CN206844662U - A kind of civil engineering load-bearing hanger reinforced joint - Google Patents
A kind of civil engineering load-bearing hanger reinforced joint Download PDFInfo
- Publication number
- CN206844662U CN206844662U CN201720662627.2U CN201720662627U CN206844662U CN 206844662 U CN206844662 U CN 206844662U CN 201720662627 U CN201720662627 U CN 201720662627U CN 206844662 U CN206844662 U CN 206844662U
- Authority
- CN
- China
- Prior art keywords
- joint
- half slot
- offers
- jack
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of civil engineering in brick or concrete duct field load-bearing hanger reinforced joint,Including the first joint and the second joint,The top of first joint longitudinally offers first and inserts chamber,The right-hand member of second joint laterally offers second and inserts chamber,The left and right sides of first joint and the both sides up and down of the second joint are plugged with two groups of fixing bolts,The right side lower end of first joint offers the first half slot,The left side upper end of second joint offers the second half slot being adapted with the first half slot,Chamber is inserted by first,Second inserts the setting of chamber and fixing bolt,Two groups of hanger ends can be connected,Pass through the first half slot,Second half slot,Bur,Flexible Connector,First jack,Second jack,Fastening bolt,U-shaped post,Fixed plate and nut are equipped with,After can two groups of hangers be connected and it is fixed on the main steel frame post of outside,Good fixing effect,Bear great efforts.
Description
Technical field
Brick or concrete duct field is the utility model is related to, specially a kind of civil engineering load-bearing hanger reinforced joint.
Background technology
At present during civil engineering, typically using one-piece casting, need first to build bearing plate before pouring, bearing plate is typically by holding
Weight hanger support, load-bearing hanger are typically fixed when turning connects using iron wire, and iron wire fix tightly solidity is relatively low, therefore,
We have proposed a kind of civil engineering load-bearing hanger reinforced joint.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering load-bearing hanger reinforced joint, to solve above-mentioned background
The problem of iron wire fix tightly solidity proposed in technology is relatively low.
To achieve the above object, the utility model provides following technical scheme:A kind of civil engineering is strengthened with load-bearing hanger
Joint, including the first joint and the second joint, and the first joint is located at the left side of the second joint, the top of first joint is indulged
Chamber is inserted to offering first, the right-hand member of second joint laterally offers second and inserts chamber, the left and right sides of first joint
Two groups of fixing bolts are plugged with the both sides up and down of the second joint, the right side lower end of first joint offers the first semicircle
Groove, the left side upper end of second joint offer the second half slot being adapted with the first half slot, first half slot
Bur is evenly arranged with the inwall of the second half slot, flexible company is connected between the bottom of first joint and the second joint
Fitting, the outer wall of first joint offer the first jack, and the first jack is located at the upper end of the first half slot, and described second
The outer wall of joint offers the second jack, and the second jack is located at the right-hand member of the second half slot, and first joint and second connects
Through there is fastening bolt between the lower end of head, U-shaped post is plugged between first jack and the second jack, the U-shaped post
Fixed plate is connected between both ends, and fixed plate is located at the rear side of the first joint and the second joint, the both ends set of the U-shaped post
Nut is connected to, and nut is located at the rear side of fixed plate.
Preferably, first joint, the second joint and U-shaped post are steel construction.
Preferably, the bur is taper bur.
Compared with prior art, the beneficial effects of the utility model are:Chamber, the second slotting chamber and fixing bolt are inserted by first
Setting, two groups of hanger ends can be connected, pass through the first half slot, the second half slot, bur, Flexible Connector,
One jack, the second jack, fastening bolt, U-shaped post, fixed plate and nut are equipped with, can will be after two groups of hangers connections and solid
It is scheduled on the main steel frame post of outside, good fixing effect, bears great efforts.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model front view;
Fig. 3 is the utility model rearview;
Fig. 4 is the utility model U-shaped rod structure schematic diagram.
In figure:Chamber, 4 second slotting chambers, 5 fixing bolts, 6 first half slots, 7 are inserted in 1 first joint, 2 second joints, 3 first
Second half slot, 8 burs, 9 Flexible Connectors, 10 first jacks, 11 second jacks, 12 fastening bolts, 13U shapes post, 14 are fixed
Plate, 15 nuts.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of civil engineering load-bearing hanger is strengthened connecing
Head, including the first joint 1 and the second joint 2, and the first joint 1 is located at the left side of the second joint 2, the top of first joint 1
Portion longitudinally offers first and inserts chamber 3, and the right-hand member of second joint 2 laterally offers second and inserts chamber 4, first joint 1
The left and right sides and the both sides up and down of the second joint 2 are plugged with two groups of fixing bolts 5, and the right side lower end of first joint 1 is opened
Provided with the first half slot 6, the left side upper end of second joint 2 offers the second half slot being adapted with the first half slot 6
7, the inwall of the half slot 7 of the first half slot 6 and second is evenly arranged with bur 8, the joint 2 of the first joint 1 and second
Bottom between be connected with Flexible Connector 9, the outer wall of first joint 1 offers the first jack 10, and the first jack 10
Positioned at the upper end of the first half slot 6, the outer wall of second joint 2 offers the second jack 11, and the second jack 11 is positioned at the
The right-hand member of two half slots 7, through there is fastening bolt 12 between the lower end of the joint 2 of the first joint 1 and second, described first inserts
U-shaped post 13 is plugged between the jack 11 of hole 10 and second, fixed plate 14 is connected between the both ends of the U-shaped post 13, and it is solid
Fixed board 14 is located at the rear side of the first joint 1 and the second joint 2, and the both ends of the U-shaped post 13 are socketed with nut 15, and 15, nut
In the rear side of fixed plate 14.
Wherein, first joint 1, the second joint 2 and U-shaped post 13 are steel construction, and bonding strength is high, service life
Long, the bur 8 is taper bur, and anticreep and fastening effect are good.
Operation principle:Fastening bolt 12 and U-shaped post 13 are dismantled, open the first joint 1 and the second joint 2, makes the first half
The half slot 7 of circular groove 6 and second surrounds the main steel frame post of outside, by the both ends of U-shaped post 13 again through the first jack 10 and the
The inner chamber of two jacks 11, then fixed plate 14 is enclosed on to the both ends of U-shaped post 13, then fixed with nut 15, be not easy U-shaped post 13
Come off, together with the first joint 1 is closely attached by U-shaped post 13 with the second joint 2, then fastening bolt 12 plugged and solid again
Live calmly, make the first half slot 6 and the second half slot 7 that outside main steel frame post is surrounded into the tighter of clamping, bur 8 can increase fastening
Effect, make the connection of the first joint 1 and the second joint 2 and outside main steel frame post more stable, it would be desirable to two groups of hangers of connection
End is respectively inserted in first and inserted in the slotting chamber 4 of chamber 3 and second, fixes hanger end by fixing bolt 5, can complete two groups
First joint 1 and the second joint 2 can both be linked together, convenience in transport, can facilitated again by the connection of hanger, Flexible Connector 9
Spacing change of the end of first joint 1 and the second joint 2 when fixing.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (3)
1. a kind of civil engineering load-bearing hanger reinforced joint, including the first joint (1) and the second joint (2), and the first joint
(1) it is located at the left side of the second joint (2), it is characterised in that:The top of first joint (1) longitudinally offers first and inserts chamber
(3), the right-hand member of second joint (2) laterally offers second and inserts chamber (4), the left and right sides of first joint (1) and the
The both sides up and down of two joints (2) are plugged with two groups of fixing bolts (5), and the right side lower end of first joint (1) offers
One half slot (6), the left side upper end of second joint (2) offer the second half slot being adapted with the first half slot (6)
(7), the inwall of first half slot (6) and the second half slot (7) is evenly arranged with bur (8), first joint (1) and
Flexible Connector (9) is connected between the bottom of second joint (2), the outer wall of first joint (1) offers the first jack
(10), and the first jack (10) is located at the upper end of the first half slot (6), and the outer wall of second joint (2) offers second and inserted
Hole (11), and the second jack (11) is located at the right-hand member of the second half slot (7), under first joint (1) and the second joint (2)
Through there is fastening bolt (12) between end, U-shaped post (13), institute are plugged between first jack (10) and the second jack (11)
State and be connected with fixed plate (14) between the both ends of U-shaped post (13), and fixed plate (14) is located at the first joint (1) and the second joint
(2) rear side, the both ends of the U-shaped post (13) are socketed with nut (15), and nut (15) is located at the rear side of fixed plate (14).
A kind of 2. civil engineering according to claim 1 load-bearing hanger reinforced joint, it is characterised in that:Described first connects
Head (1), the second joint (2) and U-shaped post (13) are steel construction.
A kind of 3. civil engineering according to claim 1 load-bearing hanger reinforced joint, it is characterised in that:The bur
(8) it is taper bur.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720662627.2U CN206844662U (en) | 2017-06-08 | 2017-06-08 | A kind of civil engineering load-bearing hanger reinforced joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720662627.2U CN206844662U (en) | 2017-06-08 | 2017-06-08 | A kind of civil engineering load-bearing hanger reinforced joint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206844662U true CN206844662U (en) | 2018-01-05 |
Family
ID=60799382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720662627.2U Expired - Fee Related CN206844662U (en) | 2017-06-08 | 2017-06-08 | A kind of civil engineering load-bearing hanger reinforced joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206844662U (en) |
-
2017
- 2017-06-08 CN CN201720662627.2U patent/CN206844662U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204850389U (en) | Wedge-shaped clamping groove type steel pipe scaffold | |
CN203594213U (en) | Flexible assembling and disassembling bearing truss | |
CN203403661U (en) | Detachable triangular support | |
CN204644863U (en) | A kind of Steel Tubes For Bridge Application performance of concrete column confined construction steel pipe welding bushing pipe device | |
CN104032850B (en) | Precast shear wall dry type vertical connection nodes and construction method | |
CN206844662U (en) | A kind of civil engineering load-bearing hanger reinforced joint | |
CN206784905U (en) | Socket joint key slot type connector for vertical rod | |
CN213979431U (en) | Prefabricated assembled shear force wall | |
CN210739554U (en) | Stable form piping lane support convenient to installation | |
CN209653466U (en) | A kind of construction combined type ladder cage | |
CN203034455U (en) | Hoop component for preventing tubular pile from slipping | |
CN206917125U (en) | A kind of assembled stair | |
CN206071047U (en) | A kind of beam formwork for building | |
CN207110068U (en) | A kind of connecting node of i-shape steel beam and steel box column | |
CN206245590U (en) | It is provided with the concrete inner wall plate for reinforcing door opening | |
CN211597737U (en) | Template fastener for building engineering construction | |
CN205894350U (en) | Prefabricated formula wall connection structure and utilize this connection structure's prefabricated formula housing construction | |
CN204001301U (en) | A kind of fixed structure of Glass Rib | |
CN214423991U (en) | Cement pouring device for building construction | |
CN213417879U (en) | Rock anchor rod foundation for extra-high voltage alternating current transmission line | |
CN204899218U (en) | Superimposed sheet support frame | |
CN209493959U (en) | A kind of civil engineering groundwork formwork-support | |
CN208202756U (en) | The rod segment attachment device of cement pole | |
CN211949608U (en) | Support for pouring fabricated building component | |
CN208009656U (en) | A kind of plug-in type beam-to-column joint structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180105 Termination date: 20180608 |