CN206722067U - Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system - Google Patents

Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system Download PDF

Info

Publication number
CN206722067U
CN206722067U CN201720396250.0U CN201720396250U CN206722067U CN 206722067 U CN206722067 U CN 206722067U CN 201720396250 U CN201720396250 U CN 201720396250U CN 206722067 U CN206722067 U CN 206722067U
Authority
CN
China
Prior art keywords
air
conditioning plate
conditioning
interlayer air
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720396250.0U
Other languages
Chinese (zh)
Inventor
张鹏
杨顺
杨金锋
任新民
鲁飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING TIANHENG CONSTRUCTION Co Ltd
Original Assignee
BEIJING TIANHENG CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING TIANHENG CONSTRUCTION Co Ltd filed Critical BEIJING TIANHENG CONSTRUCTION Co Ltd
Priority to CN201720396250.0U priority Critical patent/CN206722067U/en
Application granted granted Critical
Publication of CN206722067U publication Critical patent/CN206722067U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

The utility model discloses cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system, belong to building cast-in-place shear wall structure technical field.The method of existing interlayer air-conditioning slab muscle pre-buried in shear wall structure, easily causes thickness of protection tier off quality;And because embedded bar passes through twice bended, the quality of reinforcing bar is not easy to ensure;Because interlayer air-conditioning plate is located in the middle part of floor, air-conditioning template die plate installs that difficulty is larger, larger to the construction infection of finishing operations.The utility model is first depending on design requirement prefabricated reinforced concrete interlayer air-conditioning plate, then the support of interlayer air-conditioning plate is installed, prefabricated interlayer air-conditioning plate is installed, colligation wall steel bar is simultaneously attached with air-conditioning plate embedded bar, wall form is installed, walls concrete is poured, removes wall form, finally waits top to remove the support of interlayer air-conditioning plate after reaching requirement with layer air-conditioning board concrete intensity.It ensure that the construction quality of armored concrete interlayer air-conditioning plate, reduce cost.

Description

Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system
Technical field
Building engineering field is the utility model is related to, more particularly to a kind of cast-in-place shear wall structure armored concrete interlayer Air-conditioning plate construction system.
Background technology
The construction of cast-in-place shear wall structure armored concrete interlayer air-conditioning plate is typically using the pre-buried interlayer in shear wall structure The method of air-conditioning slab muscle, easily cause thickness of protection tier off quality;And because embedded bar passes through twice bended, The quality of reinforcing bar is not easy to ensure;Because interlayer air-conditioning plate is located in the middle part of floor, air-conditioning template die plate to install difficulty larger, to postorder The construction infection of process is larger.In summary, it is necessary to propose a kind of cast-in-place shear wall structure armored concrete interlayer air-conditioning plate Construction method solves the above problems.
Utility model content
The purpose of this utility model is to propose a kind of cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction System and method, by the system can reduce air-conditioning template die plate install difficulty and realize armored concrete interlayer reinforcing bar protect The control of thickness degree.
Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system, the system include reserved anchor bar 1, pre- Armored concrete air-conditioning plate 2 processed, three vertical rod air-conditioning plate support systems 3, it is empty that prefabricated reinforced concrete air-conditioning plate 2 is arranged on three vertical rods On tuned plate support system 3, reserved anchor bar 1 is arranged on the side of prefabricated reinforced concrete air-conditioning plate 2, reserves anchor bar 1 It is mutually corresponding with wall steel bar 4.
Three vertical rod air-conditioning plate support systems 3 include three vertical rod adjusting brackets and support platform, and three vertical rod adjusting brackets are certainly By stretching structure, support platform is arranged on the top of adjusting bracket.Three vertical rod adjusting brackets are the vertical rod knot of three vertical supportings Structure, horizontal connecting rod is provided between three vertical supportings.
Prefabricated reinforced concrete air-conditioning plate 2 is precast construction;
Cast-in-place shear wall structure armored concrete interlayer air-conditioning board construction method, the first step:According to design requirement pre-manufactured steel Reinforced concrete air-conditioning plate 2;Second step:Three vertical rod air-conditioning plate support systems 3;3rd step:Prefabricated reinforced concrete air-conditioning plate is installed 2;4th step:Colligation wall steel bar 4 is simultaneously attached with reserved anchor bar 1;5th step:Wall form 5 is installed;6th step: Pour walls concrete 6;7th step:Remove wall form 5;8th step:Top is waited to reach with layer air-conditioning board concrete intensity Three vertical rod support sections of three vertical rod air-conditioning plate support systems 3 are removed after design requirement.
Cast-in-place shear wall structure armored concrete interlayer air-conditioning board construction method, solves armored concrete interlayer air-conditioning plate Thickness of protection tier quality is not easy to ensure;And because air-conditioning slab muscle does not pass through twice bended, the quality of reinforcing bar is guaranteed; Because independent supporting module, the construction on finishing operations need not it not influence so as to ensure that the construction period additionally.
Brief description of the drawings
Fig. 1 is the elevation in the prefabricated air-conditioning plate installation support of the utility model;
Fig. 2 is elevation when the reserved anchor bar of the prefabricated air-conditioning plate of the utility model is connected with wall steel bar;
Fig. 3 are the elevation after the installation of the utility model wall form;
Fig. 4 are the elevation after the completion of the utility model cast-in-place shear wall body concrete pours;
In figure:1st, anchor bar is reserved;2nd, prefabricated reinforced concrete air-conditioning plate;3rd, three vertical rod air-conditioning plate support system;4、 Wall steel bar;5th, wall form;6th, walls concrete.
Embodiment
According to design requirement prefabricated reinforced concrete interlayer air-conditioning plate and reserved anchor bar 1;
Install three vertical rod air-conditioning plate support systems;Prefabricated reinforced concrete air-conditioning plate 2 is installed, colligation wall steel bar 4 and with Reserved anchor bar 1 is attached;
Top is waited to remove the support of interlayer air-conditioning plate after reaching requirement with layer air-conditioning board concrete intensity.
Ensure the quality of interlayer air-conditioning plate by prefabricated air-conditioning plate;Install the support of three vertical rod interlayer air-conditioning plates and ensure that interlayer The stability of air-conditioning plate installation;Top is waited to remove the support of interlayer air-conditioning plate after reaching requirement with layer air-conditioning board concrete intensity, It ensure that the globality that interlayer air-conditioning plate is connected with walls concrete.
The first step:According to design requirement prefabricated reinforced concrete air-conditioning plate 2;Second step:Three vertical rod air-conditioning plate support systems 3;3rd step:Prefabricated reinforced concrete air-conditioning plate 2 is installed;4th step:Colligation wall steel bar 4 is simultaneously carried out with reserved anchor bar 1 Connection;5th step:Wall form 5 is installed;6th step:Pour walls concrete 6;7th step:Remove wall form 5;8th step: Top is waited to remove the support of interlayer air-conditioning plate after reaching requirement with layer air-conditioning board concrete intensity.

Claims (3)

1. cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system, it is characterised in that:The system includes reserved anchor Gu reinforcing bar (1), prefabricated reinforced concrete air-conditioning plate (2), three vertical rod air-conditioning plate support systems (3), prefabricated reinforced concrete air-conditioning Plate (2) is arranged on three vertical rod air-conditioning plate support systems (3), and reserved anchor bar (1) is arranged on prefabricated reinforced concrete air-conditioning The side of plate (2), it is mutually corresponding with wall steel bar (4) to reserve anchor bar (1).
2. cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system according to claim 1, its feature exist In:Three vertical rod air-conditioning plate support systems (3) include three vertical rod adjusting brackets and support platform, and three vertical rod adjusting brackets are freely to stretch Shrinking structure, support platform are arranged on the top of adjusting bracket;Three vertical rod adjusting brackets are the vertical rod structure of three vertical supportings, three Horizontal connecting rod is provided between root vertical supporting.
3. cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system according to claim 1, its feature exist In:Prefabricated reinforced concrete air-conditioning plate (2) is precast construction.
CN201720396250.0U 2017-04-16 2017-04-16 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system Expired - Fee Related CN206722067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720396250.0U CN206722067U (en) 2017-04-16 2017-04-16 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720396250.0U CN206722067U (en) 2017-04-16 2017-04-16 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system

Publications (1)

Publication Number Publication Date
CN206722067U true CN206722067U (en) 2017-12-08

Family

ID=60505555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720396250.0U Expired - Fee Related CN206722067U (en) 2017-04-16 2017-04-16 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system

Country Status (1)

Country Link
CN (1) CN206722067U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869313A (en) * 2017-04-16 2017-06-20 北京天恒建设工程有限公司 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869313A (en) * 2017-04-16 2017-06-20 北京天恒建设工程有限公司 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system and method

Similar Documents

Publication Publication Date Title
CN106639336A (en) Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof
CN105507476B (en) Construction method of multi-arch roof
CN103104091B (en) Sliding mold whole lifting platform and construction method
CN108312291A (en) A kind of concrete 3D printing building structure and its method of construction
CN207841654U (en) A kind of concrete 3D printing building structure
CN105735532A (en) Method for assembling prefabricated uperimposed slab shear wall structure
CN109487955A (en) A kind of precast concrete column in-situ cast-in-place construction method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN205669281U (en) A kind of cast-in-place integral concrete frame wall filled with masonry system
CN110318490A (en) A kind of construction method that superimposed sheet is connect with secondary beam and node connecting structure
CN207003723U (en) High-rise assembled single row of holes precast shear wall and its assembling structure
CN108755972A (en) Prefabricated component feet and its application method
CN206722067U (en) Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system
CN111663659B (en) Staggered floor synchronous construction method
CN106869313A (en) Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system and method
CN105442737B (en) A kind of complex heat-preservation floorboard and its construction method
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN204753834U (en) Partition plate of scissors stair and connection structure of floor roof beam
CN206289784U (en) The PCF Side fascias of prefabricated band window frame
CN210597742U (en) Shear wall
CN105507475B (en) Continuous alternating semi-conical roof and construction method thereof
CN104847111B (en) Construction method for coupling beam between shear wall limbs
CN106677527B (en) Every beam one-time-concreting molding construction method in elevator
CN211447283U (en) Connecting beam of main building and skirt house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

CF01 Termination of patent right due to non-payment of annual fee