CN206722377U - A kind of external scaffolding drawknot node structure - Google Patents

A kind of external scaffolding drawknot node structure Download PDF

Info

Publication number
CN206722377U
CN206722377U CN201720476325.6U CN201720476325U CN206722377U CN 206722377 U CN206722377 U CN 206722377U CN 201720476325 U CN201720476325 U CN 201720476325U CN 206722377 U CN206722377 U CN 206722377U
Authority
CN
China
Prior art keywords
external scaffolding
leg
connecting rod
drawknot node
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720476325.6U
Other languages
Chinese (zh)
Inventor
隋海涛
锦晓晨
梁荣峰
张伯川
王宁宁
王进平
朱筱理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch filed Critical Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority to CN201720476325.6U priority Critical patent/CN206722377U/en
Application granted granted Critical
Publication of CN206722377U publication Critical patent/CN206722377U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model proposes a kind of external scaffolding drawknot node structure, comprising constructure body structure and external scaffolding, also it is embedded in comprising zinc-coated flat steel sheet, zinc-coated flat steel sheet in constructure body structure, external scaffolding includes wall connecting rod, and zinc-coated flat steel sheet is connected with wall connecting rod by diesis fastener.The external scaffolding drawknot node structure make it that external scaffolding is more firm, simple in construction, construction is simple, and does not influence secondary structure construction, and avoids the hidden danger of follow-up patch work and seepage.

Description

A kind of external scaffolding drawknot node structure
Technical field
It the utility model is related to building construction technology neighborhood, more particularly to a kind of external scaffolding drawknot node structure.
Background technology
In architectural engineering neighborhood, for convenience of operation and solve the problems, such as vertically and horizontally to transport, it will usually building Beyond the region of objective existence, which encloses, sets up external scaffolding.At present, external scaffolding has been used widely.In order that external scaffolding consolidates, external scaffolding quilt It is connected to wall.For connected mode, the way of prior art is the pre-buried steel member in wall casting concrete, such as steel bushing Pipe or claw type steel member, using the drawknot node as external scaffolding.If using steel sleeve, steel sleeve will be perpendicular to metope and distance Wall top portion certain distance, when building scaffold, wall connecting rod uses fixed mount by wall connecting rod respectively through steel sleeve and in wall both sides Vertically fixed relative to metope.If it is desired that with claw type steel member, the claw-shaped sections of claw type steel member are embedded in wall and apart from wall Top certain distance, one piece of surface of steel plate being only connected with claw-shaped sections end is exposed to metope, when building scaffold, wall connecting rod End be welded and fixed therewith.To be easy for construction, pre-buried steel sleeve or claw type steel member can not protrude from metope, at most and wall Face is concordant.
But there are some drawbacks in above-mentioned existing connected mode.Fixed mount is coordinated to fix wall connecting rod with pre-buried steel sleeve When, on the one hand to be used component more, cost is high;On the other hand, the more difficult control of the depth of parallelism of the multiple pre-buried steel sleeves of a row, The wall connecting rod depth of parallelism is caused to be frequently necessary to correction to meet that scaffold builds requirement;Furthermore, it is necessary to fill steel after dismounting scaffold Inside pipe casing makes it complete to repair metope, but workload is big after this repairing and is easy to seep water after repairing, and influences wall construction Water resistance.During with claw type steel member by being welded to connect fixed wall connecting rod, on the one hand, need professional welder to carry out welding behaviour Make, and need support staff to assist welder to hold up wall connecting rod in welding process, waste time and energy and take a lot of work, butt welding is wanted when removing scaffold The place of connecing is cut, and cutting quantity is big;On the other hand, after scaffold is removed, claw type steel member is exposed at surface of steel plate at metope also Can influence the follow-up plastering construction of metope, the later stage at this metope coating material it is easy to fall off, be unfavorable for keeping the outward appearance of metope finished product.
The content of the invention
To solve the problems, such as that prior art is present, the utility model proposes a kind of improved external scaffolding drawknot node structure, The external scaffolding drawknot node structure causes external scaffolding to have preferable stability, simple in construction, construction is simple, and does not influence Secondary structure is constructed, and avoids the hidden danger of follow-up patch work and seepage.
To achieve the above object, external scaffolding drawknot node structure of the present utility model includes constructure body structure and outer pin Hand cradle, also it is embedded in comprising antirust band steel, antirust band steel in constructure body structure, external scaffolding includes wall connecting rod, and antirust is flat Steel is connected with wall connecting rod by diesis fastener.
Further, antirust band steel is L-type, and comprising the first leg and the second leg, the first leg is perpendicular to the second leg.
Further, the first leg is embedded in constructure body structure, and parallel to the metope of constructure body structure, Two legs are located on the upper surface of constructure body structure, perpendicular to the metope of constructure body structure, and partially extend through and build Build the metope of thing agent structure.
Further, the second leg is provided with 2 bolts hole, and the bolt of diesis fastener is extended there through and fixed, so as to Second leg is fixedly connected with diesis fastener.
Further, the wall connecting rod of external scaffolding is withstood on the metope of constructure body structure by wall end.
Above-mentioned external scaffolding drawknot structure ensure that stability and the construction of external scaffolding by the way of soft drawn is resisted stubbornly Security.In addition, as drawknot node antirust band steel without remove, therefore do not influence secondary structure construction, and avoid because Hidden leakage defect caused by box out.
Brief description of the drawings
The utility model is made below in conjunction with the accompanying drawings further to describe and illustrate.
Fig. 1 is the schematic diagram of the external scaffolding drawknot node structure of preferred embodiment of the present utility model.
Fig. 2 is the schematic diagram of the zinc-coated flat steel sheet of external scaffolding drawknot node structure.
Fig. 3 is the schematic diagram of the second leg of zinc-coated flat steel sheet.
Embodiment
As shown in figure 1, the external scaffolding drawknot node structure 10 of preferred embodiment of the present utility model includes building owner Body structure 1, external scaffolding 2, zinc-coated flat steel sheet 3.Wherein, zinc-coated flat steel sheet 3 is pre-buried in 1 casting concrete of constructure body structure Wherein.
As shown in Figure 2,3, drawknot node of the zinc-coated flat steel sheet 3 as external scaffolding, made using L50*5 zinc-coated flat steel sheets, it is L Type structure, comprising the first leg 31 and the second leg 32, the first leg 31 is embedded in building main body perpendicular to the second leg 32, the first leg 31 In the concrete of structure 1, and it is located at constructure body structure 1 parallel to the metope of constructure body structure 1, the second leg 32 On upper surface, perpendicular to the metope of constructure body structure 1, and the metope of constructure body structure 1 is partially extended through.It is preferred that Ground, the length of every leg is 350mm.2 bolt hole 32a, holes center spacing 110mm, control errors are provided with second leg 32 Within 2mm.
As shown in figure 1, external scaffolding 2 includes wall connecting rod 20, one end of wall connecting rod 20 extends to the metope of agent structure 1, And it is against on the metope, meanwhile, the elongated end of wall connecting rod 20 is located at the lower section of the second leg 32 of zinc-coated flat steel sheet 3.In wall connecting rod 20 Bearing of trend on, wall connecting rod 20 partially overlaps with the second leg 32.Wall connecting rod 20 is connected to zinc-coated flat steel sheet by two cruciform fastening for falsework 4 On 3 the second leg 32.The bolt of 2 cruciform fastening for falsework 4 is each passed through the bolt hole 32a on zinc-coated flat steel sheet 3, then is tightened with nut, So as to which the second leg 32 be fixedly connected with diesis fastener 4.Preferably, the screw-down torque of nut is 40-65Nm, and bolt exposes Length is no less than 10mm.
The wall connecting rod 20 of above-mentioned external scaffolding drawknot node structure 10 is resisted stubbornly on the metope of agent structure 1 by wall end, plating Zinc band steel 3 holds wall connecting rod 20 in the presence of diesis fastener 4, by way of this soft drawn is resisted stubbornly, ensure that out-mould scaffold The stability of frame, avoids potential safety hazard.
The construction technology process of the external scaffolding drawknot node structure 10 is:Pre-buried zinc-coated flat steel sheet → wall connecting rod construction → support body Set up → hang up safety net → laying reinforced mesh → inspect for acceptance → use during detect maintenance → outrigger remove, excision plating Zinc band steel.
It is zinc-plated on band steel primarily to antirust, in other embodiments, can also be adopted in this preferred embodiment With the antirust band steel of other materials.An extra benefit is also brought using band steel, after scaffold is removed, as long as wall will be exposed The band steel part in face is cut away with cutting machine, and other parts stayed on wall construction are because of band steel thickness very little, the steel being exposed on metope Surface area is very small, has no effect on the secondary construction of wall construction, for example, wall of laying bricks on the wall on surface, carry out on metope it is outer Layer material coating etc..
The step of construction technology process in the utility model first choice embodiment is described below in detail:
Pre-buried zinc-coated flat steel sheet:
First, zinc-coated flat steel sheet drawknot node is made, drawknot node is outer using zinc-coated flat steel sheet L50*5 making, length 350mm Two bolts hole are opened in frame (i.e. external scaffolding) side, and bolt hole is identical with cruciform fastening for falsework screw diameter, hole center spacing 110mm, Within 2mm, perforate should ensure that mellow and full, smooth control errors.
The pre-buried zinc-coated flat steel sheet in constructure body structure.Every layer of setting band steel formula drawknot node of external scaffolding, it is therefore an objective to be With cruciform fastening for falsework wall connecting rod is set to be reliably connected with zinc-coated flat steel sheet drawknot node.Force Calculation and analysis are first carried out before construction, by counting Calculate result and determine whether drawknot node meets construction parameter.Before agent structure concreting, it is strict audit architectural working drawing and Structural working drawing, pre-buried point position is subjected to electronic composition arrangement, and reasonably optimizing.After determining the pre-buried position of drawknot node, in master Body structure reinforcing bars side bundle finishes, after the completion of model sheetinstallat, and snap the line positions in template, and zinc-coated flat steel sheet need to be embedded on beam, expose Concrete surface cannot be greater than 20mm.Protection is should be noted that during form removal, with anti-tamper.
Wall connecting rod is constructed:
After the completion of zinc-coated flat steel sheet drawknot node is pre-buried, it is connected using diesis fastener with wall connecting rod, wall connecting rod pushes up by wall end On the metope of constructure body structure, drawknot node soft drawn is resisted stubbornly, and cruciform fastening for falsework bolt passes through band steel drawknot node preformed hole (i.e. spiral shell Keyhole), the screw-down torque of nut is 40-65Nm, and after nut is tightened, bolt exposed length is no less than 10mm.
Set up external scaffolding support body and hang up safety net:
Scaffold building step pitch 1.8m, vertical rod advance are not more than 1.5m, transfer 0.8m.Consider frame body safe and after Continuous moulding property easy for construction, to determine that vertical rod is not away from main wall spacing (being preferably greater than 300mm) in scaffold.Railing and foot guard plate The inner side of outer vertical rod all should be ridden upon.Every section of builder's jack every layer of shield of all setting up defences, protection between vertical rod and main body in outrigger by floor It is isolated into:Horizontal cross bar Inner chooses plus the soft isolation (being located between interior vertical rod and wall) of one layer of horizontal safety net.Scaffold every three The thick red template of layer completely paving 12 does hard isolation closing, and remaining often walks laying steel basketry piece.Scaffold board forbids plate of popping one's head in, fixation. Builder's jack outside safety net is totally-enclosed, chooses string bag bottom with white, material selection green is dust-proof, noise isolating fire retardant safety net.Using steel During basketry scaffold board, vertical equity bar is fixed on transverse horizontal bar using right-angle coupler.When vertical rod transfer is less than or equal to 800mm When, should not be less than by often walking the vertical equity steel pipe of snapping on transverse horizontal bar by 3;When vertical rod transfer is more than 800mm, often step is horizontal The vertical equity steel pipe of snapping is no less than 4 on to horizon bar.The alien invasion bridging of suspension scaffold should continuously be set from bottom to top Put, per pass bridging width is no less than 4 across and no more than 7 across, and no less than 6m, and the inclination angle on brace and ground should be at 45 ° Between~60 °.Wall-connecting piece uses two steps three across setting, using form of the embedded steel tube on beam.Steel pipe specifications and models should meet Calculating and code requirement.
Inspection and maintenance during use:
After support body is set up, organize management and Party A's acceptance(check) to come into operation by project management department, using process In should often to support body carry out Inspection and maintenance.Check points for attention:Under general state, it is allowed to have two operation layers while apply Work, every layer of maximum construction loads are 3.0KN/m2.Support body must not overload use, must not use load.Support body can only conduct Crosshead, formwork-support must not be used as.Emphasis is answered to check whether junction bolt loosens, whether nut lacks.Inspection and maintenance Formulate special messenger to be responsible for, at least check once weekly, form written process inspection record, timely maintenance of pinpointing the problems, rectification.
Outrigger is removed, excision zinc-coated flat steel sheet:
It is zinc-plated flat along the metope excision of constructure body structure using oxygen-acetylene after wall connecting rod of dismantling when outrigger is removed The part of the stretching agent structure of steel, using cement mortar repairing preventing and treating corrosion after the completion of cutting.Outrigger is forbidden to remove when removing Two step above wall connecting rods.
Compared with traditional construction technology, the construction method of above-mentioned zinc-coated flat steel sheet drawknot node, using zinc-coated flat steel sheet as outer pin The drawknot node of hand cradle, zinc-coated flat steel sheet is on building construction without influence, and hidden leakage defect caused by box out and worker construct when reduction is built by laying bricks or stones When remove the potential safety hazard of wall connecting rod, building structure is destroyed light, is easy to construct, it is few that the structure later stage blocks up hole amount, saves material, section The about duration, save cost.
Only preferred embodiment of the present utility model is described for above-mentioned embodiment, and not to this practicality New protection domain is defined.On the premise of the utility model design conception and scope is not departed from, this area Those of ordinary skill is according to word description provided by the utility model, accompanying drawing to made by the technical solution of the utility model Various modifications, replacement and improvement, protection category of the present utility model all should be belonged to.The scope of protection of the utility model will by right Ask determination.

Claims (5)

1. a kind of external scaffolding drawknot node structure, includes constructure body structure and external scaffolding, it is characterised in that also comprising anti- Become rusty band steel, and the antirust band steel is embedded in constructure body structure, and the external scaffolding includes wall connecting rod, the antirust band steel It is connected with wall connecting rod by diesis fastener.
2. external scaffolding drawknot node structure as claimed in claim 1, it is characterised in that the antirust band steel is L-type, includes One leg and the second leg, the first leg is perpendicular to the second leg.
3. external scaffolding drawknot node structure as claimed in claim 2, it is characterised in that first leg is embedded in the building In agent structure, and it is located at the building body junction parallel to the metope of the constructure body structure, second leg On the upper surface of structure, perpendicular to the metope of the constructure body structure, and the constructure body structure is partially extended through Metope.
4. external scaffolding drawknot node structure as claimed in claim 3, it is characterised in that second leg is provided with 2 bolts Hole, the bolt of the diesis fastener are extended there through and fixed, so as to which second leg be fixedly connected with diesis fastener.
5. the external scaffolding drawknot node structure as any one of claim 1-4, it is characterised in that the external scaffolding Wall connecting rod is withstood on the metope of constructure body structure by wall end.
CN201720476325.6U 2017-05-02 2017-05-02 A kind of external scaffolding drawknot node structure Active CN206722377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720476325.6U CN206722377U (en) 2017-05-02 2017-05-02 A kind of external scaffolding drawknot node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720476325.6U CN206722377U (en) 2017-05-02 2017-05-02 A kind of external scaffolding drawknot node structure

Publications (1)

Publication Number Publication Date
CN206722377U true CN206722377U (en) 2017-12-08

Family

ID=60507051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720476325.6U Active CN206722377U (en) 2017-05-02 2017-05-02 A kind of external scaffolding drawknot node structure

Country Status (1)

Country Link
CN (1) CN206722377U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930522A (en) * 2017-05-02 2017-07-07 中建二局第二建筑工程有限公司华东分公司 A kind of external scaffolding drawknot node structure and its construction method
CN113957990A (en) * 2021-11-05 2022-01-21 中建一局集团建设发展有限公司 Open field ultrahigh structure lightning protection system and node device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930522A (en) * 2017-05-02 2017-07-07 中建二局第二建筑工程有限公司华东分公司 A kind of external scaffolding drawknot node structure and its construction method
CN113957990A (en) * 2021-11-05 2022-01-21 中建一局集团建设发展有限公司 Open field ultrahigh structure lightning protection system and node device
CN113957990B (en) * 2021-11-05 2023-03-14 中建一局集团建设发展有限公司 Open field ultrahigh structure lightning protection system and node device

Similar Documents

Publication Publication Date Title
CN104032948B (en) Steel and wood composite template and construction method
CN106639319A (en) Rotten root prevention construction method for shear walls, columns and other concrete vertical structures
CN106926359A (en) A kind of vertical manufacture method of slag concrete sandwich insulation exterior wall plate
CN104295109B (en) Do not register one's residence balcony rapid reinforcement structure and construction method thereof in old community
CN104631513A (en) Construction method for closing basement exterior wall post-cast strip
CN106930531A (en) A kind of pull-up manomelia is encorbelmented the construction method of heavy frame
CN113605771B (en) Prestress assembly type frame structure system
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN206722377U (en) A kind of external scaffolding drawknot node structure
CN212224705U (en) Horizontal protective structure of elevator shaft opening in building construction process
CN107143141A (en) External wall of high-rise building warming plate construction
CN110284702A (en) A kind of constructing device and construction method of hyperboloid arc mixed mud wall
CN106088447A (en) A kind of exterior wall builder's jack shaped steel eye protective brick device and construction method
CN206722378U (en) A kind of pull-up manomelia is encorbelmented heavy frame
CN207048305U (en) Shear force wall piece together template bearing structure
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN113323359A (en) Novel flower basket pull rod tool type overhanging frame construction method
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN204418229U (en) Poured band of outer wall of basement concrete draw-in groove
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN203795842U (en) Ring-buckling and direct-inserting type steel pipe support
CN110821163A (en) Construction method for preventing upward floating of elevator shaft hoisting formwork
CN106930522A (en) A kind of external scaffolding drawknot node structure and its construction method
CN111608376B (en) Comprehensive construction method for shaping component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Sui Haitao

Inventor after: Jin Xiaochen

Inventor after: Liang Rongfeng

Inventor after: Zhang Bochuan

Inventor after: Wang Ningning

Inventor after: Zhu Xiaoli

Inventor after: Wang Jinping

Inventor after: Zhang Shujun

Inventor before: Sui Haitao

Inventor before: Jin Xiaochen

Inventor before: Liang Rongfeng

Inventor before: Zhang Bochuan

Inventor before: Wang Ningning

Inventor before: Wang Jinping

Inventor before: Zhu Xiaoli

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180104

Address after: 450003, Henan, Zhengzhou Jinshui District Garden Road West, agricultural road south 6, 1 units, 22, 2207

Patentee after: The Second Construction Company Of China Construction Second Engineering Bureau

Address before: 210000 Jiangsu city of Nanjing Province along the Yangtze River Industrial Development Zone geguan Road No. 815