CN206791317U - One kind insulation pig house - Google Patents

One kind insulation pig house Download PDF

Info

Publication number
CN206791317U
CN206791317U CN201720280295.1U CN201720280295U CN206791317U CN 206791317 U CN206791317 U CN 206791317U CN 201720280295 U CN201720280295 U CN 201720280295U CN 206791317 U CN206791317 U CN 206791317U
Authority
CN
China
Prior art keywords
wall
layer
ground
furred ceiling
pig house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720280295.1U
Other languages
Chinese (zh)
Inventor
陶灯
李祥慧
王建林
孟园
杨文华
李晓珍
宋涛
施林玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianchuan Family Pigs Ltd Qiao
Yunnan Qiao Family Pig Industry Co Ltd
Original Assignee
Jianchuan Family Pigs Ltd Qiao
Yunnan Qiao Family Pig Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianchuan Family Pigs Ltd Qiao, Yunnan Qiao Family Pig Industry Co Ltd filed Critical Jianchuan Family Pigs Ltd Qiao
Priority to CN201720280295.1U priority Critical patent/CN206791317U/en
Application granted granted Critical
Publication of CN206791317U publication Critical patent/CN206791317U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Housing For Livestock And Birds (AREA)

Abstract

The utility model discloses a kind of insulation pig house, belongs to pig breeding facility technical field.Including wall, roof, swinery, swinery ground, soil drainage system, ventilation fan, hopper, drinking-water system;Wall includes wall external layer, wall intermediate thermal insulating layer and wall internal layer;Heat-insulated furred ceiling, including furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer are provided with below roof;Swinery ground is thermal-insulation floor, including ground surface layer, ground layer and positioned at the ground intermediate thermal insulating layer between them;Swinery ground is inclined domatic to wall direction in the middle part of the pig house, and wall internal layer is divided into upper and lower two parts, and the bottom of wall internal layer is divided into brick masonry structure, top is divided into platy structure, and wall external layer is platy structure;Deep bead is stamped in activity on the defecation hole exits of soil drainage system, and the external wall upper and lower end that the upper end of deep bead is hinged on the wall above defecation hole exits is freely hanging.With facility it is simple, be not required to power consumption, low cost and other advantages, suitable for cold area popularizing application.

Description

One kind insulation pig house
Technical field
A kind of pig house is the utility model is related to, especially a kind of insulation pig house, belongs to pig breeding facility technical field.
Background technology
When in the winter time, the temperature in pig house is relatively low, is unfavorable for growth and the health of pig.Especially on the north or cold ground Area, the Winter protection of pig house are particularly important.Traditional pig house insulation is mainly using the heating such as electric energy or stove, and facility is complicated, energy Consumption is big, cost is high, and popularization and application are difficult.
The content of the invention
Technical problem to be solved in the utility model is that do not have heat insulation function or facility complexity, energy consumption for existing pig house Big deficiency, a kind of insulation pig house is proposed, using simple insulated wall, roof construction, reduces pig house radiating, improve heat-insulating property, Realize low energy consumption and the low cost of pig house insulation.
In order to solve the above technical problems, the utility model provides a kind of insulation pig house, including wall 1, roof 7, swinery 6, Swinery ground 9, ventilation fan 5, soil drainage system, hopper, drinking-water system;Wall 1 is in insulated wall, including wall external layer 1-1, wall It is spaced thermosphere 1-2 and wall internal layer 1-3;The lower section of roof 7 is provided with heat-insulated furred ceiling 8, including furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer With furred ceiling layer.
The swinery ground 9 is thermal-insulation floor, including ground surface layer 9-1, ground layer 9-3 and positioned at the ground between them Face intermediate thermal insulating layer 9-2;The swinery ground 9 is inclined domatic to wall direction in the middle part of pig house, facilitates dirt in groove Collection neutralizes discharge.
Preferably, the thickness of the ground surface layer 9-1 is 5-10cm, ground intermediate thermal insulating layer 9-2 thickness is 5- 15cm.Ground surface layer 9-1, ground layer 9-3 and ground intermediate thermal insulating layer 9-2 thickness can according to being actually needed specific determination, Ensure enough intensity and heat insulating effect.Ground surface layer 9-1 is cement layer, and ground layer 9-3 is concrete layer, ground Face intermediate thermal insulating layer 9-2 can use the common heat-barrier materials such as cinder or asbestos, be used with specific reference to selection is actually needed.
The wall internal layer 1-3 points are upper and lower two parts, and wall internal layer 1-3 bottom is divided into brick masonry structure, to be formed The basis of pig house, support pig house superstructure;Wall internal layer 1-3 top is divided into platy structure, and wall external layer 1-1 is tabular knot Structure.
Preferably, the lower part brick masonry structure of the wall internal layer 1-3 is highly 1.2-1.6m, with specific reference to reality It needs to be determined that ensure enough intensity, pig house superstructure can be supported.
Preferably, the thickness of the wall intermediate thermal insulating layer 1-2 and furred ceiling intermediate thermal insulating layer is 10-20cm, wall Outer layer 1-1, furred ceiling upper epidermis, the thickness of furred ceiling layer are 1-5mm.Each layer with specific reference to be actually needed determine, ensure Pig house is incubated and enough intensity,
The soil drainage system includes the slurry gutte 4 being longitudinally arranged along the inner side of wall 1, the collection being longitudinally arranged along on the outside of wall 1 Multiple defecation holes 3 of dirty ditch 2, the connection bottom of slurry gutte 4 and the side wall of sludge collecting ditch 2, on slurry gutte 4 activity be stamped screen 4-1, discharge feces The bottom surface of ditch 4 is inclined domatic to wall direction out of pig house.The length of discharge launder 3 is equal to wall length, groove width and groove depth Determined according to being actually needed, ensure that pig excretion is convenient and dirt collection needs.
Deep bead 10 is stamped in activity in the outlet in the defecation hole 3 of the soil drainage system, and the upper end of deep bead 10 is hinged on row On the external wall of the wall 1 of the outlet of excrement hole 3 top, the lower end of deep bead 10 is freely hanging.Deep bead 10 can prevent cold wind from row Excrement system enters pig house, strengthens the heat insulation effect of pig house.
It is bonded between the wall external layer 1-1, wall intermediate thermal insulating layer 1-2 and wall internal layer 1-3 by glue;Furred ceiling upper table It is bonded between layer, furred ceiling intermediate thermal insulating layer and furred ceiling layer by glue.The common glue such as epoxy resin, glass cement can be used to glue Connect, to strengthen the intensity of wall and furred ceiling, used with specific reference to selection is actually needed.
Preferably, the gradient of the swinery ground 9 and the bottom surface of slurry gutte 4 is 3%-5%, it is true with specific reference to being actually needed It is fixed, ensure that cleaning up excrement, blowdown are smooth.
The lower part of wall external layer 1-1 and wall the internal layer 1-3 can use the common buildings such as PVC composite tiles or color steel tile Material, used with specific reference to selection is actually needed;Wall intermediate thermal insulating layer 1-2 can use high-density foam(Such as 8-10kg/m3 High-density foam)Or the common heat-barrier material such as asbestos, used with specific reference to selection is actually needed.
The swinery 6 can arrange in pig house in intermediate symmetry double-row type, and pig house centre is walkway, both sides are swinery 6, swinery 6 is pig activity and feed area, is discharge area by the side of wall 1 close to walkway side;Swinery ground is from pig house Middle part tilts to wall direction(Tilt from inside to outside)It is domatic, dirt is concentrated side by side to excretory system at foundation in convenient house Go out.
The periphery of sludge collecting ditch 2 can be provided with the flange for more than the 5cm that is above the ground level, to ensure that it is outer that pig house sewage will not be spilt over outside Enveloping field.
The utility model uses composite thermal-insulating wall, furred ceiling and earth construction with heat-insulation layer, and in soil drainage system Deep bead is stamped at defecation hole exits, is made so as to farthest play insulation under conditions of the energy is not consumed With forming insulation pig house, have that facility is simple, is not required to power consumption, low cost and other advantages, suitable in cold area popularizing application.
Brief description of the drawings
Fig. 1 is the utility model pig house diagrammatic side-view cross-sectional schematic diagram.
Fig. 2 is that the utility model pig house overlooks schematic cross-sectional view.
Fig. 3 is the utility model pig house A-A partial schematic sectional views.
In figure:1- walls, 1-1- wall external layers, 1-2- wall intermediate thermal insulating layers, 1-3- wall internal layers, 2- sludge collecting ditches, 3- Defecation hole, 4- slurry guttes, 4-1- screens, 5- ventilation fans, 6- swinerys, 7- roofs, 8- furred ceilings, 9- swinerys ground, 9-1- ground face Layer, 9-2- ground intermediate thermal insulating layer, 9-3- ground layers, 10- deep beads.
Embodiment
Specific embodiment of the present utility model is further described in detail below in conjunction with the accompanying drawings, it is unreceipted in embodiment Technology or product, be prior art or can by buy obtain conventional products.
Embodiment 1:As Figure 1-3, this insulation pig house, including bag wall 1, roof 7, swinery 6, swinery ground 9, ventilation Fan 5, soil drainage system, hopper, drinking-water system;Wall 1 is insulated wall, including wall external layer 1-1, wall intermediate thermal insulating layer 1-2 and Wall internal layer 1-3;The lower section of roof 7 is provided with heat-insulated furred ceiling 8, including furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer. Swinery ground 9 is thermal-insulation floor, and to strengthen the heat insulation effect of pig house, swinery ground 9 includes ground surface layer 9-1, ground layer 9-3 And positioned at the ground intermediate thermal insulating layer 9-2 between them;Ground surface layer 9-1 thickness is 5cm, ground intermediate thermal insulating layer 9-2's Thickness is 5cm;Swinery ground 9 is inclined domatic to wall direction in the middle part of the pig house, and dirt is to discharging feces at foundation in convenient house System collection neutralizes discharge;Ground surface layer 9-1 is cement layer, and ground layer 9-3 is concrete layer, and ground intermediate thermal insulating layer 9-2 is adopted Use cinder layer.
1-3 points of wall internal layer is upper and lower two parts, and wall internal layer 1-3 bottom is divided into brick masonry structure, to form pig house Basis, support pig house superstructure;Wall internal layer 1-3 top is divided into platy structure, and wall external layer 1-1 is platy structure. Wall internal layer 1-3 lower part brick masonry structure is highly 1.2m.Wall intermediate thermal insulating layer 1-2 and furred ceiling intermediate thermal insulating layer thickness Spend for 10cm, wall external layer 1-1 and furred ceiling upper epidermis, the thickness of furred ceiling layer are 1mm.It is spaced in wall external layer 1-1, wall It is bonded between thermosphere 1-2 and wall internal layer 1-3 by glue, between furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer It is bonded by glue, using adhering with epoxy resin, to strengthen the intensity of wall and furred ceiling.Wall external layer 1-1, wall internal layer 1-3 Upper part, furred ceiling upper epidermis, furred ceiling layer use PVC composite tiles;Spaced heat in wall intermediate thermal insulating layer 1-2 and furred ceiling Layer uses 8kg/m3 high-density foam layer.
Soil drainage system includes the slurry gutte 4 being longitudinally arranged along the inner side of wall 1, the sludge collecting ditch being longitudinally arranged along on the outside of wall 1 2nd, multiple defecation holes 3 of the bottom of slurry gutte 4 and the side wall of sludge collecting ditch 2 are connected, on slurry gutte 4 activity be stamped screen 4-1, slurry gutte 4 Bottom surface to be inclined domatic to wall direction out of pig house.The length of discharge launder 3 be equal to wall length, groove width and groove depth according to Determination is actually needed, ensures that pig excretion is convenient and dirt collection needs.Activity is stamped in the outlet in the defecation hole 3 of soil drainage system Deep bead 10, prevent cold wind from entering pig house from soil drainage system, strengthen the heat insulation effect of pig house;The upper end of deep bead 10 is hinged on row On the external wall of the wall 1 of the outlet of excrement hole 3 top, the lower end of deep bead 10 is freely hanging.Swinery ground 9 and the bottom surface of slurry gutte 4 The gradient be 3%, be easy to ensure that cleaning up excrement, blowdown are smooth.Swinery 6 can arrange in pig house in intermediate symmetry double-row type, among pig house It is swinery 6 for walkway, both sides, swinery 6 is pig activity and feed area, is row by the side of wall 1 close to walkway side Let out area.The periphery of sludge collecting ditch 2 is provided with the flange for the 5cm that is above the ground level, to ensure that pig house sewage will not with spilling over peripheral field outside.
Embodiment 2:As Figure 1-3, this insulation pig house, including bag wall 1, roof 7, swinery 6, swinery ground 9, ventilation Fan 5, soil drainage system, hopper, drinking-water system;Wall 1 is insulated wall, including wall external layer 1-1, wall intermediate thermal insulating layer 1-2 and Wall internal layer 1-3;The lower section of roof 7 is provided with heat-insulated furred ceiling 8, including furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer. Swinery ground 9 is thermal-insulation floor, and to strengthen the heat insulation effect of pig house, swinery ground 9 includes ground surface layer 9-1, ground layer 9-3 And positioned at the ground intermediate thermal insulating layer 9-2 between them;Ground surface layer 9-1 thickness is 8cm, ground intermediate thermal insulating layer 9-2's Thickness is 10cm;Swinery ground 9 is inclined domatic to wall direction in the middle part of the pig house, and dirt is to discharging feces at foundation in convenient house System collection neutralizes discharge;Ground surface layer 9-1 is cement layer, and ground layer 9-3 is concrete layer, and ground intermediate thermal insulating layer 9-2 is adopted Use asbestos layer.
1-3 points of wall internal layer is upper and lower two parts, and wall internal layer 1-3 bottom is divided into brick masonry structure, to form pig house Basis, support pig house superstructure;Wall internal layer 1-3 top is divided into platy structure, and wall external layer 1-1 is platy structure. Wall internal layer 1-3 lower part brick masonry structure is highly 1.5m.Wall intermediate thermal insulating layer 1-2 and furred ceiling intermediate thermal insulating layer thickness Spend for 15cm, wall external layer 1-1 and furred ceiling upper epidermis, the thickness of furred ceiling layer are 2mm.It is spaced in wall external layer 1-1, wall It is bonded between thermosphere 1-2 and wall internal layer 1-3 by glue, between furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer It is bonded by glue, using glass glue sticking, to strengthen the intensity of wall and furred ceiling.Wall external layer 1-1's and wall internal layer 1-3 Upper part, furred ceiling upper epidermis, furred ceiling layer use color steel tile;Wall intermediate thermal insulating layer 1-2 and furred ceiling intermediate thermal insulating layer are equal Using 10kg/m3 high-density foam layer.
Soil drainage system includes the slurry gutte 4 being longitudinally arranged along the inner side of wall 1, the sludge collecting ditch being longitudinally arranged along on the outside of wall 1 2nd, multiple defecation holes 3 of the bottom of slurry gutte 4 and the side wall of sludge collecting ditch 2 are connected, on slurry gutte 4 activity be stamped screen 4-1, slurry gutte 4 Bottom surface to be inclined domatic to wall direction out of pig house.The length of discharge launder 3 be equal to wall length, groove width and groove depth according to Determination is actually needed, ensures that pig excretion is convenient and dirt collection needs.Activity is stamped in the outlet in the defecation hole 3 of soil drainage system Deep bead 10, prevent cold wind from entering pig house from soil drainage system, strengthen the heat insulation effect of pig house;The upper end of deep bead 10 is hinged on row On the external wall of the wall 1 of the outlet of excrement hole 3 top, the lower end of deep bead 10 is freely hanging.Swinery ground 9 and the bottom surface of slurry gutte 4 The gradient be 4%, be easy to ensure that cleaning up excrement, blowdown are smooth.Swinery 6 can arrange in pig house in intermediate symmetry double-row type, among pig house It is swinery 6 for walkway, both sides, swinery 6 is pig activity and feed area, is row by the side of wall 1 close to walkway side Let out area.The periphery of sludge collecting ditch 2 is provided with the flange for the 8cm that is above the ground level, to ensure that pig house sewage will not with spilling over peripheral field outside.
Embodiment 3:As Figure 1-3, this insulation pig house, including bag wall 1, roof 7, swinery 6, swinery ground 9, ventilation Fan 5, soil drainage system, hopper, drinking-water system;Wall 1 is insulated wall, including wall external layer 1-1, wall intermediate thermal insulating layer 1-2 and Wall internal layer 1-3;The lower section of roof 7 is provided with heat-insulated furred ceiling 8, including furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer. Swinery ground 9 is thermal-insulation floor, and to strengthen the heat insulation effect of pig house, swinery ground 9 includes ground surface layer 9-1, ground layer 9-3 And positioned at the ground intermediate thermal insulating layer 9-2 between them;Ground surface layer 9-1 thickness is 10cm, ground intermediate thermal insulating layer 9-2's Thickness is 15cm;Swinery ground 9 is inclined domatic to wall direction in the middle part of the pig house, and dirt is to discharging feces at foundation in convenient house System collection neutralizes discharge;Ground surface layer 9-1 is cement layer, and ground layer 9-3 is concrete layer, and ground intermediate thermal insulating layer 9-2 is adopted Use asbestos layer.
1-3 points of wall internal layer is upper and lower two parts, and wall internal layer 1-3 bottom is divided into brick masonry structure, to form pig house Basis, support pig house superstructure;Wall internal layer 1-3 top is divided into platy structure, and wall external layer 1-1 is platy structure. Wall internal layer 1-3 lower part brick masonry structure is highly 1.6m.Wall intermediate thermal insulating layer 1-2 and furred ceiling intermediate thermal insulating layer thickness Spend for 20cm, wall external layer 1-1 and furred ceiling upper epidermis, the thickness of furred ceiling layer are 5mm.It is spaced in wall external layer 1-1, wall It is bonded between thermosphere 1-2 and wall internal layer 1-3 by glue, between furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer It is bonded by glue, using adhering with epoxy resin, to strengthen the intensity of wall and furred ceiling.Wall external layer 1-1, wall internal layer 1-3 Upper part, furred ceiling upper epidermis, furred ceiling layer use PVC composite tiles;Spaced heat in wall intermediate thermal insulating layer 1-2 and furred ceiling Layer uses asbestos layer.
Soil drainage system includes the slurry gutte 4 being longitudinally arranged along the inner side of wall 1, the sludge collecting ditch being longitudinally arranged along on the outside of wall 1 2nd, multiple defecation holes 3 of the bottom of slurry gutte 4 and the side wall of sludge collecting ditch 2 are connected, on slurry gutte 4 activity be stamped screen 4-1, slurry gutte 4 Bottom surface to be inclined domatic to wall direction out of pig house.The length of discharge launder 3 be equal to wall length, groove width and groove depth according to Determination is actually needed, ensures that pig excretion is convenient and dirt collection needs.Activity is stamped in the outlet in the defecation hole 3 of soil drainage system Deep bead 10, prevent cold wind from entering pig house from soil drainage system, strengthen the heat insulation effect of pig house;The upper end of deep bead 10 is hinged on row On the external wall of the wall 1 of the outlet of excrement hole 3 top, the lower end of deep bead 10 is freely hanging.Swinery ground 9 and the bottom surface of slurry gutte 4 The gradient be 5%, be easy to ensure that cleaning up excrement, blowdown are smooth.Swinery 6 can arrange in pig house in intermediate symmetry double-row type, among pig house It is swinery 6 for walkway, both sides, swinery 6 is pig activity and feed area, is row by the side of wall 1 close to walkway side Let out area.The periphery of sludge collecting ditch 2 is provided with the flange for the 10cm that is above the ground level, to ensure that pig house sewage will not with spilling over peripheral field outside.
Embodiment 4:As Figure 1-3, this insulation pig house, including bag wall 1, roof 7, swinery 6, swinery ground 9, ventilation Fan 5, soil drainage system, hopper, drinking-water system;Wall 1 is insulated wall, including wall external layer 1-1, wall intermediate thermal insulating layer 1-2 and Wall internal layer 1-3;The lower section of roof 7 is provided with heat-insulated furred ceiling 8, including furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer. Swinery ground 9 is thermal-insulation floor, and to strengthen the heat insulation effect of pig house, swinery ground 9 includes ground surface layer 9-1, ground layer 9-3 And positioned at the ground intermediate thermal insulating layer 9-2 between them;Ground surface layer 9-1 thickness is 6cm, ground intermediate thermal insulating layer 9-2's Thickness is 8cm;Swinery ground 9 is inclined domatic to wall direction in the middle part of the pig house, and dirt is to discharging feces at foundation in convenient house System collection neutralizes discharge;Ground surface layer 9-1 is cement layer, and ground layer 9-3 is concrete layer, and ground intermediate thermal insulating layer 9-2 is adopted Use cinder layer.
1-3 points of wall internal layer is upper and lower two parts, and wall internal layer 1-3 bottom is divided into brick masonry structure, to form pig house Basis, support pig house superstructure;Wall internal layer 1-3 top is divided into platy structure, and wall external layer 1-1 is platy structure. Wall internal layer 1-3 lower part brick masonry structure is highly 1.4m.Wall intermediate thermal insulating layer 1-2 and furred ceiling intermediate thermal insulating layer thickness Spend for 16cm, wall external layer 1-1 and furred ceiling upper epidermis, the thickness of furred ceiling layer are 2.5mm.Among wall external layer 1-1, wall Be bonded between thermal insulation layer 1-2 and wall internal layer 1-3 by glue, furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer it Between be bonded by glue, using silica gel bonding agent be bonded, to strengthen the intensity of wall and furred ceiling.Wall external layer 1-1, wall internal layer 1- 3 upper part, furred ceiling upper epidermis, furred ceiling layer use PVC composite tiles;It is spaced in wall intermediate thermal insulating layer 1-2 and furred ceiling Thermosphere uses 9kg/m3 high-density foam layer.
Soil drainage system includes the slurry gutte 4 being longitudinally arranged along the inner side of wall 1, the sludge collecting ditch being longitudinally arranged along on the outside of wall 1 2nd, multiple defecation holes 3 of the bottom of slurry gutte 4 and the side wall of sludge collecting ditch 2 are connected, on slurry gutte 4 activity be stamped screen 4-1, slurry gutte 4 Bottom surface to be inclined domatic to wall direction out of pig house.The length of discharge launder 3 be equal to wall length, groove width and groove depth according to Determination is actually needed, ensures that pig excretion is convenient and dirt collection needs.Activity is stamped in the outlet in the defecation hole 3 of soil drainage system Deep bead 10, prevent cold wind from entering pig house from soil drainage system, strengthen the heat insulation effect of pig house;The upper end of deep bead 10 is hinged on row On the external wall of the wall 1 of the outlet of excrement hole 3 top, the lower end of deep bead 10 is freely hanging.Swinery ground 9 and the bottom surface of slurry gutte 4 The gradient be 4%, be easy to ensure that cleaning up excrement, blowdown are smooth.Swinery 6 can arrange in pig house in intermediate symmetry double-row type, among pig house It is swinery 6 for walkway, both sides, swinery 6 is pig activity and feed area, is row by the side of wall 1 close to walkway side Let out area.The periphery of sludge collecting ditch 2 is provided with the flange for the 6cm that is above the ground level, to ensure that pig house sewage will not with spilling over peripheral field outside.
Technology contents of the present utility model are described above in conjunction with accompanying drawing, but the scope of protection of the utility model is not It is limited to the content, can also be not depart from this practicality new in one skilled in the relevant art's possessed knowledge Technology contents of the present utility model are made a variety of changes on the premise of type objective, it is all the spirit and principles of the utility model it It is interior, any modification, equivalent substitution and improvements done etc., it should be included within the scope of protection of the utility model.

Claims (8)

1. one kind insulation pig house, including wall(1), roof(7), swinery(6), swinery ground(9), ventilation fan(5), defecation system System, hopper, drinking-water system, it is characterised in that:The wall(1)For insulated wall, including wall external layer(1-1), be spaced in wall Thermosphere(1-2)With wall internal layer(1-3), wall internal layer(1-3)It is divided into upper and lower two parts, wall internal layer(1-3)Bottom be divided into Brick masonry structure, wall internal layer(1-3)Top be divided into platy structure, wall external layer(1-1)For platy structure;Roof(7)Under Side is provided with heat-insulated furred ceiling(8), including furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer;The swinery ground(9)For Thermal-insulation floor, including ground surface layer(9-1), ground layer(9-3)And positioned at the ground intermediate thermal insulating layer between them(9-2); The defecation hole of the soil drainage system(3)Outlet on activity be stamped deep bead(10), deep bead(10)Upper end be hinged on defecation Hole(3)Export the wall of top(1)External wall on, deep bead(10)Lower end it is freely hanging.
2. insulation pig house according to claim 1, it is characterised in that:The swinery ground(9)For from pig house middle part to wall Body direction is inclined domatic.
3. insulation pig house according to claim 1, it is characterised in that:The ground surface layer(9-1)Thickness be 5-10cm, Ground intermediate thermal insulating layer(9-2)Thickness be 5-15cm.
4. insulation pig house according to claim 3, it is characterised in that:The wall internal layer(1-3)Lower part brick setting Structure height is 1.2-1.6m.
5. insulation pig house according to claim 1, it is characterised in that:The wall intermediate thermal insulating layer(1-2)In furred ceiling The thickness of interval thermosphere is 10-20cm, wall external layer(1-1), furred ceiling upper epidermis, the thickness of furred ceiling layer be 1-5mm.
6. insulation pig house according to claim 1, it is characterised in that:The soil drainage system is included along wall(1)Indulge inner side To the slurry gutte of arrangement(4), along wall(1)The sludge collecting ditch that outside is longitudinally arranged(2), connection slurry gutte(4)Bottom and sludge collecting ditch (2)Multiple defecation holes of side wall(3), slurry gutte(4)Screen is stamped in upper activity(4-1), slurry gutte(4)Bottom surface be from pig activity Area is inclined domatic to wall direction.
7. insulation pig house according to claim 1, it is characterised in that:The wall external layer(1-1), wall intermediate thermal insulating layer (1-2)With wall internal layer(1-3)Between be bonded by glue;Between furred ceiling upper epidermis, furred ceiling intermediate thermal insulating layer and furred ceiling layer It is bonded by glue.
8. insulation pig house according to claim 1, it is characterised in that:The swinery ground(9)And slurry gutte(4)Bottom surface The gradient is 3%-5%.
CN201720280295.1U 2017-03-22 2017-03-22 One kind insulation pig house Active CN206791317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720280295.1U CN206791317U (en) 2017-03-22 2017-03-22 One kind insulation pig house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720280295.1U CN206791317U (en) 2017-03-22 2017-03-22 One kind insulation pig house

Publications (1)

Publication Number Publication Date
CN206791317U true CN206791317U (en) 2017-12-26

Family

ID=60729693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720280295.1U Active CN206791317U (en) 2017-03-22 2017-03-22 One kind insulation pig house

Country Status (1)

Country Link
CN (1) CN206791317U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109275579A (en) * 2018-10-24 2019-01-29 贵州黔峰原生态食品有限公司 A kind of pig house that the cultivation of Congjiang perfume (or spice) pig is good with epidemic prevention property
CN109302994A (en) * 2018-10-19 2019-02-05 泗县惠民生态养殖有限公司 A kind of heat preservation pig house

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109302994A (en) * 2018-10-19 2019-02-05 泗县惠民生态养殖有限公司 A kind of heat preservation pig house
CN109275579A (en) * 2018-10-24 2019-01-29 贵州黔峰原生态食品有限公司 A kind of pig house that the cultivation of Congjiang perfume (or spice) pig is good with epidemic prevention property

Similar Documents

Publication Publication Date Title
CN203646253U (en) Novel piggery
CN201365440Y (en) Energy-saving and environment-friendly fattening pig house
CN206791317U (en) One kind insulation pig house
CN101491217A (en) Energy-saving environmental protection fattening house
CN107989239A (en) One kind is exempted to tear reinforced concrete shear wall ecology exterior sheathing open
CN203942906U (en) A kind of pig house
CN202324250U (en) Novel thermal-insulation and energy-saving wall body
CN205804785U (en) Self waterproofing environment-friendly type overhead heat insulation Rotating fields
CN202202471U (en) Thermal-insulating and heat-preserving brick capable of planting flowers and plants
CN206061844U (en) A kind of integrated porous wall temperature control laying pigeon house
CN203087105U (en) Rear roof and wall body of sunlight energy-saving green house
CN103556764A (en) Self-balancing extra-large-area roof reservoir and building method thereof
CN205912644U (en) Pig house heat preservation system
CN102696491A (en) Ecotype energy-saving and emission-reducing hog house design and construction technology
CN207211423U (en) A kind of heat-preserving heat-insulating wall structure
CN203531205U (en) Self-balancing extra-large-area roof reservoir
CN208251177U (en) A kind of compound stratum structure
CN206591676U (en) Construction wall insulation construction
CN206660587U (en) Ice slide
CN100565020C (en) Electric heating warming module
CN104947864A (en) Straw stalk roof panel with heat dissipation function
CN203755492U (en) Novel thermal insulation wall
CN205976061U (en) Thermal -insulated architectural decoration outer wall keeps warm
CN203846694U (en) Water saving and energy saving building
CN203924433U (en) Monolithic insulation floor structure

Legal Events

Date Code Title Description
GR01 Patent grant