CN206784371U - Cast-in-situ bored pile building mortion under a kind of Karst Geology - Google Patents

Cast-in-situ bored pile building mortion under a kind of Karst Geology Download PDF

Info

Publication number
CN206784371U
CN206784371U CN201720681972.0U CN201720681972U CN206784371U CN 206784371 U CN206784371 U CN 206784371U CN 201720681972 U CN201720681972 U CN 201720681972U CN 206784371 U CN206784371 U CN 206784371U
Authority
CN
China
Prior art keywords
casing
interior
interior casing
outer casing
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720681972.0U
Other languages
Chinese (zh)
Inventor
李瑞卿
王伟方
杨贵佳
何小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Friendship Three Gong Ju Bridge Tunnel Engineering Co Ltd
Original Assignee
Middle Friendship Three Gong Ju Bridge Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Friendship Three Gong Ju Bridge Tunnel Engineering Co Ltd filed Critical Middle Friendship Three Gong Ju Bridge Tunnel Engineering Co Ltd
Priority to CN201720681972.0U priority Critical patent/CN206784371U/en
Application granted granted Critical
Publication of CN206784371U publication Critical patent/CN206784371U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Cast-in-situ bored pile building mortion under a kind of Karst Geology, including support, outer casing, interior casing and the pump line being connected with pump truck;Support is provided with vertical, levelness test section, and mid-stent coordinates outer casing to be provided with the pilot hole being vertically arranged, and outer casing is slideably positioned in pilot hole, and for outer casing in ground, outer casing top surface is concordant with ground;Interior casing is located at below outer casing, and interior casing is slideably positioned in outer casing, and interior casing at least 1, each interior casing is sequentially distributed along short transverse, is connected between adjacent interior casing by connecting cylinder.The utility model is simple in construction, and outer casing perpendicularity is controllable, and interior casing is easy to connect, is less prone to the phenomenon of tomography, adjacent interior casing junction sealing is preferable, can improve the molding effect of bored concrete pile.

Description

Cast-in-situ bored pile building mortion under a kind of Karst Geology
Technical field
The utility model belongs to cast-in-situ bored pile under drilling hole bored concrete pile technology field, more particularly to a kind of Karst Geology Use building mortion.
Background technology
Cast-in-situ bored pile is as a kind of bridge infrastructure form with spies such as its strong adaptability, moderate cost, easy constructions Point is widely used in highway, bridge and other engineering fields.Pile foundation belongs to concealed work, influences bored pile construction matter The factor of amount is a lot, and wherein karst cave treatment is exactly an important job, if dealing with improperly, is easy for that thing occurs in perfusion Therefore it is small to collapse hole is loose, necking down, scrapped to broken pile greatly, directly affect the duration of a project and unfavorable shadow is produced to whole construction quality Ring.
The method of existing Karst Geological Landscape bored pile construction is:Outer casing is positioned in drilling and positioned, is met Interior casing is then transferred to solution cavity, the fluids such as mud are stopped by interior casing, it is disadvantageous in that:Adjacent interior casing is independent In the presence of, it is easy to the phenomenon not planned a successor, outer casing are transferred by crane and positioned, easily occurred in decentralization process inclined existing As influenceing the molding effect of final bored concrete pile.
Utility model content
The utility model aims to provide cast-in-situ bored pile under a kind of Karst Geology simple in construction, using effect is good and used Building mortion.
In order to solve the above technical problems, the utility model provides following technical scheme:Under a kind of Karst Geology Cast-in-situ bored pile building mortion, including support, outer casing, interior casing and the pump line being connected with pump truck;Support be provided with it is vertical, Levelness test section, mid-stent coordinate outer casing to be provided with the pilot hole being vertically arranged, and outer casing slides to ground from pilot hole top In face, outer casing top surface is concordant with ground;Interior casing is located at below outer casing, and interior casing is slided under outer casing from outer casing top Side, interior casing at least 1, each interior casing is sequentially distributed along short transverse, is connected between adjacent interior casing by connecting cylinder.
The backplate set in pilot hole provided with the outer casing of the curved cooperation in cross section, outer casing are slideably positioned in backplate Side.
Vertically, levelness test section includes level meter and the counter weight in back taper, and level meter is arranged at the upper table of support On face;Counter weight top is provided with the rope being connected with support;Counter weight bottom is provided with pointer, coordinates pointer to be provided with circular arc on support The dial of shape, dial are provided with scale.
Interior casing upper end is provided with upper plate, and upper plate inner surface is concordant with interior casing inner surface;Interior casing lower end is provided with down Plate, the inner surface of the lower plugboard of interior casing above are bonded with the outer surface of underlying upper plate, lower plugboard and The thickness of upper plate and, lower plugboard outer surface and interior casing flush with outer surface identical with interior casing thickness.
The outward-dipping setting from top to bottom of the inner surface of lower plugboard.
Pump line includes inner tube and the outer tube being slideably positioned in outside inner tube, and inner tube is connected with pump truck.
Pump line is connected with support.
By above technical scheme, the beneficial effects of the utility model are:1st, the utility model is by setting support, outer shield Cylinder, interior casing and pump line be connected with pump truck, set on support vertically, levelness test section, so as to ensure that the vertical of outer casing The perpendicularity of degree and interior casing, use more convenient, connective stability height.2nd, it is curved that cross section is provided with pilot hole The backplate for coordinating outer casing to set, ensure that the track in outer casing decentralization process.3rd, vertical, the levelness test section pair set Environmental suitability is stronger, uses more convenient, and cost is cheap.4th, interior casing upper end is provided with upper plate, upper plate inner surface It is concordant with interior casing inner surface;Interior casing lower end is provided with lower plugboard, and the inner surface of lower plugboard is bonded with the outer surface of upper plate, side Positioning in adjacent interior casing connection procedure.5th, the inner surface of lower plugboard outward-dipping setting from top to bottom, is lowered into To the impurity level in upper plate and lower plugboard connecting sewing, the mass rate of emission of impurity is also improved.6th, pump line includes inner tube and slip The outer tube being arranged at outside inner tube, pump tube length are adjustable.7th, pump line and support connect, so as to which pump line is steady in concreting process Qualitative height.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is supporting structure schematic diagram;
Fig. 3 is interior casing structure schematic diagram.
Embodiment
Cast-in-situ bored pile building mortion under a kind of Karst Geology, as shown in figure 1, including support 1, on support 1 Provided with support bar 101, support bar 101 shares 4, and 4 support bars 101 are respectively arranged on 4 drift angles of support 1.Support bar 101 adjustable length, wherein, the length of support bar 101 is identical with the length of support 1.
Vertical, levelness test section is provided with support 1, vertical, levelness test section includes level meter 13 and counter weight 4, level meter 13 is arranged on the upper surface of support 1.Counter weight 4 is in back taper, and the top of counter weight 4 is provided with the rope being connected with support 1 Son 3;The bottom of counter weight 4 is provided with pointer 5, coordinates pointer 5 to be provided with the dial 6 of circular arc on support 1, and dial 6, which is provided with, to be carved Degree.When use, rope 3 lifts counter weight 4, the scale on pointer indication dial disc 6 on counter weight 4, passes through reading The scale is taken to learn the perpendicularity of support 1, so as to learn whether support 1 tilts, when support 1 tilts, by adjusting branch The length of strut 101 is adjusted to support 1.Level meter and dial are ripe prior art.
The pilot hole 14 being vertically arranged is provided with support 1, as shown in Fig. 2 two backplates 2 are provided with pilot hole 14, two The cross section of individual backplate 2 is curved.Coordinate backplate 2 to slide in pilot hole 14 and be provided with outer casing 8, the wherein cross section of backplate 2 The center of circle and the center of circle of circle where the outer cross section of casing 8 of place circle are located on same vertical curve.The outer surface of outer casing 8 and backplate 2 inner surface fitting, the perpendicularity in the outer decentralization process of casing 8 is further ensured that by backplate 2.
The outer surface of outer casing 8 is provided with spiral lamination, so that outer casing 8 is more convenient during decentralization.Outside Casing 8 is slided in ground 7 from the top of pilot hole 14 along backplate 2, while the top surface of outer casing 8 is concordant with ground.
The outer lower section of casing 8 is provided with interior casing 9, and interior casing 9 slides to the outer lower section of casing 8 from the outer top of casing 8 along outer casing 8. Interior casing 9 at least 1, interior casing 9 shares two in the present embodiment.Each interior casing 9 is sequentially distributed along short transverse, is such as schemed Shown in 3, it is connected between adjacent interior casing 9 by connecting cylinder 15, the upper and lower part of the connecting cylinder 15 interior casing with top respectively Welded with the interior casing of lower section.
Meanwhile the interior upper end of casing 9 is provided with upper plate 10, the upper inner surface of plate 10 is concordant with the interior inner surface of casing 9;Interior casing 9 lower ends are provided with lower plugboard 11, and the inner surface of the lower plugboard 11 of interior casing above is inserted with the upper of underlying interior casing The outer surface fitting of plate 10, the thickness of lower plugboard 11 and upper plate 10 and identical with the interior thickness of casing 9, the outer surface of lower plugboard 11 with The interior flush with outer surface of casing 9.The connection of adjacent interior casing is realized by the cooperation of upper plate and lower plugboard.Meanwhile lower plugboard 11 Inner surface outward-dipping setting from top to bottom, so as to the impurity level being lowered between upper plate and lower plugboard in connecting sewing.
In order to realize pouring for concrete, pump line 12 is connected with support, the one end of pump line 12 is connected with pump truck, pump line 12 The other end is extend into interior casing, is poured so as to which the concrete in pump truck can enter realization in interior casing.Pump line 12 includes Inner tube and the outer tube being slideably positioned in outside inner tube, inner tube is connected with pump truck, it is achieved thereby that the adjustment of pump tube length, is improved The accommodation of device, use more convenient.
First, punched according to the design size of bored concrete pile, adjusting bracket so that the upper surface of support is in horizontal State, the pilot hole on support are in vertical state;Outer casing is transferred into pilot hole;According to design size, suitable quantity is selected Interior casing, adjacent interior casing is connected in the case where ensureing vertical degree;Then, the leading by outer casing by interior casing To transferring in hole, then steel reinforcement cage is placed in inside casing, can be achieved finally by casting concrete in the inside casing of pump line The shaping of bored concrete pile.
The utility model is simple in construction, and outer casing perpendicularity is controllable, and interior casing is easy to connect, is less prone to showing for tomography As adjacent interior casing junction sealing is preferable, can improve the molding effect of bored concrete pile.

Claims (7)

  1. A kind of 1. cast-in-situ bored pile building mortion under Karst Geology, it is characterised in that:Including support, outer casing, interior shield Cylinder and the pump line being connected with pump truck;Support is provided with vertical, levelness test section, and the outer casing of mid-stent cooperation is provided with to be set vertically The pilot hole put, outer casing are slided in ground from pilot hole top, and outer casing top surface is concordant with ground;Interior casing is located at outer casing Lower section, interior casing are slided to below outer casing from outer casing top, interior casing at least 1, each interior casing along short transverse according to Secondary distribution, it is connected by connecting cylinder between adjacent interior casing.
  2. 2. cast-in-situ bored pile building mortion under Karst Geology as claimed in claim 1, it is characterised in that:In pilot hole The backplate set provided with casing outside the curved cooperation in cross section, outer casing are slideably positioned on the inside of backplate.
  3. 3. cast-in-situ bored pile building mortion under Karst Geology as claimed in claim 2, it is characterised in that:Vertically, water Pingdu test section includes level meter and the counter weight in back taper, and level meter is arranged on the upper surface of support;Counter weight top Provided with the rope being connected with support;Counter weight bottom is provided with pointer, coordinates pointer to be provided with the dial of circular arc, scale on support Disk is provided with scale.
  4. 4. cast-in-situ bored pile building mortion under Karst Geology as claimed in claim 3, it is characterised in that:On interior casing End is provided with upper plate, and upper plate inner surface is concordant with interior casing inner surface;Interior casing lower end is provided with lower plugboard, and above is interior The inner surface of the lower plugboard of casing is bonded with the outer surface of underlying upper plate, the thickness of lower plugboard and upper plate and with it is interior Casing thickness is identical, lower plugboard outer surface and interior casing flush with outer surface.
  5. 5. cast-in-situ bored pile building mortion under Karst Geology as claimed in claim 4, it is characterised in that:Lower plugboard Inner surface outward-dipping setting from top to bottom.
  6. 6. cast-in-situ bored pile building mortion under Karst Geology as claimed in claim 5, it is characterised in that:Pump line includes Inner tube and the outer tube being slideably positioned in outside inner tube, inner tube are connected with pump truck.
  7. 7. cast-in-situ bored pile building mortion under the Karst Geology as described in claim 1 to 6 any one, its feature exist In:Pump line is connected with support.
CN201720681972.0U 2017-06-13 2017-06-13 Cast-in-situ bored pile building mortion under a kind of Karst Geology Active CN206784371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720681972.0U CN206784371U (en) 2017-06-13 2017-06-13 Cast-in-situ bored pile building mortion under a kind of Karst Geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720681972.0U CN206784371U (en) 2017-06-13 2017-06-13 Cast-in-situ bored pile building mortion under a kind of Karst Geology

Publications (1)

Publication Number Publication Date
CN206784371U true CN206784371U (en) 2017-12-22

Family

ID=60715762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720681972.0U Active CN206784371U (en) 2017-06-13 2017-06-13 Cast-in-situ bored pile building mortion under a kind of Karst Geology

Country Status (1)

Country Link
CN (1) CN206784371U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056706A (en) * 2018-08-03 2018-12-21 上海宝冶集团有限公司 A kind of Karst Geological Landscape poured pile base construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056706A (en) * 2018-08-03 2018-12-21 上海宝冶集团有限公司 A kind of Karst Geological Landscape poured pile base construction method

Similar Documents

Publication Publication Date Title
CN205296874U (en) Information -based construction monitor positioning device of stake integration
CN103205965B (en) Root pressure grouting pile and construction method thereof
CN109487822B (en) Method for installing and adjusting steel pipe column in reverse construction and control device
CN104264902B (en) Steel pipe concrete column and pile foundation connection structure
CN203891009U (en) Structure for installing reverse steel pipe column in rotary excavating pile hole
CN203583497U (en) Inversed operation steel pipe column perpendicularity collecting device
CN105863042A (en) All-steel structure building and construction method thereof
CN208604645U (en) A kind of vertical cylinder pore arbitrary point center measuring device
CN105064381A (en) High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN114673153A (en) Construction method of complex stratum overlength large-diameter pile foundation casing structure
CN104372798A (en) Construction method of all-casing all-direction drilling rig
CN206784371U (en) Cast-in-situ bored pile building mortion under a kind of Karst Geology
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN202688989U (en) Upright pile
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN206477240U (en) A kind of trestle pile foundation for deep water drift net riverbed
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN113338273B (en) Stirring pile construction method based on water-rich organic matter soft soil layer river channel
CN205776259U (en) A kind of deep basal pit retaining wall one side formwork constructing device
CN209368828U (en) Reverse construction erection of steel pipe column control device
CN208088290U (en) Organizational pile foundation structure
CN210827478U (en) Deep foundation pit underground structure reverse construction method steel pipe column positioning device
CN110005367B (en) Device for hole sealing of drilling holes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant