CN206728826U - A kind of large span junior unit industrial aquaculture sheep hurdle - Google Patents

A kind of large span junior unit industrial aquaculture sheep hurdle Download PDF

Info

Publication number
CN206728826U
CN206728826U CN201720426330.6U CN201720426330U CN206728826U CN 206728826 U CN206728826 U CN 206728826U CN 201720426330 U CN201720426330 U CN 201720426330U CN 206728826 U CN206728826 U CN 206728826U
Authority
CN
China
Prior art keywords
workshop
unit
sheep
large span
cultivation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720426330.6U
Other languages
Chinese (zh)
Inventor
张尤嘉
刘锦年
张振韬
卢曾奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Three And Sheep Industry Technology Research Institute
Original Assignee
Lanzhou Three And Sheep Industry Technology Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Three And Sheep Industry Technology Research Institute filed Critical Lanzhou Three And Sheep Industry Technology Research Institute
Priority to CN201720426330.6U priority Critical patent/CN206728826U/en
Application granted granted Critical
Publication of CN206728826U publication Critical patent/CN206728826U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of large span junior unit industrial aquaculture sheep hurdle, including house body, the sheep hurdle use large span junior unit enclosed construction:Its internal overall channel for having large span longitudinal, and the overall channel side or the Elementary Function area of bilateral are built in, Elementary Function area grows according to flock of sheep is divided into separate multiple cultivation units or workshop from the different production phases bred;Singly raised, which is built, in each cultivation unit or workshop feeds road or double feeding roads, and some sheep pens are built in the both sides fed;The overall channel is separated with Elementary Function area by glass wall, and overall channel is connected with the feeding road of each cultivation unit or workshop by the door being located on glass wall.For large span equivalent to the plant area of factory, for junior unit equivalent to different workshops, each unit plays different functions, realizes the workshop formula fine-grained management of industrial sheep raising, realizes efficient industrial sheep raising pattern in the utility model.

Description

A kind of large span junior unit industrial aquaculture sheep hurdle
Technical field
The utility model is related to Yang Chang designs and the construction technique field of industrial sheep raising pattern, refer specifically to it is a kind of greatly across Spend the sheep hurdle of junior unit industrial aquaculture.
Background technology
China's Mutton Sheep Industry is undergo the serious test of the market risk at present, particularly since the second half year in 2013 By after epidemic situation " PPR " sickness influence of sheep, the mutton market price significantly declines domestic mutton sheep, sheep procurement price living Lattice fall below 6-8 members from 13-15 members/jin, almost have dropped 50%, cause drylot feeding mutton sheep livestock on hand in China's to reduce 50- in 2-3 60%, cause scale indoor sheep production in loss or bankruptcy status.This situation of China indoor sheep production is caused also to be supported with China mutton sheep Growing pattern has direct relation, and present China's major part mutton sheep scale confined farming is also in a scale tradition cultivation shape State, some sheep field sheep hurdles are in spacious paulin jumpbogroup cultivation, and flock of sheep are almost extensive management, low production efficiency, an ewe year lambing Less than 2;Also some sheep field sheep hurdle appearances are tall and big grand, but do not have any auxiliary facility in sheep hurdle, and flock of sheep, which are appointed, so to crouch in excrement Urinate on heap, sheep hurdle summer high temperature is sultry, winter cold wet.There is no supporting sheep bed, ventilation, warming, cooling, wait facility, root This is it cannot be guaranteed that the growth and production of flock of sheep health.Therefore, flock of sheep healthy water adjustment, the incidence of disease, the death rate are high, production efficiency It is low, cause scale indoor sheep production in loss or bankruptcy status.
Scale indoor sheep production in China's must change the extensive cultivation idea of tradition, improve simple and crude sheep hurdle, and it is supporting to focus on sheep hurdle Facility, the flock of sheep general level of the health is only improved, the safety of breeding production efficiency and mutton product could be improved.
Utility model content
The utility model provides a kind of large span junior unit industrial aquaculture sheep hurdle, is meeting industrial sheep raising production work While the primary condition of skill, workshop formula fine-grained management, efficient industrial sheep raising pattern are realized.
Therefore, used technical scheme is:
A kind of large span junior unit industrial aquaculture sheep hurdle, including house body, the sheep hurdle are closed using large span junior unit Structure:Its internal overall channel for having large span longitudinal, and it is built in the overall channel side or the Elementary Function area of bilateral, unit Functional areas grow according to flock of sheep is divided into separate multiple cultivation units or workshop from the different production phases bred;Each Cultivate and singly raised hello road or double feeding roads is built in unit or workshop, and some sheep pens are built in the both sides fed;The overall channel Separated with Elementary Function area by glass wall, overall channel is with each cultivation unit or the feeding road in workshop by being located on glass wall Door be connected.
Further:
The overall channel upper space is closed, forms it into closed total air supply duct;Closed total air-supply One end of pipeline introduces the fresh air of subterranean tunnel relative constancy temperature, total air supply duct and each cultivation unit or workshop Feeding road above the unit air supply duct of installation communicate, and there is air outlet the unit air supply duct both sides against sheep pen.
The sheep pen ground is leakage dropping-board, is cleaning up excrement layer below leakage dropping-board, the cleaning up excrement layer is located at the space below overall channel For total cleaning up excrement road, total conveyer belt is provided with total cleaning up excrement road, branch transmission belt is provided with the cleaning up excrement layer below sheep pen;The cleaning up excrement layer Air exhausting device is installed on the sheep hurdle wall at place.
Exhaust outlet is provided with She Tiqiang at the cleaning up excrement layer, the exhaust outlet is come together in the exhaust duct on exterior wall, should Wind pumping channle insertion on exhaust duct and She Ticeqiang, and wind channel upper end installation air-introduced machine.
The cultivation unit or workshop include breeding cultivation unit or workshop, gestation cultivation unit or workshop, lambing cultivation Unit or workshop, child care cultivation unit or workshop, it is bred as cultivation unit or workshop and fattening cultivation unit or workshop.
The breeding cultivation unit or workshop configuration artificial insemination room, the lambing cultivation unit or workshop configuration mothers and sons Column.
Heat-insulation layer is installed additional outside the exterior wall of the sheep hurdle, and sheep hurdle She Ding is made using color steel warming plate, and window is using double-deck Vacuum glass makes, and overall channel gate is two pass thermal insulating door thermally insulated door.
The house body is provided with window, while gives up above internal cultivation unit or workshop and be provided with fluorescent lamp.
Supporting full-time grain pellet automatic feeding stockline in each cultivation unit or workshop.
The utility model considers that sheep hurdle employs large span, small list from sheep hurdle design and construction and auxiliary facility composite factor The closed design of member, wherein covers functional, the small list of large span that Yang Chang is cultivated in addition to feed manufacturing in large span Land resource is greatly saved in meta design method, improves unit area utilization ratio, reduces building cost;Large span solves Whole Yang Chang insulations and the supporting ventilation of unit, illumination, automatic feeding, sterilization, cleaning up excrement erection of equipment, grow and raw for flock of sheep Production creates clean and comfortable surroundings;Large span junior unit mentality of designing is adapted with its production technology, and large span is equivalent to work The plant area of factory, for junior unit equivalent to different workshops, each unit plays different functions, realizes industrial sheep raising Workshop formula fine-grained management;The design of large span junior unit effectively solves the problems, such as cleaning up excrement difficulty, carries out the dirty innoxious place of excrement Reason, is reduced to environment and the pollution of itself, so as to realize efficient industrial green cultivation.
Brief description of the drawings
Fig. 1 is the external perspective structural representation of the utility model single-pitch type structure;
Fig. 2 is Fig. 1 interior layout structural representations;
Fig. 3 is Fig. 1 inner cross-sectional structural representations;
Fig. 4 is the external perspective structural representation of the utility model double slope structure;
Fig. 5 is Fig. 4 interior layout structural representations;
Fig. 6 is Fig. 4 inner cross-sectional structural representations.
Embodiment
The utility model and its advantage are illustrated further below.
The utility model is illustrated with the scale of long-term 2500 sheep of livestock on hand below.
Referring to figs. 1 to 6, a kind of large span junior unit industrial aquaculture sheep hurdle, the industrial aquaculture sheep hurdle uses large span Junior unit enclosed construction:Overall channel 1 with large span longitudinal direction, and it is built in the unit work(of the side of overall channel 1 or bilateral Energy area, grows according to flock of sheep in Elementary Function area and is divided into separate multiple cultivation units from the different production phases bred Or workshop, such as breeding cultivation unit or workshop, gestation cultivation unit or workshop, lambing cultivation unit or workshop, child care cultivation are single Member or workshop, it is bred as cultivation unit or workshop, fattening cultivation unit or workshop;The breeding cultivation unit or workshop configuration are artificial Insemination room, the lambing cultivation unit or workshop configuration mothers and sons column;Elementary Function area, should equivalent to the different workshops of factory Residence time is set the flock of sheep in cultivation unit or workshop by production technology wherein, and flock of sheep cultivate unit or car at it Between complete to branch to next cultivation unit or workshop after the stage predetermined productive target;The suitable factory of division in Elementary Function area The operation of metaplasia production. art, it is more beneficial for the workshop formula fine-grained management of industrial sheep raising.Such as breed cultivation unit or workshop Ewe manages, and ewe stops 2 feelings phases in breeding cultivation unit or workshop(6 weeks), the breeding of first feelings phase, the second feelings phase do not returned Feelings, gestation cultivation unit or workshop are transferred to after carrying out the pregnant inspection of B ultrasound;Ewe stops 14 weeks, the 7th week in gestation cultivation unit or workshop Start, by its pregnant several pay standard nutrition, to carry out prenatal care within the 13rd week, be transferred within antenatal one week lambing cultivation unit or car Between.The overall channel passes through dividing plate with Elementary Function area(Glass wall)Isolation, and dividing plate is provided with each of door and Elementary Function area Individual cultivation unit or workshop feeding road communicate.
The sheep hurdle top external structure of large span junior unit industrial aquaculture sheep hurdle is in Dan Po and two slope formulas(Herringbone)Two kinds Form, a height of 3-5 rice of ridge, the high 2.3-2.5 rice of eaves.
Reference picture 1,2,3, cultivation unit or workshop inside the sheep hurdle of the single-pitch type are arranged in order in overall channel one side It is 20, each to cultivate unit or workshop specification:Length and width is 28 meters, 7.2 meters, and it is in hang down to cultivate the length of unit or workshop and overall channel In line row, cultivate separate by unit partition wall 24 between unit or workshop.
Reference picture 4,5,6, cultivation unit or workshop inside the sheep hurdle of the double-pitch type are arranged in order in the bilateral of overall channel 1 Each 10;Each cultivation unit or workshop specification:Length and width is 28 meters, 7.2 meters, and the length for cultivating unit or workshop is in overall channel Vertical arrangement, cultivate separate by unit partition wall 24 between unit or workshop.
So-called large span is can to accommodate the place according to sheep field scale design to have the big drill shack of sheep, and its width is equal to blower fan The maximum radius of air draft, single-pitch type are 30 meters, and double-pitch type is 60 meters.Its length is determined that scale is got over by Yang Chang cultivation scale Imperial palace set unit just it is more, natural length is longer.Equivalent to one building of its function;Junior unit is exactly variant life in large span Produce the sheep hurdle of function.
The cultivation unit or the basic structure in workshop feed that road cultivates unit and double feeding roads cultivate two kinds of units for singly raised Specification;Some sheep pens 3 are built in the both sides for feeding road 23, and the ground of sheep pen 3 is sheep bed 8(Leakage dropping-board), between each two sheep pen 3 Jube is provided with ball float drinking trough 7, and feeding road 23 is provided with crib 15.The breeding stock of double feeding road cultivation unit sheep is that singly raised is fed 2 times of road cultivation unit.Illustrated so that singly raised feeds road cultivation unit as an example:The specification of unit:Length and width:It is 28 meters, 7.2 meters, single The length of member and the perpendicular arrangement of overall channel.Each unit has a door communicated with unit feeding road, Mei Gedan on overall channel Member is all separate, has partition plate to separate between unit and unit.The both sides for feeding road be sheep pen, often side totally 10 sheep Column, each sheep pen specification are 2.8*2.8 rice, and each sheep pen can 8 sheep of livestock on hand.Each unit shares 20 sheep pens, can livestock on hand 160 Sheep.
The structure and specification of overall channel:The length of overall channel with cultivation unit or workshop quantity depending on, it is wide generally 2.5-3 Rice, a height of 5-7 rice of overall channel, overall channel have in the glass wall side seal of the side by Elementary Function area, the function of overall channel Turn group, the erection of ventilation shaft, observation of flock of sheep etc..
Temperature control facility is designed based on following two thinkings in the utility model:First is to control temperature by lagging facility Degree:The exterior wall of the industrial aquaculture sheep hurdle uses 40cm brick walls, adds external-wall heat-insulation material, and She Ding employs 18 centimeters of high density Color steel warming plate, window use double-layer vacuum 6-8 millimeter glass, and overall channel gate is two pass thermal insulating door thermally insulated door, make whole sheep hurdle not by The seasonal effect of summer high temperature and winter severe cold;Second is to control temperature by ventilation equipment:The ventilation equipment leads to for tunnel type Wind facility(Using Patent No.:201620717045.5 disclosed technical scheme);By 2.2-2.4 meters of the overall channel with Upper part is closed, and forms it into closed total air supply duct 12;The closed one end of total air supply duct 12 and it is built in ground Under tunnel connection, tunnel fresh air is introduced closed total air supply duct, total air supply duct and each cultivation unit or car Between feeding road above the unit air supply duct 2 of installation connect, and there is air outlet the both sides of unit air supply duct 2 against sheep pen 3 12, fresh air is through sheep body, then by sheep bed(Leakage dropping-board), the discharge of cleaning up excrement layer air exhausting device.Tunnel type ventilating system continues throughout the year The feed unit steady temperature of property(15-17℃)Fresh air, there is key effect to maintenance unit steady temperature.
The air exhausting device is side wall exhaust way:Opened on She Tiqiang described in each cultivation unit or workshop at cleaning up excrement layer There is exhaust outlet 6, the exhaust outlet 6 is come together in the exhaust duct 17 on exterior wall, the exhausting on the exhaust duct 17 and She Ticeqiang Road 13 penetrates, and the upper end of wind pumping channle 13 installation air-introduced machine 14.The air exhausting device realizes the emergency flight control to temperature:Such as:Summer With the rise of environment temperature, intelligent temperature control system will start side wall blower fan, the sheep hurdle moment is in design temperature model In enclosing.Through exhaust duct, then through the exhaust column in unit side wall extroversion, unit is harmful to by the air-introduced machine installed by wind pumping channle upper end Gas is discharged
Illumination controls the facility to be in the utility model:It is implemented in combination with by what natural lighting and artificially feed supplied, it is natural Illumination makes cultivation unit or workshop illuminating area reach 10-15% by cultivating unit or workshop window 21;Artificially feed is logical Cross fluorescent lamp 16, according to morning and evening light to different breeding unit or workshop flock of sheep to the demand of illumination come the deficiency of supplementary light. Illumination controls healthy growth and the production for directly affecting totally enclosed type flock of sheep, and suitable intensity of illumination and light application time are for lamb The growing of sheep, the breeding of ewe production are all very important.Such as:The heat of ewe needs short-day, the growth of lamb Phase needs to strengthen illumination and extends light application time.
The implementation method of automatic feeding facility is in the utility model:The supporting full-time grain of each cultivation unit or workshop Grain feed automatic feeding stockline 22, has feed tower outside cultivation unit or workshop side wall, in each cultivation unit or workshop feeding Self-feeding pipeline has been set up above road, Measuring glass is mounted with below self-feeding pipeline, threeway, threeway are connected under Measuring glass Under communicated by flexible pipe with both sides crib tremie pipe, the pellet of Measuring glass is determined by cultivation unit or workshop flock of sheep nutritional need Shi Dingliang's flows to both sides crib, realizes automatic feeding.Feeding line of the prior art can be used.
The implementation method of cleaning up excrement facility is in the utility model:Sheep bed and feeding road are erected by steel construction, improve sheep bed The lower height of cleaning up excrement layer 9, using conveyer belt automatic manure-cleaning mode, installs 25 degree of manure-blocking plates 4 under sheep bed, sheep manure is collected decline and exists On unit branch conveyer belt 5, each unit sheep manure is sent to total conveyer belt by timing by unit branch conveyer belt 5 sooner or later daily, then by total Sheep manure is sent to organic fertilizer production workshop by conveyer belt classification, thoroughly solves the problems, such as northern scale sheep raising cleaning up excrement difficulty.The biography Work-feeding means use prior art.
Label 19 is the blower fan installed on sheep hurdle side wall in Fig. 1 and Fig. 4.
Influence of the utility model to the flock of sheep general level of the health and productivity effect:

Claims (10)

1. a kind of large span junior unit industrial aquaculture sheep hurdle, including house body, it is characterised in that:The sheep hurdle uses the small list of large span First enclosed construction:Its internal overall channel for having large span longitudinal, and it is built in the unit work(of the overall channel side or bilateral Can area, Elementary Function area according to flock of sheep growth with breeding the different production phases be divided into separate multiple cultivation units or Workshop;Singly raised, which is built, in each cultivation unit or workshop feeds road or double feeding roads, and some sheep pens are built in the both sides fed;Institute State overall channel to separate by glass wall with Elementary Function area, overall channel is with each cultivation unit or the feeding road in workshop by being located at Door on glass wall is connected.
A kind of 2. large span junior unit industrial aquaculture sheep hurdle according to claim 1, it is characterised in that:Will be described total logical Road upper space is closed, and forms it into closed total air supply duct;One end of closed total air supply duct introduces ground The fresh air of lower tunnel relative constancy temperature, total air supply duct and installation above each cultivation unit or the feeding road in workshop Unit air supply duct communicates, and there is air outlet the unit air supply duct both sides against sheep pen.
A kind of 3. large span junior unit industrial aquaculture sheep hurdle according to claim 1, it is characterised in that:The sheep pen Face is leakage dropping-board, is cleaning up excrement layer below leakage dropping-board, and the space that the cleaning up excrement layer is located at below overall channel is total cleaning up excrement road, total cleaning up excrement road Inside it is provided with total conveyer belt, branch transmission belt is provided with the cleaning up excrement layer below sheep pen;The row of installation on sheep hurdle wall at the cleaning up excrement layer Wind apparatus.
A kind of 4. large span junior unit industrial aquaculture sheep hurdle according to claim 3, it is characterised in that:The cleaning up excrement layer Exhaust outlet is provided with the She Tiqiang at place, the exhaust outlet is come together in the exhaust duct on exterior wall, the exhaust duct and She Ticeqiang On wind pumping channle insertion, and the wind pumping channle upper end installation air-introduced machine.
A kind of 5. large span junior unit industrial aquaculture sheep hurdle according to claim 1, it is characterised in that:The cultivation is single Member or workshop include breeding cultivation unit or workshop, gestation cultivation unit or workshop, lambing cultivation unit or workshop, child care cultivation Unit or workshop, it is bred as cultivation unit or workshop and fattening cultivation unit or workshop.
A kind of 6. large span junior unit industrial aquaculture sheep hurdle according to claim 5, it is characterised in that:It is described to match somebody with somebody breeding Grow unit or workshop configuration artificial insemination room, the lambing cultivation unit or workshop configuration mothers and sons column.
A kind of 7. large span junior unit industrial aquaculture sheep hurdle according to claim 1, it is characterised in that:The sheep hurdle Heat-insulation layer is installed additional outside exterior wall, and sheep hurdle She Ding is made using color steel warming plate, and window is made using dual-layer vacuum glass, overall channel Gate is two pass thermal insulating door thermally insulated door.
A kind of 8. large span junior unit industrial aquaculture sheep hurdle according to claim 1, it is characterised in that:On the house body Provided with window, while give up above internal cultivation unit or workshop and fluorescent lamp is installed.
A kind of 9. large span junior unit industrial aquaculture sheep hurdle according to claim 1, it is characterised in that:It is each described foster Grow supporting full-time grain pellet automatic feeding stockline in unit or workshop.
10. a kind of large span junior unit industrial aquaculture sheep hurdle according to any one of claim 1 to 9, its feature exist In:The top of the house body is single-pitch type or double slope structure.
CN201720426330.6U 2017-04-21 2017-04-21 A kind of large span junior unit industrial aquaculture sheep hurdle Active CN206728826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720426330.6U CN206728826U (en) 2017-04-21 2017-04-21 A kind of large span junior unit industrial aquaculture sheep hurdle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720426330.6U CN206728826U (en) 2017-04-21 2017-04-21 A kind of large span junior unit industrial aquaculture sheep hurdle

Publications (1)

Publication Number Publication Date
CN206728826U true CN206728826U (en) 2017-12-12

Family

ID=60561804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720426330.6U Active CN206728826U (en) 2017-04-21 2017-04-21 A kind of large span junior unit industrial aquaculture sheep hurdle

Country Status (1)

Country Link
CN (1) CN206728826U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106942069A (en) * 2017-04-21 2017-07-14 兰州三和羊业科技研究所 A kind of large span junior unit industrial aquaculture sheep hurdle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106942069A (en) * 2017-04-21 2017-07-14 兰州三和羊业科技研究所 A kind of large span junior unit industrial aquaculture sheep hurdle

Similar Documents

Publication Publication Date Title
CN101982068B (en) Legehenne smooth farm and legehenne breeding method
CN103081864B (en) Method for turtle egg intensive cultivation in lighting greenhouse
CN103385204A (en) Summer live pig cultivation method based on biological fermentation bed
CN112273239A (en) Ecological environment-friendly floor pig-raising integrated system and pig-raising method thereof
CN102626061A (en) Underground broiler chicken breeding method and underground broiler chicken breeding house
CN107926727A (en) Building solid pig raising system
CN102322161B (en) Composite system for poultry cultivation and vegetable planting
CN106417047A (en) Novel environment-friendly pig house and pollution-free intensive pig farming method
CN104351071A (en) Standard growing and fattening pig house
CN203136815U (en) Daylighting greenhouse
CN101617633A (en) Temperature-control pigsty
CN101790964A (en) Semi-underground culture system
CN102235101A (en) Agricultural culture facility
CN103563837B (en) A kind of method using duck to raise in cages to grow egg duck
CN206728826U (en) A kind of large span junior unit industrial aquaculture sheep hurdle
CN201690888U (en) Semi-underground culture system
CN109089892A (en) A kind of solid animal-breeding method
KR101483983B1 (en) Roughage planting house using earthworm breeding
CN108782265A (en) A kind of building type animal room
CN112154937A (en) Laying hen farm and breeding method
CN106942069A (en) A kind of large span junior unit industrial aquaculture sheep hurdle
CN103081865B (en) Lighting greenhouse for turtle egg intensive cultivation
CN104705211A (en) Breeding greenhouse
CN208657658U (en) A kind of high density brooder
CN207201488U (en) Breeding circulates integral canopy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant