CN206769908U - A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate - Google Patents

A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate Download PDF

Info

Publication number
CN206769908U
CN206769908U CN201720497945.8U CN201720497945U CN206769908U CN 206769908 U CN206769908 U CN 206769908U CN 201720497945 U CN201720497945 U CN 201720497945U CN 206769908 U CN206769908 U CN 206769908U
Authority
CN
China
Prior art keywords
bim
ingate
vertical shaft
opens
protecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720497945.8U
Other languages
Chinese (zh)
Inventor
孔恒
翟永山
卢常亘
陈建华
王渭
杨明超
张兴昕
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Beijing No 4 Municipal Construction Engineering Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Beijing No 4 Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd, Beijing No 4 Municipal Construction Engineering Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201720497945.8U priority Critical patent/CN206769908U/en
Application granted granted Critical
Publication of CN206769908U publication Critical patent/CN206769908U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Alarm Devices (AREA)
  • Alarm Systems (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The protecting, monitoring system that a kind of subway station vertical shaft based on BIM opens ingate is the utility model is related to, belongs to BIM fields.Metro station construction vertical shaft has fore shaft collar tie beam in the utility model, metro station construction vertical shaft, which opens up, is provided with ingate reinforcing ring at ingate, sedimentation detection terminal is equipped with fore shaft collar tie beam and ingate reinforcing ring, sedimentation detection terminal includes settlement sensor, processor, wireless communication module and power module;The utility model also includes BIM servers, BIM work stations and display;Display is connected with BIM work stations, and BIM work stations are connected with BIM server networks;Settle detection terminal and network is accessed by wireless communication module, and be connected with BIM server networks.The utility model ingate reinforcing ring, which is realized, provides reinforcement protection when metro station construction vertical shaft opens up ingate, and sedimentation detection terminal detects the sedimentation situation of fore shaft collar tie beam and ingate reinforcing ring in real time.

Description

A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate
Technical field
The utility model belongs to BIM fields, and in particular to a kind of subway station vertical shaft based on BIM opens the protection of ingate Monitoring system.
Background technology
Subway station build be subway construction important component, it is invested, and big, difficulty is high so that subway station Build construction requirement height, cycle length.During City Subway Station construction, because of surface structures, road, underground utilities etc. in city It is complicated various, and the requirement to noise, dust etc., can be solved using subsurface excavation method during City Subway Station construction above-mentioned Problem.
In the construction of city underground bored tunnel, ingate is the key link that structure stress is changed in work progress, When opening up ingate, if dealt with improperly, it may appear that vault such as caves at the accident.Thus opened up in metro station construction Construction of Silo Just it is highly desirable to take corresponding reinforcement protection measure and surveillance and control measure during ingate.
In work progress, construction monitoring is by artificial gathered data, finishing analysis, analysis result manually in plane After being identified on layout drawing, variation tendency, such monitoring mode one are expressed in a manner of form coordinates two-dimensional curve, figure Aspect takes substantial amounts of human time, and Monitoring Data is difficult to meet engine request in terms of real-time;On the other hand to report Table coordinates two-dimensional curve, the mode of figure expresses variation tendency is not manifestation mode directly perceived, and this comes to veteran engineer Say, can quickly skilled discriminatory analysis, but then different, it is necessary to aid in helping for the new engineer for participating in project or layman Help and instructed.
Utility model content
In view of this, the purpose of this utility model is overcome the deficiencies in the prior art, there is provided a kind of subway based on BIM Station vertical shaft opens the protecting, monitoring system of ingate, with realized when metro station construction vertical shaft opens up ingate reinforcement protection and Monitoring in real time.
To realize object above, the utility model adopts the following technical scheme that:
A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate, the metro station construction vertical shaft With fore shaft collar tie beam, the metro station construction vertical shaft opens up and ingate reinforcing ring is provided with ingate, the fore shaft collar tie beam and Sedimentation detection terminal is equipped with the ingate reinforcing ring, the sedimentation detection terminal includes settlement sensor, processor, nothing Line communication module and power module, the settlement sensor electrically connect with the processor, the processor with it is described wireless Communication module electrically connects, and the power module provides the working power of the sedimentation detection terminal;
The protecting, monitoring system that the subway station vertical shaft based on BIM opens ingate also includes BIM servers, BIM works Stand and display;The display electrically connects with the BIM work stations, between the BIM work stations and the BIM servers Pass through network connection;The sedimentation detection terminal accesses network by the wireless communication module, and leads to the BIM servers Cross network connection.
Further, the subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate also including BIM movements Terminal device, pass through network connection between the BIM mobile terminal devices and the BIM servers.
Further, the BIM mobile terminal devices are notebook computer or smart mobile phone.
Further, the sedimentation detection terminal also includes alarm module, and the alarm module is electrically connected with the processor Connect.
Further, the alarm module is buzzer or LED Color-changing lamps.
Further, the subway station vertical shaft based on BIM, which opens the protecting, monitoring system of ingate, also includes printer, The printer electrically connects with the BIM work stations.
Further, the printer is laser color printer.
Further, the settlement sensor is hydrostatic level.
Further, the wireless communication module is 3G wireless communication modules or 4G wireless communication modules.
Further, the display is large screen display.
The utility model uses above technical scheme, at least possesses following beneficial effect:
The utility model provides the protecting, monitoring system that a kind of subway station vertical shaft based on BIM opens ingate, in subway Station construction vertical shaft, which opens up, sets ingate reinforcing ring to realize when metro station construction vertical shaft opens up ingate at ingate Reinforcement protection is provided, it is ensured that the stable safety of peripheral structure when opening up ingate, in the fore shaft collar tie beam of metro station construction vertical shaft Detection terminal is settled with being set on ingate reinforcing ring, detects the sedimentation situation of fore shaft collar tie beam and ingate reinforcing ring, and in real time BIM servers are sent to, real-time visual control analysis are carried out by BIM work stations and display, and realize to sedimentation Situation makes timely reactive measures.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is that the utility model metro station construction vertical shaft sets ingate reinforcing ring and settles the signal of detection terminal Figure;
Fig. 2 is the work for the protecting, monitoring system that a kind of subway station vertical shaft based on BIM of the utility model opens ingate Schematic diagram;
Fig. 3 is the fundamental diagram that the utility model sets up BIM mobile terminal devices on the basis of Fig. 2 fundamental diagrams;
Fig. 4 is the fundamental diagram that the utility model sets up alarm module on the basis of Fig. 2 fundamental diagrams;
Fig. 5 is the fundamental diagram that the utility model sets up printer on the basis of Fig. 2 fundamental diagrams.
In figure, 1- metro station construction vertical shafts;2- ingate reinforcing rings;3- settles detection terminal;4-BIM servers;5- BIM work stations;6- displays;7- networks;8-BIM mobile terminal devices;9- printers;101- fore shaft collar tie beams;301- sedimentations pass Sensor;302- processors;303- wireless communication modules;304- power modules;305- alarm modules.
Embodiment
, below will be to technology of the present utility model to make the purpose of this utility model, technical scheme and advantage clearer Scheme is described in detail.Obviously, described embodiment is only the utility model part of the embodiment, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made Resulting all other embodiment is put, belongs to the scope that the utility model is protected.
Name Resolution:BIM, English Building Information Modeling abbreviation, Chinese is architecture information mould Type.BIM is based on every relevant information data of construction-engineering project, it is established that three-dimensional BUILDINGS MODELS, passes through number Real information possessed by word information emulator simulant building thing.With information completeness, information relevance, consistency on messaging, can The advantages that depending on change, harmony, simulation, optimization property and figure can be gone out.
For building trade, it is very big that visualization, which is used in the effect of construction industry, such as that often takes apply Work drawing, simply the information of each component draws expression on drawing using lines, but its real structural form just needs Construction industry participant is wanted to go voluntarily to imagine.For general simple thing, this imagination also should be all right, but closely The construction style of several years construction industries is different, and complex model is constantly being released, then this human brain of depending alone removes the thing of the imagination just It is rather somewhat unrealistic.So BIM provides visual thinking, allow people that the component of conventional line type is formed into one The three-dimensional three-dimensional real object figure of kind is illustrated in face of people.In BIM BIMs, because whole process is all visual Change, so visual result can not only be used for the displaying of design sketch and the generation of form, it is often more important that, project is set Communication, discussion, decision-making during meter, construction, operation are carried out all in the state of visualization.
Thus, for the metro building for also belonging to Building class, metro building, which uses, can also use BIM as visual Change monitoring means.
For prior art in, BIM merely provides a kind of visual simulation tool, and the input of its data is still to rely on people Work inputs, thus when people utilize BIM in the prior art, the collection of data, which is imported into BIM models, still relies on manual site Collection, so collection importing cycle are longer, can not be met in terms of real-time.
For the purpose realized reinforcement protection when metro station construction vertical shaft opens up ingate and monitored in real time, such as Fig. 1 Shown in Fig. 2, the utility model provides following scheme:
A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate, the metro station construction vertical shaft 1 With fore shaft collar tie beam 101, the metro station construction vertical shaft 1, which opens up, is provided with ingate reinforcing ring 2, the fore shaft circle at ingate Sedimentation detection terminal 3 is equipped with beam 101 and the ingate reinforcing ring 2, the sedimentation detection terminal 3 includes settlement sensor 301st, processor 302, wireless communication module 303 and power module 304, the settlement sensor 301 and the processor 302 Electrical connection, the processor 302 electrically connect with the wireless communication module 303, and the power module 304 provides the sedimentation inspection Survey the working power of terminal 3;
The metro station construction vertical shaft 1 based on BIM open the protecting, monitoring system of ingate also include BIM servers 4, BIM work stations 5 and display 6;The display 6 electrically connects with the BIM work stations 5, the BIM work stations 5 and the BIM Connected between server 4 by network 7;The sedimentation detection terminal 3 accesses network 7 by the wireless communication module 303, and It is connected with the BIM servers 4 by network 7.
By such scheme, opened up in the metro station construction vertical shaft 1 and the ingate reinforcing ring 2 is set at ingate Reinforcement protection can be realized when metro station construction vertical shaft 1 opens up ingate, further reduce the mistake caused by vault destroys Security risk caused by big surface subsidence, the stable safety of peripheral structure when ensureing to open up ingate.
Metro station construction vertical shaft opens up conventional being realized by vertical shaft grid in horse-head ingate and reinforced at present, such as in horse Head door opening even reinforced by vertical four Pin grids, and the utility model is in actual application, for the ingate reinforcing ring 2, the ingate reinforcing ring 2 can coordinate vertical shaft grid while use, as set up institute of the present utility model in vertical shaft grid State ingate reinforcing ring 2 and realize further reinforcing.
Described in being set on the fore shaft collar tie beam 101 and the ingate reinforcing ring 2 of the metro station construction vertical shaft 1 Detection terminal 3 is settled, the settlement sensor 301 settled in detection terminal 3 detects the He of detection fore shaft collar tie beam 101 The sedimentation situation of the ingate reinforcing ring 2, obtained sedimentation signal are sent to institute in real time by the wireless communication module 303 BIM servers 4 are stated, real-time visual control analysis is carried out by the cooperation of the BIM work stations 5 and the display 6, with Ensure that settlement Control in prescribed limit, can make engineers and technicians in metro station construction vertical shaft 1 by the utility model Correct understanding and efficiently reply are made when opening up ingate, timely reactive measures such as are made to sedimentation situation.
Need herein additionally, it is noted that the part such as the BIM servers 4 of the present utility model, described BIM work stations 5 Although and be related between each part of network connection and be related to computer program and agreement, the realization of its function belongs to existing skill Art, the essence of the utility model is the improvement of composition and the annexation progress to hardware components, specially described Metro station construction vertical shaft 1, which opens up, sets the ingate reinforcing ring 2 at ingate, gathered by the sedimentation detection terminal 3 Sedimentation signal is simultaneously sent to the BIM servers 4 in real time, and the utility model is not related to enter computer program and agreement in itself Capable improvement.
By such scheme, engineers and technicians can be operated in the BIM work stations 5, then by described aobvious Show sedimentation situation when the real-time monitoring analysis metro station construction vertical shaft 1 of device 6 opens ingate, to ensure settlement Control in regulation model In enclosing.But the program is used, the BIM work stations 5 are normally located in office, away from job site, due to described The limitation of BIM work stations 5, behaviour is monitored before the BIM work stations 5 that the engineers and technicians of monitoring can only be in an office Make, the engineers and technicians of monitoring can not go to job site to understand the condition of construction at scene, can not accomplish that reality is carried out with theoretical Synchronous interaction analysis.On the other hand, in order to solve before engineers and technicians are limited in the BIM work stations 5, the utility model is also Solution further below is provided, as shown in figure 3, being specially:
A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate, the metro station construction vertical shaft 1 With fore shaft collar tie beam 101, the metro station construction vertical shaft 1, which opens up, is provided with ingate reinforcing ring 2, the fore shaft circle at ingate Sedimentation detection terminal 3 is equipped with beam 101 and the ingate reinforcing ring 2, the sedimentation detection terminal 3 includes settlement sensor 301st, processor 302, wireless communication module 303 and power module 304, the settlement sensor 301 and the processor 302 Electrical connection, the processor 302 electrically connect with the wireless communication module 303, and the power module 304 provides the sedimentation inspection Survey the working power of terminal 3;
The metro station construction vertical shaft 1 based on BIM open the protecting, monitoring system of ingate also include BIM servers 4, BIM work stations 5 and display 6;The display 6 electrically connects with the BIM work stations 5, the BIM work stations 5 and the BIM Connected between server 4 by network 7;The sedimentation detection terminal 3 accesses network 7 by the wireless communication module 303, and It is connected with the BIM servers 4 by network 7;
The protecting, monitoring system that the metro station construction vertical shaft 1 based on BIM opens ingate also includes BIM mobile terminals Equipment 8, connected between the BIM mobile terminal devices 8 and the BIM servers 4 by network 7.
By the scheme of BIM mobile terminal devices 8 this described, the BIM mobile terminal devices 8 have portability advantage, ground When iron station construction vertical shaft 1 opens up horse-head ingate, due to the difference of soil layer, sinking speed also can be different, engineering technology people Member can carry the BIM mobile terminal devices 8 to job site, be supervised in real time by the BIM mobile terminal devices 8 during construction The situation of construction soil layer when controlling sedimentation situation, while can actually know site operation, to accomplish that reality synchronizes with theory Interaction analysis, realize it is more directly perceived, more fully monitor.
In the scheme of BIM mobile terminal devices 8 described above, the BIM mobile terminal devices 8 can use notebook electricity Brain, in view of the lifting of the hardware performance of smart mobile phone at present, there is the performance of computer of matching in excellence or beauty, in the utility model, the BIM is moved Dynamic terminal device 8 can also use smart mobile phone.
As shown in figure 4, in the utility model, for the sedimentation detection terminal 3, the utility model gives one kind can The sedimentation detection terminal 3 is realized the scheme of warning function, be specially:
A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate, the metro station construction vertical shaft 1 With fore shaft collar tie beam 101, the metro station construction vertical shaft 1, which opens up, is provided with ingate reinforcing ring 2, the fore shaft circle at ingate Sedimentation detection terminal 3 is equipped with beam 101 and the ingate reinforcing ring 2, the sedimentation detection terminal 3 includes settlement sensor 301st, processor 302, wireless communication module 303 and power module 304, the settlement sensor 301 and the processor 302 Electrical connection, the processor 302 electrically connect with the wireless communication module 303, and the power module 304 provides the sedimentation inspection Survey the working power of terminal 3;
The metro station construction vertical shaft 1 based on BIM open the protecting, monitoring system of ingate also include BIM servers 4, BIM work stations 5 and display 6;The display 6 electrically connects with the BIM work stations 5, the BIM work stations 5 and the BIM Connected between server 4 by network 7;The sedimentation detection terminal 3 accesses network 7 by the wireless communication module 303, and It is connected with the BIM servers 4 by network 7;
The sedimentation detection terminal 3 also includes alarm module 305, and the alarm module 305 is electrically connected with the processor 302 Connect.
By such scheme, the sedimentation detection terminal 3 is as daily on-site supervision terminal, in real-time monitoring shape State, its sedimentation signal data monitored pass the BIM servers 4 back, so that engineers and technicians analyze, when settling exceeded, The sedimentation detection terminal 3 sends alarm by the scene of alarm module 305, to prompt field personnel, passes through The alarm module 305 can make the utility model realize more fully monitoring function.
For alarm module 305 described above, the alarm module 305 can use buzzer, LED can also be used to become Colored lights.
In actual applications, it is necessary to which associated monitoring data-printing is out analyzed, this utility model is also provided The scheme of printing is implemented as described below, as shown in figure 5, being specially:The subway station vertical shaft based on BIM opens the protection prison of ingate Control system also includes printer 9, and the printer 9 electrically connects with the BIM work stations 5.The printer 9 can use laser Color printer.
In actual applications, the settlement sensor 301 can use hydrostatic level conventional on the market to realize.
In actual applications, the wireless communication module 303 can use 3G wireless communication modules or 4G radio communications Module.
In actual applications, the display 6 can use large screen display, be easy to more people while analysis is discussed.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model discloses Or replace, it should all cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model should be with the power The protection domain that profit requires is defined.

Claims (10)

1. a kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate, the metro station construction vertical shaft tool There is fore shaft collar tie beam, it is characterised in that:The metro station construction vertical shaft, which opens up, is provided with ingate reinforcing ring, the lock at ingate Be equipped with sedimentation detection terminal on mouth circle beam and the ingate reinforcing ring, the sedimentation detection terminal include settlement sensor, Processor, wireless communication module and power module, the settlement sensor electrically connect with the processor, the processor with The wireless communication module electrical connection, the power module provide the working power of the sedimentation detection terminal;
The protecting, monitoring system that the subway station vertical shaft based on BIM opens ingate also includes BIM servers, BIM work stations And display;The display electrically connects with the BIM work stations, passes through between the BIM work stations and the BIM servers Network connection;The sedimentation detection terminal accesses network by the wireless communication module, and passes through net with the BIM servers Network connects.
2. the subway station vertical shaft according to claim 1 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The protecting, monitoring system that the subway station vertical shaft based on BIM opens ingate also includes BIM mobile terminal devices, described Pass through network connection between BIM mobile terminal devices and the BIM servers.
3. the subway station vertical shaft according to claim 2 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The BIM mobile terminal devices are notebook computer or smart mobile phone.
4. the subway station vertical shaft according to claim 1 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The sedimentation detection terminal also includes alarm module, and the alarm module electrically connects with the processor.
5. the subway station vertical shaft according to claim 4 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The alarm module is buzzer or LED Color-changing lamps.
6. the subway station vertical shaft according to claim 1 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The protecting, monitoring system that the subway station vertical shaft based on BIM opens ingate also includes printer, the printer and institute State the electrical connection of BIM work stations.
7. the subway station vertical shaft according to claim 6 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The printer is laser color printer.
8. the subway station vertical shaft according to claim 1 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The settlement sensor is hydrostatic level.
9. the subway station vertical shaft according to claim 1 based on BIM opens the protecting, monitoring system of ingate, its feature exists In:The wireless communication module is 3G wireless communication modules or 4G wireless communication modules.
10. the subway station vertical shaft according to claim 1 based on BIM opens the protecting, monitoring system of ingate, its feature It is:The display is large screen display.
CN201720497945.8U 2017-05-05 2017-05-05 A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate Active CN206769908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720497945.8U CN206769908U (en) 2017-05-05 2017-05-05 A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720497945.8U CN206769908U (en) 2017-05-05 2017-05-05 A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate

Publications (1)

Publication Number Publication Date
CN206769908U true CN206769908U (en) 2017-12-19

Family

ID=60649395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720497945.8U Active CN206769908U (en) 2017-05-05 2017-05-05 A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate

Country Status (1)

Country Link
CN (1) CN206769908U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110454188A (en) * 2019-07-10 2019-11-15 中交路桥北方工程有限公司 The construction method and system of shield tunnel model based on BIM

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110454188A (en) * 2019-07-10 2019-11-15 中交路桥北方工程有限公司 The construction method and system of shield tunnel model based on BIM

Similar Documents

Publication Publication Date Title
Zhou et al. Building information modelling review with potential applications in tunnel engineering of China
WO2021128675A1 (en) Bim technology-based method for constructing underground continuous wall
CN110263460A (en) A kind of assembled 4D construction simulation safety monitoring system based on BIM
CN107808349A (en) Existing building operation management system based on BIM technology
CN108875273B (en) BIM-based foundation pit engineering forward design and operation and maintenance management system
CN105631154A (en) Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN108446889A (en) A kind of exchange method of construction site and construction speed platform
CN111021265A (en) BIM technology-based railway large-span continuous beam swivel construction control method
CN111945796A (en) Foundation pit deformation monitoring synchronous simulation analysis and real-time early warning system based on BIM technology
CN103669366A (en) Remote monitoring early warning system for deep foundation pit support structure deformation
Lin et al. Automating closed-loop structural safety management for bridge construction through multisource data integration
CN109933900A (en) A kind of construction three dimensional field cloth modeling method based on BIM technology
CN113722797A (en) Lightweight BIM prefabricated part full life cycle comprehensive information management system
CN111877184A (en) Railway continuous beam swivel construction method based on BIM
CN104166697A (en) Three-dimensional interactive navigation lock monitoring system
Huang et al. The city management based on smart information system using digital technologies in China
CN112465390A (en) BIM-based subway station construction progress management method
CN210072621U (en) BIM management-based deepened transformation system for vehicle section with ultra-large cover body
Bi et al. Research on the construction of City information modelling basic platform based on multi-source data
CN206769908U (en) A kind of subway station vertical shaft based on BIM opens the protecting, monitoring system of ingate
Zhang et al. WebGIS-based collaborative construction quality control of RCC gravity dam using sensing devices
Yao Internet of things in the quality control of cement mixing pile construction
Gao et al. Research on BIM technology in construction safety & emergency management
Tian et al. Research on the application of BIM technology in bridge engineering
Lu et al. Dynamic data monitoring of building information of nano-modified building steel structure materials using BIM Model

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant