CN206723599U - Electrical cable bridge support meanss - Google Patents

Electrical cable bridge support meanss Download PDF

Info

Publication number
CN206723599U
CN206723599U CN201720485968.7U CN201720485968U CN206723599U CN 206723599 U CN206723599 U CN 206723599U CN 201720485968 U CN201720485968 U CN 201720485968U CN 206723599 U CN206723599 U CN 206723599U
Authority
CN
China
Prior art keywords
cable
testing bridge
fixedly connected
pair
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720485968.7U
Other languages
Chinese (zh)
Inventor
邵来平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720485968.7U priority Critical patent/CN206723599U/en
Application granted granted Critical
Publication of CN206723599U publication Critical patent/CN206723599U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of electrical cable bridge support meanss, including support body is fixedly connected with, inner panel is fixedly mounted, bolt, cable testing bridge, anti-fall edge, multiple erecting cable grooves, cable hanging rack, more region partition rods, a pair of crane span structure bosses, a pair of bolts mounting hole, a pair of erection preformed grooves and a plurality of first reinforcement is fixedly mounted for a pair;Support body is fixedly connected with to be located on fixed installation inner panel, bolt mounting holes, erection preformed groove, which are located at, to be fixedly connected with support body and is fixedly mounted on inner panel, cable testing bridge connects support body surely by crane span structure boss fixed, anti-fall edge, erecting cable groove are located on cable testing bridge, cable hanging rack connects cable testing bridge, region partition rod is located between cable hanging rack and cable testing bridge, and the first reinforcement is located on cable testing bridge.The utility model can greatly improve the intensity of cable testing bridge by reinforcement, improve weight capacity, reduce material usage and cost, improve the convenience of installation.

Description

Electrical cable bridge support meanss
Technical field
It the utility model is related to electric field, more particularly to a kind of electrical cable bridge support meanss.
Background technology
Cable testing bridge is very extensive in sector applications such as oil, chemical industry, electric power, light industry, telecommunications, primarily serve to electric wire, The protective effect of cable finished product.Existing various cable testing bridges are that section is simple, structure through cutting material, punching, bending aftershaping mostly It is stiff, process velocity is slow.And because crane span structure span is larger, the cable and crane span structure own wt of carrying are also larger, in order to ensure Bearing capacity and the as far as possible deformation of reduction crane span structure, compacting crane span structure material are also corresponding thickening, so that material cost increase, are not easy to The installation and transportation of pellet type crane span structure and the shortcomings that low intensity, cost is higher be present.
Utility model content
The purpose of this utility model:A kind of electrical cable bridge support meanss are provided, simple in construction, easy to use, cost is low.
To achieve these goals, the technical solution of the utility model is:
A kind of electrical cable bridge support meanss, including be fixedly connected with support body, inner panel, a pair of fixed installation spiral shells are fixedly mounted Bolt, cable testing bridge, anti-fall edge, multiple erecting cable grooves, cable hanging rack, more region partition rods, a pair of crane span structure bosses, A pair of bolts mounting hole, set up preformed groove and a plurality of first reinforcement a pair;It is described be fixedly connected support body be arranged on it is described It is fixedly mounted in the end face outside of inner panel, described fixed installation inner panel is the rectangular plate-like structure and fixed setting-in being vertically arranged In metope, the described support body that is fixedly connected is set to be fitted on metope surface;Described a pair of bolts mounting hole is respectively symmetrically set Put and be fixedly connected with support body described and be fixedly mounted on inner panel, be fixedly connected with support body positioned at described and inner panel is fixedly mounted Top and bottom, described being fixedly connected with support body and inner panel is fixedly mounted are fixedly mounted described in bolt warp by described a pair A pair of bolts mounting hole is fixedly mounted;One end of described cable testing bridge is consolidated by a pair of described crane span structure bosses with described Surely the end face outside for connecting support body is fixedly connected, and a pair of described crane span structure bosses are triangle block structure and are located at described The top and bottom of cable testing bridge;Described anti-fall edge is arranged on the other end of described cable testing bridge, described anti-fall side Edge is bent upwards camber structure;Described multiple erecting cable grooves are recessed separately down is arranged on the upper of described cable testing bridge On end face, width of the described multiple erecting cable grooves along described cable testing bridge runs through described cable testing bridge;It is described Cable hanging rack " u "-shaped frame structure and to be fixedly connected with described cable testing bridge, under described cable testing bridge End middle part, more described region partition rods, which are respectively separated, is vertically arranged in described cable hanging rack and described cable testing bridge Between, and described cable hanging rack is separated into multiple cable areas;It is respectively semiellipse that described a pair, which set up preformed groove, Shape structure and be symmetricly set on it is described be fixedly connected with support body and be fixedly mounted on inner panel, positioned at it is described be fixedly connected support body and Top and the bottom center of inner panel is fixedly mounted;Described a plurality of first reinforcement is in turn connected into meander line structure and set respectively On the both sides end face of described cable testing bridge, at the lower edge of described cable testing bridge.
Above-mentioned electrical cable bridge support meanss, wherein, described cable testing bridge is inclined upwardly setting, and described cable The angle of inclination of crane span structure is 5 ° -15 °.
Above-mentioned electrical cable bridge support meanss, wherein, multiple cable jacks, institute are interval with described cable testing bridge The multiple cable jacks stated are staggered with described multiple erecting cable grooves respectively.
Above-mentioned electrical cable bridge support meanss, wherein, a plurality of second reinforcement is interval with described cable testing bridge, Width of described a plurality of second reinforcement along described cable testing bridge is distributed in the both sides of described multiple cable jacks.
Above-mentioned electrical cable bridge support meanss, wherein, the outboard end edge at described anti-fall edge is provided with the 3rd and added Strengthening tendons, described anti-fall edge are structure as a whole with the 3rd described reinforcement.
Above-mentioned electrical cable bridge support meanss, wherein, a plurality of is interval with the upper surface at described anti-fall edge Four reinforcements, length direction of described a plurality of 4th reinforcement along described cable testing bridge are set.
Above-mentioned electrical cable bridge support meanss, wherein, described being fixedly connected in the end face outside of support body is respectively separated Provided with a plurality of the 5th reinforcement being vertically arranged, positioned at a pair of described crane span structure bosses over and under.
The utility model can greatly improve the intensity of cable testing bridge by reinforcement, improve weight capacity, reduce material and use Amount and cost, improve the convenience of installation.
Brief description of the drawings
Fig. 1 is the front view of the utility model electrical cable bridge support meanss.
Fig. 2 is the side view for being fixedly connected with support body of the utility model electrical cable bridge support meanss.
Fig. 3 is the top view of the cable testing bridge of the utility model electrical cable bridge support meanss.
Embodiment
Embodiment of the present utility model is further illustrated below in conjunction with accompanying drawing.
Refer to shown in accompanying drawing 1 and accompanying drawing 2, a kind of electrical cable bridge support meanss, including be fixedly connected with support body 1, fix Install inner panel 2, a pair be fixedly mounted bolts 3, cable testing bridge 4, anti-fall edge 5, multiple erecting cable grooves 6, cable hanging rack 7, More region partition rods 8, a pair of crane span structure bosses 9, a pair of bolts mounting hole 10, a pair of erection preformed grooves 11 and a plurality of first add Strengthening tendons 12;The described support body 1 that is fixedly connected is arranged in the end face outside of described fixed installation inner panel 2, described fixed peace Dress inner panel 2 is inlaid in metope for the rectangular plate-like structure being vertically arranged and fixation, is fitted in the described support body 1 that is fixedly connected On metope surface;Described a pair of bolts mounting hole 10, which is symmetrically arranged at, described to be fixedly connected with support body 1 and is fixedly mounted On inner panel 2, positioned at the described top and bottom that are fixedly connected with support body 1 and inner panel 2 is fixedly mounted, described is fixedly connected with support body 1 and inner panel 2 is fixedly mounted by described a pair bolts 3 is fixedly mounted and passes through described a pair of bolts mounting hole 10 and be fixedly mounted; One end of described cable testing bridge 4 passes through a pair of described crane span structure bosses 9 and the described end face outside for being fixedly connected with support body 1 It is fixedly connected, a pair of described crane span structure bosses 9 are triangle block structure and are located at the top and bottom of described cable testing bridge 4 Portion;Described anti-fall edge 5 is arranged on the other end of described cable testing bridge 4, and described anti-fall edge 5 is bent upwards camber Structure;Described multiple erecting cable grooves 6 are recessed separately down to be arranged on the upper surface of described cable testing bridge 4, described Width of multiple erecting cable grooves 6 along described cable testing bridge 4 runs through described cable testing bridge 4;Described cable is hung Frame 7 is " u "-shaped frame structure and is fixedly connected with described cable testing bridge 4, in the middle part of the lower end of described cable testing bridge 4, More described region partition rods 8 be respectively separated be vertically arranged in described cable hanging rack 7 and described cable testing bridge 4 it Between, and described cable hanging rack 7 is separated into multiple cable areas;It is respectively semiellipse that described a pair, which set up preformed groove 11, Shape structure and be symmetricly set on it is described be fixedly connected with support body 1 and be fixedly mounted on inner panel 2, be fixedly connected with support body positioned at described 1 and be fixedly mounted inner panel 2 top and bottom center;Described a plurality of first reinforcement 12 is in turn connected into meander line structure and divided It is not arranged on the both sides end face of described cable testing bridge 4, at the lower edge of described cable testing bridge 4.
Described cable testing bridge 4 is inclined upwardly setting, and the angle of inclination of described cable testing bridge 4 is 5 ° -15 °, can be had Effect prevents the cable that is erected on cable testing bridge 4 from sliding, also can be by a part of force dispersion to being fixedly connected on support body 1.
Refer to shown in accompanying drawing 3, multiple cable jacks 13, described multiple electricity are interval with described cable testing bridge 4 Cable jack 13 is staggered with described multiple erecting cable grooves 6 respectively, available for cable is interted, is advantageous to the arrangement of cable.
It is interval with a plurality of second reinforcement 14 on described cable testing bridge 4, described a plurality of second reinforcement 14 is along institute The width for the cable testing bridge 4 stated is distributed in the both sides of described multiple cable jacks 13, can play the multiple cables of enhancing and insert The effect of intensity around hole 13.
The outboard end edge at described anti-fall edge 5 is provided with the 3rd reinforcement 15, described anti-fall edge 5 with it is described 3rd reinforcement 15 is structure as a whole, and can play a part of strengthening the intensity at anti-fall edge 5, avoid it from can't bear load-bearing and be broken.
A plurality of 4th reinforcement 16 is interval with the upper surface at described anti-fall edge 5, the described a plurality of 4th strengthens Length direction of the muscle 16 along described cable testing bridge 4 is set, and can be played a part of further improving the intensity at anti-fall edge 5, be carried High weight capacity.
Described being fixedly connected is respectively separated in the end face outside of support body 1 provided with a plurality of the 5th reinforcement being vertically arranged 17, the intensity and weight capacity for being fixedly connected with support body 1 can be improved positioned at a pair of described crane span structure bosses 9 over and under.
During installation, inner panel 2 is fixedly mounted and is directly inlaid in concrete wall surface, make to be fixedly connected support body 1 and be bonded metope and set Put, and bolt 3 is fixedly mounted by a pair and is fixed through a pair of bolts mounting hole 10;It is fixedly connected with support body 1 and inner panel 2 is fixedly mounted Also preformed groove 11 can be set up across pipeline by a pair, be easy to the installation of the utility model under circumstances;Erecting cable exists In multiple the erecting cable grooves 6 and cable hanging rack 7 of cable testing bridge 4, anti-fall edge 5 can prevent the cable on cable testing bridge 4 from sliding Fall, the cable classification in cable hanging rack 7, subregion can be easy to the erection and distribution of cable by more region partition rods 8;It is described A plurality of first reinforcement 12 can strengthen the weight capacity of cable testing bridge 4, make it that there is preferably carrying energy in the horizontal direction Power.
In summary, the utility model can greatly improve the intensity of cable testing bridge by reinforcement, improve weight capacity, drop Low material usage and cost, improve the convenience of installation.
Preferred embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, Every equivalent structure transformation made using the utility model description, or it is directly or indirectly related with other are attached to The technical field of product, similarly it is included in scope of patent protection of the present utility model.

Claims (7)

  1. A kind of 1. electrical cable bridge support meanss, it is characterised in that:Including being fixedly connected with support body, fixed installation inner panel, consolidating for a pair Determine installation bolt, cable testing bridge, anti-fall edge, multiple erecting cable grooves, cable hanging rack, more region partition rods, a pair of bridges Frame boss, a pair of bolts mounting hole, set up preformed groove and a plurality of first reinforcement a pair;Described is fixedly connected with support body setting In the end face outside of described fixed installation inner panel, described fixed installation inner panel be the rectangular plate-like structure being vertically arranged simultaneously Fixation is inlaid in metope, the described support body that is fixedly connected is fitted on metope surface;Described a pair of bolts mounting hole point Being fixedly connected on support body and fixed installation inner panel described in not being symmetricly set on, support body and fixed peace are fixedly connected with positioned at described The top and bottom of inner panel are filled, described being fixedly connected with support body and inner panel is fixedly mounted passes through a pair of described fixed installation bolts It is fixedly mounted through described a pair of bolts mounting hole;One end of described cable testing bridge by described a pair of crane span structure bosses with The described end face outside for being fixedly connected with support body is fixedly connected, and a pair of described crane span structure bosses are triangle block structure and position In the top of described cable testing bridge and bottom;Described anti-fall edge is arranged on the other end of described cable testing bridge, described Anti-fall edge be bent upwards camber structure;Described multiple erecting cable grooves are recessed separately down is arranged on described cable On the upper surface of crane span structure, width of the described multiple erecting cable grooves along described cable testing bridge runs through described cable bridge Frame;Described cable hanging rack is " u "-shaped frame structure and is fixedly connected with described cable testing bridge, positioned at described cable bridge In the middle part of the lower end of frame, more described region partition rods, which are respectively separated, is vertically arranged in described cable hanging rack and described electricity Between cable crane span structure, and described cable hanging rack is separated into multiple cable areas;Described a pair set up preformed groove Half elliptic structure and be symmetricly set on it is described be fixedly connected with support body and be fixedly mounted on inner panel, be fixedly connected positioned at described Support body and top and the bottom center that inner panel is fixedly mounted;Described a plurality of first reinforcement is in turn connected into meander line structure and divided It is not arranged on the both sides end face of described cable testing bridge, at the lower edge of described cable testing bridge.
  2. 2. electrical cable bridge support meanss according to claim 1, it is characterised in that:Described cable testing bridge is inclined upwardly Set, and the angle of inclination of described cable testing bridge is 5 ° -15 °.
  3. 3. electrical cable bridge support meanss according to claim 1, it is characterised in that:Interval is set on described cable testing bridge There are multiple cable jacks, described multiple cable jacks are staggered with described multiple erecting cable grooves respectively.
  4. 4. electrical cable bridge support meanss according to claim 3, it is characterised in that:Interval is set on described cable testing bridge There is a plurality of second reinforcement, width of described a plurality of second reinforcement along described cable testing bridge is distributed in described more The both sides of individual cable jack.
  5. 5. electrical cable bridge support meanss according to claim 1, it is characterised in that:The outboard end at described anti-fall edge Edge is provided with the 3rd reinforcement, and described anti-fall edge is structure as a whole with the 3rd described reinforcement.
  6. 6. electrical cable bridge support meanss according to claim 1, it is characterised in that:The upper surface at described anti-fall edge On be interval with a plurality of 4th reinforcement, length direction of described a plurality of 4th reinforcement along described cable testing bridge is set.
  7. 7. electrical cable bridge support meanss according to claim 1, it is characterised in that:Described is fixedly connected with the outer of support body Be respectively separated on side end face provided with a plurality of the 5th reinforcement being vertically arranged, positioned at the top of a pair of described crane span structure bosses and Lower section.
CN201720485968.7U 2017-05-03 2017-05-03 Electrical cable bridge support meanss Expired - Fee Related CN206723599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720485968.7U CN206723599U (en) 2017-05-03 2017-05-03 Electrical cable bridge support meanss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720485968.7U CN206723599U (en) 2017-05-03 2017-05-03 Electrical cable bridge support meanss

Publications (1)

Publication Number Publication Date
CN206723599U true CN206723599U (en) 2017-12-08

Family

ID=60507759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720485968.7U Expired - Fee Related CN206723599U (en) 2017-05-03 2017-05-03 Electrical cable bridge support meanss

Country Status (1)

Country Link
CN (1) CN206723599U (en)

Similar Documents

Publication Publication Date Title
CN205205694U (en) No. 0 piece multipurpose triangle -shaped bracket construction equipment on continuous beam pier top
CN206580442U (en) A kind of hanging apparatus suitable for Assembled Building gangboard prefabricated components
CN207314904U (en) A kind of C-type steel structure of ruggedized construction
CN104594178B (en) The suspension bridge of high torsional rigidity
CN206723599U (en) Electrical cable bridge support meanss
CN204311818U (en) A kind of DC linear tower tower head
CN204960458U (en) Light -duty communication angle steel tower structure of acting as go -between
CN202227755U (en) Cable-stayed tower for power transmission line of power grid
CN212033733U (en) Ground wire cross arm increased hanging point connecting piece
CN207918285U (en) A kind of pulley support
CN203529707U (en) Double-plate-hole type H-steel balance beam with bending moment
CN211923732U (en) Stay wire type power transmission tower
CN212837035U (en) Cantilever power transmission tower
CN104234210B (en) The reinforcing steel bar connecting device of a kind of precast beam Column border node and construction method thereof
CN209586402U (en) A kind of pretightning force anchor net
CN201695592U (en) Inversion type color steel tile fast mounting platform
CN101906871A (en) Simple bearing type template truss
CN207828905U (en) A kind of fastening type lattice guest's barricade
CN206053116U (en) A kind of prestressing force groove type plate that can be used for 5 grades of civil air defense constructions and installations
CN202441098U (en) Ladder and pull rope type steel tube tower
CN101787705B (en) Anti-rotation angle tower frame foundation and manufacturing method
CN205296589U (en) Steelframe for building and shear force wall
CN205421654U (en) Light steel concrete floor
CN109458032B (en) Double-loop body-penetrating straight line narrow foundation tower
CN219411510U (en) Herringbone symmetrical inclined column structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

Termination date: 20180503