CN206810863U - The high-efficiency water cooling device of cold bed in a kind of high speed - Google Patents

The high-efficiency water cooling device of cold bed in a kind of high speed Download PDF

Info

Publication number
CN206810863U
CN206810863U CN201720659262.8U CN201720659262U CN206810863U CN 206810863 U CN206810863 U CN 206810863U CN 201720659262 U CN201720659262 U CN 201720659262U CN 206810863 U CN206810863 U CN 206810863U
Authority
CN
China
Prior art keywords
water
hollow shaft
structure beam
rotary unit
pylon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720659262.8U
Other languages
Chinese (zh)
Inventor
赵道成
吴建荣
秦志井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chste (beijing) Shougao Metallurgical Engineering & Equipment Co Ltd
Original Assignee
Chste (beijing) Shougao Metallurgical Engineering & Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chste (beijing) Shougao Metallurgical Engineering & Equipment Co Ltd filed Critical Chste (beijing) Shougao Metallurgical Engineering & Equipment Co Ltd
Priority to CN201720659262.8U priority Critical patent/CN206810863U/en
Application granted granted Critical
Publication of CN206810863U publication Critical patent/CN206810863U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermotherapy And Cooling Therapy Devices (AREA)

Abstract

The utility model provides a kind of high-efficiency water cooling device of cold bed in high speed, it is characterised in that:The driver element formed with two sets of motors and reductor, often set driver element connects and drives its corresponding main shaft rotation, main shaft is made up of several rotary units, each rotary unit is made up of a hollow shaft and several guide grooves being set in outside hollow shaft, it is connected with each other using several taper bolts between each two rotary unit, is connected between the hollow shaft of each two rotary unit with bellows;The water through structure beam of two groups of rectangular square tube compositions is installed, water through structure beam is connected with cooling water pipeline, and respective pylon, the corresponding hollow axis connection of pylon are connected respectively below every group of water through structure beam on support.The utility model improves causes pylon to conduct heating problem in continuous production;What is cooled down is more efficient, stabilizes the performance of product.

Description

The high-efficiency water cooling device of cold bed in a kind of high speed
Technical field
The utility model belongs to a kind of a kind of high-efficiency water cooling device equipment of cold bed on steel rolling equipment, more particularly to high speed.
Background technology
As shown in figure 1, upper cold bed device is the end-equipment of high speed feeding system at a high speed, the effect of the device is to enter Finished product (generally a diameter of 8mm-30mm) bar to high speed feeding system is sent into the guide groove 11 of rotary unit 1, rotation Turning unit 1 includes hollow shaft 10 and the guide groove 11 being set in outside hollow shaft 10.Rotated by rotary unit 1 and be thrown into finished product bar Cold bed 100.
As shown in Figure 1 and Figure 2, the transmission parts of the device are mounted on the square structure beam 3' at head and the tail both ends, by motor Reductor forms.The square structure beam 3' of the device is connected by the 6m of pylon 2 and every section of rotary unit 1 hollow shafts 10 grown Connect, motor reducer driving hollow shaft 10 and rotary unit 1 rotate;Conventional hoses 4' is used between hollow shaft 10 and hollow shaft 10 Connection, flexible pipe 4' water flowings radiating.
The shortcomings that prior art, is:Pylon 2 is easily caused in continuous production to generate heat, and is unfavorable for radiating;Hollow shaft The flexible pipe 4' of 10 connections bends difficulty in narrow space, should not install, and flexible pipe 4' internal diameters are big compared with flow is carefully limited It is small to be unfavorable for water flowing radiating.
Utility model content
The utility model provides a kind of high-efficiency water cooling device of cold bed in high speed, and the purpose is to solve existing for prior art Shortcoming, improve the heat dispersal situations of upper cold bed at a high speed.
Technical scheme is used by the utility model solves its technical problem:
The high-efficiency water cooling device of cold bed in a kind of high speed, it is characterised in that:The drive formed with two sets of motors and reductor Moving cell, often cover driver element and connect and drive its corresponding main shaft rotation, main shaft is made up of several rotary units, each rotation Unit is made up of a hollow shaft and several guide grooves being set in outside hollow shaft, and several circular cones are used between each two rotary unit Pin is connected with each other, and is connected between the hollow shaft of each two rotary unit with bellows;Two groups of rectangular square tube compositions are installed on support Water through structure beam, water through structure beam is connected with cooling water pipeline, and respective hanging is connected respectively below every group of water through structure beam Frame, the corresponding hollow axis connection of pylon.
It is of the present utility model to be beneficial in that:
The utility model employs the water flowing beam of double square, improves and causes pylon conduction heating to ask in continuous production Topic;Hollow shaft connecting tube employs the bigger bellows of internal diameter and adds water-carrying capacity and then improve the radiating of main shaft and guide groove, What is cooled down is more efficient, stabilizes the performance of product.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is prior art cross-section structure;
Fig. 2 is prior art rotary unit junction structure chart;
Fig. 3 is the utility model complete machine structure figure;
Fig. 4 is the utility model side view;
Fig. 5 is the utility model rotary unit junction structure chart.
Embodiment
In order to illustrate more clearly of the technical solution of the utility model, the required accompanying drawing used in description will be made below Simply introduce, it should be apparent that, drawings in the following description are only some embodiments of the utility model, for this area For those of ordinary skill, on the premise of not paying creative work, other implement can also be obtained according to these accompanying drawings Example.
As shown in Fig. 3, Fig. 4, Fig. 5:
Cold bed device is the end-equipment of high speed feeding system in high speed, and the effect of the device is to will go into high speed feeding Finished product (generally a diameter of 8mm-30mm) bar of system is sent into the guide groove 11 of rotary unit 1, is filled by revolving bed Put 1 rotation and finished product bar is thrown into cold bed 100.
The device includes water through structure beam 3, support 200, pylon 3, the rotary unit 1, two of two groups of rectangular square tube compositions Cover the driver element that motor 300 and reductor 400 form.Driver element is arranged on the water through structure beam 3 at head and the tail both ends, is often covered Driver element is made up of two motors 300, reductor 400 and air-actuated band brake, drive shaft rotation.
The water through structure beam 3 of two groups of rectangular square tube compositions, the water through structure of every group of rectangular square tube composition are installed on support 200 The lower section of beam 3 connects the pylon 3 of this side respectively, and water through structure beam 3 is connected by cooling water in it with cooling water pipeline, connected The heating of pylon 3 is taken away by the cooling water of water through structure beam 3 during continuous production.
Cold bed device includes two sets of main shafts altogether in high speed, often covers main shaft and forms (120m cold beds matching by multiple rotary units 1 High speed on cold bed device need 20 sets of 6m rotary unit 1).The length of each rotary unit 1 is 6m, by 5.6m sky The guide groove 11 of mandrel 10 and 12 470mm length forms, be connected with each other between each two rotary unit 1 using 4 taper bolts 5 and Into.Connected between the hollow shaft 10 of each two rotary unit 1 using bellows 4, it is primarily due to than identical using bellows 4 The inner diameter of specification is big, and identical time internal ratio conventional hoses take away more heats, and cooling effect is more preferable.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.To the upper of the disclosed embodiments State bright, professional and technical personnel in the field is realized or using the utility model.A variety of modifications pair to these embodiments It will be apparent for those skilled in the art, generic principles defined herein can not depart from this reality In the case of with new spirit or scope, realize in other embodiments.Therefore, the utility model is not intended to be limited to this These embodiments shown in text, and it is to fit to the most wide scope consistent with principles disclosed herein and features of novelty.

Claims (1)

  1. A kind of 1. high-efficiency water cooling device of cold bed in high speed, it is characterised in that:The driving formed with two sets of motors and reductor Unit, often cover driver element and connect and drive its corresponding main shaft rotation, main shaft is made up of several rotary units, and each rotation is single Member is made up of a hollow shaft and several guide grooves being set in outside hollow shaft, and several taper bolts are used between each two rotary unit It is connected with each other, is connected between the hollow shaft of each two rotary unit with bellows;Install what two groups of rectangular square tubes formed on support Water through structure beam, water through structure beam are connected with cooling water pipeline, and respective pylon is connected respectively below every group of water through structure beam, The corresponding hollow axis connection of pylon.
CN201720659262.8U 2017-06-07 2017-06-07 The high-efficiency water cooling device of cold bed in a kind of high speed Expired - Fee Related CN206810863U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720659262.8U CN206810863U (en) 2017-06-07 2017-06-07 The high-efficiency water cooling device of cold bed in a kind of high speed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720659262.8U CN206810863U (en) 2017-06-07 2017-06-07 The high-efficiency water cooling device of cold bed in a kind of high speed

Publications (1)

Publication Number Publication Date
CN206810863U true CN206810863U (en) 2017-12-29

Family

ID=60759196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720659262.8U Expired - Fee Related CN206810863U (en) 2017-06-07 2017-06-07 The high-efficiency water cooling device of cold bed in a kind of high speed

Country Status (1)

Country Link
CN (1) CN206810863U (en)

Similar Documents

Publication Publication Date Title
CN201997581U (en) Pipe bender
CN102553988A (en) Pipe bending machine
CN103033079A (en) Drawing-bulging skew type fin heat exchanger
CN102626734A (en) Spiral flat pipe roll forming machine for heat exchanging equipment
CN206810863U (en) The high-efficiency water cooling device of cold bed in a kind of high speed
CN111692898B (en) Stainless steel sleeve heat exchanger
CN206767332U (en) A kind of high intensity cable shafts with fin radiating
CN206373196U (en) A kind of bending header structure on bending machine
CN204597370U (en) The running gear of the horizontal double bundle conductor conductor spacer of 220kV can be crossed
CN206810862U (en) The Fast Installation structure of cold bed device in a kind of high speed
CN212962943U (en) Stainless steel sleeve heat exchanger with stroke adjusting mechanism
CN102562449B (en) Stepless blade pitch transformation system of medium and small power wind-driven generator
CN209101885U (en) A kind of large heat exchanger heat exchanger tube skirt device
CN201579311U (en) Copper pipe straightener
CN203083415U (en) Tension-expansion-skew-type finned heat exchanger
CN209961026U (en) Efficient ground source heat pump heat exchanger and spiral copper pipe processing equipment
CN209157203U (en) A kind of perforating device of stainless steel pipes
CN208592290U (en) A kind of turbulated tube process equipment
CN208466883U (en) A kind of stretching device of copper pipe threeway
CN202377507U (en) Interconvertible structure for drive roller of two-flow continuous casting machine
CN108747966B (en) Installation tool for sheath of warm air water pipe
CN202381256U (en) Stepless propeller pitch conversion system of middle/small power wind-driven generator
CN206366611U (en) A kind of new-type of hose buckle machine
CN212962942U (en) Stainless steel sleeve heat exchanger with heat conduction structure
CN109387090B (en) Spiral condensing heat exchanger and heat exchange method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20210607