CN206829576U - A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk - Google Patents

A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk Download PDF

Info

Publication number
CN206829576U
CN206829576U CN201720593039.8U CN201720593039U CN206829576U CN 206829576 U CN206829576 U CN 206829576U CN 201720593039 U CN201720593039 U CN 201720593039U CN 206829576 U CN206829576 U CN 206829576U
Authority
CN
China
Prior art keywords
steel pipe
steel tube
wall
embedded steel
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720593039.8U
Other languages
Chinese (zh)
Inventor
李锦通
潘怡华
张坤
占冬平
黎光军
张寅�
李海玲
孙方荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201720593039.8U priority Critical patent/CN206829576U/en
Application granted granted Critical
Publication of CN206829576U publication Critical patent/CN206829576U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of steel pipe to open the pre-buried assembling wall-connecting piece of silk, including joint steel pipe and embedded steel tube, one end of joint steel pipe is provided with external screw thread, the internal thread coordinated with external screw thread is provided with the outer end of embedded steel tube, doughnut-shaped steel plate is welded with the outer wall of embedded steel tube.Embedded steel tube can be fixed in floor wall column by the utility model before mould is sealed, specific arrangement determines across number interval according to scaffold construction scheme, form removal when wall column reaches form removal requirement, the internal thread on the external screw thread and embedded steel tube on joint steel pipe is screwed using spanner, guarantee is connected firmly close, and joint steel pipe is connected with vertical rod on the inside of scaffold with fastener, it can so complete the fixed installation of scaffold, convenient and quick construction.

Description

A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk
Technical field
It the utility model is related to a kind of steel pipe and open the pre-buried assembling wall-connecting piece of silk, belong to construction tool technical field.
Background technology
At present, with the continuous development of construction industry, especially in room Construction Bank industry, the security of external scaffolding is increasingly by people Concern and attention, the reasonable selection of wherein outer scaffold wall connector be ensure that external scaffolding system is firm necessary links it One.Simultaneously in work progress, it is considered however that the facility and exterior wall perception of other subdivisional work constructions.
Wall-connecting piece form most commonly seen at this stage is that round steel is pre-buried with steel-pipe welding form and steel pipe is pre-buried and steel pipe With fastener type of attachment.And considered in work progress several aspects such as steadiness, convenient construction, wall face perception because Element, in place of both wall-connecting piece forms have many imperfections, such as:, can be to later stage door and window column when wall-connecting piece is arranged on side bar Bar installation causes to hinder, and railing installation must slice off wall-connecting piece and could carry out, and the cutting of wall-connecting piece can be to whole out-mould scaffold Frame system stability causes necessarily to influence, if excessive cutting can produce certain potential safety hazard and even result in support body unstability.
Utility model content
For above-mentioned technical problem, the utility model provides a kind of simple in construction, easy for construction, strong applicability, stability It is good, be easily installed and dismantle, the steel pipe of low manufacture cost opens the pre-buried assembling wall-connecting piece of silk, to overcome deficiency of the prior art.
The technical solution of the utility model:A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk, including joint steel pipe and pre-buried Steel pipe, one end of joint steel pipe is provided with external screw thread, the internal thread coordinated with external screw thread is provided with the outer end of embedded steel tube, Doughnut-shaped steel plate is welded with the outer wall of embedded steel tube.
Further, the inner end of the embedded steel tube is welded with end plate.
Due to using above-mentioned technical proposal, the utility model has the advantage of:The utility model can be before mould be sealed by advance Bury steel pipe to be fixed in floor wall column, specific arrangement determines across number interval according to scaffold construction scheme, treats that wall column reaches form removal It is required that when form removal, the internal thread on the external screw thread and embedded steel tube on joint steel pipe is screwed using spanner, ensure connection Secure rigid, and joint steel pipe is connected with vertical rod on the inside of scaffold with fastener, the fixed installation of scaffold can be so completed, Convenient and quick construction.Meanwhile joint steel pipe of the present utility model is to be connected through a screw thread with embedded steel tube, being not only convenient for the later stage tears open Remove, the joint steel pipe after dismounting can be recycled, and save construction cost, and embedded steel tube is embedded in wall column completely, no The installation of later stage door and window railing can be caused to hinder.Compared with prior art, the utility model not only has that form is simple, connection jail Gu the advantages of, and avoid wall-connecting piece and be located on side bar the shortcomings that influenceing railing installation and the plate that floats anti-bank hoisting die construction.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is structural representation when the utility model is implemented.
Description of reference numerals:1- joint steel pipes, 2- embedded steel tubes, 3- external screw threads, 4- doughnut-shaped steel plates, 5- end plates, spiral shell in 6- Line, 7- scaffolds, 8- fasteners.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are clearer, it is right with reference to the accompanying drawings and examples The utility model is described in further detail.
Embodiment of the present utility model:Steel pipe opens the structural representation of the pre-buried assembling wall-connecting piece of silk as shown in Figures 1 and 2, Including joint steel pipe 1 and embedded steel tube 2, one end of joint steel pipe 1 is provided with external screw thread 3, set in the outer end of embedded steel tube 2 The internal thread 6 coordinated with external screw thread 3 is equipped with, doughnut-shaped steel plate 4 is welded with the outer wall of embedded steel tube 2, the embedded steel tube 2 Inner end is welded with end plate 5, and the doughnut-shaped steel plate 4 and end plate 5 being arranged on embedded steel tube 2 are improved in embedded steel tube 2 and wall column The fastness of connection.
When it is implemented, embedded steel tube 2 is fixed in floor wall column before mould is sealed, specific arrangement is spaced basis across number Scaffold construction scheme determines, form removal when wall column reaches form removal requirement, using spanner by the external screw thread on joint steel pipe 1 3 screw with the internal thread 6 on embedded steel tube 2, guarantee be connected firmly it is close, and by joint steel pipe 1 and the inner side vertical rod of scaffold 7 with Fastener 8 is connected, and can so complete the fixed installation of scaffold, convenient and quick construction.Due to joint steel pipe 1 of the present utility model It is to be connected through a screw thread with embedded steel tube 2, therefore is easy to the later stage to remove, the joint steel pipe 1 after dismounting can recycles, and save Construction cost, and embedded steel tube 2 is embedded in wall column completely, later stage door and window railing will not be installed and be caused to hinder.With it is existing Technology is compared, and the utility model not only has the advantages of form is simple, is connected firmly, and avoids wall-connecting piece and be located on side bar The shortcomings that influenceing railing installation and the plate that floats anti-bank hoisting die construction.

Claims (2)

1. a kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk, including joint steel pipe (1) and embedded steel tube (2), it is characterised in that: One end of joint steel pipe (1) is provided with external screw thread (3), is provided with the outer end of embedded steel tube (2) interior with external screw thread (3) cooperation Screw thread (6), doughnut-shaped steel plate (4) is welded with the outer wall of embedded steel tube (2).
2. steel pipe according to claim 1 opens the pre-buried assembling wall-connecting piece of silk, it is characterised in that:The embedded steel tube (2) Inner end is welded with end plate (5).
CN201720593039.8U 2017-05-25 2017-05-25 A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk Expired - Fee Related CN206829576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720593039.8U CN206829576U (en) 2017-05-25 2017-05-25 A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720593039.8U CN206829576U (en) 2017-05-25 2017-05-25 A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk

Publications (1)

Publication Number Publication Date
CN206829576U true CN206829576U (en) 2018-01-02

Family

ID=60772776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720593039.8U Expired - Fee Related CN206829576U (en) 2017-05-25 2017-05-25 A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk

Country Status (1)

Country Link
CN (1) CN206829576U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737744A (en) * 2022-03-18 2022-07-12 五冶集团上海有限公司 Novel wall connecting piece setting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114737744A (en) * 2022-03-18 2022-07-12 五冶集团上海有限公司 Novel wall connecting piece setting method

Similar Documents

Publication Publication Date Title
CN107503440A (en) For 3-dimensional boxlike structure with assembled lightweight steel multi-module structure and its connected mode
CN107246141A (en) A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk and its construction method
CN202627475U (en) Scaffold wall connecting member
CN105113789A (en) Bare concrete bay window steel formwork structural body device
CN204040458U (en) A kind of aluminum template system aluminium extruded sections
CN105113790A (en) Bare-concrete corner floating window steel formwork structure body device
CN205777482U (en) A kind of back cord formula aluminum alloy mould plate
CN206829576U (en) A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk
CN109653485A (en) A kind of wall-connecting piece and its construction method without cutting off and can be recycled
CN205046844U (en) Clear water concrete window steel form structure device that wafts
CN206048254U (en) A kind of seamless spliced installation adjusting device of truss robot multistage beam guideway
CN216840656U (en) Telescopic separator for beam column node concrete pouring
CN205224596U (en) A reserve sleeve pipe for floor reservation hole
CN211172363U (en) Vertical connecting steel node of prefabricated frame column of prefabricated concrete structure
CN204529157U (en) Tower crane attached wall service platform
CN203547123U (en) Supporting device for deformation joint template
CN203769327U (en) Tower concrete pump pipe fixing device
CN207761274U (en) Easy-to-mount-dismount and reusable cantilever tripod
CN201850654U (en) Steel structure node device
CN206971790U (en) A kind of detachable guardrail fixing device
CN206769427U (en) A kind of reinforced steel beam and girder for the prefabricated components that are open
CN206667732U (en) A kind of fastener type steel pipe scaffold connects wall member
CN212836643U (en) Embedded nut adds bolted connection's outer scaffold frame even wall spare
CN102561728B (en) Recyclable steel-skeleton model-house system
CN217420503U (en) Tool type cast-in-place beam formwork system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102

Termination date: 20200525