CN206735908U - A kind of ecology retention administration structure for not cutting dirty river course - Google Patents
A kind of ecology retention administration structure for not cutting dirty river course Download PDFInfo
- Publication number
- CN206735908U CN206735908U CN201621205139.0U CN201621205139U CN206735908U CN 206735908 U CN206735908 U CN 206735908U CN 201621205139 U CN201621205139 U CN 201621205139U CN 206735908 U CN206735908 U CN 206735908U
- Authority
- CN
- China
- Prior art keywords
- ecology
- retention
- river course
- enclosure wall
- flexible water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/40—Protecting water resources
- Y02A20/402—River restoration
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W10/00—Technologies for wastewater treatment
- Y02W10/10—Biological treatment of water, waste water, or sewage
Landscapes
- Farming Of Fish And Shellfish (AREA)
Abstract
The utility model discloses a kind of ecology retention administration structure for not cutting dirty river course, including flexible water enclosure wall, ecology retention band and ecology structure area in situ, the flexible water enclosure wall surrounds the embankment with blow-off pipe and set, to form ecology retention band, river course is divided into by ecology retention band by flexible water enclosure wall and ecology in situ builds area;Two sides up and down of the flexible water enclosure wall connect round-shaped float and heavy burden cage respectively.This practicality by set ecology retention band to enter river pollution be effectively controlled, centered on water course in situ restoration of the ecosystem create advantage.This practicality builds the clear water type ecosystem, for eliminating the black smelly phenomenon in river course by kind of a planting submerged plant, dispensing aquatic animal and microorganism.
Description
Technical field
Ecological management field is the utility model is related to, specifically a kind of ecology retention administration structure for not cutting dirty river course.
Background technology
With the continuous development of national economy and society, urbanization and the quickening of process of industrialization, new socialist countryside
That builds is pushed forward comprehensively, and infrastructure construction is continuously increased, growing, the raising of living standards of the people of the wealth of society,
Build a well-off society in an all-round way and propose higher and higher want to flood control safety guarantee, ecological environmental guarantee etc. with socio-economic development
Ask.Sustainable development view it is also proposed new requirement to water development, water development must establish it is people-oriented, economize on resources, protect
The idea of the idea and overall, concerted and sustainable development of retaining ring border and harmony between man and nature, solution relation numerous people group
The Problems of Water Conservancy of many vital interests is placed on extrusion position, considers basin, region, the coordinated development of town and country water conservancy as a whole, improves constantly
Social management ability and level of the government to water resource, resource is saved and protected, strengthens the protection to ecology, promotes man and nature
Harmony, the sustainable development of economic society is supported with the sustainable use of water resource.In black-odor riverway governance process, edge be present
The various sewage of bank are in line to be put into river phenomenon, and city planting ductwork can not transform a section dirty and black-odor riverway in time and need the contradiction of improvement badly increasingly
It is prominent, due to river course two sides sewage enter it is constantly in line enter river, conventional Treatment process is unable to reach river channel ecology system constructing and length
Phase persistently solves black smelly effect.Carry out river regulation, cycle length, it is impossible to solve river water body in time again after river channel sewage intercepting
Black smelly problem.
Utility model content
The purpose of this utility model is to provide a kind of ecology retention administration structure for not cutting dirty river course, to solve the above-mentioned back of the body
The problem of being proposed in scape technology.
To achieve the above object, the utility model provides following technical scheme:
A kind of ecology retention administration structure for not cutting dirty river course, including flexible water enclosure wall, ecology retention band and original position life
State builds area, and the flexible water enclosure wall surrounds the embankment with blow-off pipe and set, anti-by flexibility to form ecology retention band
River course is divided into water enclosure wall into ecology retention band and ecology in situ builds area;The difference of two sides up and down of the flexible water enclosure wall
Connect round-shaped float and heavy burden cage.
As further program of the utility model:The round-shaped float is slidably connected on column.
As further program of the utility model:The inside of the ecology retention band sets landscape chinampa, landscape chinampa
Bottom be connected with biologic packing material.
As further program of the utility model:The bottom of the ecology retention band sets microporous aeration device.
As further program of the utility model:The bottom in the ecology structure area in situ sets kind of planting submerged plant
Growing area.
Compared with prior art, the beneficial effects of the utility model are:This practicality is by setting ecology retention band to entering river
Pollution wait until effectively to control, centered on water course in situ restoration of the ecosystem create advantage.This practicality by kind of a planting submerged plant,
Aquatic animal and microorganism are launched, the clear water type ecosystem is built, for eliminating the black smelly phenomenon in river course.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, in the utility model embodiment, a kind of ecology retention administration structure for not cutting dirty river course, including dike
Bank 1, blow-off pipe 2, landscape chinampa 3, round-shaped float 4, flexible water enclosure wall 5, heavy burden cage 6, biologic packing material 7, micro-pore aeration dress
8, submerged plant 9, ecological retention band 10 and ecology structure area 11 in situ, the flexible water enclosure wall 5 is put to surround and carry blow-off pipe 2
Embankment 1 set, to form ecology retention band 10, river course is divided into by ecology retention band 10 and original by flexible water enclosure wall 5
Position ecology structure area 11.
Two sides up and down of the flexible water enclosure wall 5 connect round-shaped float 4 and heavy burden cage 6 respectively, soft so as to ensure
Property waterproof enclosure wall 5 can be by water segmentation, and the round-shaped float 4 is slidably connected on column, ensures the stabilization of rise and fall.
The inside of the ecology retention band 10 sets landscape chinampa 3, and the bottom on landscape chinampa 3 is connected with biologic packing material 7, from
And microorganism treating sewage is utilized, the bottom of ecology retention band 10 sets microporous aeration device 8, and microporous aeration device 8 can connect
The feeders such as air pump are connect, for providing the oxygen of abundance by microorganism decomposition pollutant.
The bottom in the ecology structure area 11 in situ sets the growing area of kind of planting submerged plant 9, so as to comprehensive to river
Road carries out ecological management.
The construction method of ecology retention band is as follows:A. flexible water enclosure wall 5 is set:Flexible water enclosure wall 5 leans in river course
Offshore side is set, according to the retention band that rational width is set situations such as entering the river discharge of sewage, sewage characteristic and flow width, it is determined that
The setting position of flexible water enclosure wall 5.The in line sewage in two sides is trapped in flexible water enclosure wall 5 and embankment by flexible water enclosure wall 5
Between it is limited within the scope of, reduce pollution range of the sewage to river course, provided for the original position restoration of the ecosystem of river course central area
Ensure, while the sewage retained in band is discharged into downstream river course after too strong purified treatment or administers section original position Ecological Restoration Area and carries out
Moisturizing, flexible water enclosure wall 5 is made up of the part such as upper circular floating body, flexible water enclosure, heavy burden cage and supporting construction, soft
Property waterproof enclosure wall 5 has blocked the water body free exchange of sewage and river course center original position Ecological Restoration Area;Added in supporting construction certainly
Dynamic lifting type support, upper circular floating drum is fixed on automatic-lifting type support, circular floating drum with SEA LEVEL VARIATION on
Rise or decline, the both sides of flexible water enclosure wall 5 do not form water-head;B. microporous aeration device is set:It is micro- that band setting is retained in ecology
Hole aerator, increase Dissolved Oxygen in Water content, increase water body self-purification ability;C. ecoscape chinampa is set:Retained in ecology
With interior setting ecoscape chinampa, ecoscape chinampa is covered with the whole ecology retention band water surface, while is hung under ecological floating island
Biologic packing material, increase microorganisms in water bond area, strengthen water body self-purification ability.
This practicality by set ecology retention band to enter river pollution wait until effectively to control, centered on water course in situ restoration of the ecosystem
Create advantage.This practicality builds clear water type ecosystem by kind of a planting submerged plant, dispensing aquatic animal and microorganism
System, for eliminating the black smelly phenomenon in river course.When municipal administration cut it is dirty in place, sewage no longer it is in line enter river when, enclose the retention of river course both sides is soft
Every dismounting, retain ecoscape chinampa, biologic packing material and microorganism.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (5)
1. a kind of ecology retention administration structure for not cutting dirty river course, including flexible water enclosure wall, ecology retention band and original position ecology
Building area, it is characterised in that the flexible water enclosure wall surrounds the embankment with blow-off pipe and set, to form ecology retention band,
River course is divided into by ecology retention band by flexible water enclosure wall and ecology in situ builds area;Above and below the flexible water enclosure wall
Two sides connect round-shaped float and heavy burden cage respectively.
A kind of 2. ecology retention administration structure for not cutting dirty river course according to claim 1, it is characterised in that the circle
Floating body is slidably connected on column.
A kind of 3. ecology retention administration structure for not cutting dirty river course according to claim 1, it is characterised in that the ecology
The inside for retaining band sets landscape chinampa, and the bottom on landscape chinampa is connected with biologic packing material.
4. a kind of ecology retention administration structure for not cutting dirty river course according to claim 1 or 3, it is characterised in that described
The bottom of ecology retention band sets microporous aeration device.
A kind of 5. ecology retention administration structure for not cutting dirty river course according to claim 1, it is characterised in that the original position
The bottom in ecology structure area sets the growing area of kind of planting submerged plant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621205139.0U CN206735908U (en) | 2016-11-09 | 2016-11-09 | A kind of ecology retention administration structure for not cutting dirty river course |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621205139.0U CN206735908U (en) | 2016-11-09 | 2016-11-09 | A kind of ecology retention administration structure for not cutting dirty river course |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206735908U true CN206735908U (en) | 2017-12-12 |
Family
ID=60555194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621205139.0U Active CN206735908U (en) | 2016-11-09 | 2016-11-09 | A kind of ecology retention administration structure for not cutting dirty river course |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206735908U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532539A (en) * | 2018-04-19 | 2018-09-14 | 中国科学院南京地理与湖泊研究所 | A kind of vegetation type monomer solid base formula ecological revetment system |
CN110697903A (en) * | 2019-11-11 | 2020-01-17 | 北控(杭州)生态环境投资有限公司 | Efficient sewage intercepting in-situ purification ditch system |
-
2016
- 2016-11-09 CN CN201621205139.0U patent/CN206735908U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532539A (en) * | 2018-04-19 | 2018-09-14 | 中国科学院南京地理与湖泊研究所 | A kind of vegetation type monomer solid base formula ecological revetment system |
CN110697903A (en) * | 2019-11-11 | 2020-01-17 | 北控(杭州)生态环境投资有限公司 | Efficient sewage intercepting in-situ purification ditch system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104030449B (en) | A kind of type semienclosed treating landscape water body method of closing | |
CN106045055B (en) | A kind of ecological restoration device and method of city black-odor riverway | |
CN204058075U (en) | A kind of biologic packing material repairs the device of water body in lake | |
CN104787958A (en) | Culturing farm sewage treatment system, and sewage treatment method | |
CN206735908U (en) | A kind of ecology retention administration structure for not cutting dirty river course | |
CN103601301B (en) | In-situ sewage treatment method and self-circulation ecological floating bed able to reduce secondary pollution | |
CN103896458B (en) | Deluge type efficient ecological floating bed suitable for still water lake | |
CN204058070U (en) | A kind of rainwater purification system | |
CN204434369U (en) | The polluted water body in-situ that a kind of aeration air lift promotes current administers refining plant | |
CN204310868U (en) | The biological floating bed waste disposal plant of a kind of micro-aeration reinforcing | |
CN206705789U (en) | A kind of vertical streaming water plant waste water treatment box | |
CN203781981U (en) | Sewage treatment device combining anaerobic biological treatment and ecological treatment | |
CN105645590B (en) | A kind of water circulating purification biological and ecological island of Driven by Solar Energy | |
CN205035137U (en) | Point source sewage treatment plant | |
CN204022566U (en) | A kind of strengthening composite type artificial wetland Sewage treatment systems | |
CN204569552U (en) | A kind of unpowered downstream riverbank artificial wet land water quality purification system | |
CN204079607U (en) | A kind of natural energy layering aeration aerating artificial swamp | |
CN104016546B (en) | Environment-friendly artificial wetland system for purifying dredging remained water/tail water | |
CN206109171U (en) | Type septic tank is reinforceed to four form functions | |
CN202046970U (en) | Sewage purification system giving priority to constructed wetlands | |
CN210491838U (en) | Multi-ecological-position aquatic plant community construction device | |
CN210482455U (en) | Pump station diversion and drainage combined overpass culvert gate | |
CN204162504U (en) | A kind of outlet system of denitrification filter pool | |
CN207160181U (en) | A kind of water resource for pollution of area source is regulated and stored and purification facility | |
CN105800786A (en) | Method for improving water quality in deepwater areas of lakes and reservoirs and controlling cyanobacterial bloom through artificial biological carriers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |