CN206819377U - A kind of power construction management system for safety instruments Handheld intelligent equipment - Google Patents
A kind of power construction management system for safety instruments Handheld intelligent equipment Download PDFInfo
- Publication number
- CN206819377U CN206819377U CN201720791001.1U CN201720791001U CN206819377U CN 206819377 U CN206819377 U CN 206819377U CN 201720791001 U CN201720791001 U CN 201720791001U CN 206819377 U CN206819377 U CN 206819377U
- Authority
- CN
- China
- Prior art keywords
- selection key
- button
- instruments
- apparatus casing
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009430 construction management Methods 0.000 title claims abstract description 18
- 230000004044 response Effects 0.000 claims abstract description 28
- 238000004891 communication Methods 0.000 claims abstract description 22
- 230000005611 electricity Effects 0.000 claims abstract description 7
- 238000012905 input function Methods 0.000 claims description 3
- 230000006399 behavior Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 17
- 238000002474 experimental method Methods 0.000 abstract description 4
- 238000012544 monitoring process Methods 0.000 description 11
- 238000012790 confirmation Methods 0.000 description 6
- 238000012360 testing method Methods 0.000 description 6
- 238000007689 inspection Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 4
- 238000011017 operating method Methods 0.000 description 3
- 230000000007 visual effect Effects 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000004321 preservation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
Landscapes
- Studio Devices (AREA)
Abstract
A kind of power construction management system for safety instruments Handheld intelligent equipment is the utility model is related to, belongs to managing security tools and instruments administrative skill field during electricity power engineering is built.Technical scheme is:The communication module(1)The upper left corner in apparatus casing, camera(2)The upper right corner in apparatus casing, TF data memory modules(4)The lower left corner in apparatus casing, battery module(5)The lower right corner in apparatus casing;LCDs(3)Positioned at apparatus casing surface top, apparatus casing surface lower portions are provided with power on button(6), scanning Quick Response Code button(7), upload data button(8), shooting button(9).The utility model is used for power construction management system for safety instruments, realizes that managing security tools and instruments carries out scientific and effective management from buying, use, experiment, keeping to the whole-life cycle fee scrapped, convenient construction administrative staff to managing security tools and instruments.
Description
Technical field
A kind of power construction management system for safety instruments Handheld intelligent equipment is the utility model is related to, belongs to power network
Managing security tools and instruments administrative skill field in engineering construction.
Background technology
In recent years, power grid construction develops rapidly, and electricity power engineering construction task quickly increases therewith, electric power construction enterprise administration
Managing security tools and instruments also exponentially increasing.Especially when carrying out uninterrupted operation such as crossing construction, cable testing etc., band is closed on
Electric equipment or circuit, the complexity and danger of operation are higher, it is necessary to use a variety of managing security tools and instruments.But the ring of operation field
Border is noisy, and the safety education and training of construction unit is commonly present leak, and the awareness of safety of workmen is not high, and technical merit is also irregular
Uneven, be present problems in inspection, use, experiment, storage and the keeping of managing security tools and instruments, often occur due to managing security tools and instruments
Improper use causes security incident using substandard product, and very big hidden danger is buried to safety construction.To safe work device
The scientific and effective management of tool is to ensure the important means of job site operating personnel, equipment and power grid security.Therefore, power network is established
Engineering safety tool management system to managing security tools and instruments carry out standardized management be it is particularly significant with it is necessary.
Utility model content
The utility model purpose is to provide a kind of power construction management system for safety instruments Handheld intelligent equipment, real
Existing managing security tools and instruments is from buying, use, experiment, keeping to the whole-life cycle fee scrapped, and convenient construction administrative staff are to peace
Full Work tool carries out scientific and effective management, provides for electricity power engineering building security civilized construction and reliably ensures, solves background
Above mentioned problem existing for technology.
The technical solution of the utility model is:
A kind of power construction management system for safety instruments Handheld intelligent equipment, includes communication module, camera, liquid
Crystal display screen, TF data memory modules, battery module, power on button, scanning Quick Response Code button, upload data button, shooting are pressed
Selection key under selection key, the left selection key in direction, confirmation selection key, the right selection key in direction and direction on button, direction;The communication mould
Block is located at the upper left corner in apparatus casing, and camera is located at the upper right corner in apparatus casing, and TF data memory modules are located at equipment
The lower left corner in housing, battery module are located at the lower right corner in apparatus casing;LCDs is located at apparatus casing surface top,
Apparatus casing surface lower portions are provided with power on button, scanning Quick Response Code button, upload data button, shooting button, select on direction
Selection key under key, the left selection key in direction, confirmation selection key, the right selection key in direction and direction.
The power construction management system for safety instruments, module, photographing module, remote monitoring mould are used comprising auxiliary
Block, managing security tools and instruments account management module and Quick Response Code module, using Quick Response Code module will aid in using module, photographing module,
Remote monitoring module and managing security tools and instruments management account module connect.
The camera is the photographing module of power construction management system for safety instruments, scans Quick Response Code, the communication
Module provides communication, TF data memory modules and battery mould for the remote monitoring module of power construction management system for safety instruments
Block is communication module and camera stores data and provides power supply.
The power on button, scanning Quick Response Code button, upload data button, shooting button, selection key, direction are left on direction
Selection key under selection key, confirmation selection key, the right selection key in direction and direction, is communication module and the operation input function of camera
Key.
It is managed using power construction management system for safety instruments, administrative staff are by the Data Enter of managing security tools and instruments
Management system, information include engineering name, managing security tools and instruments title, numbering, date of test, quality inspection, next date of test,
And generation can set size, the Quick Response Code of position;Administrative staff's adhesive band at the above the fold of qualified managing security tools and instruments
There is the label of Quick Response Code.
Before workmen's Work tool safe to use, Quick Response Code is scanned using camera of the present utility model, reads safe work
The information of utensil, the auxiliary related to the managing security tools and instruments uses content and the related platform in module in automatic connection management system
Account;Auxiliary allows workmen to grasp work flow, the electric power safety working regulation of managing security tools and instruments before use using module(Electricity
Net construction parts)Regulation, application method and preservation and regulation is scrapped, the proper use of qualified safe work device of auxiliary construction personnel
Tool;
Photographing module and remote monitoring module, the use of the managing security tools and instruments of Added Management personnel inspection job site, protect
Pipe situation;Photographing module uses image and short visual form, the apparent condition of record security Work tool, live ring when using
The keeping situation in border, the operating method of organiztion measure and workmen and managing security tools and instruments, with real-time time, it is not possible to the later stage
Modification, to ensure that record is true, reliable;Remote monitoring module sends state, the species for the managing security tools and instruments that job site uses
And quantity;
Workmen is pasted onto the Quick Response Code on managing security tools and instruments with the utility model scanning, additionally it is possible to counts job site
The type and quantity of the Work tool used, if any underproof managing security tools and instruments, management system can alarm, and be automatically transmitted to pipe
Reason personnel;After the end of job, workmen scans the Quick Response Code on managing security tools and instruments again, and if any omission, management system will
Alarm.
Good effect of the present utility model:The utility model is used for power construction management system for safety instruments, realizes peace
Full Work tool is from buying, use, experiment, keeping to the whole-life cycle fee scrapped, and convenient construction administrative staff are to safe work
Utensil carries out scientific and effective management.Quick Response Code has uniqueness and antiforge function, managing security tools and instruments is had unique information, keeps away
Exempt from using effective life and untested Work tool is exceeded, can also prevent onsite application personnel and forge Test Information.Take the photograph
As module use image and short visual form, site environment, organiztion measure when the apparent condition of record security Work tool, use
With the operating method of workmen and the keeping situation of managing security tools and instruments, with timestamp function, and cannot change in the later stage, with
Ensure that record is true, reliable.Remote monitoring module can send the state for the managing security tools and instruments that job site uses, species sum
Amount.Standby provided for electricity power engineering building security civilized construction of management system for safety instruments reliably ensures.
Brief description of the drawings
Fig. 1 is the structured flowchart of the utility model embodiment;
In figure:Communication module 1, camera 2, LCDs 3, TF data memory modules 4, battery module 5, power on button
6th, Quick Response Code button 7 is scanned, data button 8, shooting button 9, selection key 10, the left selection key 11 in direction on direction is uploaded, confirms
Selection key 14 under selection key 12, the right selection key 13 in direction, direction.
Embodiment
Below in conjunction with the accompanying drawings, by embodiment, the utility model is described in further detail.
A kind of power construction management system for safety instruments Handheld intelligent equipment, comprising communication module 1, camera 2,
LCDs 3, TF data memory modules 4, battery module 5, power on button 6, scanning Quick Response Code button 7, upload data button
8th, button 9, selection key 10, the left selection key 11 in direction on direction are imaged, is confirmed under selection key 12, the right selection key 13 in direction and direction
Selection key 14;The communication module 1 is located at the upper left corner in apparatus casing, and camera 2 is located at the upper right corner in apparatus casing, TF
Data memory module 4 is located at the lower left corner in apparatus casing, and battery module 5 is located at the lower right corner in apparatus casing;Liquid crystal display
Screen 3 is located at apparatus casing surface top, and apparatus casing surface lower portions are provided with power on button 6, scanning Quick Response Code button 7, upload number
According to selection key 10, the left selection key 11 in direction, confirmation selection key 12, the right and of selection key 13 in direction on button 8, shooting button 9, direction
Selection key 14 under direction.
The power construction management system for safety instruments, module, photographing module, remote monitoring mould are used comprising auxiliary
Block, managing security tools and instruments account management module and Quick Response Code module, using Quick Response Code module will aid in using module, photographing module,
Remote monitoring module and managing security tools and instruments management account module connect;The camera 2 is power construction managing security tools and instruments
The photographing module of management system, scans Quick Response Code, and the communication module 1 is long-range for power construction management system for safety instruments
Monitoring module provides communication, TF data memory modules 4 and battery module 5 are communication module 1 and camera 2 store data and
Power supply is provided.
The power on button 6, scanning Quick Response Code button 7, upload data button 8, shooting button 9, selection key 10 on direction,
Selection key 14 under the left selection key 11 in direction, confirmation selection key 12, the right selection key 13 in direction and direction, is communication module 1 and shooting
First 2 operation input function key.
It is managed using power construction management system for safety instruments, administrative staff are by the Data Enter of managing security tools and instruments
Management system, information include engineering name, managing security tools and instruments title, numbering, date of test, quality inspection, next date of test,
And generation can set size, the Quick Response Code of position;Administrative staff's adhesive band at the above the fold of qualified managing security tools and instruments
There is the label of Quick Response Code.
Before workmen's Work tool safe to use, Quick Response Code is scanned using camera of the present utility model, reads safe work
The information of utensil, the auxiliary related to the managing security tools and instruments uses content and the related platform in module in automatic connection management system
Account;Auxiliary allows workmen to grasp work flow, the electric power safety working regulation of managing security tools and instruments before use using module(Electricity
Net construction parts)Regulation, application method and preservation and regulation is scrapped, the proper use of qualified safe work device of auxiliary construction personnel
Tool;
Photographing module and remote monitoring module, the use of the managing security tools and instruments of Added Management personnel inspection job site, protect
Pipe situation;Photographing module uses image and short visual form, the apparent condition of record security Work tool, live ring when using
The keeping situation in border, the operating method of organiztion measure and workmen and managing security tools and instruments, with real-time time, it is not possible to the later stage
Modification, to ensure that record is true, reliable;Remote monitoring module sends state, the species for the managing security tools and instruments that job site uses
And quantity;
Workmen is pasted onto the Quick Response Code on managing security tools and instruments with the utility model scanning, additionally it is possible to counts job site
The type and quantity of the Work tool used, if any underproof managing security tools and instruments, management system can alarm, and be automatically transmitted to pipe
Reason personnel;After the end of job, workmen scans the Quick Response Code on managing security tools and instruments again, and if any omission, management system will
Alarm.
The utility model is hand-held intelligent equipment, the image of the display data of LCDs 3 and shooting, selection key on direction
10th, selection key 14 can be with convenient to showing boundary under the left selection key 11 in direction, confirmation selection key 12, the right selection key 13 in direction and direction
Face is operated.Function key scanning Quick Response Code button 7, upload data button 8 and shooting button 9 can quickly switch equipment
Barcode scanning, upload data and camera function.Communication module 1 can realize fast and reliable 4G communications.
Claims (2)
- A kind of 1. power construction management system for safety instruments Handheld intelligent equipment, it is characterised in that:Include communication module (1), camera(2), LCDs(3), TF data memory modules(4), battery module(5), power on button(6), scanning two Tie up code button(7), upload data button(8), shooting button(9), selection key on direction(10), the left selection key in direction(11), really Recognize selection key(12), the right selection key in direction(13)With selection key under direction(14);The communication module(1)In apparatus casing The upper left corner, camera(2)The upper right corner in apparatus casing, TF data memory modules(4)A left side in apparatus casing Inferior horn, battery module(5)The lower right corner in apparatus casing;LCDs(3)Positioned at apparatus casing surface top, equipment Surface of shell bottom is provided with power on button(6), scanning Quick Response Code button(7), upload data button(8), shooting button(9), side Upward selection key(10), the left selection key in direction(11), confirm selection key(12), the right selection key in direction(13)With selection key under direction (14).
- 2. a kind of power construction management system for safety instruments Handheld intelligent equipment according to claim 1, it is special Sign is:The camera(2)Scan Quick Response Code, the communication module(1)Communication, TF data memory modules are provided(4)And electricity Pond module(5), it is communication module(1)And camera(2)Store data and power supply is provided;The power on button(6), scanning two Tie up code button(7), upload data button(8), shooting button(9), selection key on direction(10), the left selection key in direction(11), really Recognize selection key(12), the right selection key in direction(13)With selection key under direction(14), it is communication module(1)And camera(2)Behaviour Make input function key.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720791001.1U CN206819377U (en) | 2017-07-03 | 2017-07-03 | A kind of power construction management system for safety instruments Handheld intelligent equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720791001.1U CN206819377U (en) | 2017-07-03 | 2017-07-03 | A kind of power construction management system for safety instruments Handheld intelligent equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206819377U true CN206819377U (en) | 2017-12-29 |
Family
ID=60762620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720791001.1U Active CN206819377U (en) | 2017-07-03 | 2017-07-03 | A kind of power construction management system for safety instruments Handheld intelligent equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206819377U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112994238A (en) * | 2021-03-03 | 2021-06-18 | 国网河北省电力有限公司正定县供电分公司 | Be used for portable operation splint of electric wire netting construction management |
CN113036914A (en) * | 2021-03-03 | 2021-06-25 | 国网河北省电力有限公司正定县供电分公司 | Power grid construction management system |
CN115499026A (en) * | 2022-08-11 | 2022-12-20 | 贵州电网有限责任公司 | Tool for checking solidified safety tool before use |
-
2017
- 2017-07-03 CN CN201720791001.1U patent/CN206819377U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112994238A (en) * | 2021-03-03 | 2021-06-18 | 国网河北省电力有限公司正定县供电分公司 | Be used for portable operation splint of electric wire netting construction management |
CN113036914A (en) * | 2021-03-03 | 2021-06-25 | 国网河北省电力有限公司正定县供电分公司 | Power grid construction management system |
CN115499026A (en) * | 2022-08-11 | 2022-12-20 | 贵州电网有限责任公司 | Tool for checking solidified safety tool before use |
CN115499026B (en) * | 2022-08-11 | 2023-12-08 | 贵州电网有限责任公司 | Tool for checking solidified safety tool before use |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206819377U (en) | A kind of power construction management system for safety instruments Handheld intelligent equipment | |
CN105825556A (en) | Intelligent inspection system | |
CN107121606B (en) | Intelligent terminal for transformer substation operation and patrol | |
CN105334827B (en) | Manufacturing Supervision and quality real-time control system | |
CN111062504A (en) | AR technology-based intelligent power distribution station operation and maintenance system and method | |
CN105375374B (en) | A kind of station Intelligent toolbox and its application method | |
CN107909674B (en) | Electric power inspection mobile terminal | |
CN104463469A (en) | Grid infrastructural project digital photo management method and device | |
CN110795583A (en) | Intelligent management method for pump station trash remover | |
CN207155816U (en) | A kind of robot inspection system based on intelligent power generation station | |
CN204882852U (en) | Long -range calibration equipment of electric energy meter parameter | |
CN102538871A (en) | Test platform for wind power water-cooling device | |
CN206931184U (en) | Power information online data monitoring device | |
CN103499122B (en) | Heat supply production equipment routing inspection monitoring system and method | |
CN105279610A (en) | Safety supervision auxiliary method | |
US20190105773A1 (en) | Map creation system and method thereof for movable robot | |
CN103778682A (en) | Base-station maintenance-based routing inspection terminal and control system thereof | |
CN103559652A (en) | Communication work-ticket management system based on unattended substation and operation method of communication work-ticket management system | |
CN105611247B (en) | Visualized operation whole process supervision method | |
CN107392458A (en) | Based on field device operation intellectual analysis relative influence equipment topological analysis | |
CN204515470U (en) | The long-range gate control system of sun power | |
CN207067999U (en) | A kind of intelligent mobile cruising inspection system | |
CN206272758U (en) | A kind of building fire-fighting construction monitoring system based on Internet of Things | |
CN103647945A (en) | Intelligent power inspection device supporting remote camera shooting and temperature measuring | |
CN208092802U (en) | One kind is without patrol system of networking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |