CN206817658U - A kind of round-the-clock ceiling radiation temperature-controlling system - Google Patents

A kind of round-the-clock ceiling radiation temperature-controlling system Download PDF

Info

Publication number
CN206817658U
CN206817658U CN201720394449.XU CN201720394449U CN206817658U CN 206817658 U CN206817658 U CN 206817658U CN 201720394449 U CN201720394449 U CN 201720394449U CN 206817658 U CN206817658 U CN 206817658U
Authority
CN
China
Prior art keywords
coil pipe
reinforcing bar
round
radiation temperature
clapped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720394449.XU
Other languages
Chinese (zh)
Inventor
马玉涛
郝文涛
荆树波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Botai Construction Group Co Ltd
Original Assignee
Shandong Botai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Botai Construction Group Co Ltd filed Critical Shandong Botai Construction Group Co Ltd
Priority to CN201720394449.XU priority Critical patent/CN206817658U/en
Application granted granted Critical
Publication of CN206817658U publication Critical patent/CN206817658U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B80/00Architectural or constructional elements improving the thermal performance of buildings

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

It the utility model is related to ceiling radiation temperature control technique field, and in particular to a kind of that there is refrigeration and the round-the-clock radiation temperature-controlling system of heating on ceiling.The utility model includes coil pipe, reinforcing bar is clapped, and coil pipe is fixed on reinforcing bar and clapped;Coil pipe and reinforcing bar, which are clapped, to be embedded in concrete floor;Expose concrete floor in the both ends of coil pipe.The system can ensure that indoor temperature is uniform and stable, system operation is without any noise by controlling heating refrigeration system ceiling face radiation temperature.Due to the accumulation of heat effect of mass concrete and the heating and refrigeration temperature difference of very little, whole system is set to have very strong capacity of self-regulation, while fresh air replacement system, enhancing humidification, dehumidification function, soft air-supply.The two systems are combined, and it is one of best high degree of comfort, micro- energy consumption, sustainable system in the world at present to be recognized.

Description

A kind of round-the-clock ceiling radiation temperature-controlling system
Technical field
It the utility model is related to ceiling radiation temperature control technique field, and in particular to a kind of that there is refrigeration on ceiling With the round-the-clock radiation temperature-controlling system of heating.
Background technology
In recent years, quality of life more and more higher, people are to house comfort level requirement also more and more higher.The sky of interior of building Adjusting system is also towards comfort air conditioning system System Development.General floorings heating system includes hot-water radiator heating system and steam is adopted Heating system.Hot-water radiator heating system is generally used in civil buildings, by pressure differential conduct caused by the density contrast for backwater Circulation power, thus effect pressure head is small, required caliber is big, but noiseless during operation, and management is simple.It is only applicable to not concentrate confession Thermal source, have to heating quality in the aedicula of particular/special requirement.The spreader surface temperature of high-temperature-water heating system is high, easily Skin is scalded, burned organic dust, sanitary condition and comfort level are poor, and hot water easily gasifies, and are mainly used in hygienic requirements In not high industrial building and its accessory building.Low-temperature water heating system needs to increase radiator dosage, and supply backwater temperature difference is smaller, needs Increase pipe-line system caliber, the electric energy that increase conveying heating agent is consumed, be mainly used in civil buildings.In steam heating system, According to the pressure of steam supply vapour source, to the limit of spreader surface maximum temperature and the bearing capacity of heating equipment come select high pressure or Low-pressure steam heating system.Vacuum type steam heating system needs vaccum-pumping equipment, and higher, comparison typically is required to pipeline air-tightness It is few.For low-pressure steam heating system, lower fraction system saves standpipe tubing than downfeed system, and because main is laid in In indoor trench, so invalid heat loss is small.But there is the shortcomings that serious on, steam can occur to coagulate on the way in standpipe Bear water the steam for falling and rising and bump against i.e. water hammer.In order to weaken water attack, standpipe caliber is often increased to reduce steam flow rate, So add tubing used again.Both the above heating system also has the shortcomings that only radiating is not freezed simultaneously.And common refrigeration system System, during refrigerating operaton, the low-pressure low-temperature refrigerant gas from indoor machine evaporation is compressed into high pressure-temperature by compressor suction Gas, outdoor condenser is discharged into, by the effect of aerofoil fan, carries out heat exchange with the air of outdoor and turn into medium temperature high pressure Refrigerant liquid, reducing pressure by regulating flow by capillary, enter evaporator after cooling, under the fan of machine acts on indoors, with room The air of domestic demand regulation carries out heat exchange as the refrigerant gas of low-pressure low-temperature, so circulates again and again and reaches system Cold purpose.This air-conditioning refrigeration system needs electric power to energize, and the system installation cost is high, and power consumption is big, equally has and only freezes not The shortcomings that radiating.
Embodying the documents of disadvantages mentioned above includes:
1st, CN201520951552.0 is a kind of based on the ceiling radiant tube buried under reinforcing bar construction.
2nd, CN201320600067.X ceiling radiation control system.
3rd, CN201520568856.9 Back Words type radiant tube underneath type awning structure.
4th, CN201520568859.2 double flats line radiant tube underneath type awning structure.
Utility model content
The purpose of this utility model is to provide a kind of round-the-clock ceiling radiation temperature-controlling system.
What the purpose of this utility model was realized in:
A kind of round-the-clock radiation temperature-controlling system, including coil pipe 4, reinforcing bar are clapped, and coil pipe 4 is fixed on reinforcing bar and clapped;Coil pipe and steel Muscle is clapped and is embedded in concrete floor;Expose concrete floor in the both ends of coil pipe.
Described reinforcing bar is clapped positioned at the top of coil pipe 4, and coil pipe is clapped with nylon binding strap and reinforcing bar every 30 centimetres and fixed.
The concrete floor is made up of top mat 7, concrete 6 and the net three parts of lower floor's reinforcing bar 5;The coil pipe 4 Clapped with reinforcing bar and be fixed on side close with concrete 6 on lower floor's bar-mat reinforcement 5.
The reinforcing bar clap be byThe spacing that steel bar meter is fabricated to is 200mm single-layer bidirectional mesh sheet, and its specification is 4000mm × 3800mm or 4000mm × 3000mm.
The material of the coil pipe 4 is polymer or composite;Coil pipe 4 is after mould shape in the horizontal plane into " S " The shape of word or " returning " word;Pipeline enclosure is away from for 200 or 400 millimeters;The internal diameter of coil pipe 4 is 18 millimeters, and external diameter 4 is 20 millimeters;Coil pipe 4 The diameter of knee circular arc is more than 8 times of outer diameter tube.
The mould is welded by band steel 2 and angle steel 3 and is made on steel plate 1;The section of angle steel 3 is angular;Angle steel 3 into Box formation is arranged on steel plate 1;The band steel 2 refers to that section is rectangular steel;Into semicircle after band steel 2 is processed, The square formation of angle steel 3 mutually non-conterminous both sides are arranged in, and the both ends of band steel 2 are alignd with angle steel 3.
The both ends that the coil pipe exposes concrete floor are respectively water inlet and delivery port, the water inlet and delivery port with Water treatment component is connected.
The water treatment component includes:Filter 8, water inlet check valve 9, pressure gauge 10, safety valve 11, water knockout drum 12, Delivery port check valve 13, water collector 14;The water inlet sequentially with filter 8, water inlet check valve 9, pressure gauge 10, safety valve 11st, water knockout drum 12 is connected;The delivery port is sequentially connected with delivery port check valve 13, water collector 14.
The inside nominal diameter of the water inlet check valve 9 and delivery port check valve 13 is greater than the external diameter of coil pipe 4 and is less than disk 1.1 times of the external diameter of pipe 4;The highest allowable pressure of the safety valve 11 is more than 2 times of the operating pressure of coil pipe 4;The pressure gauge 10 Specified range be more than 1.5 times of the operating pressure of coil pipe 4.
The beneficial effects of the utility model are:
1. heat balance in Room, human comfort is high.
2. the energy consumption of heating and refrigeration is decreased obviously, expense is low.
3. system operation noiseless, indoor temperature is uniform, and room air is without convection current, calm sense.
4. being not take up the interior space, be advantageous to interior decoration.
5. can a point family energize, beneficial to control and metering.
Round-the-clock ceiling radiation temperature-controlling system is mutually tie low-temp radiation heating refrigeration system with fresh air replacement system one The new system of kind.The system is cold and hot coal Jie's regulation indoor temperature by normal-temperature water, passes through control by the water pipe being embedded in floor Heating refrigeration system ceiling face radiation temperature processed, ensure that indoor temperature is uniform and stable, system operation is without any noise.Due to The accumulation of heat effect of mass concrete and the heating and refrigeration temperature difference of very little, make whole system have very strong capacity of self-regulation, together When fresh air replacement system, enhancing humidification, dehumidification function, soft air-supply.The system is suitable for the heating of various different energy sources energy supplies Or refrigeration modes.Solve that conventional diffusers heating system floor space is big, temperature rise effect is uneven, heat energy loss is more and efficiency The problem of low;Also solve the problems, such as that floor heating system only radiates the simple function not freezed;Avoiding air-conditioning system can only electricity The problem of power energizes.It is another energy-conservation, efficient novel heating and refrigeration system after radiator, floor heating, air-conditioning system. Be recognized is one of best high degree of comfort, micro- energy consumption, sustainable system in the world at present.
Ceiling radiation cooling/warming system is can to radiate in a kind of winter, the new bidirectional radiation heating ventilation air-conditioning system that the summer can freeze.System Cold uniform, comfortableness height, be suitable for various different energy sources energy supplies adopts or warms up refrigeration modes.System solves the problem conventional diffusers The problem of heating system is taken up an area, temperature rise effect is uneven, heat energy loss is more;Also solve floor heating system and only radiate and do not freeze Simple function problem;Avoid air-conditioning system can only electric power energy supply the problem of.It is continuous radiator, floor heating, air-conditioning system Another energy-conservation, efficient novel heating and refrigeration system afterwards.
Heating and refrigeration are carried out using low temperature, reduce thermal technology's output of main frame, efficiency is improved and reduces and be transmitted across Heat loss in journey.Energy resource consumption has been saved on the premise of it ensure that indoor comfort degree, has reduced environmental pollution.Construction party Face:Construction is succinct quick, and streamlined degree is high, is easy to quality control.Picked due to nothing and drill through the processes such as hole, reduce repairing for later stage Benefit and finished product protection expense.Use:Because coil pipe is embedded in structure floor, construction area is not take up, increases indoor make With area and service life is improved, reduces maintenance cost.
Brief description of the drawings
Fig. 1 is the type circuit system in upright arrangement in ceiling radiation cooling/warming system;
Fig. 2 is the rotary-type circuit system in ceiling radiation cooling/warming system;
Fig. 3 is the Reciprocatory circuit system in ceiling radiation cooling/warming system;
Fig. 4 is the coil pipe mould in ceiling radiation cooling/warming system;
Fig. 5 is the concrete floor structure chart in ceiling radiation cooling/warming system;
Fig. 6 is the cooling/warming system sketch in ceiling radiation cooling/warming system;
Fig. 7 is that the coil pipe reinforcing bar in ceiling radiation cooling/warming system claps sketch.
Embodiment
The present invention is described further below in conjunction with the accompanying drawings.
This ceiling radiation cooling/warming system structure is as follows:
The purpose of this utility model is to provide a kind of round-the-clock ceiling radiation temperature-controlling system.
A kind of round-the-clock radiation temperature-controlling system, including coil pipe 4, reinforcing bar are clapped, it is characterised in that:Coil pipe 4 is fixed on reinforcing bar bat On;Coil pipe and reinforcing bar, which are clapped, to be embedded in concrete floor;Expose concrete floor in the both ends of coil pipe.
Described reinforcing bar is clapped positioned at the top of coil pipe 4, and coil pipe is clapped with nylon binding strap and reinforcing bar every 30 centimetres and fixed.
The concrete floor is made up of top mat 7, concrete 6 and the net three parts of lower floor's reinforcing bar 5;The coil pipe 4 Clapped with reinforcing bar and be fixed on side close with concrete 6 on lower floor's bar-mat reinforcement 5.
The reinforcing bar clap be byThe spacing that steel bar meter is fabricated to is 200mm single-layer bidirectional mesh sheet, and its specification is 4000mm × 3800mm or 4000mm × 3000mm.
The material of the coil pipe 4 is polymer or composite;Coil pipe 4 is after mould shape in the horizontal plane into " S " The shape of word or " returning " word;Pipeline enclosure is away from for 200 or 400 millimeters;The internal diameter of coil pipe 4 is 18 millimeters, and external diameter 4 is 20 millimeters;Coil pipe 4 The diameter of knee circular arc is more than 8 times of outer diameter tube.
The mould is welded by band steel 2 and angle steel 3 and is made on steel plate 1;The section of angle steel 3 is angular;Angle steel 3 into Box formation is arranged on steel plate 1;The band steel 2 refers to that section is rectangular steel;Into semicircle after band steel 2 is processed, The square formation of angle steel 3 mutually non-conterminous both sides are arranged in, and the both ends of band steel 2 are alignd with angle steel 3.
The both ends that the coil pipe exposes concrete floor are respectively water inlet and delivery port, the water inlet and delivery port with Water treatment component is connected.
The water treatment component includes:Filter 8, water inlet check valve 9, pressure gauge 10, safety valve 11, water knockout drum 12, Delivery port check valve 13, water collector 14;The water inlet sequentially with filter 8, water inlet check valve 9, pressure gauge 10, safety valve 11st, water knockout drum 12 is connected;The delivery port is sequentially connected with delivery port check valve 13, water collector 14.
The inside nominal diameter of the water inlet check valve 9 and delivery port check valve 13 is greater than the external diameter of coil pipe 4 and is less than disk 1.1 times of the external diameter of pipe 4;The highest allowable pressure of the safety valve 11 is more than 2 times of the operating pressure of coil pipe 4;The pressure gauge 10 Specified range be more than 1.5 times of the operating pressure of coil pipe 4.
The cooling/warming system technological process of this ceiling radiation is as follows:
Iron → aid making → coil pipe disk system → coil pipe fixes → installation of embedded parts → electrical conduits under floor colligation Laying → coil pipe lifting → prefabricated coil pipe positioning and laying → coil pipe pressure test → coil pipe pressurize and finished product protection → floor are tied up On bundle iron → structure set aside pre-embedded → cast concrete → coil pipe pressure release mouth of pipe closure → water collecting and diversifying device is installed → register one's residence main and Standpipe installation → system pressure testing and flushing → heating debugging.
4.1 key points for operation
4.1.1 pipe arrangement principle
According to thermal characteristics, the higher water inlet segment of coolant-temperature gage is preferentially arranged in the place of the high energy consumptions such as exterior wall, window, Or water inlet segment is arranged in these local encryptions, to increase the heating load of heat consumption general goal, so that the transmission by heat energy perseverance To room temperature.
4.1.2 aid makes
(1) coil pipe Mold Making heating coil pipe is with mould shape, and mould is welded using steel plate, angle steel and band steel, in steel plate On Flat steel bending is welded in coil pipe turning into diameter 200mm is semi-circular, straight length is welded on steel plate fixed with angle steel.
Coil pipe reinforcing bar is clapped making heating coil pipe and is pre-assembled on reinforcing bar bat, and reinforcing bar is clapped according to the big I of every group of coil pipe point For 2 kinds of specifications.Reinforcing bar bat is usedSteel bar meter is fabricated to spacing 200mm single-layer bidirectional mesh sheet, and specification is:4000mm× 3800mm, 4000mm × 3000mm such as Fig. 7, explanation:1st, black round dot is connected using spot welding, and other crosspoints are tied up using galvanized wire Prick.
4.1.3 reinforcing bar is clapped mast-up and made
Ceiling heating and refrigeration coil are fixed on the reinforcing bar side of taking, and coil pipe and reinforcing bar, which are clapped, to be fixed on mast-up, then through tower It is hung to relevant position.Make reinforcing bar and clap mast-up, it is ensured that mast-up rigidity.
Explanation:
1st, mast-up uses the welding productions of Φ 28.
2nd, the reinforcing bars of mast-up Φ 28 curve 90 degree of cripple's full weld connections, ensure two-sided welding.
3rd, the high 70mm of steel bar welding supporting leg of mast-up Φ 28.
4.2 heating coil pipe disk systems
Have according to the spacing and circuit type coil pipe, more typical circuit type of design:Fig. 1 arrays type, Fig. 2 be rotary-type, Fig. 3 Reciprocatories etc..There must not be joint in the same circuit, pipeline enclosure is not more than ± 10mm away from that should meet design requirement, spacing deviation, Keep pipe surface smooth.It directly can by hand be bent during disk, should slowly be carried out during bending, hard curved, bending must not occur Diameter is not less than 8 times of pipe external diameter.Operation temperature is not less than 5 DEG C.First pipeline disk when should be noted that one end according to drawing size A reserved segment length, length in reserve be by point, water collector for road to return line total length, between tubing be not allow for connecting. Then it is single to fold, coil pipe is fixed in the groove being welded with angle steel, coil pipe spacing is 200mm, the disk system on mould.
4.3 coil pipes are clapped with reinforcing bar and connected
Pipeline after disk system, prefabricated reinforcing bar is clapped and is placed on coil pipe, then levelling straightening is fixed, and PB is effective on mould Nylon binding strap is fixed on reinforcing bar and clapped, and must not be fixed using iron wire.Coil pipe does a fixing point every 30cm, and corner is fitted Amount increase.
4.4 each system main suspension bracket built-in fittings are set
If main of registering one's residence is relatively more, and top plate has heating coil pipe, using expansion bolt or can not be done common on top plate Built-in fitting.Therefore special built-in fitting is used on top plate, special built-in fitting is divided into two kinds:A kind of is that the independent of pipeline is hung Frame;Another kind is into double suspension brackets of discharge pipe.
Explanation:
1st, pre-buried when steel pipe is poured into a mould with concrete, filled and process in steel pipe, closed at both ends when pre-buried.
2nd, the steel plate suspension rod later stage installs.
4.5 coil pipes lift
It will be transported into prefabricated coil pipe at lifting, prefabricated coil pipe be fixed on mast-up and is hung to tower crane Floor relevant position, fixation is answered during lifting.
4.6 heating coil pipe scene disk systems
Coil pipe is fixed on into reinforcing bar according to drawing requirement to take, coil pipe is clapped with reinforcing bar and is fixed using electrician's binding strap, Constant spacing is 300mm, and coil pipe is constructed immediately after the completion of floor fabric reinforcing bar.According to drawing size will be prefabricated after coil pipe Positioned, then by condensate correcting-distribuing device in the end plate of coil pipe two to pipeline enclosure, all coil pipe parallel lay-ups must not intersect, in diversity Equidistant parallel lay-up at hydrophone, if fixing card is fixed, coil pipe is worn and made marks at partition wall, and heating coil goes out at ground, pipeline enclosure Flexible protective sleeve pipe should be added at inscribed condensate correcting-distribuing device 15, identification label is sticked at coil pipe both ends, and each branch tube pitch is consistent, each After road laying finishes, one group of branch pipe carries out pressure test jointly.
4.7 ceiling heating pipeline pressure tests, rinse
After pipeline laying before pouring concrete construction, intensity seal examination should be carried out to the pipeline that each loop is laid Test.According to 1.5 times that design requirement test pressure is 0.8Mpa or operating pressure, and >=0.6Mpa, system pressure after acceptance(check) Power is down to 0.6Mpa, keeps pressure to carry out concrete cast.Vibrating spear must not be used by having during cast at heating coil pipe, in order to avoid cause Pipeline damage, after the completion of heating coil pipe flood or whole section, send special messenger to be nursed, until concrete is poured, treat concrete Can pressure release after solidification.All pipeline pressure tests are qualified, whole system all installs and carry out pipeline system afterwards by inspection System rinses.By water collecting and diversifying device water in-out port circulation flushing pipeline, until delivery port discharges clean water.The water of discharge is through dividing, catchmenting Device is discharged into gully or gutter, must not flow into job site.
4.8 emergency processing
Concrete vibrating should use vibrating spear, if pipeline water leakage situation occurs in concrete placement, first should The valve of branch road where closing leak coil pipe immediately and then leakage point is quickly found, found the coagulation at leakage point after leakage point Soil is pushed aside, is closed coil pipe surrounding at leakage point to carry out hot-melt adhesive paste to pipeline after cleaning pipeline with styrofoam.
4.8.1 hot melting process
Hot melting process flow
Fuse machine is adjusted to indicate insertion depth → carry out hot-melt adhesive paste → pipe on hot melt state → cleaning pipeline → pipeline Road cools down
4.8.2 hot melt operation:By the tubing cleaned and pipe fitting while insert on the soldering tip of heater and heated.Insertion When not rotate, insertion process can not be long, should be completed within 3 seconds.Tubing and pipe fitting must insert in place.After heating, Tubing and pipe fitting are at the uniform velocity taken out from heating soldering tip simultaneously, taking-up action can not be too fast and rotates and should be completed in 3 seconds.It is right Connect;After tubing and pipe fitting are removed from heating soldering tip, mating operation should be completed within 5 seconds, tubing and pipe fitting are held along axis It is plugged together, tubing and pipe fitting can not relatively rotate during socket joint.Should be coaxial between tubing and pipe fitting in the time holding, It together with tubing should be fully engaged with pipe fitting, must not move, less allow to rotate.Weld assembly must not be applied within cool time Add external force, be also not available for next step assembly working, necessarily allow it to keep coaxial.After the completion of last solder joint of system, one Hour within must not pressure testing, pressure test can be carried out in accordance with regulations after one hour according to specific needs.
4.9 heating operations are debugged
After heating system installs, the heating system water pressure test it is qualified and rinse after carry out heating trial operation, protect Heating system operational excellence is demonstrate,proved, reaches Design Requirement Drawing and specification regulation.It is logical warm by the high and low area of system, by other branch roads Control valve is closed, and opens system peak vent valve.The backwater tube valve at main entrance is opened, allows the backwater of outer net to enter system System, is so easy to the exhaust of system, and vent valve is closed after full water, opens the water supply tube valve at main entrance, makes hot water in system It is interior to form circulation, check whole system is whether there is at leak.Winter is logical warm should to open valve when just starting smaller, and water intake velocity is slow A bit, prevent that pipeline is shock heating and damages pipeline, be again all turned on valve after pipeline preheating.Such as a certain room joint leak, Ying Li I.e. the branch road valve of leakage point places under repair on switching off diversity hydrophone, repairing finish pressure test it is qualified after carry out it is logical warm.
4.10 debugging led to after warming up
The main purpose of logical warm post debugging is each room is reached design temperature, and to system, far and near each loop should reach It is uniform to flow equilibrium, i.e., each cold and hot degree of minor loop.Such as nearest loop overheat, end loop is not warm or heat is inadequate, can It is adjusted with the valve of each branch road on water collecting and diversifying device, as top layer is not warm, bottom overheat, can adjust diversity water in bottom pipe well Device supplies backwater valve, is finally reached design requirement, and temperature should test the temperature and pressure of heating agent at consumer heat inlet in debugging process Whether power meets design requirement.

Claims (9)

1. a kind of round-the-clock radiation temperature-controlling system, including coil pipe (4), reinforcing bar are clapped, it is characterised in that:Coil pipe (4) is fixed on reinforcing bar In bat;Coil pipe and reinforcing bar, which are clapped, to be embedded in concrete floor;Expose concrete floor in the both ends of coil pipe.
A kind of 2. round-the-clock radiation temperature-controlling system according to claim 1, it is characterised in that:Described reinforcing bar, which is clapped, is located at disk Manage above (4), and coil pipe is clapped with nylon binding strap and reinforcing bar every 30 centimetres and fixed.
A kind of 3. round-the-clock radiation temperature-controlling system according to claim 1, it is characterised in that:The concrete floor is by upper Layer bar-mat reinforcement (7), concrete (6) and lower floor's bar-mat reinforcement (5) three parts composition;The coil pipe (4) and reinforcing bar, which are clapped, is fixed on lower floor The side close with concrete (6) on bar-mat reinforcement (5).
A kind of 4. round-the-clock radiation temperature-controlling system according to claim 1, it is characterised in that:The reinforcing bar clap be by The spacing that steel bar meter is fabricated to is 200mm single-layer bidirectional mesh sheet, its specification be 4000mm × 3800mm or 4000mm × 3000mm。
A kind of 5. round-the-clock radiation temperature-controlling system according to claim 1, it is characterised in that:The material of the coil pipe (4) For polymer or composite;Coil pipe (4) is after mould shape in the horizontal plane into the shape of " S " word or " returning " word;Pipeline Spacing is 200 or 400 millimeters;Coil pipe (4) internal diameter is 18 millimeters, and external diameter is 20 millimeters;The diameter of coil pipe (4) knee circular arc is big In 8 times of outer diameter tube.
A kind of 6. round-the-clock radiation temperature-controlling system according to claim 5, it is characterised in that:Described mould is by band steel (2) it is welded and is made on steel plate (1) with angle steel (3);Angle steel (3) section is angular;Angle steel (3) is arranged in into box formation On steel plate (1);The band steel (2) is that section is rectangular steel;Into semicircle after band steel (2) is processed, angle steel is arranged in (3) square formation mutually non-conterminous both sides, and band steel (2) both ends are alignd with angle steel (3).
A kind of 7. round-the-clock radiation temperature-controlling system according to claim 1, it is characterised in that:The coil pipe exposes concrete The both ends of floor are respectively water inlet and delivery port, and the water inlet and delivery port are connected with water treatment component.
A kind of 8. round-the-clock radiation temperature-controlling system according to claim 7, it is characterised in that:The water treatment component bag Include:Filter (8), water inlet check valve (9), pressure gauge (10), safety valve (11), water knockout drum (12), delivery port check valve (13), water collector (14);The water inlet sequentially with filter (8), water inlet check valve (9), pressure gauge (10), safety valve (11), water knockout drum (12) is connected;The delivery port is sequentially connected with delivery port check valve (13), water collector (14).
A kind of 9. round-the-clock radiation temperature-controlling system according to claim 8, it is characterised in that:The water inlet check valve (9) and the inside nominal diameter of delivery port check valve (13) is more than the external diameter of coil pipe (4) and less than 1.1 times of coil pipe (4) external diameter;It is described The highest allowable pressure of safety valve (11) is more than 2 times of coil pipe (4) operating pressure;The specified range of the pressure gauge (10) is more than 1.5 times of coil pipe (4) operating pressure.
CN201720394449.XU 2017-04-16 2017-04-16 A kind of round-the-clock ceiling radiation temperature-controlling system Expired - Fee Related CN206817658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720394449.XU CN206817658U (en) 2017-04-16 2017-04-16 A kind of round-the-clock ceiling radiation temperature-controlling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720394449.XU CN206817658U (en) 2017-04-16 2017-04-16 A kind of round-the-clock ceiling radiation temperature-controlling system

Publications (1)

Publication Number Publication Date
CN206817658U true CN206817658U (en) 2017-12-29

Family

ID=60752661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720394449.XU Expired - Fee Related CN206817658U (en) 2017-04-16 2017-04-16 A kind of round-the-clock ceiling radiation temperature-controlling system

Country Status (1)

Country Link
CN (1) CN206817658U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339318A (en) * 2018-08-28 2019-02-15 广城建设集团有限公司 A kind of building deck construction
CN109386087A (en) * 2018-12-21 2019-02-26 潘仕高 Prefabricated hollow round pipe cast-in-place concrete building floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339318A (en) * 2018-08-28 2019-02-15 广城建设集团有限公司 A kind of building deck construction
CN109386087A (en) * 2018-12-21 2019-02-26 潘仕高 Prefabricated hollow round pipe cast-in-place concrete building floor

Similar Documents

Publication Publication Date Title
JP5067730B2 (en) Earth / Solar system
PL183921B1 (en) Power supply equipment for buildings
CN106120854B (en) A kind of underground pipe gallery
JP2011190957A (en) Improvement of earth solar system (underground heat recovery pipe system)
CN101586862A (en) Temperature control system of communication machinery room
JP2012172966A (en) Earth solar zero-energy house
CN104975654A (en) Building intelligent composite outer heat insulation temperature regulating system
AU2018408667B2 (en) Thin-shell heat exchanger, subway waste heat source heat pump system and methods
CN206817658U (en) A kind of round-the-clock ceiling radiation temperature-controlling system
CN206973923U (en) A kind of heating and refrigeration all-in-one
CN106482265A (en) A kind of ground energy pipe laying constant temperature system of efficient energy-saving and emission-reducing
JP6087497B2 (en) Ground heat utilization system using garage
JP2011102676A (en) Air conditioning system using underground water heat
JP2005024140A (en) Air conditioning system of building, and air conditioning/hot-water supply system of building
CN100513928C (en) Reinforced heat exchange method and apparatus for geothermal pump under ground heat exchanger
CN207751094U (en) A kind of air-conditioning system carrying out load rating processing using natural energy resources
CN206222570U (en) Earth-source hot-pump system based on drainage and anti-float basis
JP4970817B2 (en) Indoor ventilation system with heat storage function for waste heat and temperature adjustment function for outside air
CN201407768Y (en) Ground source heat pump with civil air defense as cold source or heat source
CN106718358A (en) A kind of temperature canopy and its environmental control system
CN107338786B (en) Ground heating type heating-based soil body surface layer freezing prevention and control system
CN208329313U (en) The ceiling heating refrigeration structure being mounted on the downside of floor
CN207317053U (en) A kind of building and heating radiating system
KR101337353B1 (en) Heat pump system using water for irrigation of golf course reservoir
RU119369U1 (en) DEVICE FOR PREVENTING THE FORMATION OF SNOW, NALEDI AND IZKILIK ON ROOFS OF BUILDINGS AND CONSTRUCTIONS

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

CF01 Termination of patent right due to non-payment of annual fee