pole of mining slip casting
CN110453673B (en) Pier foundation reinforcement structure and method
CN101100858A (en) Construction method for drilling tool center pumping concrete post mudjack concrete pouring pile and construction device thereof
CN204877514U (en) Modular cavity slip casting stock
CN210315529U (en) Self-drilling high-pressure rotary-jetting bag grouting expanding anti-floating anchor rod
CN106120714A (en) A kind of device improving hollow pile bearing capacity and using method thereof
CN204475323U (en) The telescopic Inner bolt head of a kind of modified
CN103206222A (en) Method for constructing reinforced surrounding rock inside precast-segment tunnels
CN103410529A (en) Tunnel supporting arch foot reinforced structure for soft surrounding rocks and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant