CN206829624U - A kind of regularization formwork reinforcement system - Google Patents

A kind of regularization formwork reinforcement system Download PDF

Info

Publication number
CN206829624U
CN206829624U CN201720619754.4U CN201720619754U CN206829624U CN 206829624 U CN206829624 U CN 206829624U CN 201720619754 U CN201720619754 U CN 201720619754U CN 206829624 U CN206829624 U CN 206829624U
Authority
CN
China
Prior art keywords
back cord
gear
catch
main
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720619754.4U
Other languages
Chinese (zh)
Inventor
刘成亮
崔秋
杨富荣
王旭杰
潘卫勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201720619754.4U priority Critical patent/CN206829624U/en
Application granted granted Critical
Publication of CN206829624U publication Critical patent/CN206829624U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of regularization formwork reinforcement system, it is related to form work engineering technical field.The utility model includes template, main back cord and secondary back cord, in addition to gear support back cord and catch.The utility model conveniently can be reinforced firmly by special regularization component to concrete blinding external corner, due to the mutual cooperation between main back cord, gear support back cord and catch and support back cord connector, the dual connection function of catch connector, it can make to be mutually twisted between main back cord, gear support back cord and catch, it is completely embedded, preferably the angle of concrete blinding can be fixed, concrete blinding deforms caused by also preventing external force simultaneously, improves Forming Quality.

Description

A kind of regularization formwork reinforcement system
Technical field
It the utility model is related to form work engineering technical field.
Background technology
Traditional formwork reinforcement system is using wooden agglutination formwork+lumps of wood+steel pipe composition, because lumps of wood rigidity is small, makes essence Degree is poor, and steel pipe and flitch are the reasons such as linear contact lay, easily causes that concrete formation is of poor quality, and negative and positive angle is not upright, spillage, and actual measurement is in fact Measure many quality problems such as not up to standard.
Utility model content
The utility model provides a kind of regularization formwork reinforcement system, it is intended to solves to be molded during prior art concreting The problem of effect difference.
A kind of regularization formwork reinforcement system provided by the utility model, including template, main back cord and secondary back cord, described time Back cord is shored on the outside of the template, and the main back cord is shored on the outside of the secondary back cord, it is characterised in that:Also include external corner to lock Tool and internal corner lock, the corner lock include gear support back cord and catch, and the gear support back cord is provided with along itself main shaft direction Gear support back cord connector;The catch includes friction plate, main back cord card and supporting plate, and the main back cord card is fixed on described The front of friction plate, the supporting plate are fixed on the edge of the reverse side of the friction plate, and the supporting plate and the friction plate Vertically;The gear support back cord is vertically shored on the outside of the secondary back cord, and the gear support back cord is vertically shored on the main back cord Back cord connector is supportted by the gear to be fixed on the main back cord, the catch is fixed on the main back of the body by catch connector On stupefied, and the main back cord card and the main back cord clamping, the supporting plate abut with the gear support back cord.
Further, in a kind of foregoing regularization formwork reinforcement system, in addition to internal corner lock, the internal corner lock bag Include two inner corner trim being mutually connected vertically back cords, one or two in the inner corner trim back cord is main back cord, the inner corner trim back cord For double back cord structures.
Further, in a kind of foregoing regularization formwork reinforcement system, first is provided with the middle part of the friction plate of the catch Bolt hole, the catch connector include the first bolt, and the main back cord is provided with and first bolt hole corresponding first Through hole.
Further, in a kind of foregoing regularization formwork reinforcement system, the gear support back cord includes gear strut, the gear Strut end is provided with claw.
Further, in a kind of foregoing regularization formwork reinforcement system, it is described gear support back cord include two gear struts and Strut connector is kept off, two gear struts are be arranged in parallel and two by the gear strut connector, two gear struts There is gap, the gear support back cord connector is gib headed bolt between the gear strut.
Further, in a kind of foregoing regularization formwork reinforcement system, the gear strut connector includes gear strut and connected Connecting bolt, gear strut limit casing and gear strut attaching nut, the gear strut connecting bolt through two gear struts and The gear strut limit casing is simultaneously fastened two gear struts by the gear strut attaching nut, and the gear strut is spacing Sleeve pipe is between two gear struts, and the gear strut limit casing is withstood on two gear struts.
Further, in a kind of foregoing regularization formwork reinforcement system, the gear strut both ends, which are equipped with, unidirectionally to be set The claw put, and the claw on two gear struts is in opposite direction.
Further, in a kind of foregoing regularization formwork reinforcement system, the catch also includes top plate, and the top plate is consolidated The reverse side of the friction plate is scheduled on, and positioned at the opposite side of the supporting plate.
Further, in a kind of foregoing regularization formwork reinforcement system, the catch also includes gear support back cord card, institute State gear support back cord card and be fixed on the side that the supporting plate contacts with the gear support back cord.
Further, in a kind of foregoing regularization formwork reinforcement system, the main back cord is double back cord structures, the master Back cord includes two mobile jibs and mobile jib connector, and two mobile jibs are connected by the mobile jib connector, two mobile jibs It is arranged in parallel and there is gap between two mobile jibs.
Further, in a kind of foregoing regularization formwork reinforcement system, the main back cord, which is provided with, to be used to adjust the master The stretching structure of back cord length.
Further, in a kind of foregoing regularization formwork reinforcement system, set on two mobile jibs of the main back cord Have dislocation the expansion joint structure of setting.
Further, in a kind of foregoing regularization formwork reinforcement system, the expansion joint structure includes loop bar and stretched Bar, two loop bars are socketed in the both ends of the expansion link respectively.
Further, in a kind of foregoing regularization formwork reinforcement system, the mobile jib connector includes mobile jib connection spiral shell Bolt, mobile jib limit casing and mobile jib attaching nut, the mobile jib connecting bolt are spacing through two mobile jibs and the mobile jib Sleeve pipe is simultaneously fastened two mobile jibs by the mobile jib attaching nut, and the mobile jib limit casing is located at two mobile jibs Between, and the mobile jib limit casing is withstood on two mobile jibs.
Had the beneficial effect that caused by technical scheme described in the utility model:
A kind of regularization formwork reinforcement system provided by the utility model can be conveniently steady by special regularization component Admittedly concrete blinding external corner is reinforced, due to main back cord, gear support back cord and catch between mutual cooperation and support the back of the body The dual connection function of stupefied connector, catch connector, it can make to be mutually twisted between main back cord, gear support back cord and catch, connect Closely, preferably the angle of concrete blinding can be fixed, while concrete blinding caused by also preventing external force deforms, Improve Forming Quality.
Brief description of the drawings
Fig. 1 is a kind of structural representation of embodiment of the utility model;
Fig. 2 is the structural representation after Fig. 1 embodiment partial resolutions;
Fig. 3 is a kind of structural representation of embodiment of the utility model;
Fig. 4 is the structural representation after Fig. 3 embodiment partial resolutions;
Fig. 5 is the structural representation of Fig. 3 embodiment catch;
Fig. 6 is the structural representation of Fig. 1 embodiment catch;
Fig. 7 is the cross-sectional view of Fig. 3 embodiments gear support back cord;
Fig. 8 is the cross-sectional view of Fig. 1 embodiments gear support back cord;
Fig. 9 is the cross-sectional view of the main back cord of Fig. 1 embodiments;
Figure 10 is a kind of inner corner trim of embodiment of the utility model and the overlooking the structure diagram of external corner;
Figure 11 is a kind of overlooking the structure diagram of the inner corner trim of embodiment of the utility model;
Figure 12 is a kind of schematic top plan view of the supporting construction of embodiment of the utility model.
Mark corresponding relation is in above-mentioned accompanying drawing:
100 main back cords;110 mobile jibs;111 loop bars;112 expansion links;
120 mobile jib connectors;121 mobile jib connecting bolts;122 mobile jib limit casings;123 mobile jib attaching nuts;
200 gear support back cords;210 gear struts;211 screw holes;220 claws;
230 gear strut connectors;231 gear strut connecting bolts;232 gear strut limit casings;233 gear strut connection spiral shells It is female;
310 gib headed bolts;320 screw rods;
400 catch;410 friction plates;411 first bolts hole;420 main back cord cards;430 top plates;440 supporting plates;441 gears Support back cord card;
510 back cords;520 templates;
610 pads;
710 tie rods;720 diagonal braces;
800 internal corner locks.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
With reference to figures 1 through accompanying drawing 8, a kind of regularization formwork reinforcement system provided by the utility model, including template 520, Main back cord 100 and time back cord 510, the secondary back cord 510 is shored to be shored in institute in the outside of template 520, the main back cord 100 State the outside of time back cord 510, it is characterised in that:Also include corner lock and internal corner lock 800, the corner lock includes the gear support back of the body Stupefied 200 and catch 400, the gear support back cord 200 is provided with gear support back cord connector along itself main shaft direction;The catch 400 Including friction plate 410, main back cord card 420 and supporting plate 440, the main back cord card 420 is fixed on the friction plate 410 Front, the supporting plate 440 are fixed on the edge of the reverse side of the friction plate 410, and the supporting plate 440 and the friction plate 410 is vertical;Vertical shore of the gear support back cord 200 is vertically shored in the secondary outside of back cord 510, the gear support back cord 200 On the main back cord 100 and support back cord connector by the gear to be fixed on the main back cord 100, the catch 400 passes through Catch connector is fixed on the main back cord 100, and the main back cord card 420 and the main clamping of back cord 100, supporting plate 440 abut with the gear support back cord 200.
In use, template 520, main back cord 100 and secondary back cord 510 are tentatively set up, gear support back cord is set in external angle position 200, it then will keep off support back cord 200 with gear support back cord connector and be tentatively connected on main back cord 100, then catch 400 is installed In the right angle that gear support back cord 200 and main back cord 100 are formed, the friction plate 410 of catch 400 is close on main back cord 100, makes gear The main back cord card 420 of piece 400 is stuck on main back cord 100, while the supporting plate 440 of catch 400 is withstood gear support back cord 200, The catch 400 is fixed on the main back cord 100 by catch connector, finally by template 520, main back cord 100 and secondary Back cord 510 and catch 400 will gear support back cord connector, catch connector and other structures that should be fastened after tentatively fixing It is firm to fasten.
A kind of regularization formwork reinforcement system provided by the utility model can be conveniently steady by special regularization component Admittedly concrete blinding external corner is reinforced, due to main back cord 100, gear support back cord 200 and catch 400 between mutual cooperation And support back cord connector, the dual connection function of catch connector, main back cord 100, gear support back cord 200 and catch 400 can be made Between be mutually twisted, be completely embedded, preferably the angle of concrete blinding can be fixed, while can also prevent external force from causing Concrete blinding deformation, improve Forming Quality.
Further, refer to the attached drawing 10 and accompanying drawing 11, in a kind of foregoing regularization formwork reinforcement system, in addition to inner corner trim Lockset 800, the internal corner lock 800 include two inner corner trim back cords being mutually connected vertically, one in the inner corner trim back cord or Two are main back cord 100, and the inner corner trim back cord is double back cord structures.Internal corner lock 800 is equivalent to L-type thick stick, with angle square shape class Seemingly, internal corner lock 800 is fixed on the main back cord 100 of inner corner trim position, or is fixed in concrete and can ensure by leading screw The angle of inner corner trim is accurate.
Further, refer to the attached drawing 4 and accompanying drawing 5, in a kind of foregoing regularization formwork reinforcement system, the catch 400 The middle part of friction plate 410 be provided with the first bolt hole 411, the catch connector includes the first bolt, set on the main back cord 100 Have and the 411 corresponding first through hole of the first bolt hole.First bolt leads to through the first bolt hole 411 and described first Hole connects the catch 400 and the main back cord 100.It is connected by screw bolts easy and effective, main back cord 100 and catch 400 are logical The first bolt for crossing the gap through 100 two mobile jibs 110 of the first bolt hole 411 and main back cord is fixed, and the first bolt is located at Main side of the back cord 100 away from catch 400 can be set pad 610 and prevent from slipping.
Further, refer to the attached drawing 7, in a kind of foregoing regularization formwork reinforcement system, gear support back cord 200 end Provided with claw 220.The gear support back cord 200 blocks the main back cord 100 by the claw 220.In use, gear is supportted into back cord 200 are supportted on main back cord 100 by claw 220.
Further, refer to the attached drawing 7, in a kind of foregoing regularization formwork reinforcement system, the gear support back cord 200 includes Strut 210 is kept off, gear strut 210 both ends are equipped with claw 220, and the gear strut 210 is hollow and end is provided with screw hole 211, the gear support back cord connector is screw rod 320.This gear support back cord 200 is suitable to reinforce the knot with two continuous external corners Structure, support back cord 200 will be kept off using screw rod 320 and be fastened on main back cord 100, the fastening of the one end of screw rod 320 can make gear support back cord 200 Fastening, the gear support both ends uniform force of back cord 200, whole regularization formwork reinforcement system are unlikely to deform.
Further, refer to the attached drawing 8, in a kind of foregoing regularization formwork reinforcement system, the gear support back cord 200 includes Two gear struts 210 and gear strut connector 230, two gear struts 210 are by the gear strut connector 230, two The gear strut 210 be arranged in parallel and has gap between two gear struts 210, and the gear support back cord connector is gib head Bolt 310.This gear support back cord 200 is suitable to the structure for reinforcing single external corner, can be used for reinforcing the knot with multiple external corners Structure, support back cord 200 will be kept off using gib headed bolt 310 and be fastened on main back cord 100, be easy to the position of regulation gear support back cord 200, make External corner angle is more accurate.In a kind of embodiment of the present utility model, this gear support back cord 200 is with claw 220 main back cord 100.
Further, refer to the attached drawing 8, in a kind of foregoing regularization formwork reinforcement system, the gear strut connector 230 Including gear strut connecting bolt 231, gear strut limit casing 232 and gear strut attaching nut 233, the gear strut connecting bolt 231 through two gear struts 210 and the gear strut limit casing 232 and will by the gear strut attaching nut 233 Two gear struts 210 fasten, and the gear strut limit casing 232 is between two gear struts 210, and the gear Strut limit casing 232 is withstood on two gear struts 210.Gear can effectively ensure that using gear strut limit casing 232 The distance between strut 210, while keep off strut limit casing 232 and also allow for catching on fastening using gib headed bolt 310.
Further, refer to the attached drawing 7 and accompanying drawing 8, in a kind of foregoing regularization formwork reinforcement system, the gear strut 210 both ends are equipped with the claw 220 unidirectionally set, and the claw 220 on two gear struts 210 is in opposite direction.It is this Gear support back cord 200 is suitable to reinforce the structure with two continuous external corners, and the main back cord 100 of two external corners supports back cord 200 by gear Support, gear support back cord 200 had not only defined external corner angle but also had defined the distance between two main back cords 100, simple in construction, user Just.
Further, refer to the attached drawing 5, in a kind of foregoing regularization formwork reinforcement system, the catch 400 also includes top Plate 430, the top plate 430 are fixed on the reverse side of the friction plate 410, and positioned at the opposite side of the supporting plate 440.Top plate 430 Be provided with beneficial to being finely adjusted to the position of catch 400, tap the adjustable position of catch 400 of top plate 430 during regulation, prevent from adjusting When saving 400 position of catch, percussion effect makes the other positions of catch 400 deform or damage.
Further, refer to the attached drawing 6, in a kind of foregoing regularization formwork reinforcement system, the catch 400 also includes gear Back cord card 441 is supportted, the gear support back cord card 441 is fixed on the side that the supporting plate 440 contacts with the gear support back cord 200 Face.Gear support back cord card 441 is used to block gear support back cord 200, so being capable of axle of the anti-backstop support back cord 200 along main back cord 100 To rotation, angle is caused to produce deviation.
Further, refer to the attached drawing 9, in a kind of foregoing regularization formwork reinforcement system, the main back cord 100 is double back ofs the body Stupefied structure, the main back cord 100 include two mobile jibs 110 and mobile jib connector 120, and two mobile jibs 110 pass through the master Joint element for bar 120 connects, and two mobile jibs 110 be arranged in parallel and have gap between two mobile jibs 110.
Further, refer to the attached drawing 9, in a kind of foregoing regularization formwork reinforcement system, the main back cord 100, which is provided with, to be used In the stretching structure for adjusting the main length of back cord 100.Angle position can produce requirement to the length of main back cord 100, and stretch knot Structure can adjust the length of main back cord 100, prevent from causing to waste by the way of main back cord 100 is directly blocked.
Further, refer to the attached drawing 9, in a kind of foregoing regularization formwork reinforcement system, two of the main back cord 100 The mobile jib 110 is provided with the expansion joint structure shifted to install.The expansion joint structure shifted to install can effectively ensure that main back cord 100 stress, prevent local Local Sliding or the swollen harm being molded as.
Further, refer to the attached drawing 9, in a kind of foregoing regularization formwork reinforcement system, the expansion joint structure includes Loop bar 111 and expansion link 112, two loop bars 111 are socketed in the both ends of the expansion link 112 respectively.Using loop bar knot Structure is the most easy and effective, and loop bar 111 can both be slidably connected with expansion link 112, can be fixedly connected, made using fastening structure again With simple and convenient.
Further, refer to the attached drawing 9, in a kind of foregoing regularization formwork reinforcement system, the mobile jib connector 120 wraps Mobile jib connecting bolt 121, mobile jib limit casing 122 and mobile jib attaching nut 123 are included, the mobile jib connecting bolt 121 passes through two Mobile jib 110 described in root and the mobile jib limit casing 122 and by the mobile jib attaching nut 123 by two mobile jibs 110 Fastening, the mobile jib limit casing 122 is between two mobile jibs 110, and the mobile jib limit casing 122 withstands on two Described in root on mobile jib 110.
Further, refer to the attached drawing 12, in a kind of foregoing regularization formwork reinforcement system, in addition to knot is supportted outside outer drawing Structure, the outer support structure of the outer drawing include tie rod 710 and diagonal brace 720, and the middle part of tie rod 710 is provided with flower basket bolt, the diagonal brace 720 be Telescopic rod structure, and the Telescopic rod structure is screw rod type Telescopic rod structure.Diagonal brace 720 is arranged near tie rod 710, and one Support one is drawn, and can effectively ensure that the accurate of template position.Wherein tie rod 710 is elastic, and screw rod type stretches for adjusting for flower basket bolt What bar structure was used to adjusting diagonal brace 720 shores position.
With reference to the concrete engineering example using regularization formwork reinforcement system provided by the utility model to this practicality It is new to be described further.
1. foreword
Construction scale expands day by day, and building consumptive material consumption increasingly increases, and the forest reserves are increasingly deficient, domestic timber supply and demand lance Shield is outstanding day by day, and the work of the realm of building construction timber saving and substitution is imperative.
In order to reach the purpose for economizing on resources, increasing the benefit, my project management department is carried out by investigation to conventional template system Improve, traditional flitch is replaced as template primary and secondary keel using sizing zinc-plated square steel, mashed up one kind with two-sided overlay film multi-layer sheet New type formwork system.This technical operation is simple, is applied in my project entity engineering, and comprehensive benefit is obvious, and promoting should With having good prospects.The popularization and application of square steel keel template system can give and save more timber resources, create bigger society and Economic benefit.
2. engineering method feature
Traditional formwork reinforcement system is using wooden agglutination formwork+lumps of wood+steel pipe composition, because lumps of wood rigidity is small, makes essence Degree is poor, and steel pipe and flitch are the reasons such as linear contact lay, easily causes that concrete formation is of poor quality, and negative and positive angle is not upright, spillage, and actual measurement is in fact Measure many quality problems such as not up to standard.
Regularization formwork reinforcement construction technology is improved to the reinforcement material in traditional method, using double-deck overlay film multilayer Plate+square steel tube time back cord+main back cord of both sides' steel pipe combines, and successfully solves above-mentioned common quality defect, improves actual measurement actual quantities The quality problems such as achievement.
Regularization formwork reinforcement construction technology has following technical characterstic:
(1)Square steel pipe stiffness is big, and dimensional accuracy is accurate, securely and reliably, simple and direct efficient.It is unlikely to deform, is carried on the back with template, primary and secondary Stupefied contact area is big, efficiently avoid influence of the back cord deformation to formwork system.
(2)Using unified regularization processing and fabricating, uniform specification, it is convenient to assemble and disassemble, improve efficiency of construction, be used in turn rate Height, reduce material usage.Construction is more simple and convenient, more efficient.
(3)Physical dimension and impression quality after concrete formation is preferable, improves actual measurement actual quantities achievement, reduces the later stage Decoration cost.
(4)Component moulding and size are flexible and changeable, meet the requirement of building structure various sizes, and product can be random group Close, can repeat to be used in turn in multiple engineerings, the number of turnover is more, and cost recovery is high, and amortization charge is few, overall economic efficiency Significantly.
(5)In light weight, small volume, is readily transported.Square steel keel small volume, in light weight, most long 4.2 meters of weight of component are not More than 13kg, most of is 2.7m, no more than 8kg.Only need to set below elevating capacity 5t tower crane to complete mould in construction The vertical transport of plate, mechanical one-shift expense 25% can be saved compared with Large Formwork Technology, short distance, long-distance transport are all convenient, can carry out Strange land engineering is used in turn, and overall economic efficiency is notable.Zinc-plated square steel replaces flitch, and the low value easy consumption product in engineering are reformed For circulation material, square steel keel can be recycled in multiple engineering constructions, can be used in turn more than 300 times, amortization charge is low.
(6)It is small to take construction site, is had a clear superiority for the narrow and small project in construction site.
(7)Component standardization, modularization, annex is simple, strong applicability.Square steel uniform specification, connected using sizing auxiliary, Simple and reliable, installation rate is fast.Shear wall construction is not only applicable to, applies also for frame column, beam, plate construction.Standardization, mould The worker's construction of numberization specification, while construction quality is improved, ensure that the clean and tidy of job site, and base is laid for civilized construction Plinth.
(8)Energy-conserving and environment-protective.Timber is saved, protects the limited forest reserves;Saving steel, protect non-renewable resources;Section About plastics, construction quality is ensured, ensure health of masses;It is not required to cut the lumps of wood, without wood chip, mitigates atmosphere pollution;Save work Power, improve operating efficiency;Square steel can be recycled, and can be regenerated with useless.
3. the scope of application
Suitable for various building engineering cast in place frame, frame-shear structure beam slab, shear wall, column template engineering.
4. technological principle
1st, square steel keel bearing capacity compared with it is high, rigidity is big, deformation is small, simple to operate with plank sheathing composite assembly, for floor Template, by rationally setting the spacing of the stupefied square steel of primary and secondary, the square steel keel template system that square steel keel combine with plank sheathing can be compared with The dead load and construction loads on slab form top are born well;For wall column side form, by rationally setting vertical square steel dragon The spacing of bone, square steel keel template system can preferably bear in wall column concreting process and pour after lateral pressure.
2nd, square steel keel template system is to make secondary joist, 2 40*40*2.5mm platings with 1 40*40*2.5mm zinc-plated square steel Zinc square steel makees main joist, and the composition roof plate template combined support system such as bottom adjustable jack, support frame.In vertical supporting rod member After setting up, zinc-plated square steel main joist is supported with adjustable jack, secondary joist is installed on main joist, is adjusted and marked with adjustable jack Height, arch camber is carried out on request, template is arranged above primary and secondary skeletal frame combining structure.
5. construction technology and key points for operation
5.1 execution conditions
(1)Material and instrument
Use 40*100mm flitches, 40*40*2.5mm square steel, Screw arbor with nut at both-ends etc..
In place, and the bulk storage that should try one's best avoids concentration of local load excessive for placing of material;
(2)Flooring intensity meets detail design intensity requirement;
(3)Flooring setting-out work has been completed;
(4)Outrigger protects the security protection for ensureing floor periphery in place highly to meet construction requirement;
(5)Safe practice is carried out to worker to tell somebody what one's real intentions are, worker is all familiar with construction technology and in construction according to arrangement and method for construction It should be noted that the problem of.
The making at 5.2 holes
After template matched moulds, main back cord, secondary back cord are installed, then assembles hole, opening lockset is fixed to split bolt On main back cord, a corner lock is taken per side and is reinforced.
5.3 beams, slab formwork technological process and key points for operation
1 technological process
Steel pipe scaffold sets up → installing plate bottom adjustable jack → installation beam bottom board, plate bed die, beam side.
2 key points for operation
Small cross sections beam(Deck-molding H<600)And slab form and support system.
Steel pipe scaffold is set up
The position of vertical rod, then vertical steel pipe vertical rod, the vertical rod of plate bottom are made according to beam plate supporting system design first Spacing is 1000~1200mm, and framed bent vertical rod array pitch in beam bottom is 900mm, and framed bent vertical rod advance is 1000~1200mm, Ran Houan It is 1200~1500mm to fill sweep the floor in length and breadth bar, the step pitch of horizontal connection bar.
Installing plate bottom adjustable jack
The depth of adjustable jack insertion vertical rod is not less than the 2/3 of adjustable jack length.Adjustable jack upper opening supporting plate Width must is fulfilled for placing more than two row's 45*45 square steel, placement during overlap joint stupefied in order to square steel master, the remaining width of adjustable jack Degree can be by somewhat reversing come clamping square steel.
Beam bottom board, plate bed die, beam side are installed
Plate bottom secondary joist, main joist installation:The absolute altitude of adjustable jack is first adjusted, and spring quantum is set by code requirement, then Square steel main joist is installed, the specification of square steel is 40*40*2.5mm, and square steel length is 2700mm, then installs square steel secondary joist, side For the specification of steel with main joist square steel, secondary joist spacing is 250~400mm.
When main joist overlaps, it is (i.e. two neighboring that the overlap joint scopes of two square steel is arranged on two neighboring main joist bearing At adjustable jack);When secondary joist overlaps, the overlap joint scope of two square steel is arranged on two neighboring secondary joist bearing(It is and adjacent Two main joists);
Plate bed die is installed:Plate bed die is laid on secondary joist, using the thick two-sided overlay film multi-layer sheet of wood of 15mm, plate bed die interval 1500mm sets the lumps of wood with size with secondary joist square steel, and plate bed die and the piece lumps of wood are connected firmly by nail iron nail.
Put according to understructure after axis makes beam bottom board position, correction absolute altitude and beam bottom board is installed.Deck-molding H<When 600, Beam bottom board is directly rested on small cross bar using the thick two-sided overlay film multi-layer sheet of 15mm, beam bottom board, it is desirable to and small cross bar installation is horizontal, and According to specification, springing height is set.It is first that the beam bottom longitudinal direction lumps of wood and beam bottom board assembly is good during 600≤H of deck-molding≤800, then install Beam bottom board.
Seal beam side:First beam bottom side form assembly is connected with longitudinal lumps of wood, then beam side is installed, is finally installed step by step Tightly, then with step fastener by the lumps of wood clamping of following end outside the side form of beam two, with fixed beam both sides side form.Deck-molding 600≤H≤800 When also need in beam set Screw arbor with nut at both-ends carry out consolidation process.
5.3 wall column formwork engineering process flows and key points for operation
1 technological process
Wall column line setting → nail pressure foot → wall column formwork installation.
2 key points for operation
Snap the line releases wall column position line on floor after lower floor's beam slab concreting 12 hours, then installs wall column presser feet Plate, then wall column assembled good plank sheathing in advance is installed(Shear wall sets the splicing lumps of wood, pillar along wall length direction interval 1500mm A piece jigsaw lumps of wood is respectively then set at the both ends of every side, the jigsaw lumps of wood is 45*45mm), square steel uses 40*40*2.5 square steel@ 250mm, template is using the thick two-sided overlay film multi-layer sheet of wood of 15mm.
6. quality control
6.1 perform standard
《Building construction formwork technical specification of security》JGJ 162-2008
《Concrete structure engineering construction quality accident specification》GB50204-2015
Engineering technology, quality guarantee data are accomplished synchronous with entity, timely, accurate, complete, and meet specification and evaluation criteria will Ask.
6.2 quality control
To template and its support system requirement:
Ensure structure, component each several part geomery it is accurate;
Must have enough intensity, rigidity and stability;
Form joint is tight, must not spillage;
It is easy to the peace of template to tear open;
To cast-in-situ steel reinforced concrete beam of the span not less than 4 meters, plate, its template should be by design requirement arch camber;When design nothing During specific requirement, springing height is preferably 1 ‰~the 3 ‰ of span;
The contact surface full coat interleaving agent of template and concrete, plank sheathing is soaked with water before casting concrete, but there must not be product Water;
In order to improve work efficiency, ensure quality, template should number positioning when reusing, clean out mortar in template, brush Interleaving agent, concrete is reached not arrisdefect, do not peel, any surface finish.
Processing post, beam, the template assembly of plate junction meticulously, accomplish stabilization, firmly, not spillage.
The built-in fitting and reserving hole being fixed in template must not be omitted, and installing must firmly, and position is accurate, and it allows Deviation all should be controlled in permissible value.
Test block is carried out in construction at the construction field (site), with structural concrete cured under same condition, tests determined specific form removal Time;
The template and support that following one layer is should ensure that during the Beam-Slab Construction of upper strata are not removed.
7. safety measure
The electric wire set up in 7.1 templates and the electric tool used, should be using 36v low-tension supply or using special electronic box With earth leakage protective device.
During 7.2 work high above the ground, various accessories should be placed in tool box or kit bag, must not be dropped.Forbid to be placed on template or On scaffold.
7.3 work high above the ground personnel No Climbing template or scaffold etc. up and down, also must not high-level wall top, isolated beam and Its template etc. is walked above.
Reserving hole of 7.4 templates etc., setting safety net should be capped.
During 7.5 assembly and disassembly template, answer someone to scoop out up and down, with tearing open with transporting, and movable part fixation should be forbidden heap It is placed on scaffold and leaves.
During 7.6 assembly and disassembly template, it is necessary to using firm ascending tool, highly more than 3.5m when, it is necessary to set up scaffold.Dress When tearing construction open, in addition to operator, must not stand people below.During work high above the ground, operating personnel should hang up safety belt.
When 7.7 installation walls, column template, fixation should be supported at any time, prevents from toppling.
The installation of 7.8 pre-splicing deckings, answers side in place, side correction, while installing connector, and adds temporary support and consolidates.
During the vertical handling of 7.9 pre-splicing deckings, more than two suspension centres should be taken, should set four suspension centres during horizontal handling.
During 7.10 dismounting bearing form, temporary support should be first set up, prevents overall suddenly collapse.
8. environmental practice
8.1 march into the arena before carry out employee's environmental protection education, improve employee's environmental consciousness.
8.2 strengthen machine management, improve construction technology, reduce the noise in work progress.Noise measarement meets national mark It is accurate《Construction site noise level limit》.
8.3 disposal that are waste and old, eliminating template:Scene sets recovery place respectively by damaged template degree and size, realizes Classification Management, and make mark.Phenomenon is arbitrarily stacked without rubbish in job site.Discarded template timing is single by timber recovery in useless 1 day Position cleaning, damage it is lighter or it is rotten while big-size formwork will per while cut off 150mm, to be used in turn again or for secondary structure Fragmentary small members use.
The all high-quality steel of square steel keel template system make, the minimum 2.5mm of thickness, therefore can be used in turn repeatedly 300 times, and traditional lumps of wood keel mode consumes billion cubic meter on timber every year in construction, thus with traditional lumps of wood support phase Than saving 70% cost.Big punching block purchase cost is high, and second institutional reform expense is high, and construction speed is slow, can be saved compared with large steel moulding plate Save 50% cost.Timber is saved, is protected forest resources, to give grandson to leave a piece of green.
9. Economic and Efficiency Analysis
My project is carried out statistical summaries to the information fed back to and drawn by Tracking investigation square steel keel template system, with
10000 ㎡ are that unit is calculated, and the saving of flat cost and overhead cost is as shown in the table:
Specific case used herein is set forth to principle of the present utility model and embodiment, above example Explanation be only intended to help and understand method and its core concept of the present utility model.It should be pointed out that for the art For those of ordinary skill, on the premise of the utility model principle is not departed from, some change can also be carried out to the utility model Enter and modify, these are improved and modification is also fallen into the protection domain of the utility model claims.

Claims (10)

1. a kind of regularization formwork reinforcement system, including template(520), main back cord(100)With secondary back cord(510), the described back of the body It is stupefied(510)Shore in the template(520)Outside, the main back cord(100)Shore in the secondary back cord(510)Outside, it is special Sign is:Also include corner lock and internal corner lock(800), the corner lock, which includes keeping off, supports back cord(200)And catch (400);
The gear support back cord(200)Gear support back cord connector is provided with along itself main shaft direction;
The catch(400)Including friction plate(410), main back cord card(420)And supporting plate(440), the main back cord card (420)It is fixed on the friction plate(410)Front, the supporting plate(440)It is fixed on the friction plate(410)Reverse side Edge, and the supporting plate(440)With the friction plate(410)Vertically;
The gear support back cord(200)Vertically shore in the secondary back cord(510)Outside, the gear support back cord(200)Vertically shore In the main back cord(100)Above and back cord connector is supportted by the gear and be fixed on the main back cord(100)On, the catch (400)The main back cord is fixed on by catch connector(100)On, and the main back cord card(420)With the main back cord (100)Clamping, the supporting plate(440)With the gear support back cord(200)Abut;
Also include being used for the internal corner lock for fixing inner corner trim angle(800).
A kind of 2. regularization formwork reinforcement system as claimed in claim 1, it is characterised in that:The internal corner lock(800)Bag Include two inner corner trim being mutually connected vertically back cords, one or two in the inner corner trim back cord is main back cord(100), the inner corner trim Back cord is double back cord structures.
A kind of 3. regularization formwork reinforcement system as claimed in claim 1, it is characterised in that:The catch(400)Friction Plate(410)Middle part is provided with the first bolt hole(411), the catch connector includes the first bolt, the main back cord(100)On set Have and first bolt hole(411)Corresponding first through hole.
A kind of 4. regularization formwork reinforcement system as claimed in claim 1, it is characterised in that:The gear support back cord(200)End Portion is provided with claw(220).
A kind of 5. regularization formwork reinforcement system as claimed in claim 1, it is characterised in that:The gear support back cord(200)Bag Include two gear struts(210)With gear strut connector(230), two gear struts(210)Pass through the gear strut connector (230), two gear struts(210)It is arranged in parallel and two gear struts(210)Between there is gap, the gear support back of the body Stupefied connector is gib headed bolt(310).
A kind of 6. regularization formwork reinforcement system as claimed in claim 1, it is characterised in that:The catch(400)Also include Top plate(430), the top plate(430)It is fixed on the friction plate(410)Reverse side, and be located at the supporting plate(440)Pair Side.
A kind of 7. regularization formwork reinforcement system as claimed in claim 1, it is characterised in that:The catch(400)Also include Gear support back cord card(441), the gear support back cord card(441)It is fixed on the supporting plate(440)With the gear support back cord (200)The side of contact.
A kind of 8. regularization formwork reinforcement system as claimed in claim 1, it is characterised in that:The main back cord(100)To be double Back cord structure, the main back cord(100)Including two mobile jibs(110)With mobile jib connector(120), two mobile jibs(110) Pass through the mobile jib connector(120)Connection, two mobile jibs(110)It is arranged in parallel and two mobile jibs(110)Between With gap.
A kind of 9. regularization formwork reinforcement system as claimed in claim 8, it is characterised in that:The main back cord(100)Two Mobile jib described in root(110)The expansion joint structure shifted to install is provided with, the expansion joint structure includes loop bar(111)And expansion link (112), two loop bars(111)The expansion link is socketed in respectively(112)Both ends.
A kind of 10. regularization formwork reinforcement system as claimed in claim 8, it is characterised in that:The mobile jib connector(120) Including mobile jib connecting bolt(121), mobile jib limit casing(122)With mobile jib attaching nut(123), the mobile jib connecting bolt (121)Through two mobile jibs(110)With the mobile jib limit casing(122)And pass through the mobile jib attaching nut(123) By two mobile jibs(110)Fastening, the mobile jib limit casing(122)Positioned at two mobile jibs(110)Between, and it is described Mobile jib limit casing(122)Withstand on two mobile jibs(110)On.
CN201720619754.4U 2017-05-31 2017-05-31 A kind of regularization formwork reinforcement system Expired - Fee Related CN206829624U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720619754.4U CN206829624U (en) 2017-05-31 2017-05-31 A kind of regularization formwork reinforcement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720619754.4U CN206829624U (en) 2017-05-31 2017-05-31 A kind of regularization formwork reinforcement system

Publications (1)

Publication Number Publication Date
CN206829624U true CN206829624U (en) 2018-01-02

Family

ID=60772640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720619754.4U Expired - Fee Related CN206829624U (en) 2017-05-31 2017-05-31 A kind of regularization formwork reinforcement system

Country Status (1)

Country Link
CN (1) CN206829624U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108972831A (en) * 2018-07-23 2018-12-11 中国十七冶集团有限公司 A kind of sump, septic tank precast concrete cover manufacturing system
CN111576870A (en) * 2020-05-27 2020-08-25 惠安洛强装修设计中心 Building construction template fastening structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108972831A (en) * 2018-07-23 2018-12-11 中国十七冶集团有限公司 A kind of sump, septic tank precast concrete cover manufacturing system
CN111576870A (en) * 2020-05-27 2020-08-25 惠安洛强装修设计中心 Building construction template fastening structure
CN111576870B (en) * 2020-05-27 2022-08-30 南安市恒创机械设计有限公司 Building construction template fastening structure

Similar Documents

Publication Publication Date Title
CN107217840A (en) A kind of regularization template external corner reinforcement system
US9016025B2 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN106677211A (en) Early-dismantling assembly type pipe gallery aluminum mould trolley system for integrally casting wall and top plate and construction method thereof
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN102704684B (en) Construction method for high-strength shaping combined template of plank frame of shear wall
CN108589767B (en) Turnbuckle single-sided vertical die inclined throwing and supporting device and construction method thereof
CN105926942A (en) Construction method of combined aluminum/steel frame wood-plastic formwork system
CN108677962B (en) Subway entrance and exit segment foundation pit formwork installing and dismantling method
CN104196231A (en) Concrete floor aluminum alloy template and construction method thereof
CN206829624U (en) A kind of regularization formwork reinforcement system
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN206581591U (en) A kind of inside wall formwork and roof plate template system
CN204983649U (en) Big inclination cylinder steel form
CN207392558U (en) A kind of readily removable aluminium sheet floor support plate of steel bar girder
CN101148910B (en) Reinforced composite dismounting-free die building construction method
CN206538685U (en) Twin shaft pier and middle binder truss move integrally system
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN204728688U (en) A kind of combined template for architecture
CN111764401B (en) Full-assembled combined board support
CN107201796A (en) A kind of truss plate
CN201225001Y (en) Composite die for casting building frame
CN211201150U (en) Shear wall template structure
CN106592438A (en) Two-column pier and middle tie beam construction method employing integral movement of trusses
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN206873922U (en) A kind of dismountable steel bar truss floor support plate cheek board attachment structure of end template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102

Termination date: 20200531