CN206722965U - A kind of wind-power electricity generation main frame of achievable Fast Installation - Google Patents

A kind of wind-power electricity generation main frame of achievable Fast Installation Download PDF

Info

Publication number
CN206722965U
CN206722965U CN201720100343.4U CN201720100343U CN206722965U CN 206722965 U CN206722965 U CN 206722965U CN 201720100343 U CN201720100343 U CN 201720100343U CN 206722965 U CN206722965 U CN 206722965U
Authority
CN
China
Prior art keywords
pillar
main frame
connecting pole
mounting groove
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720100343.4U
Other languages
Chinese (zh)
Inventor
安丙辰
安晨亮
安晨明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Shuo Shuo Machinery Co Ltd
Original Assignee
Hebei Shuo Shuo Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Shuo Shuo Machinery Co Ltd filed Critical Hebei Shuo Shuo Machinery Co Ltd
Priority to CN201720100343.4U priority Critical patent/CN206722965U/en
Application granted granted Critical
Publication of CN206722965U publication Critical patent/CN206722965U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a kind of wind-power electricity generation main frame of achievable Fast Installation, including pillar, mounting groove is offered at the top of the pillar, connecting pole is plugged with the mounting groove, the top of the connecting pole is fixedly connected with base, the upper surface of the base is fixedly connected with main frame, the both sides of the mounting groove inwall are flexibly connected by top of the fixed plate respectively with two pressing boards, and the relative side of two pressing boards is overlapped on the both sides on connecting pole surface respectively, the pressing board side opposite with connecting pole is flexibly connected by return spring with the inwall of mounting groove.The utility model passes through the improvement to fixture block and neck, when connecting pole is inserted in mounting groove, being arranged on the fixture block at the top of clamping plate can be connected in neck, so as to which wind-power electricity generation main frame is quick installed on pillar, and time saving and energy saving, in the presence of back-moving spring screen resilience, kelly can be caught in groove, so as to increase stability of the connecting pole in mounting groove, the process is convenient and swift.

Description

A kind of wind-power electricity generation main frame of achievable Fast Installation
Technical field
Technical field of wind power generating equipment is the utility model is related to, specially a kind of wind-power electricity generation of achievable Fast Installation Main frame.
Background technology
Wind-power electricity generation is that the kinetic energy kept watch switchs to electric energy.Wind energy as a kind of regenerative resource of cleaning, increasingly by The attention of countries in the world.Its amount of accumulateing is huge, and global wind energy is about 2.74 × 10^9MW, wherein available wind energy is 2 × 10^ 7MW, the water energy total amount than that can be developed on the earth are also big 10 times.
Wind is utilized by people very early -- mainly by windmill to draw water, flour milling etc., it is and present, people it is interested be How to use wind to generate electricity.
Main frame is arranged on pillar by existing wind-power electricity generation main frame in installation process generally by crane, although energy It is enough successfully to install, but the process excessively wastes time and energy, it is necessary to crane is hung always, is then being propped up by manually climbing On post, by the floor installation of main frame on pillar, the Cheng Ruo duration of correcting one's mistakes is long easily to have an accident.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of wind-power electricity generation main frame of achievable Fast Installation, Solve the problems, such as that installation wind-power electricity generation main frame is wasted time and energy and danger is big.
(2) technical scheme
To achieve the above object, the utility model provides following technical scheme:A kind of wind-force hair of achievable Fast Installation Electric main frame, including pillar, mounting groove is offered at the top of the pillar, connecting pole, the connection are plugged with the mounting groove The top of post is fixedly connected with base, and the upper surface of the base is fixedly connected with main frame, and the both sides of the mounting groove inwall are equal It is flexibly connected by top of the fixed plate respectively with two pressing boards, and the relative side of two pressing boards is overlapped on connecting pole table respectively The both sides in face, the pressing board side opposite with connecting pole are flexibly connected by return spring with the inwall of mounting groove, the branch The both sides of post are interspersed with pressure ram, and one end of pressure ram is overlapped on the side of pressing board and positioned at the lower section of return spring, institute State the both sides of abutment surface and transverse slat is fixedly connected with above the pressure ram, and transverse slat one end opposite with pillar and clamping plate The back side be flexibly connected, and the other end of pressure ram is flexibly connected with the bottom at the clamping plate back side, and the top of the clamping plate side is consolidated Surely it is connected with fixture block, and fixture block one end opposite with clamping plate is connected in the neck that susceptor surface opens up, on the pillar and position Kelly is interspersed with above transverse slat, and one end of kelly is plugged in the groove that connecting pole surface opens up, the kelly it is another One end is fixedly connected with arm-tie, and the arm-tie side relative with pillar and positioned at kelly upper and lower ends by back-moving spring with The surface activity connection of pillar.
Preferably, the bottom of the connecting pole is fixedly connected with inserted link, and inserted link inserting of being plugged on that installation trench bottom opens up In hole.
Preferably, the angle of inclination of the neck to the right is 15 degree, and the inclination of the angle of inclination of fixture block and neck Angle is equal.
Preferably, the bottom of the base is overlapped on the upper surface of pillar, and the top of pillar is overlapped on base bottom Centre position.
Preferably, the quantity of the return spring is four, and four return springs are that one group of difference is equidistant with two It is arranged on two pressing boards.
Preferably, the length inside the kelly insertion connecting pole is 1/3rd of kelly total length, and kelly is straight Footpath is equal with the diameter of groove.
(3) beneficial effect
The utility model provides a kind of wind-power electricity generation main frame of achievable Fast Installation.Possesses following beneficial effect:
(1), the utility model, when connecting pole is inserted in mounting groove, can extrude two by the improvement to fixture block and neck Individual inclined pressing board, now, two pressing boards can be promoted the bottom of clamping plate by pressure ram and drive clamping plate to be rotated on transverse slat, from And being arranged on the fixture block at the top of clamping plate can be connected in neck, so as to which wind-power electricity generation main frame is quick installed on pillar, It is and time saving and energy saving.
(2), the utility model when backwards to two arm-ties of pulling, can make kelly by the improvement to kelly and groove Depart from neck, when unclamping arm-tie, in the presence of back-moving spring screen resilience, kelly can be made to be caught in groove, so as to increase Stability of the connecting pole in mounting groove, and the process is convenient and swift, it is not necessary to the excessive set-up time is wasted, reduces danger The incidence of dangerous accident.
Brief description of the drawings
Fig. 1 is the utility model structure front section view;
Fig. 2 is the enlarged diagram of structure at A in the utility model Fig. 1.
In figure:1 pillar, 2 mounting grooves, 3 connecting poles, 4 bases, 5 main frames, 6 fixed plates, 7 pressing boards, 8 return springs, 9 extruding Bar, 10 transverse slats, 11 clamping plates, 12 fixture blocks, 13 necks, 14 kellies, 15 grooves, 16 arm-ties, 17 back-moving springs, 18 inserted links.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in Figure 1-2, the utility model provides a kind of technical scheme:A kind of wind-power electricity generation master of achievable Fast Installation Machine, including pillar 1, the top of pillar 1 offer mounting groove 2, connecting pole 3 are plugged with mounting groove 2, and the bottom of connecting pole 3 is consolidated Surely inserted link 18 is connected with, and inserted link 18 is plugged in the jack that the bottom of mounting groove 2 opens up, by the way that there is provided inserted link 18, Neng Gouzeng Add stability of the connecting pole 3 in mounting groove 2, the top of connecting pole 3 is fixedly connected with base 4, and the bottom of base 4 is overlapped on branch The upper surface of post 1, and the top of pillar 1 is overlapped on the centre position of the bottom of base 4, and branch is placed on so as to which base 4 can be stablized The top of post 1, the upper surface of base 4 are fixedly connected with main frame 5, and the both sides of the inwall of mounting groove 2 are by fixed plate 6 respectively with two The top of individual pressing board 7 is flexibly connected, and the relative side of two pressing boards 7 is overlapped on the both sides on the surface of connecting pole 3, pressing board 7 respectively The side opposite with connecting pole 3 is flexibly connected by return spring 8 with the inwall of mounting groove 2, and the quantity of return spring 8 is four It is individual, and four return springs 8 are one group with two and are equidistantly positioned respectively on two pressing boards 7, when four return springs 8 are in During initial state, the bottom of pressing board 7 tilts to the right, so as to when connecting pole 3 pushes, promote two pressing boards 7, and make it In plumbness, so as to smoothly promote the relative one end of two pressure rams 9, the both sides of pillar 1 are interspersed with pressure ram 9, and one end of pressure ram 9 is overlapped on the side of pressing board 7 and positioned at the lower section of return spring 8, the both sides on the surface of pillar 1 and is located at The top of pressure ram 9 is fixedly connected with transverse slat 10, and the back side activity of the one end opposite with pillar 1 of transverse slat 10 and clamping plate 11 is even Connect, and the other end of pressure ram 9 is flexibly connected with the bottom at the back side of clamping plate 11, clamping plate 11 is fixedly connected with fixture block at the top of side 12, and the one end opposite with clamping plate 11 of fixture block 12 is connected in the neck 13 that the surface of base 4 opens up, the inclination of neck 13 to the right Angle is 15 degree, and the angle of inclination of fixture block 12 is equal with the angle of inclination of neck 13, by by the angle of inclination of neck 13 Be arranged to 15 degree, can mating splint 11 drive fixture block 12 move when track, so as to make fixture block 12 smoothly enter card Groove 13 departs from neck 13, and when pulling up connecting pole 3, in the presence of return spring 8, two pressing boards 7 have relatively Mobile trend, now, two clamping plates 11 are stirred backwards, connecting pole 3 can be made to depart from mounting groove 2, by fixture block 12 and card The improvement of groove 13, when connecting pole 3 is inserted in mounting groove 2, two inclined pressing boards 7 can be extruded, now, two pressing boards 7 can lead to Cross pressure ram 9 to promote the bottom of clamping plate 11 and drive clamping plate 11 to rotate on transverse slat 10, so as to be arranged on the card at the top of clamping plate 11 Block 12 can be connected in neck 13, so as to which wind-power electricity generation main frame 5 is quick installed on pillar 1, and time saving and energy saving, branch Kelly 14 is interspersed with post 1 and positioned at the top of transverse slat 10, and one end of kelly 14 is plugged on the groove that the surface of connecting pole 3 opens up In 15, the length that kelly 14 is inserted inside connecting pole 3 is 1/3rd of the total length of kelly 14, and the diameter and groove of kelly 14 15 diameter is equal, and the other end of kelly 14 is fixedly connected with arm-tie 16, and the side relative with pillar 1 of arm-tie 16 and positioned at card The upper and lower ends of bar 14 are connected by back-moving spring 17 with the surface activity of pillar 1, by by the straight of kelly 14 and groove 15 Footpath is arranged to equal, by increasing capacitance it is possible to increase stability of the kelly 14 in groove 15, and the intubating length of kelly 14 can increase company The stability between post 3 and mounting groove 2 is connect, the intubating length of kelly 14 equally facilitates kelly 14 to be disconnected post 3, by right The improvement of kelly 14 and groove 15, when backwards to two arm-ties 16 of pulling, kelly 14 can be made to depart from neck 13, unclamp arm-tie 16 When, in the presence of the screen resilience of back-moving spring 17, kelly 14 can be made to be caught in groove 15, pacified so as to increase connecting pole 3 Stability in tankage 2, and the process is convenient and swift, it is not necessary to the excessive set-up time is wasted, reduces peril Incidence.
It can to sum up obtain, the wind-power electricity generation main frame of Fast Installation can be achieved in this, by the improvement to fixture block 12 and neck 13, when When connecting pole 3 is inserted in mounting groove 2, two inclined pressing boards 7 can be extruded, now, two pressing boards 7 can be promoted by pressure ram 9 The bottom of clamping plate 11 simultaneously drives clamping plate 11 to be rotated on transverse slat 10, and card can be connected to so as to be arranged on the fixture block 12 at the top of clamping plate 11 In groove 13, so as to which wind-power electricity generation main frame 5 is quick installed on pillar 1, and time saving and energy saving, by kelly 14 and logical The improvement of groove 15, when backwards to two arm-ties 16 of pulling, kelly 14 can be made to depart from neck 13, when unclamping arm-tie 16, resetted In the presence of the screen resilience of spring 17, kelly 14 can be made to be caught in groove 15, so as to increase connecting pole 3 in mounting groove 2 Stability, and the process is convenient and swift, it is not necessary to the excessive set-up time is wasted, reduces the incidence of peril.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that a variety of to the progress of these embodiments can change in the case where not departing from principle of the present utility model and spirit, Modification, replacement and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of wind-power electricity generation main frame of achievable Fast Installation, including pillar (1), it is characterised in that:The top of the pillar (1) Portion offers mounting groove (2), is plugged with connecting pole (3) in the mounting groove (2), the top of the connecting pole (3) is fixedly connected There is base (4), the upper surface of the base (4) is fixedly connected with main frame (5), and the both sides of mounting groove (2) inwall pass through Top of the fixed plate (6) respectively with two pressing boards (7) is flexibly connected, and the relative side of two pressing boards (7) company of being overlapped on respectively The both sides on post (3) surface are connect, the pressing board (7) side opposite with connecting pole (3) passes through return spring (8) and mounting groove (2) Inwall be flexibly connected, the both sides of the pillar (1) are interspersed with pressure ram (9), and one end of pressure ram (9) is overlapped on pressing board (7) side and consolidate positioned at the lower section of return spring (8), the both sides on pillar (1) surface and positioned at the top of pressure ram (9) Surely it is connected with transverse slat (10), and transverse slat (10) one end opposite with pillar (1) is flexibly connected with the back side of clamping plate (11), and extrude The other end of bar (9) is flexibly connected with the bottom at clamping plate (11) back side, and card is fixedly connected with the top of clamping plate (11) side Block (12), and fixture block (12) one end opposite with clamping plate (11) is connected in the neck (13) that base (4) surface opens up, the branch Kelly (14) is interspersed with post (1) and above transverse slat (10), and one end of kelly (14) is plugged on connecting pole (3) surface In the groove (15) opened up, the other end of the kelly (14) is fixedly connected with arm-tie (16), and arm-tie (16) and pillar (1) phase To side and be connected positioned at the upper and lower ends of kelly (14) by back-moving spring (17) with the surface activity of pillar (1).
A kind of 2. wind-power electricity generation main frame of achievable Fast Installation according to claim 1, it is characterised in that:The connection The bottom of post (3) is fixedly connected with inserted link (18), and inserted link (18) is plugged in the jack that mounting groove (2) bottom opens up.
A kind of 3. wind-power electricity generation main frame of achievable Fast Installation according to claim 1, it is characterised in that:The neck (13) angle of inclination to the right is 15 degree, and the angle of inclination of fixture block (12) is equal with the angle of inclination of neck (13).
A kind of 4. wind-power electricity generation main frame of achievable Fast Installation according to claim 1, it is characterised in that:The base (4) bottom is overlapped on the upper surface of pillar (1), and the top of pillar (1) is overlapped on the centre position of base (4) bottom.
A kind of 5. wind-power electricity generation main frame of achievable Fast Installation according to claim 1, it is characterised in that:The return The quantity of spring (8) is four, and four return springs (8) are one group with two and are equidistantly positioned respectively in two pressing boards (7) On.
A kind of 6. wind-power electricity generation main frame of achievable Fast Installation according to claim 1, it is characterised in that:The kelly (14) it is 1/3rd of kelly (14) total length to insert the internal length of connecting pole (3), and the diameter and groove of kelly (14) (15) diameter is equal.
CN201720100343.4U 2017-01-24 2017-01-24 A kind of wind-power electricity generation main frame of achievable Fast Installation Expired - Fee Related CN206722965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720100343.4U CN206722965U (en) 2017-01-24 2017-01-24 A kind of wind-power electricity generation main frame of achievable Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720100343.4U CN206722965U (en) 2017-01-24 2017-01-24 A kind of wind-power electricity generation main frame of achievable Fast Installation

Publications (1)

Publication Number Publication Date
CN206722965U true CN206722965U (en) 2017-12-08

Family

ID=60500469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720100343.4U Expired - Fee Related CN206722965U (en) 2017-01-24 2017-01-24 A kind of wind-power electricity generation main frame of achievable Fast Installation

Country Status (1)

Country Link
CN (1) CN206722965U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372311A (en) * 2018-09-11 2019-02-22 北京中建建筑科学研究院有限公司 Pylon steel wire bundle entirety punch track construction frame device and its installation method
CN109798621A (en) * 2019-01-07 2019-05-24 浙江琦远科技有限公司 A kind of small-sized new blower of energy Fast Installation
CN111219301A (en) * 2018-11-26 2020-06-02 吉林大学 Monitoring and repairing device for fracture of blade connecting point of wind driven generator
CN112282373A (en) * 2020-09-23 2021-01-29 安徽省力通稀土钢缆有限公司 Steel strand bundle integral perforation tunnel scaffold for tower

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372311A (en) * 2018-09-11 2019-02-22 北京中建建筑科学研究院有限公司 Pylon steel wire bundle entirety punch track construction frame device and its installation method
CN109372311B (en) * 2018-09-11 2024-02-23 北京中建建筑科学研究院有限公司 Steel strand bundle integral tunnel penetrating construction frame body device for tower and installation method thereof
CN111219301A (en) * 2018-11-26 2020-06-02 吉林大学 Monitoring and repairing device for fracture of blade connecting point of wind driven generator
CN109798621A (en) * 2019-01-07 2019-05-24 浙江琦远科技有限公司 A kind of small-sized new blower of energy Fast Installation
CN112282373A (en) * 2020-09-23 2021-01-29 安徽省力通稀土钢缆有限公司 Steel strand bundle integral perforation tunnel scaffold for tower

Similar Documents

Publication Publication Date Title
CN206722965U (en) A kind of wind-power electricity generation main frame of achievable Fast Installation
CN206211923U (en) A kind of photovoltaic generation solar-cell panel support
CN212518206U (en) Line pressing device for communication engineering
CN207420014U (en) A kind of reinforced building template device
CN207193872U (en) A kind of easy-to-dismount Construction for Hydroelectric Project support bracket
CN206726674U (en) A kind of LED display fixed frame for being easy to assembling
CN206065746U (en) Adjustable type group welding of storage battery frock
CN205111723U (en) Solar PV modules's installation positioning tool
CN206289997U (en) Construction protection safety net
CN103486749B (en) A kind of flat-plate solar collector frame combining structure
CN206059351U (en) A kind of audion encapsulating mould
CN205781815U (en) A kind of supporting construction of the semi-automatic yarn brushing machine of network
CN219877861U (en) Water conservancy water and electricity construction is with show shelf
CN207064408U (en) A kind of frame set load joint kit
CN215290624U (en) Environment-friendly energy-saving steel structure for photovoltaic power generation
CN207010602U (en) Solar cell board mounting stand is used in a kind of rural households' illumination
CN205908093U (en) Electronic information engineering is with communication tower
CN206053186U (en) Spliced triangle grid
CN203550252U (en) Novel flat-plate solar thermal collector side frame combining structure
CN211959111U (en) Solar panel installation fixed bolster for new forms of energy
CN205212351U (en) Plastics multilayer chute solidus ware
CN205189390U (en) H shaped steel post operation platform
CN207283485U (en) A kind of mounting structure of solar panel
CN220263591U (en) Storage device is used in glass cement production
CN220962750U (en) Art is show stand for exchange

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

Termination date: 20220124

CF01 Termination of patent right due to non-payment of annual fee