CN206800279U - A kind of Bridge guardrail high-efficiency cleaning equipment - Google Patents
A kind of Bridge guardrail high-efficiency cleaning equipment Download PDFInfo
- Publication number
- CN206800279U CN206800279U CN201720290804.9U CN201720290804U CN206800279U CN 206800279 U CN206800279 U CN 206800279U CN 201720290804 U CN201720290804 U CN 201720290804U CN 206800279 U CN206800279 U CN 206800279U
- Authority
- CN
- China
- Prior art keywords
- clamping plate
- welded
- hand member
- plate
- bridge guardrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
It the utility model is related to a kind of cleaning equipment, more particularly to a kind of Bridge guardrail high-efficiency cleaning equipment.The technical problems to be solved in the utility model is to provide the Bridge guardrail high-efficiency cleaning equipment that a kind of cleaning efficiency is high, time saving and energy saving.In order to solve the above-mentioned technical problem, the utility model provides such a Bridge guardrail high-efficiency cleaning equipment, includes bottom plate, left frame, head rod, mobile device, installing plate, first clamping plate, second clamping plate, foam-rubber cushion, water tank, water pump, the first water pipe, funnel etc.;Bottom plate top left is welded with left frame, and top is welded with head rod on the right side of left frame, and head rod right-hand member is welded with mobile device, and mobile device right-hand member is welded with installing plate, and installing plate right-hand member rotary type is connected with first clamping plate and second clamping plate.The utility model makes the water in water tank enter the second water pipe by the first water pipe by controlling pump working, and then entering the first branch pipe and the second branch pipe makes foam-rubber cushion wetted.
Description
Technical field
It the utility model is related to a kind of cleaning equipment, more particularly to a kind of Bridge guardrail high-efficiency cleaning equipment.
Background technology
Bridge guardrail refers to be arranged at the guardrail on bridge.Its purpose is to prevent errant vehicle from running off outside bridge, have
Prevent vehicle from breaking through, under wear, cross bridge and beautify bridge construction function.
Bridge belongs to an essential part in traffic, and Bridge guardrail is then a part for bridge, at present to bridge
The cleaning of beam guardrail is mostly artificial cleaning, and artificial cleaning has the shortcomings that cleaning efficiency is low, wastes time and energy, therefore it is a kind of to need research and development badly
High, the time saving and energy saving Bridge guardrail high-efficiency cleaning equipment of cleaning efficiency.
Utility model content
(1) technical problems to be solved
The utility model is mostly artificial cleaning to Bridge guardrail cleaning at present to overcome, and artificial cleaning has cleaning efficiency
Low, the shortcomings that wasting time and energy, the technical problems to be solved in the utility model is to provide the bridge that a kind of cleaning efficiency is high, time saving and energy saving
Beam guardrail high-efficiency cleaning equipment.
(2) technical scheme
In order to solve the above-mentioned technical problem, the utility model provides such a Bridge guardrail high-efficiency cleaning equipment, bag
Included bottom plate, left frame, head rod, mobile device, installing plate, first clamping plate, second clamping plate, foam-rubber cushion, water tank, water pump,
First water pipe, funnel, the second water pipe, the first branch pipe, the second branch pipe, wheel and spring, bottom plate top left are welded with left frame, left
Top is welded with head rod on the right side of frame, and head rod right-hand member is welded with mobile device, and mobile device right-hand member is welded with peace
Loading board, installing plate right-hand member rotary type are connected with first clamping plate and second clamping plate, and first clamping plate coordinates with second clamping plate, first clamping plate
Be welded with spring between left end and second clamping plate left end, first clamping plate and second clamping plate are provided with cavity, on the inside of first clamping plate with
Through hole is uniformly provided with the inside of second clamping plate, first clamping plate inner side on the inside of second clamping plate with being respectively connected with foam-rubber cushion, bottom plate top right
Side is welded with water tank, and funnel is welded with the left of tank top, water pump is connected with by bolted connection on the right side of tank top,
Water pump left end is connected with the first water pipe by way of flange connection, and the first water pipe left end is passed through and is fixed in water tank, water pump
Top is connected with the second water pipe by way of flange connection, and the second water pipe right-hand member is connected with first by way of flange connection
Branch pipe and the second branch pipe, the first branch pipe right-hand member are passed through and are fixed in first clamping plate, and the second branch pipe right-hand member passes through and is fixed on
On second splint, bottom base plate rotary type is connected with wheel.
Preferably, mobile device includes casing, first bearing seat, screw mandrel, nut, electric rotating machine, guide rail, guide pin bushing and
Two connecting rods, casing inner left wall front side and rear side are connected with first bearing seat, two first axles by bolted connection
Screw mandrel is connected between bearing in bearing by way of interference connection, electric rotating machine is fixed by bolted connection to be connected
Be connected on front side of casing inner left wall, electric rotating machine immediately ahead of first bearing seat, output shaft on electric rotating machine by shaft coupling with
Screw mandrel connects, and screw mandrel is provided with nut, and nut coordinates with screw mandrel, and two first bearing seat right-hand members are welded with guide rail, covered on guide rail
Guide pin bushing is connected to, guide rail coordinates with guide pin bushing, and guide pin bushing is connected with nut, and guide pin bushing right-hand member is welded with the second connecting rod, and casing right wall is provided with
One word hole, the second connecting rod pass through a word hole, and the second connecting rod right-hand member is welded with installing plate.
Preferably, adjusting means is also included, adjusting means includes the first slide rail, the first sliding block, rack, gear,
Two bearing bracket, rotating shaft and rocking bar, are welded with second bearing seat on the downside of left frame, what the bearing in second bearing seat was connected by interference
Mode is connected with rotating shaft, and rotating shaft passes through left frame, and rotating shaft left end is welded with rocking bar, and rotating shaft right-hand member is connected by way of interference connection
There is a gear, bolted mode is passed on left at the top of bottom plate and is connected with the first slide rail, slidingtype is connected with the on the first slide rail
One sliding block, rack, rack and pinion engagement are welded with the first sliding block, and rack right-hand member is welded with head rod.
Preferably, also include device for opening, device for opening include the second slide rail, the second sliding block, push rod, fixed pulley and
Steel wire, front side is connected with the second slide rail by bolted connection among installing plate, and slidingtype is connected with the on the second slide rail
Two sliding blocks, are welded with push rod on the second sliding block, on the right side of installing plate above and below be symmetrically welded with fixed pulley, on the left of first clamping plate
With being welded with steel wire on the left of second clamping plate, the steel wire of upside through upside fixed pulley and by way of welding with the second sliding block
Right-hand member is connected, and downside steel wire is connected through downside fixed pulley and with the second sliding block right-hand member by way of welding.
Preferably, also include pushing hands and rubber blanket, be welded with pushing hands among left frame left side, pushing hands left end is socketed with rubber
Pad.
Preferably, baseboard material is stainless steel.
Preferably, installing plate material is Q235 steel.
Preferably, electric rotating machine is servomotor.
Operation principle:When needing to use this equipment, equipment is pushed into need by the Bridge guardrail cleared up by staff, is led to
Cross funnel and appropriate water is added into water tank, first clamping plate and second clamping plate are opened, promote this equipment, when first clamping plate and the
Second splint is moved to the place of cleaning needed for Bridge guardrail, stops promoting this equipment, unclamps first clamping plate and second clamping plate, and first
Clamping plate and second clamping plate under spring contraction effect by Bridge guardrail to clamping, manual control pump working, pump working is by water
Water in case is pumped to the second water pipe from the first water pipe, and then water is flowed to the first branch pipe and the second branch pipe, the first branch pipe with
Water in second branch pipe enters cavity by flow therethrough to foam-rubber cushion, moistens foam-rubber cushion, at the same time controls mobile device
Work, when mobile device travels forward, installing plate is driven to travel forward, installing plate drives first clamping plate and the sea in second clamping plate
Silk floss pad travels forward, and when mobile device is moved backward, drives installing plate to move backward, and installing plate drives first clamping plate and the second folder
Foam-rubber cushion on plate moves backward, by repeating this process, has reached the effect for cleaning out Bridge guardrail, has worked as Bridge guardrail
When cleaning out, manual control water pump is stopped, and control mobile device is stopped, and first clamping plate and second clamping plate are beaten
Open, artificial pushing equipment, after first clamping plate leaves Bridge guardrail with second clamping plate, stop promoting this equipment, unclamp the first folder
Plate and second clamping plate, first clamping plate are recovered to initial position with second clamping plate under spring contraction effect, are then pushed into next place
Need the place cleaned, to act on repetition, clean it.This device structure Nover practical is strong, can be simply by bridge
Beam guardrail cleans up, and reduces the labor intensity of worker.
Because mobile device includes casing, first bearing seat, screw mandrel, nut, electric rotating machine, guide rail, guide pin bushing and second
Connecting rod, casing inner left wall front side and rear side are connected with first bearing seat, two clutch shaft bearings by bolted connection
Screw mandrel is connected with by way of interference connection between bearing in seat, electric rotating machine is fixedly connected by bolted connection
On front side of casing inner left wall, for electric rotating machine immediately ahead of first bearing seat, the output shaft on electric rotating machine passes through shaft coupling and silk
Bar connects, and screw mandrel is provided with nut, and nut coordinates with screw mandrel, and two first bearing seat right-hand members are welded with guide rail, are socketed on guide rail
There is guide pin bushing, guide rail coordinates with guide pin bushing, and guide pin bushing is connected with nut, and guide pin bushing right-hand member is welded with the second connecting rod, and casing right wall is provided with one
Word hole, the second connecting rod pass through a word hole, and the second connecting rod right-hand member is welded with installing plate, and manual control electric rotating machine turns counterclockwise
Dynamic, electric rotating machine drives screw mandrel to rotate counterclockwise, and nut moves backward on screw mandrel, and then drives the second connecting rod to transport backward
Dynamic, the second connecting rod drives installing plate to move backward, and the foam-rubber cushion between installing plate drive first clamping plate and second clamping plate is backward
Motion, when the second connecting rod is moved on rear side of a word hole, manual control electric rotating machine rotates clockwise, and electric rotating machine drives silk
Bar rotates clockwise, and nut travels forward on screw mandrel, and then drives the second connecting rod to travel forward, and the second connecting rod drives peace
Loading board travels forward, and installing plate drives the foam-rubber cushion between first clamping plate and second clamping plate to travel forward, by constantly carrying out this
Process, the effect of mobile cleaning Bridge guardrail is reached.
Because also including adjusting means, adjusting means includes the first slide rail, the first sliding block, rack, gear, the second axle
Bearing, rotating shaft and rocking bar, are welded with second bearing seat on the downside of left frame, and the bearing in second bearing seat is by way of interference connection
Rotating shaft is connected with, rotating shaft left end is welded with rocking bar, and rotating shaft right-hand member is connected with gear, bottom plate top left by way of interference connection
Side is connected with the first slide rail by bolted connection, and slidingtype is connected with the first sliding block on the first slide rail, on the first sliding block
It is welded with rack, rack and pinion engagement, rack right-hand member is welded with head rod, when Bridge guardrail is higher than first clamping plate and the
During second splint, staff rotates clockwise rocking bar, and rocking bar drives the gear in rotating shaft to rotate clockwise, gear band moving gear to
Upper motion, it is artificial to stop pin rotating rocker when first clamping plate and second clamping plate arrival high together with the Bridge guardrail of required cleaning,
When Bridge guardrail is less than first clamping plate and second clamping plate, staff rotates counterclockwise rocking bar, and rocking bar drives the tooth in rotating shaft
Wheel rotates counterclockwise, and gear band moving gear moves downward, when first clamping plate and second clamping plate arrival are protected with the bridge of required cleaning
It is artificial to stop pin rotating rocker when column is high together, reach the effect that height can be cleaned according to Bridge guardrail height adjusting apparatus.
Because also including device for opening, device for opening includes the second slide rail, the second sliding block, push rod, fixed pulley and steel
Silk, installing plate centre front side are connected with the second slide rail by bolted connection, and slidingtype is connected with second on the second slide rail
Sliding block, is welded with push rod on the second sliding block, on the right side of installing plate above and below be symmetrically welded with fixed pulley, on the left of first clamping plate with
Steel wire is welded with the left of second clamping plate, the steel wire of upside is through upside fixed pulley and right with the second sliding block by way of welding
End connection, downside steel wire are connected through downside fixed pulley and with the second sliding block right-hand member by way of welding, and staff is to the left
Promote push rod, push rod drives the second sliding block to left movement, and the second sliding block drives steel wire to left movement, and then drive first clamping plate with
Second clamping plate makes first clamping plate be opened with second clamping plate, staff promotes this equipment, when first clamping plate and second to left movement
When clamping plate is moved to clear position needed for Bridge guardrail, staff promotes to the right push rod, and first clamping plate is with second clamping plate in bullet
By Bridge guardrail to clamping under spring contraction, device for opening can make equipment use more convenient, reduce the work of worker
Intensity.
Because also including pushing hands and rubber blanket, middle on the left of left frame to be welded with pushing hands, pushing hands left end is socketed with rubber blanket,
Pushing hands facilitates worker to promote this equipment, and rubber blanket improves comfortableness when worker promotes this equipment.
Because baseboard material is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture service life.
Because installing plate material is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device longer.
Because electric rotating machine is servomotor, anti-overload ability is strong, and high speed performance is good, can be precisely controlled its rotating speed.
(3) beneficial effect
The utility model makes the water in water tank enter the second water pipe by the first water pipe by controlling pump working,
And then entering the first branch pipe and the second branch pipe makes foam-rubber cushion wetted, the effect of more preferable cleaning Bridge guardrail is reached, has passed through
Mobile device work is controlled, and then drives the first clamping plate on installing plate to be moved forward and backward with second clamping plate, improves cleaning bridge
The scope of guardrail, the effect for reducing the labor intensity of worker is reached.
Brief description of the drawings
Fig. 1 is main structure diagram of the present utility model.
Fig. 2 is the overlooking the structure diagram of the utility model mobile device.
Fig. 3 is the first main structure diagram of the utility model adjusting means.
Fig. 4 is the main structure diagram of the utility model device for opening.
Fig. 5 is second of main structure diagram of the utility model adjusting means.
Mark in accompanying drawing for:1- bottom plates, the left framves of 2-, 3- head rods, 4- mobile devices, 41- casings, the words of 42- mono-
Hole, 43- first bearing seats, 44- screw mandrels, 45- nuts, 46- electric rotating machines, 47- guide rails, 48- guide pin bushings, the connecting rods of 49- second,
5- installing plates, 6- first clamping plates, 7- second clamping plates, 8- cavitys, 9- through holes, 10- foam-rubber cushions, 11- water tanks, 12- water pumps, 13-
One water pipe, 14- funnels, the water pipes of 15- second, the branch pipes of 16- first, the branch pipes of 17- second, 18- wheels, 19- springs, 20- regulation dresses
Put, the slide rails of 201- first, the sliding blocks of 202- first, 203- racks, 204- gears, 205- second bearing seats, 206- rotating shafts, 207-
Rocking bar, 21- device for opening, the slide rails of 211- second, the sliding blocks of 212- second, 213- push rods, 214- fixed pulleys, 215- steel wires, 22-
Pushing hands, 23- rubber blankets.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of Bridge guardrail high-efficiency cleaning equipment, as Figure 1-5, include bottom plate 1, left frame 2, head rod 3, shifting
Dynamic device 4, installing plate 5, first clamping plate 6, second clamping plate 7, foam-rubber cushion 10, water tank 11, water pump 12, the first water pipe 13, funnel
14th, the second water pipe 15, the first branch pipe 16, the second branch pipe 17, wheel 18 and spring 19, the top left of bottom plate 1 are welded with left frame 2,
The left right side of frame 2 top is welded with head rod 3, and the right-hand member of head rod 3 is welded with mobile device 4, the weldering of the right-hand member of mobile device 4
Installing plate 5 is connected to, the right-hand member rotary type of installing plate 5 is connected with first clamping plate 6 and second clamping plate 7, first clamping plate 6 and second clamping plate 7
Coordinate, spring 19 is welded between the left end of first clamping plate 6 and the left end of second clamping plate 7, first clamping plate 6 is provided with second clamping plate 7
Cavity 8, the inner side of first clamping plate 6 are uniformly provided with through hole 9, the inner side of first clamping plate 6 and the inner side of second clamping plate 7 with the inner side of second clamping plate 7
Foam-rubber cushion 10 is respectively connected with, the top right side of bottom plate 1 is welded with water tank 11, and the top left side of water tank 11 is welded with funnel 14, water tank 11
Top right side is connected with water pump 12 by bolted connection, and the left end of water pump 12 is connected with first by way of flange connection
Water pipe 13, the left end of the first water pipe 13 are passed through and are fixed in water tank 11, and the top of water pump 12 is connected with by way of flange connection
Second water pipe 15, the right-hand member of the second water pipe 15 are connected with the first branch pipe 16 and the second branch pipe 17 by way of flange connection, and first
The right-hand member of branch pipe 16 is passed through and is fixed in first clamping plate 6, and the right-hand member of the second branch pipe 17 is passed through and is fixed in second clamping plate 7, bottom plate 1
Lower rotation formula is connected with wheel 18.
Embodiment 2
A kind of Bridge guardrail high-efficiency cleaning equipment, as Figure 1-5, include bottom plate 1, left frame 2, head rod 3, shifting
Dynamic device 4, installing plate 5, first clamping plate 6, second clamping plate 7, foam-rubber cushion 10, water tank 11, water pump 12, the first water pipe 13, funnel
14th, the second water pipe 15, the first branch pipe 16, the second branch pipe 17, wheel 18 and spring 19, the top left of bottom plate 1 are welded with left frame 2,
The left right side of frame 2 top is welded with head rod 3, and the right-hand member of head rod 3 is welded with mobile device 4, the weldering of the right-hand member of mobile device 4
Installing plate 5 is connected to, the right-hand member rotary type of installing plate 5 is connected with first clamping plate 6 and second clamping plate 7, first clamping plate 6 and second clamping plate 7
Coordinate, spring 19 is welded between the left end of first clamping plate 6 and the left end of second clamping plate 7, first clamping plate 6 is provided with second clamping plate 7
Cavity 8, the inner side of first clamping plate 6 are uniformly provided with through hole 9, the inner side of first clamping plate 6 and the inner side of second clamping plate 7 with the inner side of second clamping plate 7
Foam-rubber cushion 10 is respectively connected with, the top right side of bottom plate 1 is welded with water tank 11, and the top left side of water tank 11 is welded with funnel 14, water tank 11
Top right side is connected with water pump 12 by bolted connection, and the left end of water pump 12 is connected with first by way of flange connection
Water pipe 13, the left end of the first water pipe 13 are passed through and are fixed in water tank 11, and the top of water pump 12 is connected with by way of flange connection
Second water pipe 15, the right-hand member of the second water pipe 15 are connected with the first branch pipe 16 and the second branch pipe 17 by way of flange connection, and first
The right-hand member of branch pipe 16 is passed through and is fixed in first clamping plate 6, and the right-hand member of the second branch pipe 17 is passed through and is fixed in second clamping plate 7, bottom plate 1
Lower rotation formula is connected with wheel 18.
Mobile device 4 include casing 41, first bearing seat 43, screw mandrel 44, nut 45, electric rotating machine 46, guide rail 47,
The connecting rod 49 of guide pin bushing 48 and second, the inner left wall of casing 41 front side and rear side are connected with clutch shaft bearing by bolted connection
Seat 43, screw mandrel 44 is connected with by way of interference connection between the bearing in two first bearing seats 43, electric rotating machine 46 is logical
Cross bolted mode to be fixedly connected on front side of the inner left wall of casing 41, electric rotating machine 46 is in the front of first bearing seat 43, rotation
Output shaft on rotating motor 46 is connected by shaft coupling with screw mandrel 44, and screw mandrel 44 is provided with nut 45, and nut 45 is matched somebody with somebody with screw mandrel 44
Closing, two right-hand members of first bearing seat 43 are welded with guide rail 47, guide pin bushing 48 are socketed with guide rail 47, and guide rail 47 coordinates with guide pin bushing 48,
Guide pin bushing 48 is connected with nut 45, and the right-hand member of guide pin bushing 48 is welded with the second connecting rod 49, and the right wall of casing 41 is provided with a word hole 42, and second
Connecting rod 49 passes through a word hole 42, and the right-hand member of the second connecting rod 49 is welded with installing plate 5.
Embodiment 3
A kind of Bridge guardrail high-efficiency cleaning equipment, as Figure 1-5, include bottom plate 1, left frame 2, head rod 3, shifting
Dynamic device 4, installing plate 5, first clamping plate 6, second clamping plate 7, foam-rubber cushion 10, water tank 11, water pump 12, the first water pipe 13, funnel
14th, the second water pipe 15, the first branch pipe 16, the second branch pipe 17, wheel 18 and spring 19, the top left of bottom plate 1 are welded with left frame 2,
The left right side of frame 2 top is welded with head rod 3, and the right-hand member of head rod 3 is welded with mobile device 4, the weldering of the right-hand member of mobile device 4
Installing plate 5 is connected to, the right-hand member rotary type of installing plate 5 is connected with first clamping plate 6 and second clamping plate 7, first clamping plate 6 and second clamping plate 7
Coordinate, spring 19 is welded between the left end of first clamping plate 6 and the left end of second clamping plate 7, first clamping plate 6 is provided with second clamping plate 7
Cavity 8, the inner side of first clamping plate 6 are uniformly provided with through hole 9, the inner side of first clamping plate 6 and the inner side of second clamping plate 7 with the inner side of second clamping plate 7
Foam-rubber cushion 10 is respectively connected with, the top right side of bottom plate 1 is welded with water tank 11, and the top left side of water tank 11 is welded with funnel 14, water tank 11
Top right side is connected with water pump 12 by bolted connection, and the left end of water pump 12 is connected with first by way of flange connection
Water pipe 13, the left end of the first water pipe 13 are passed through and are fixed in water tank 11, and the top of water pump 12 is connected with by way of flange connection
Second water pipe 15, the right-hand member of the second water pipe 15 are connected with the first branch pipe 16 and the second branch pipe 17 by way of flange connection, and first
The right-hand member of branch pipe 16 is passed through and is fixed in first clamping plate 6, and the right-hand member of the second branch pipe 17 is passed through and is fixed in second clamping plate 7, bottom plate 1
Lower rotation formula is connected with wheel 18.
Mobile device 4 include casing 41, first bearing seat 43, screw mandrel 44, nut 45, electric rotating machine 46, guide rail 47,
The connecting rod 49 of guide pin bushing 48 and second, the inner left wall of casing 41 front side and rear side are connected with clutch shaft bearing by bolted connection
Seat 43, screw mandrel 44 is connected with by way of interference connection between the bearing in two first bearing seats 43, electric rotating machine 46 is logical
Cross bolted mode to be fixedly connected on front side of the inner left wall of casing 41, electric rotating machine 46 is in the front of first bearing seat 43, rotation
Output shaft on rotating motor 46 is connected by shaft coupling with screw mandrel 44, and screw mandrel 44 is provided with nut 45, and nut 45 is matched somebody with somebody with screw mandrel 44
Closing, two right-hand members of first bearing seat 43 are welded with guide rail 47, guide pin bushing 48 are socketed with guide rail 47, and guide rail 47 coordinates with guide pin bushing 48,
Guide pin bushing 48 is connected with nut 45, and the right-hand member of guide pin bushing 48 is welded with the second connecting rod 49, and the right wall of casing 41 is provided with a word hole 42, and second
Connecting rod 49 passes through a word hole 42, and the right-hand member of the second connecting rod 49 is welded with installing plate 5.
Also include adjusting means 20, adjusting means 20 includes the first slide rail 201, the first sliding block 202, rack 203, tooth
Wheel 204, second bearing seat 205, rotating shaft 206 and rocking bar 207, the left downside of frame 2 are welded with second bearing seat 205, second bearing seat
Bearing in 205 is connected with rotating shaft 206 by way of interference connection, and rotating shaft 206 passes through left frame 2, the welding of the left end of rotating shaft 206
There is rocking bar 207, the right-hand member of rotating shaft 206 is connected with gear 204 by way of interference connection, and the top left side of bottom plate 1 is connected by bolt
The mode connect is connected with the first slide rail 201, and slidingtype is connected with the first sliding block 202 on the first slide rail 201, on the first sliding block 202
Rack 203 is welded with, rack 203 engages with gear 204, and the right-hand member of rack 203 is welded with head rod 3.
Embodiment 4
A kind of Bridge guardrail high-efficiency cleaning equipment, as Figure 1-5, include bottom plate 1, left frame 2, head rod 3, shifting
Dynamic device 4, installing plate 5, first clamping plate 6, second clamping plate 7, foam-rubber cushion 10, water tank 11, water pump 12, the first water pipe 13, funnel
14th, the second water pipe 15, the first branch pipe 16, the second branch pipe 17, wheel 18 and spring 19, the top left of bottom plate 1 are welded with left frame 2,
The left right side of frame 2 top is welded with head rod 3, and the right-hand member of head rod 3 is welded with mobile device 4, the weldering of the right-hand member of mobile device 4
Installing plate 5 is connected to, the right-hand member rotary type of installing plate 5 is connected with first clamping plate 6 and second clamping plate 7, first clamping plate 6 and second clamping plate 7
Coordinate, spring 19 is welded between the left end of first clamping plate 6 and the left end of second clamping plate 7, first clamping plate 6 is provided with second clamping plate 7
Cavity 8, the inner side of first clamping plate 6 are uniformly provided with through hole 9, the inner side of first clamping plate 6 and the inner side of second clamping plate 7 with the inner side of second clamping plate 7
Foam-rubber cushion 10 is respectively connected with, the top right side of bottom plate 1 is welded with water tank 11, and the top left side of water tank 11 is welded with funnel 14, water tank 11
Top right side is connected with water pump 12 by bolted connection, and the left end of water pump 12 is connected with first by way of flange connection
Water pipe 13, the left end of the first water pipe 13 are passed through and are fixed in water tank 11, and the top of water pump 12 is connected with by way of flange connection
Second water pipe 15, the right-hand member of the second water pipe 15 are connected with the first branch pipe 16 and the second branch pipe 17 by way of flange connection, and first
The right-hand member of branch pipe 16 is passed through and is fixed in first clamping plate 6, and the right-hand member of the second branch pipe 17 is passed through and is fixed in second clamping plate 7, bottom plate 1
Lower rotation formula is connected with wheel 18.
Mobile device 4 include casing 41, first bearing seat 43, screw mandrel 44, nut 45, electric rotating machine 46, guide rail 47,
The connecting rod 49 of guide pin bushing 48 and second, the inner left wall of casing 41 front side and rear side are connected with clutch shaft bearing by bolted connection
Seat 43, screw mandrel 44 is connected with by way of interference connection between the bearing in two first bearing seats 43, electric rotating machine 46 is logical
Cross bolted mode to be fixedly connected on front side of the inner left wall of casing 41, electric rotating machine 46 is in the front of first bearing seat 43, rotation
Output shaft on rotating motor 46 is connected by shaft coupling with screw mandrel 44, and screw mandrel 44 is provided with nut 45, and nut 45 is matched somebody with somebody with screw mandrel 44
Closing, two right-hand members of first bearing seat 43 are welded with guide rail 47, guide pin bushing 48 are socketed with guide rail 47, and guide rail 47 coordinates with guide pin bushing 48,
Guide pin bushing 48 is connected with nut 45, and the right-hand member of guide pin bushing 48 is welded with the second connecting rod 49, and the right wall of casing 41 is provided with a word hole 42, and second
Connecting rod 49 passes through a word hole 42, and the right-hand member of the second connecting rod 49 is welded with installing plate 5.
Also include adjusting means 20, adjusting means 20 includes the first slide rail 201, the first sliding block 202, rack 203, tooth
Wheel 204, second bearing seat 205, rotating shaft 206 and rocking bar 207, the left downside of frame 2 are welded with second bearing seat 205, second bearing seat
Bearing in 205 is connected with rotating shaft 206 by way of interference connection, and rotating shaft 206 passes through left frame 2, the welding of the left end of rotating shaft 206
There is rocking bar 207, the right-hand member of rotating shaft 206 is connected with gear 204 by way of interference connection, and the top left side of bottom plate 1 is connected by bolt
The mode connect is connected with the first slide rail 201, and slidingtype is connected with the first sliding block 202 on the first slide rail 201, on the first sliding block 202
Rack 203 is welded with, rack 203 engages with gear 204, and the right-hand member of rack 203 is welded with head rod 3.
Also include device for opening 21, device for opening 21 includes the second slide rail 211, the second sliding block 212, push rod 213, fixed
Pulley 214 and steel wire 215, the centre of installing plate 5 front side are connected with the second slide rail 211, the second slide rail by bolted connection
Slidingtype is connected with the second sliding block 212 on 211, is welded with push rod 213 on the second sliding block 212, above and below the right side of installing plate 5
Fixed pulley 214 is symmetrically welded with, the left side of first clamping plate 6 is welded with steel wire 215, the steel wire of upside with the left side of second clamping plate 7
215 pass through upside fixed pulley 214 and are connected by way of welding with the right-hand member of the second sliding block 212, and downside steel wire 215 passes through down
Side fixed pulley 214 is simultaneously connected by way of welding with the right-hand member of the second sliding block 212.
Also include pushing hands 22 and rubber blanket 23, be welded with pushing hands 22 among the left left side of frame 2, the left end of pushing hands 22 is socketed with rubber
Rubber cushion 23.
The material of bottom plate 1 is stainless steel.
The material of installing plate 5 is Q235 steel.
Electric rotating machine 46 is servomotor.
Operation principle:When needing to use this equipment, equipment is pushed into need by the Bridge guardrail cleared up by staff, is led to
Cross funnel 14 and appropriate water is added into water tank 11, first clamping plate 6 and second clamping plate 7 are opened, promote this equipment, when the first folder
Plate 6 is moved to the place of cleaning needed for Bridge guardrail with second clamping plate 7, stops promoting this equipment, unclamps first clamping plate 6 and second
Bridge guardrail is given and clamped by clamping plate 7, first clamping plate 6 with second clamping plate 7 under the contraction of spring 19, the work of manual control water pump 12
Make, water pump 12, which works, pumps the water in water tank 11 to the second water pipe 15 from the first water pipe 13, and then water is flowed to first
The branch pipe 17 of pipe 16 and second, the water in the first branch pipe 16 and the second branch pipe 17 flow to foam-rubber cushion into cavity 8 by through hole 9
10, moisten foam-rubber cushion 10, at the same time control mobile device 4 work, when mobile device 4 travels forward, drive installing plate 5 to
Preceding motion, installing plate 5 drive first clamping plate 6 to be travelled forward with the foam-rubber cushion 10 in second clamping plate 7, and mobile device 4 is moved backward
When, drive installing plate 5 to move backward, installing plate 5 drives first clamping plate 6 to be moved backward with the foam-rubber cushion 10 in second clamping plate 7,
By repeating this process, reach the effect for cleaning out Bridge guardrail, when Bridge guardrail is cleaned out, manual control water
Pump 12 is stopped, and control mobile device 4 is stopped, and first clamping plate 6 and second clamping plate 7 is opened, artificial pushing equipment, when
After first clamping plate 6 leaves Bridge guardrail with second clamping plate 7, stop promoting this equipment, unclamp first clamping plate 6 and second clamping plate 7, the
One clamping plate 6 and second clamping plate 7 are recovered to initial position, to be then pushed into the ground that next place needs to clean under the contraction of spring 19
It is square, acted on repetition, it is cleaned.This device structure Nover practical is strong, simply can clean Bridge guardrail dry
Only, the labor intensity of worker is reduced.
Because mobile device 4 includes casing 41, first bearing seat 43, screw mandrel 44, nut 45, electric rotating machine 46, guide rail
47th, the connecting rod 49 of guide pin bushing 48 and second, the inner left wall of casing 41 front side and rear side are connected with first by bolted connection
Bearing block 43, screw mandrel 44, electric rotating machine are connected with by way of interference connection between the bearing in two first bearing seats 43
46 are fixedly connected on front side of the inner left wall of casing 41 by bolted connection, electric rotating machine 46 first bearing seat 43 just before
Square, the output shaft on electric rotating machine 46 is connected by shaft coupling with screw mandrel 44, and screw mandrel 44 is provided with nut 45, nut 45 and screw mandrel
44 coordinate, and two right-hand members of first bearing seat 43 are welded with guide rail 47, guide pin bushing 48 is socketed with guide rail 47, and guide rail 47 is matched somebody with somebody with guide pin bushing 48
Closing, guide pin bushing 48 is connected with nut 45, and the right-hand member of guide pin bushing 48 is welded with the second connecting rod 49, and the right wall of casing 41 is provided with a word hole 42, the
Two connecting rods 49 pass through a word hole 42, and the right-hand member of the second connecting rod 49 is welded with installing plate 5, and manual control electric rotating machine 46 is counterclockwise
Rotate, electric rotating machine 46 drives screw mandrel 44 to rotate counterclockwise, and nut 45 moves backward on screw mandrel 44, and then drives second to connect
Extension bar 49 moves backward, and the second connecting rod 49 drives installing plate 5 to move backward, and installing plate 5 drives first clamping plate 6 and second clamping plate
Foam-rubber cushion 10 between 7 moves backward, when the second connecting rod 49 moves to 42 rear side of word hole, manual control electric rotating machine
46 rotate clockwise, and electric rotating machine 46 drives screw mandrel 44 to rotate clockwise, and nut 45 travels forward on screw mandrel 44, and then drive
Second connecting rod 49 travels forward, and the second connecting rod 49 drives installing plate 5 to travel forward, and installing plate 5 drives first clamping plate 6 and the
Foam-rubber cushion 10 between second splint 7 travels forward, and by constantly carrying out this process, has reached the effect of mobile cleaning Bridge guardrail
Fruit.
Because also including adjusting means 20, adjusting means 20 includes the first slide rail 201, the first sliding block 202, rack
203rd, gear 204, second bearing seat 205, rotating shaft 206 and rocking bar 207, the downside of left frame 2 are welded with second bearing seat 205, and second
Bearing in bearing block 205 is connected with rotating shaft 206 by way of interference connection, and the left end of rotating shaft 206 is welded with rocking bar 207, turns
The right-hand member of axle 206 is connected with gear 204 by way of interference connection, and the top left side of bottom plate 1 connects by bolted connection
There is the first slide rail 201, slidingtype is connected with the first sliding block 202 on the first slide rail 201, and rack is welded with the first sliding block 202
203, rack 203 engages with gear 204, and the right-hand member of rack 203 is welded with head rod 3, when Bridge guardrail is higher than first clamping plate
6 with second clamping plate 7 when, staff rotates clockwise rocking bar 207, and rocking bar 207 drives the gear 204 in rotating shaft 206 clockwise
Rotate, gear 204 moves upwards with moving gear 204, when first clamping plate 6 and second clamping plate 7 reach the bridge shield with required cleaning
It is artificial to stop pin rotating rocker 207 when column is high together, when Bridge guardrail is less than first clamping plate 6 and second clamping plate 7, staff
Rocking bar 207 is rotated counterclockwise, rocking bar 207 drives the gear 204 in rotating shaft 206 to rotate counterclockwise, and gear 204 is with moving gear 204
Move downward, when first clamping plate 6 and second clamping plate 7 reach Bridge guardrail with required cleaning it is high together when, the artificial pin that stops rotates
Rocking bar 207, the effect that height can be cleaned according to Bridge guardrail height adjusting apparatus is reached.
Because also including device for opening 21, device for opening 21 includes the second slide rail 211, the second sliding block 212, push rod
213rd, fixed pulley 214 and steel wire 215, the centre of installing plate 5 front side are connected with the second slide rail 211 by bolted connection, the
Slidingtype is connected with the second sliding block 212 on two slide rails 211, and push rod 213, the right side of installing plate 5 top are welded with the second sliding block 212
Fixed pulley 214 is symmetrically welded with lower section, the left side of first clamping plate 6 is welded with steel wire 215 with the left side of second clamping plate 7, upside
Steel wire 215 is connected through upside fixed pulley 214 and with the right-hand member of the second sliding block 212 by way of welding, and downside steel wire 215 is worn
Cross downside fixed pulley 214 and be connected by way of welding with the right-hand member of the second sliding block 212, staff promotes push rod to the left
213, push rod 213 drives the second sliding block 212 to left movement, and the second sliding block 212 drives steel wire 215 to left movement, and then drives the
One clamping plate 6 and second clamping plate 7 make first clamping plate 6 be opened with second clamping plate 7 to left movement, and staff promotes this equipment, when the
When one clamping plate 6 is moved to clear position needed for Bridge guardrail with second clamping plate 7, staff promotes to the right push rod 213, the first folder
Bridge guardrail is given and clamped by plate 6 with second clamping plate 7 under the contraction of spring 19, and device for opening 21 can make equipment using more
It is convenient, reduce the labor intensity of worker.
Because also including pushing hands 22 and rubber blanket 23, pushing hands 22, the left end set of pushing hands 22 are welded among the left left side of frame 2
Rubber blanket 23 is connected to, pushing hands 22 facilitates worker to promote this equipment, and rubber blanket 23 improves comfortableness when worker promotes this equipment.
Because the material of bottom plate 1 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture service life.
Because the material of installing plate 5 is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device longer.
Because electric rotating machine 46 is servomotor, anti-overload ability is strong, and high speed performance is good, can be precisely controlled its rotating speed.
Embodiment described above only expresses preferred embodiment of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area
For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all
Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (8)
1. a kind of Bridge guardrail high-efficiency cleaning equipment, it is characterised in that include bottom plate (1), left frame (2), head rod
(3), mobile device (4), installing plate (5), first clamping plate (6), second clamping plate (7), foam-rubber cushion (10), water tank (11), water pump
(12), the first water pipe (13), funnel (14), the second water pipe (15), the first branch pipe (16), the second branch pipe (17), wheel (18) and
Spring (19), bottom plate (1) top left are welded with left frame (2), and top is welded with head rod (3) on the right side of left frame (2), and first
Connecting rod (3) right-hand member is welded with mobile device (4), and mobile device (4) right-hand member is welded with installing plate (5), and installing plate (5) right-hand member turns
Dynamic formula is connected with first clamping plate (6) and second clamping plate (7), and first clamping plate (6) coordinates with second clamping plate (7), and first clamping plate (6) is left
Spring (19) is welded between end and second clamping plate (7) left end, first clamping plate (6) is provided with cavity (8) with second clamping plate (7),
With being uniformly provided with through hole (9), first clamping plate (6) inner side and second clamping plate (7) on the inside of second clamping plate (7) on the inside of first clamping plate (6)
Inner side is respectively connected with foam-rubber cushion (10), and bottom plate (1) top right side is welded with water tank (11), and water tank (11) top left side is welded with Lou
Struggle against (14), water tank (11) top right side is connected with water pump (12) by bolted connection, and water pump (12) left end passes through flange
The mode of connection is connected with the first water pipe (13), and the first water pipe (13) left end is passed through and is fixed in water tank (11), water pump (12)
Top is connected with the second water pipe (15) by way of flange connection, and the second water pipe (15) right-hand member is connected by way of flange connection
The first branch pipe (16) and the second branch pipe (17) are connected to, the first branch pipe (16) right-hand member is passed through and is fixed in first clamping plate (6), second
Branch pipe (17) right-hand member is passed through and is fixed in second clamping plate (7), and bottom plate (1) lower rotation formula is connected with wheel (18).
2. a kind of Bridge guardrail high-efficiency cleaning equipment according to claim 1, it is characterised in that mobile device (4) includes
Have casing (41), first bearing seat (43), screw mandrel (44), nut (45), electric rotating machine (46), guide rail (47), guide pin bushing (48) and
Second connecting rod (49), casing (41) inner left wall front side and rear side are connected with first bearing seat by bolted connection
(43) screw mandrel (44), electric rotating machine, are connected with by way of interference connection between the bearing in two first bearing seats (43)
(46) it is fixedly connected on by bolted connection on front side of casing (41) inner left wall, electric rotating machine (46) is in first bearing seat
(43) immediately ahead of, the output shaft on electric rotating machine (46) is connected by shaft coupling with screw mandrel (44), and screw mandrel (44) is provided with nut
(45), nut (45) coordinates with screw mandrel (44), and two first bearing seat (43) right-hand members are welded with guide rail (47), and guide rail covers on (47)
Guide pin bushing (48) is connected to, guide rail (47) coordinates with guide pin bushing (48), and guide pin bushing (48) is connected with nut (45), and guide pin bushing (48) right-hand member is welded with
Second connecting rod (49), casing (41) right wall are provided with a word hole (42), and the second connecting rod (49) passes through a word hole (42), and second connects
Extension bar (49) right-hand member is welded with installing plate (5).
3. a kind of Bridge guardrail high-efficiency cleaning equipment according to claim 2, it is characterised in that also include adjusting means
(20), adjusting means (20) includes the first slide rail (201), the first sliding block (202), rack (203), gear (204), the second axle
Bearing (205), rotating shaft (206) and rocking bar (207), left frame (2) downside are welded with second bearing seat (205), second bearing seat
(205) bearing in is connected with rotating shaft (206) by way of interference connection, and rotating shaft (206) passes through left frame (2), rotating shaft (206)
Left end is welded with rocking bar (207), and rotating shaft (206) right-hand member is connected with gear (204), bottom plate (1) top by way of interference connection
Portion passes on left bolted mode and is connected with the first slide rail (201), and slidingtype is connected with the first cunning on the first slide rail (201)
Block (202), rack (203) is welded with the first sliding block (202), rack (203) engages with gear (204), rack (203) right-hand member
It is welded with head rod (3).
4. a kind of Bridge guardrail high-efficiency cleaning equipment according to claim 3, it is characterised in that also include device for opening
(21), device for opening (21) includes the second slide rail (211), the second sliding block (212), push rod (213), fixed pulley (214) and steel
Silk (215), the middle front side of installing plate (5) are connected with the second slide rail (211), the second slide rail (211) by bolted connection
Upper slidingtype is connected with the second sliding block (212), and push rod (213), installing plate (5) right side top are welded with the second sliding block (212)
Fixed pulley (214) is symmetrically welded with lower section, first clamping plate (6) left side on the left of second clamping plate (7) with being welded with steel wire
(215), the steel wire (215) of upside connects through upside fixed pulley (214) and with the second sliding block (212) right-hand member by way of welding
Connect, downside steel wire (215) is connected through downside fixed pulley (214) and with the second sliding block (212) right-hand member by way of welding.
5. a kind of Bridge guardrail high-efficiency cleaning equipment according to claim 4, it is characterised in that also include pushing hands (22)
With rubber blanket (23), left frame (2) left side is middle to be welded with pushing hands (22), and pushing hands (22) left end is socketed with rubber blanket (23).
6. a kind of Bridge guardrail high-efficiency cleaning equipment according to claim 5, it is characterised in that bottom plate (1) material is not
Become rusty steel.
7. a kind of Bridge guardrail high-efficiency cleaning equipment according to claim 6, it is characterised in that installing plate (5) material is
Q235 steel.
8. a kind of Bridge guardrail high-efficiency cleaning equipment according to claim 7, it is characterised in that electric rotating machine (46) is to watch
Take motor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720290804.9U CN206800279U (en) | 2017-03-23 | 2017-03-23 | A kind of Bridge guardrail high-efficiency cleaning equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720290804.9U CN206800279U (en) | 2017-03-23 | 2017-03-23 | A kind of Bridge guardrail high-efficiency cleaning equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206800279U true CN206800279U (en) | 2017-12-26 |
Family
ID=60731202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720290804.9U Active CN206800279U (en) | 2017-03-23 | 2017-03-23 | A kind of Bridge guardrail high-efficiency cleaning equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206800279U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112252243A (en) * | 2020-09-22 | 2021-01-22 | 王彬 | Guardrail cleaning equipment for expressway |
CN114029286A (en) * | 2021-11-09 | 2022-02-11 | 江苏集萃纳米应用技术研究所有限公司 | Light-emitting diode device |
-
2017
- 2017-03-23 CN CN201720290804.9U patent/CN206800279U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112252243A (en) * | 2020-09-22 | 2021-01-22 | 王彬 | Guardrail cleaning equipment for expressway |
CN114029286A (en) * | 2021-11-09 | 2022-02-11 | 江苏集萃纳米应用技术研究所有限公司 | Light-emitting diode device |
CN114029286B (en) * | 2021-11-09 | 2023-02-24 | 江苏集萃中科纳米科技有限公司 | Light-emitting diode device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106583280A (en) | Decontamination equipment for unmanned automobile parts | |
CN107152002A (en) | A kind of town road watering cooling system | |
CN206800279U (en) | A kind of Bridge guardrail high-efficiency cleaning equipment | |
CN101607335A (en) | Automatic soldering instantaneous welder | |
CN216633358U (en) | Grinding type metal circular sawing machine for machining front support of vehicle | |
CN215758795U (en) | Railway track cleaning device | |
CN208912603U (en) | A kind of plastic cover plate surface cleaning apparatus | |
CN213012153U (en) | Pollutant treatment device for ecological restoration of conveniently throwing medicine | |
CN111570899A (en) | Scrap iron recyclable seamless steel tube production equipment and process thereof | |
CN204491504U (en) | A kind of semi-automatic moss scavenger along the river | |
CN114378630B (en) | Automatic scrap iron cleaning device | |
CN203401300U (en) | Cylindrical metal tube automatic multifunctional continuous machining line integrated equipment | |
CN209482282U (en) | A kind of collection device of water conservancy river floating refuse | |
CN208894680U (en) | Solar panels cleaning device | |
CN209984372U (en) | Rotary artificial insemination table for sheep | |
CN203400556U (en) | Sewage treatment and filtration device | |
CN203635531U (en) | Full-automatic washing machine for tailing blanket | |
CN203408912U (en) | Jackscrew maintaining and cleaning machine | |
CN208197592U (en) | A kind of plastic water pipe automatic soldering device | |
CN207254882U (en) | A kind of mining industry blanking lower hopper surface cleaning apparatus | |
CN212945627U (en) | Double-spindle milling machine convenient for collecting waste materials | |
CN213945861U (en) | Machining device for inner cavity of steel turbine of speed-regulating coupler | |
CN212195395U (en) | Automatic flushing system of engineering truck | |
CN221231863U (en) | Hydropower station pressure pipeline welding device | |
CN213816080U (en) | Multifunctional bonding inspection machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |