CN206801020U - Rubber waterstop protection clamp - Google Patents

Rubber waterstop protection clamp Download PDF

Info

Publication number
CN206801020U
CN206801020U CN201720524958.XU CN201720524958U CN206801020U CN 206801020 U CN206801020 U CN 206801020U CN 201720524958 U CN201720524958 U CN 201720524958U CN 206801020 U CN206801020 U CN 206801020U
Authority
CN
China
Prior art keywords
fastening band
rubber fastening
outer clamping
rubber
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720524958.XU
Other languages
Chinese (zh)
Inventor
方自强
柳晓琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201720524958.XU priority Critical patent/CN206801020U/en
Application granted granted Critical
Publication of CN206801020U publication Critical patent/CN206801020U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses the technique relates to concrete wall construction specifically is rubber waterstop protection anchor clamps with rubber waterstop protection equipment technical field. The one end of rubber waterstop is fixed in the concrete wall, and the other end is unsettled, and protection anchor clamps include: the two outer clamping templates are respectively arranged on the upper end face and the lower end face of the suspended end of the rubber water stop belt and are symmetrically distributed; the fixture framework is provided with an opening at one end, and the rubber water stop and the two outer clamping templates are sleeved in the fixture framework. The clamp is matched with the template to realize the fixed shaping; the clamp is simple to operate by workers, convenient and quick, and has less work load; the clamp can be reused and is simple to remove, and a person can operate the clamp, so that the clamp is green and environment-friendly.

Description

A kind of rubber fastening band shield jig
Technical field
The utility model technology is related to concrete walls construction rubber fastening band protection equipment technical field, specially rubber Waterstop shield jig.
Background technology
Because being the concrete structure for first completing rubber fastening band half range during rubber water-proof belt construction, another half range rubber is reserved Waterstop, then another half range rubber water-proof region concrete structure of constructing, construct later stage concrete structure when exist reinforced bar engineering, The processes such as form work engineering, easily the half range rubber fastening band thrown away is caused to damage in work progress, difficult, effect is repaired after damage Fruit is poor, so as to cause the later stage position leak, therefore needs to carry out finished product protection to rubber fastening band in this stage.
However, in the prior art, the mode to rubber fastening band protection without fixation, also without special instrument to rubber Waterstop finished product is protected.Usually rubber fastening band is protected by the way of strengthening to workers' education, but adopted With this protected mode, still can more or less cause to damage in practice of construction.It is difficult to by management and the education to worker Reach protection purpose, effect is poor.
In the prior art, also a kind of protected mode of rubber fastening band is to build protection wall by laying bricks or stones, i.e., in rubber fastening band Build protection wall by laying bricks or stones in both sides.But this kind of protected mode is cumbersome, quantities is big;And need to tear open when pouring later stage concrete Except when quantities it is big, produce a large amount of building wastes.
Based on above description, need a kind of rubber fastening band shield jig badly, stopped with solving rubber present in prior art After water belt construction, fragile rubber fastening band during construction in later period reinforced bar engineering, it is not easy to protect, later stage process is dismantled when constructing The problem of inconvenient.
Utility model content
To solve the problems, such as the above, the purpose of this utility model is to provide a kind of rubber fastening band shield jig, uses The fixture can realize that regularization is fixed, and operation is simple, convenient and swift, and quantities is few, can re-use, letter during dismounting It is single, it is green.
To achieve the above object, the utility model adopts the following technical scheme that:
A kind of rubber fastening band shield jig, one end of the rubber fastening band are fixed in concrete walls, and the other end hangs Sky, the shield jig include:
Two outer clamping plates, two outer clamping plates are separately positioned in the upper and lower ends face of rubber fastening band free end, and Two outer clamping plates are distributed in symmetry shape;
Fixture skeleton, fixture skeleton one end open, rubber fastening band and two outer clamping plates are enclosed in it.
As preferred, inwall and two outer clamping plates of the fixture skeleton away from openend are interference fit.
Preferably, the fixture skeleton coordinates close to the inwall of openend and two outer clamping plates for gap.
As preferred, the openend of the fixture skeleton is set in splayed configuration.
As preferred, the length of the outer clamping plate is more than the length of rubber fastening band exposed parts.
As preferred, antirust paint is painted with the outer wall of the fixture skeleton.
As preferred, the fixture skeleton is made using diameter 16mm spiral.
Compared with prior art, the rubber fastening band shield jig that the application provides has the characteristics that and beneficial effect:
One end of rubber fastening band provided by the utility model is fixed in concrete walls, and the other end is hanging, protective folder Tool includes:Two outer clamping plates, two outer clamping plates are separately positioned in the upper and lower ends face of rubber fastening band free end, and two Individual outer clamping plate is distributed in symmetry shape;Fixture skeleton, fixture skeleton one end open, by rubber fastening band and two outer clamping plate sets In it.1. existing rubber fastening band protection is poor without the mode of fixation, effect;Template is coordinated to realize using this fixture Regularization is fixed.2. the mode of existing rubber fastening band protection such as builds protection wall by laying bricks or stones, cumbersome, quantities is big;Use this Fixture operation is simple, convenient and swift, and quantities is few.3. existing rubber fastening band protected mode is pouring later stage concrete When need remove when quantities it is big, produce a large amount of building wastes;It can be re-used using this fixture, it is simple during dismounting, one Personnel be it is operable, it is green.
Brief description of the drawings
Fig. 1 is the installation diagram of rubber fastening band provided by the utility model and shield jig.
Reference,
1- concrete walls;2- rubber fastening bands;The outer clamping plates of 3-;4- fixture skeletons.
Embodiment
The utility model is described in further detail below by specific examples of the implementation combination accompanying drawing.
As shown in figure 1, a kind of rubber fastening band shield jig provided by the utility model, the one of the rubber fastening band 2 End is fixed in concrete walls 1, and the other end is hanging, and the shield jig includes:
Two outer clamping plates 3, two outer clamping plates 3 are separately positioned in the upper and lower ends face of the free end of rubber fastening band 2, And two outer clamping plates 3 are distributed in symmetry shape;
Fixture skeleton 4, the one end open of fixture skeleton 4, rubber fastening band 2 and two outer clamping plates 3 are enclosed in it.
In the present embodiment, preferably, inwall and two outer clampings of the fixture skeleton 4 away from openend Plate 3 is interference fit.Overall dimensions omit after i.e. the inside dimension of fixture skeleton 4 clamping plate 3 outer than two clamps rubber fastening band 2 It is small, it can be ensured that to clamp.
In the present embodiment, preferably, the fixture skeleton 4 is close to the inwall of openend and two outer clampings Plate 3 coordinates for gap.The openend of the fixture skeleton 4 is set in splayed configuration.The termination of fixture skeleton 4 is set just using splayed configuration In fixed installation, without accurate alignment.
In the present embodiment, preferably, 3 length of the outer clamping plate are more than the exposed parts of rubber fastening band 2 Length.
In the present embodiment, preferably, antirust paint is painted with the outer wall of the fixture skeleton 4.Fixture skeleton 4 outside brushing antirust paints, it is attractive and durable.
In the present embodiment, preferably, the fixture skeleton 4 is made using diameter 16mm spiral.But It is not limited thereto.
It is the construction technology of shield jig below:
Measuring the outer clamping plate 3 of 2 sizes of half range rubber fastening band → making → 4 → passed examination of making fixture skeleton input makes With
1. measure the size of half range rubber fastening band 2:Measure the length of rubber fastening band 2 thrown away, width.
2. make outer clamping plate 3:Outer clamping plate 3, outer clamping are made according to the length of rubber fastening band 2 measured, width The width of plate 3 is bigger 20mm than the width of rubber fastening band 2, and length consideration is easy to operate, by mono- section of 1.2m, in US undersize position root Set according to actual size.
3. make fixture skeleton 4:Fixture bone is made according to the width of rubber fastening band 2 and the width of outer clamping plate 3 measured Frame 4, the openend inside dimension b+40mm of fixture skeleton 4, away from openend inside dimension b-5mm, (b stops fixture skeleton 4 for rubber Clamp size after template in water band both sides);The entire length of fixture skeleton 4 is L+70mm(L is the length of rubber fastening band 2).
4. come into operation after passed examination:Fixture skeleton 4 completes after one, first carries out field test, it is ensured that fixture Outer clamping plate 3 can be clamped, in high volume makes, comes into operation after acceptance(check).
This programme also has the advantages that:
1. this programme is simple to operate, worker is readily appreciated that, installs, removes conveniently.
2. this programme can use the common material clout in scene to make, material is saved;It is repeatable to utilize, it is green.
3. this programme is fixed using template, rebar clips, which clamp, can avoid the common materials such as reinforcing bar, nail damage rubber from stopping Water band, it is ensured that rubber fastening band construction quality.
4. this programme uses the production method of regularization component, the finished product protection of rubber fastening band can be standardized, be marked Standardization.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.

Claims (7)

  1. A kind of 1. rubber fastening band shield jig, it is characterised in that one end of the rubber fastening band is fixed in concrete walls, The other end is hanging, and the shield jig includes:
    Two outer clamping plates, two outer clamping plates are separately positioned in the upper and lower ends face of rubber fastening band free end, and two Outer clamping plate is distributed in symmetry shape;
    Fixture skeleton, fixture skeleton one end open, rubber fastening band and two outer clamping plates are enclosed in it.
  2. 2. rubber fastening band shield jig according to claim 1, it is characterised in that the fixture skeleton is away from openend Inwall and two outer clamping plates be interference fit.
  3. 3. rubber fastening band shield jig according to claim 1, it is characterised in that the fixture skeleton is close to openend Inwall and two outer clamping plates be gap coordinate.
  4. 4. rubber fastening band shield jig according to claim 3, it is characterised in that the openend of the fixture skeleton is in Splayed configuration is set.
  5. 5. rubber fastening band shield jig according to claim 1, it is characterised in that the length of the outer clamping plate is more than The length of rubber fastening band exposed parts.
  6. 6. rubber fastening band shield jig according to claim 1, it is characterised in that applied on the outer wall of the fixture skeleton Brushed with antirust paint.
  7. 7. rubber fastening band shield jig according to claim 1, it is characterised in that the fixture skeleton uses diameter 16mm spiral makes.
CN201720524958.XU 2017-05-12 2017-05-12 Rubber waterstop protection clamp Expired - Fee Related CN206801020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720524958.XU CN206801020U (en) 2017-05-12 2017-05-12 Rubber waterstop protection clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720524958.XU CN206801020U (en) 2017-05-12 2017-05-12 Rubber waterstop protection clamp

Publications (1)

Publication Number Publication Date
CN206801020U true CN206801020U (en) 2017-12-26

Family

ID=60740407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720524958.XU Expired - Fee Related CN206801020U (en) 2017-05-12 2017-05-12 Rubber waterstop protection clamp

Country Status (1)

Country Link
CN (1) CN206801020U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442545A (en) * 2018-05-22 2018-08-24 中国建筑第二工程局有限公司 Middle-buried rubber waterstop clamp, clamping system and construction method thereof
CN113404092A (en) * 2021-07-21 2021-09-17 中国二十二冶集团有限公司 Protection device for externally-attached water stop for deformation joint of pipe gallery bottom plate and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442545A (en) * 2018-05-22 2018-08-24 中国建筑第二工程局有限公司 Middle-buried rubber waterstop clamp, clamping system and construction method thereof
CN108442545B (en) * 2018-05-22 2024-01-23 中国建筑第二工程局有限公司 Middle-buried rubber water stop clamp, clamping system and construction method thereof
CN113404092A (en) * 2021-07-21 2021-09-17 中国二十二冶集团有限公司 Protection device for externally-attached water stop for deformation joint of pipe gallery bottom plate and construction method
CN113404092B (en) * 2021-07-21 2024-05-14 中国二十二冶集团有限公司 Protection device for external-attaching type water stop belt of deformation joint of bottom plate of pipe gallery and construction method

Similar Documents

Publication Publication Date Title
CN206801020U (en) Rubber waterstop protection clamp
CN103061504A (en) Concrete board pipeline installation reserved hole construction mould and construction method
CN208518217U (en) Vertical positioning rib positioning device for silo slip form construction
CN206054455U (en) A kind of new electric hold hoop
CN203050108U (en) Concrete slab pipe installation reserved hole construction mold
CN204368644U (en) A kind of paint can
CN211278352U (en) Portable toolbox is used in electromechanical device maintenance
CN211007746U (en) Quick reinforcing apparatus of pole
CN207685853U (en) Anti-floating is exempted to tear type concrete equipment basis hole to be provided template open
CN206903223U (en) A kind of building construction formwork Multifunctional pull rod device
CN205426603U (en) Experiment mould of preparation rubber granule concrete sample
CN208687122U (en) A kind of reusable pipe sleeve fixes device with one heart
CN210508459U (en) Anti-pollution protection device for reinforcing steel bar
CN204448388U (en) Component link sprays paint radical occlusion device
CN206220513U (en) Three sections of Quick Release sealing up screw that a kind of two ends can recycle
CN109457997A (en) A kind of constructing device and operating method of the fragmentary concrete of fast pouring
CN206571183U (en) A kind of post angle protection component for being applicable different size concrete column
CN204050726U (en) Fixed connector between framework and safety belt during work high above the ground
CN208220203U (en) A kind of masonry ring beam template bracing means
CN206917268U (en) It is a kind of quickly to prevent concreting from blocking water power pipe joint arrangement
CN206848273U (en) A kind of concrete mix setting time automatic sieving testing machine
CN206554529U (en) One kind faces side opening protective device
CN205445132U (en) Curtain wall penel
CN206053322U (en) One kind hangs die device
CN203610560U (en) Simple tool for bending reinforcing steel bar

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20180512