CN206721872U - A kind of improved drill-pouring pilework - Google Patents
A kind of improved drill-pouring pilework Download PDFInfo
- Publication number
- CN206721872U CN206721872U CN201720593250.XU CN201720593250U CN206721872U CN 206721872 U CN206721872 U CN 206721872U CN 201720593250 U CN201720593250 U CN 201720593250U CN 206721872 U CN206721872 U CN 206721872U
- Authority
- CN
- China
- Prior art keywords
- cage
- steel reinforcement
- bar
- reinforcement cage
- pile body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720593250.XU CN206721872U (en) | 2017-05-25 | 2017-05-25 | A kind of improved drill-pouring pilework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720593250.XU CN206721872U (en) | 2017-05-25 | 2017-05-25 | A kind of improved drill-pouring pilework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206721872U true CN206721872U (en) | 2017-12-08 |
Family
ID=60511541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720593250.XU Active CN206721872U (en) | 2017-05-25 | 2017-05-25 | A kind of improved drill-pouring pilework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206721872U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112195913A (en) * | 2020-09-28 | 2021-01-08 | 中冶天工集团有限公司 | Positioning device for reinforcement cage in mountain construction process and construction method thereof |
CN112459048A (en) * | 2020-11-24 | 2021-03-09 | 嘉兴市康立德构件股份有限公司 | High-efficiency energy-saving concrete pipe pile and forming process |
-
2017
- 2017-05-25 CN CN201720593250.XU patent/CN206721872U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112195913A (en) * | 2020-09-28 | 2021-01-08 | 中冶天工集团有限公司 | Positioning device for reinforcement cage in mountain construction process and construction method thereof |
CN112195913B (en) * | 2020-09-28 | 2022-02-25 | 中冶天工集团有限公司 | Positioning device for reinforcement cage in mountain construction process and construction method thereof |
CN112459048A (en) * | 2020-11-24 | 2021-03-09 | 嘉兴市康立德构件股份有限公司 | High-efficiency energy-saving concrete pipe pile and forming process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203476347U (en) | Preliminary bracing device for collapsible loess tunnel | |
CN107268807A (en) | A kind of Prefabricated concrete-filled steel tube superposed column | |
CN208965549U (en) | A kind of poured pile construction package of mortar leakage prevention | |
CN207714314U (en) | A kind of pile foundation construction supporting construction in soft soil foundation | |
CN206721872U (en) | A kind of improved drill-pouring pilework | |
CN208167732U (en) | Grouting steel pipe pile foundation stabilization system | |
CN108571070A (en) | A kind of Prefabricated concrete-filled steel tube ring beam connection structure and construction method | |
CN105804427B (en) | A kind of reinforced construction method of reinforced concrete column beam | |
CN107386098A (en) | Flexing suppress round end type concrete pier of steel tube and with cushion cap connection structure and method | |
CN107313507A (en) | A kind of hollow column joint structure of assembly concrete framework and its construction method | |
CN103669976B (en) | Ancient pagoda correction method | |
CN206110489U (en) | Building steel reinforcement cage subassembly for post | |
CN108755663A (en) | A kind of great diameter and long variable cross-section bored pile construction method | |
CN208633272U (en) | A kind of Prefabricated concrete-filled steel tube ring beam connection structure | |
CN107366355A (en) | Add the bean column node and its construction method of new beam on existing reinforced concrete frame column | |
CN208105474U (en) | A kind of assembly node of upper and lower interior wall and floor | |
CN206681208U (en) | One kind combination constraint double steel plate concrete shear force wall | |
CN206233405U (en) | The attachment structure of shear wall and after-pouring concrete frame beam | |
CN105297758B (en) | Prestress square pile and the integrated column of steel lattice column | |
CN204983246U (en) | Hollow shear wall structure of close post of assembled | |
CN109898504A (en) | Pile for prestressed pipe applies method in layer of sand or boulder bed | |
CN204456656U (en) | A kind of welding stirrup coordinates rod iron combined steel and concrete column | |
CN209620275U (en) | A kind of prefabricated steel column node connecting structure of assembled architecture | |
CN209082702U (en) | Octagon steel core concrete column and concealed beam integrated structure | |
CN208184267U (en) | A kind of newly-increased Cantilever Beams connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230808 Address after: No. 201-204, 2nd Floor, Xinqin Construction Group Office Building, West of Zhijiang Avenue, Aksu Textile Industrial City (Development Zone), Aksu Prefecture, Xinjiang Uygur Autonomous Region, 843000 Patentee after: Xinjiang Xindongli Building Materials Technology Co.,Ltd. Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee before: Dragon totem Technology (Hefei) Co.,Ltd. Effective date of registration: 20230808 Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee after: Dragon totem Technology (Hefei) Co.,Ltd. Address before: 610106 Chengdu University of waidong mausoleum, Chengdu, Sichuan Patentee before: CHENGDU University |
|
TR01 | Transfer of patent right |