CN206789999U - Cable termination makes automatic erector - Google Patents
Cable termination makes automatic erector Download PDFInfo
- Publication number
- CN206789999U CN206789999U CN201720609579.0U CN201720609579U CN206789999U CN 206789999 U CN206789999 U CN 206789999U CN 201720609579 U CN201720609579 U CN 201720609579U CN 206789999 U CN206789999 U CN 206789999U
- Authority
- CN
- China
- Prior art keywords
- expansion link
- cable
- sleeve
- outer layer
- layer sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
A kind of cable termination makes automatic erector, including elevating lever, sleeve pipe is arranged outside described elevating lever, jacket exterior sets A-frame, expansion link is set below sleeve pipe, and sleeve bottom sets variable weights, cable fixed station is set at the top of elevating lever, described sleeve pipe includes inner layer sleeve and outer layer sleeve, and inner layer sleeve is arranged on elevating lever outer layer and is engaged with elevating lever.The utility model is simple in construction, cost is low, operation is easy to carry, the balance in the place that cable termination makes is fixed by A-frame and expansion link, again by setting variable weights to increase the stability of whole device in sleeve bottom, and some positioning holes are provided with sleeve pipe, expansion link fixing hole is provided with support, the setting of these positioning holes and expansion link fixing hole can adapt to the randomness in different operating place, substantially increase operating efficiency.
Description
Technical field
Cable mounting technique field is the utility model is related to, more particularly to a kind of cable termination makes automatic erector.
Background technology
Usually need to make cable terminal in power line construction and maintenance process.Cable terminal at present
Manufacturing process is that a people helps cable, and another person peels off major insulation with cutter, because people helps shakiness, influences operating personnel
The accuracy of operation, and the production quality of cable terminal, or even scratch support personnel;This method is also an impediment to electricity simultaneously
The raising of cable-end head producing efficiency, therefore a kind of cable terminal manufacturing bracket is just needed to solve to make inconvenient, cable termination
The problem of head quality is unstable.
The working site randomness that power cable head and power cable docking make is very big, staff to 10KV and
During 35KV cable terminals make, working site does not have power cable fixing device completely, is entirely random or faces
When support temporarily set up into(Such as:Stool, bench, equipment discard wooden case etc.).Odd-job can be caused unavoidably by making in work
Collapsing and tilting for platform or power cable, has a strong impact on technique and the requirement of making;And operating personnel's offset tool is easily caused, is made
Scratched into the unnecessary knife of power cable, cause potential safety hidden to staff, power cable insulation and power network and equipment
Suffer from.
And because power cable is heavier, so certain heavy burden ability, existing electric power electricity will also be had by making support
It is all to be provided with hook in the centre position of A-frame to be used for hanging weight with vertical steering bracket that cable, which is made in automatic erector,
Stability, but the position of centre of gravity of this mode is too high, stability or bad.
In line with operating efficiency is improved, the purpose conveniently operated with, tested by my long-term observation and summary, if energy
Make a kind of cable termination and make automatic erector, very manifold preparation can be greatly reduced, improve operating efficiency and
Construction technology.I takes into full account in use every by many testing and verifications such as structure type, support pattern
One details, have developed finally cable termination make automatic erector, make cable terminal it is easy for installation, improve construction technology.
Utility model content
In order to solve the above problems, the utility model provides a kind of cable termination and makes automatic erector.
The technical solution adopted in the utility model is:
A kind of cable termination makes automatic erector, including elevating lever, is arranged sleeve pipe outside described elevating lever, outside sleeve pipe
Portion sets A-frame, and expansion link is set below sleeve pipe, and sleeve bottom sets variable weights, sets cable to fix at the top of elevating lever
Platform, described sleeve pipe include inner layer sleeve and outer layer sleeve, and inner layer sleeve is arranged on elevating lever outer layer and is engaged with elevating lever.
Described inner layer sleeve is integrally formed with outer layer sleeve, and A-frame is flexibly connected with outer layer sleeve, outer layer sleeve
On be provided with some positioning holes, one end of each support of A-frame passes through positioning hole and outer layer sleeve by support alignment pin
It is flexibly connected, the other end of support is secured the stand on ground by earth stud.
The side of elevating lever is provided with some expansion link fixing holes on each support of described A-frame, stretched
Bar is fixed on support by expansion link alignment pin one, and expansion link includes the expansion link thick bar being connected with outer layer sleeve, stretches
Bar thick bar is connected by fastening bolt with expansion link thin bar, and expansion link thin bar is determined by expansion link alignment pin one through expansion link
Position hole is connected with support.
Described fastening bolt passes through expansion link alignment pin through expansion link thick bar locking expansion link thin bar, expansion link thick bar
Two are fixed on support through positioning hole.
Described elevating lever is made of worm and gear, and worm screw is arranged in inner layer sleeve, and worm gear is engaged with worm screw,
Inner layer sleeve at worm gear is emptied, and it is in convex shape at worm gear that outer layer sleeve, which encases worm gear,.
Described worm gear is coaxially disposed with can be manually rotated disk, be can be manually rotated disk and is arranged on outside outer layer sleeve, can be manually rotated disk
It is connected by connecting rod through outer layer sleeve with worm gear, can be manually rotated and handle is provided with disk.
Described cable fixed station is connected by connecting trays with elevating lever, and cable fixed station is U-type groove structure, U-shaped
Cable installation fittings is set among groove, and the both sides of cable fixed station are respectively provided with clamping screw, and clamping screw is used to lock through U-type groove
Cable in cable installation fittings, cable installation fittings are clip or ring flange.
Described cable fixed station, by being welded to connect, passes through the company of welding with connecting trays between connecting trays and worm screw
Connect.
The circular groove for placing sleeve pipe is provided among described variable weights, the inwall of circular groove is engaged with outer layer sleeve, circular groove
At least three sleeve pipe retention mechanisms are set between variable weights.
Described sleeve pipe retention mechanism includes spring cavity, and spring cavity bottom sets the pad being engaged with circular groove outer wall, pad
Piece is connected with steel ball, and steel ball is fixedly connected with spring, and spring is fixedly connected with bolt, close to bolt inside sleeve pipe retention mechanism
Side be provided with internal thread for fixing bolt, the internal thread is engaged with the external screw thread on bolt.
The beneficial effects of the utility model are:The utility model is simple in construction, cost is low, operation is easy to carry, passes through three
Angle support and expansion link fix the balance in the place of cable termination making, then by setting variable weights to increase in sleeve bottom
Add the stability of whole device, and some positioning holes are provided with sleeve pipe, expansion link fixing hole is provided with support, these are fixed
The setting of position hole and expansion link fixing hole can adapt to the randomness in different operating place, substantially increase operating efficiency.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the utility model sleeve pipe and wherein crosses the structural representation of a support.
Fig. 3 is the structural representation of the utility model variable weights.
Fig. 4 is the utility model worm gear and the structural representation that can be manually rotated disk.
In figure, 1, crane, 2, handle, 3, variable weights, 4, expansion link, 5, support, 6, cable fixed station, 7, cable fastening
Part, 8, clamping screw, 9, connecting trays, 10, worm screw, 11, worm gear, 12, inner layer sleeve, 13, outer layer sleeve, 14, expansion link it is thick
Bar, 15, expansion link thin bar, 16, expansion link alignment pin one, 17, fastening bolt, 18, sleeve pipe retention mechanism, 19, spring, 20, interior
Screw thread, 21, bolt, 22, steel ball, 23, pad, 24, connecting rod, 25, can be manually rotated disk, 26, circular groove, 27, U-type groove.
Embodiment
As shown in Figure 1 to 4, a kind of cable termination makes automatic erector, including elevating lever 1, outside described elevating lever 1
Portion is arranged sleeve pipe, and jacket exterior sets A-frame, and expansion link 4 is set below sleeve pipe, and sleeve bottom sets variable weights 3, lifting
The top of bar 1 sets cable fixed station 6, and described sleeve pipe includes inner layer sleeve 12 and outer layer sleeve 13, and inner layer sleeve 12 is arranged on
The outer layer of elevating lever 1 is engaged with elevating lever 1.
Described inner layer sleeve 12 is integrally formed with outer layer sleeve 13, and A-frame is flexibly connected with outer layer sleeve 13, outside
Some positioning holes are provided with layer sleeve pipe 13, one end of each support 5 of A-frame passes through positioning hole by support alignment pin
It is flexibly connected with outer layer sleeve 13, the other end of support 5 is fixed on the ground support 5 by earth stud.
The side of elevating lever 1 is provided with some expansion link fixing holes on each support 5 of described A-frame, stretched
Contracting bar 4 is fixed on support 5 by expansion link alignment pin 1, and expansion link 4 includes the expansion link being connected with outer layer sleeve 13
Thick bar 14, expansion link thick bar 14 are connected by fastening bolt 17 with expansion link thin bar 15, and expansion link thin bar 15 passes through expansion link
Alignment pin 1 is connected through expansion link positioning hole with support 5.
Described fastening bolt 17 locks expansion link thin bar 15 through expansion link thick bar 14, and expansion link thick bar 14 passes through flexible
Bar alignment pin two is fixed on support 5 through positioning hole.
Described elevating lever 1 is that worm screw 10 is arranged in inner layer sleeve 12 made of the worm screw 10 of worm gear 11, worm gear 11 with
Worm screw 10 is engaged, and the inner layer sleeve 12 at worm gear 11 is emptied, and it is in convex shaped at worm gear 11 that outer layer sleeve 13, which encases worm gear 11,
Shape.
Described worm gear 11 is coaxially disposed with can be manually rotated disk 25, be can be manually rotated disk 25 and is arranged on outside outer layer sleeve 13, hand
Dynamic rotating disk 25 is connected by connecting rod 24 through outer layer sleeve 13 with worm gear 11, can be manually rotated and handle 2 is provided with disk 25.
Described cable fixed station 6 is connected by connecting trays 9 with elevating lever 1, and cable fixed station 6 is U-type groove structure,
Cable installation fittings 7 is set among U-type groove 27, and the both sides of cable fixed station 6 are respectively provided with clamping screw 8, and clamping screw 8 passes through U-shaped
The cable that groove 27 is used in locking cable fastener 7, cable installation fittings 7 is clip or ring flange.
It with certain thickness rectangular configuration is rectangular parallelepiped structure that described connecting trays 9, which are, the shape of cable fixed station 6
There are the rectangular parallelepiped structure of U-type groove 27 or the middle cube structure for having U-type groove 27 for centre.
Described cable fixed station 6, by being welded to connect, passes through weldering with connecting trays 9 between connecting trays 9 and worm screw 10
Connect in succession.
The circular groove 26 for placing sleeve pipe is provided among described variable weights 3, inwall and the outer layer sleeve 13 of circular groove 26 match
Close, at least three sleeve pipe retention mechanisms 18 are set between circular groove 26 and variable weights 3.
Described sleeve pipe retention mechanism 18 includes spring cavity, and spring cavity bottom sets the pad being engaged with the outer wall of circular groove 26
23, pad 23 is connected with steel ball 22, and steel ball 22 is fixedly connected with spring 19, and spring 19 is fixedly connected with bolt 21, and sleeve pipe is tight
Gu the inside of mechanism 18 is provided with the internal thread for fixing bolt 21 close to the side of bolt 21, the internal thread with bolt 21
External screw thread is engaged.
Variable weights are heavy metal block made of iron or lead etc..
Sleeve pipe retaining mechanism 18 is enclosed on sleeve bottom, tightens spiral shell in use, first find suitable place by the utility model
Bolt 21, enable sleeve pipe retention mechanism 18 is enough to lock sleeve pipe, the extrusion spring 19 of bolt 21, spring 19 extrudes steel ball 22 and makes steel ball
22 prop up catch 23, are brought into close contact catch 23 and the outer wall of circular groove 26, then by three supports 5 by support alignment pin by support
5 are arranged on the correct position of outer layer sleeve 13, then use expansion link alignment pin 1 and expansion link alignment pin two again by expansion link 4
Installed in support 5 and the correct position of sleeve pipe, ensure that whole device can be stablized after being completed and place.
Cable is placed in the U-type groove 27 on cable fixed station 6 during use, and with the locking cable of cable installation fittings 7, then
Clamping screw 8 is tightened, clamping screw 8 is fastened cable, finally carries out the making of cable terminal.
Claims (10)
1. a kind of cable termination makes automatic erector, including elevating lever(1), it is characterised in that:Described elevating lever(1)It is outside
Sleeve pipe is arranged, jacket exterior sets A-frame, expansion link is set below sleeve pipe(4), sleeve bottom setting variable weights(3), rise
Bar drops(1)Top sets cable fixed station(6), described sleeve pipe includes inner layer sleeve(12)And outer layer sleeve(13), internal layer set
Pipe(12)It is arranged on elevating lever(1)Outer layer and elevating lever(1)It is engaged.
2. a kind of cable termination according to claim 1 makes automatic erector, it is characterised in that:Described inner layer sleeve
(12)With outer layer sleeve(13)It is integrally formed, A-frame and outer layer sleeve(13)It is flexibly connected, outer layer sleeve(13)Upper setting
There are some positioning holes, each support of A-frame(5)One end pass through positioning hole and outer layer sleeve by support alignment pin
(13)It is flexibly connected, support(5)The other end
By earth stud by support(5)Fix on the ground.
3. a kind of cable termination according to claim 1 makes automatic erector, it is characterised in that:Described A-frame
Each support(5)On towards elevating lever(1)Side be provided with some expansion link fixing holes, expansion link(4)Pass through expansion link
Alignment pin one(16)It is fixed on support(5)On, expansion link(4)Including with outer layer sleeve(13)The expansion link thick bar being connected
(14), expansion link thick bar(14)Pass through fastening bolt(17)With expansion link thin bar(15)It is connected, expansion link thin bar(15)Pass through
Expansion link alignment pin one(16)Through expansion link positioning hole and support(5)It is connected.
4. a kind of cable termination according to claim 3 makes automatic erector, it is characterised in that:Described fastening bolt
(17)Through expansion link thick bar(14)Lock expansion link thin bar(15), expansion link thick bar(14)Passed through by expansion link alignment pin two
Positioning hole is fixed on support(5)On.
5. a kind of cable termination according to claim 1 makes automatic erector, it is characterised in that:Described elevating lever
(1)It is by worm gear(11)Worm screw(10)It is manufactured, worm screw(10)It is arranged on inner layer sleeve(12)It is interior, worm gear(11)With worm screw(10)
It is engaged, worm gear(11)The inner layer sleeve at place(12)Empty, outer layer sleeve(13)Encase worm gear(11)In worm gear(11)Place is in convex
Play shape.
6. a kind of cable termination according to claim 5 makes automatic erector, it is characterised in that:Described worm gear(11)
With can be manually rotated disk(25)It is coaxially disposed, can be manually rotated disk(25)It is arranged on outer layer sleeve(13)Outside, it can be manually rotated disk(25)It is logical
Cross connecting rod(24)Through outer layer sleeve(13)With worm gear(11)It is connected, can be manually rotated disk(25)On be provided with handle(2).
7. a kind of cable termination according to claim 1 makes automatic erector, it is characterised in that:Described cable is fixed
Platform(6)Pass through connecting trays(9)With elevating lever(1)It is connected, cable fixed station(6)For U-type groove structure, U-type groove centre is set
Cable installation fittings(7), cable fixed station(6)Both sides be respectively provided with clamping screw(8), clamping screw(8)It is used to lock through U-type groove
Tight cable installation fittings(7)In cable, cable installation fittings(7)For clip or ring flange.
8. a kind of cable termination according to claim 7 makes automatic erector, it is characterised in that:Described cable is fixed
Platform(6)With connecting trays(9)By being welded to connect, connecting trays(9)With worm screw(10)Between by being welded to connect.
9. a kind of cable termination according to claim 1 makes automatic erector, it is characterised in that:Described variable weights
(3)Centre is provided with the circular groove for placing sleeve pipe(26), circular groove(26)Inwall and outer layer sleeve(13)It is engaged, circular groove(26)With
Variable weights(3)Between at least three sleeve pipe retention mechanisms are set(18).
10. a kind of cable termination according to claim 9 makes automatic erector, it is characterised in that:Described sleeve pipe is tight
Gu mechanism(18)Including spring cavity, spring cavity bottom is set and circular groove(26)The pad that outer wall is engaged(23), pad(23)With
Steel ball(22)It is connected, steel ball(22)With spring(19)It is fixedly connected, spring(19)With bolt(21)It is fixedly connected, sleeve pipe fastening
Mechanism(18)Internal close bolt(21)Side be provided with for fixing bolt(21)Internal thread, the internal thread and bolt
(21)On external screw thread be engaged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720609579.0U CN206789999U (en) | 2017-05-27 | 2017-05-27 | Cable termination makes automatic erector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720609579.0U CN206789999U (en) | 2017-05-27 | 2017-05-27 | Cable termination makes automatic erector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206789999U true CN206789999U (en) | 2017-12-22 |
Family
ID=60714060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720609579.0U Expired - Fee Related CN206789999U (en) | 2017-05-27 | 2017-05-27 | Cable termination makes automatic erector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206789999U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107069590A (en) * | 2017-05-27 | 2017-08-18 | 国网河南禹州市供电公司 | Cable termination makes automatic erector |
CN108824938A (en) * | 2018-07-27 | 2018-11-16 | 中铁二局第二工程有限公司 | A kind of construction Moveable Pipeline bracket and its application method |
-
2017
- 2017-05-27 CN CN201720609579.0U patent/CN206789999U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107069590A (en) * | 2017-05-27 | 2017-08-18 | 国网河南禹州市供电公司 | Cable termination makes automatic erector |
CN107069590B (en) * | 2017-05-27 | 2019-01-18 | 国网河南禹州市供电公司 | Cable termination makes automatic erector |
CN108824938A (en) * | 2018-07-27 | 2018-11-16 | 中铁二局第二工程有限公司 | A kind of construction Moveable Pipeline bracket and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107069590A (en) | Cable termination makes automatic erector | |
CN206789999U (en) | Cable termination makes automatic erector | |
CN210105345U (en) | Large-scale steel structure mounting equipment | |
CN206180456U (en) | Two pole double guide rail join in marriage electrical pillar rack | |
CN202544468U (en) | Drawbar-type electrical steel tubular rod | |
CN108915278B (en) | Ball node net rack small unit ground welding support splicing jig | |
CN109509615A (en) | A kind of repairing two-stub transformer rack and its fixed device | |
CN209168879U (en) | A kind of repairing two-stub transformer rack and its fixed device | |
CN208335944U (en) | Current transformer oil compensating tool | |
CN216451045U (en) | Fast-assembling type switch overhauls platform and safety belt linkage | |
CN205933000U (en) | Super high-rise external hanging movable arm tower crane climbing supporting device | |
CN108915279B (en) | Ball node net rack small unit ground welding grabbing and splicing jig | |
CN211007871U (en) | A reinforced structure for iron tower | |
CN209425306U (en) | The deflectable erection support of pressure vessels for the chemical industry internals | |
CN208135600U (en) | A kind of large size wire and cable spiral wheeled support device | |
CN219458599U (en) | Large-caliber tubular busbar fitting | |
CN205484430U (en) | Transformer high -voltage testing support | |
CN220164782U (en) | Connecting structure for upper cover of filling barrel | |
CN219530813U (en) | Boiler heating surface installation mechanism | |
CN215005579U (en) | Current transformer end screen wire clamp | |
CN215409942U (en) | Damping buffer | |
CN219986723U (en) | Fixed-position welding device based on steel pipe tower | |
CN218234628U (en) | Auxiliary anti-toppling device for vertical telescopic fence of transformer station | |
CN210195933U (en) | Universal wrapping rod type branch node connector for lattice concrete filled steel tube wind power tower | |
CN210186268U (en) | Transformer overhauls safety belt linkage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 Termination date: 20180527 |
|
CF01 | Termination of patent right due to non-payment of annual fee |