CN206721750U - The guardrail of lower regulation is used in a kind of municipal administration - Google Patents

The guardrail of lower regulation is used in a kind of municipal administration Download PDF

Info

Publication number
CN206721750U
CN206721750U CN201720261945.8U CN201720261945U CN206721750U CN 206721750 U CN206721750 U CN 206721750U CN 201720261945 U CN201720261945 U CN 201720261945U CN 206721750 U CN206721750 U CN 206721750U
Authority
CN
China
Prior art keywords
cavity plate
flexible cavity
support bar
guardrail
cross tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720261945.8U
Other languages
Chinese (zh)
Inventor
黄俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Boao Zongheng Network Technology Co ltd
Zhongshan Jiahe Hardware Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720261945.8U priority Critical patent/CN206721750U/en
Application granted granted Critical
Publication of CN206721750U publication Critical patent/CN206721750U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses the guardrail that lower regulation is used in a kind of municipal administration, including support bar, the support bar is set to two, two support bars are symmetrical arranged, flexible cavity plate is fixedly connected between the support bar, upper flexible cavity plate and lower flexible cavity plate are divided into by dividing plate in the flexible cavity plate, the upper flexible cavity plate in lower flexible cavity plate with being arranged at intervals telescopic cavity, the upper and lower of the flexible cavity plate sets cross tube and sheer pole respectively, the cross tube and sheer pole are between support bar, the cross tube and sheer pole are fixedly connected with flexible cavity plate and the expansion link in lower flexible cavity plate telescopic cavity, the support bar is set to hollow support rails.The guardrail of lower regulation is used in the municipal administration, and it is adjustable guardrail to change traditional fixed guardrail, and not only guardrail height is adjustable, gaps underneath is also adjustable, consequently facilitating various occasions carry out isolation use, while transport and storage time save space, convenient to carry and fixed is more stable.

Description

The guardrail of lower regulation is used in a kind of municipal administration
Technical field
It the utility model is related to urban construction field, and in particular to the guardrail of lower regulation is used in a kind of municipal administration.
Background technology
Municipal administration is that municipal subjective role refers to the party machine and state in city in municipal object and its process, the municipal administration of broad sense Organ of state power of family, to realize the politics in city itself and country, economy, culture and the every management activity and its mistake of social development Journey, the municipal administration of narrow sense refer to that the state administrative organs in city is entered to all kinds of administrative affairs in districts under city administration and function Capable management activity and its process.Urban construction is the important content of municipal activities, is the execution stage of planning and designing, is city The various public character facilities and the construction of cause that government is sponsored according to the general plan of urban planning, such as road, draining, bridge Deng, it is therefore intended that prosperity urban economy, facilitate citizen's production and living environment, promote the hair of the material progress and cultural and ideological progress in city Exhibition.The context of urban construction is active development, and municipal engineering construction is the traditional concept of urban construction, and it is heavy to belong to its Want content.
During urban construction, generally require to repair road, for pedestrian and vehicle energy safety, generally can all adopt Road is isolated with guardrail.Traditional guardrail, it is mostly to be welded and fixed, non-dismountable and regulation, causes to need in different occasions Different guardrails is changed, not only increases the cost of urban construction, the work burden of operating personnel is also improved, increases simultaneously Storage and the cost of transport.
Utility model content
The technical problems to be solved in the utility model is the defects of overcoming prior art, there is provided lower regulation is used in a kind of municipal administration Guardrail, facilitate the use in urban construction, increase the convenience used.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:A kind of municipal administration downward The guardrail of section, including support bar, the support bar are set to two, and two support bars are symmetrical arranged, fixed between the support bar The flexible cavity plate of connection, the flexible cavity plate is interior to be divided into upper flexible cavity plate and lower flexible cavity plate, the upper telescopic cavity by dividing plate For plate with being arranged at intervals telescopic cavity in lower flexible cavity plate, the upper and lower of the flexible cavity plate sets cross tube and sheer pole respectively, Between support bar, the cross tube and sheer pole are fixedly connected with flexible cavity plate and stretched with for the cross tube and sheer pole Expansion link in contracting cavity plate telescopic cavity, the support bar are set to hollow support rails, and the both sides of support bar are spaced, run through from top to bottom Tapped through hole is opened up, the cross tube and sheer pole are set to hollow stem, screw rod, screw rod inserted in the tapped through hole of the support bar The body of rod enter cross tube and sheer pole end support bar is tightened with cross tube, sheer pole together with.
Preferably, the lower end of the support bar is set to vertebral body structure or semiellipsoid structure, and the lower end of support bar opens up Pod apertures simultaneously connect hangnail.
Preferably, two sides of the flexible cavity plate are respectively articulated with knighthead.
Preferably, fully entered after the expansion link compression in flexible cavity plate.
The beneficial effect that the utility model is reached is:The guardrail of lower regulation is used in the municipal administration, changes traditional fixed shield Column is adjustable guardrail, and not only guardrail height is adjustable, and gaps underneath is also adjustable, consequently facilitating various occasions are isolated Use, while transport and storage time save space, convenient to carry and fixed more stablizes.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and a part for constitution instruction, with this practicality New embodiment is used to explain the utility model together, does not form to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is the guardrail schematic elevation view that lower regulation is used in a kind of municipal administration of the utility model;
In figure:1st, support bar, 2, flexible cavity plate, 3, dividing plate, 4, upper flexible cavity plate, 5, lower flexible cavity plate, 6, cross tube, 7, Sheer pole, 8, expansion link, 9, screw rod.
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
Embodiment 1
As shown in figure 1, the guardrail of lower regulation, including support bar 1, the support bar 1 are used in a kind of municipal administration of the present embodiment Two are set to, two support bars 1 are symmetrical arranged, and are fixedly connected with flexible cavity plate 2 between the support bar 1, in the flexible cavity plate 2 Upper flexible cavity plate 4 and lower flexible cavity plate 5 are divided into by dividing plate 3, the upper flexible cavity plate 4 in lower flexible cavity plate 5 with being spaced Telescopic cavity is set, and the upper and lower of the flexible cavity plate 2 sets cross tube 6 and sheer pole 7, the cross tube 6 and sheer pole 7 respectively Between support bar 1, the cross tube 6 and sheer pole 7 are fixedly connected with flexible cavity plate 4 and the lower flexible telescopic cavity of cavity plate 5 Interior expansion link 8, the support bar 1 are set to hollow support rails, and the both sides of support bar 1 are spaced from top to bottom, through opening up screw thread Through hole, the cross tube 6 and sheer pole 7 are set to hollow stem, screw rod 9 are inserted in the tapped through hole of the support bar 1, screw rod 9 Together with support bar 1 is tightened by the end of the body of rod into cross tube 6 and sheer pole 7 with cross tube 6, sheer pole 7.
The lower end of the support bar 1 is set to vertebral body structure or semiellipsoid structure, and the lower end of support bar 1 opens up pod apertures And hangnail is connected, prevent the internal water accumulation of support bar 1 from getting rusty, facilitate insertion into ground, increase steadiness;The both sides of the flexible cavity plate 2 While being respectively articulated with knighthead, stability is improved, prevents from toppling over;The expansion link 8 is fully entered in flexible cavity plate 2 after compressing, It is easy to use.
It should be noted that the guardrail of lower regulation is used in a kind of municipal administration of the utility model, ground is inserted in the lower end of support bar 1 Face, knighthead is pulled open, according to isolation needs, pull-up cross tube 6, drop-down sheer pole 7 so that expansion link 8 is from upper flexible cavity plate 4 Pulled out with the telescopic cavity of lower flexible cavity plate 5, screw rod 9 is then inserted in the tapped through hole of support bar 1, the body of rod of screw rod 9 enters Enter cross tube 6 and sheer pole 7 end support bar 1 is tightened with cross tube 6, sheer pole 7 together with so that guardrail It is fully opened;Whole guardrail, it is adjustable guardrail to change traditional fixed guardrail, and not only guardrail height is adjustable, under Square space is also adjustable, consequently facilitating various occasions carry out isolation use, while transport and storage time save space, it is convenient to carry, And fix more stable.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Carry out equivalent substitution.All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc., It should be included within the scope of protection of the utility model.

Claims (4)

1. the guardrail of lower regulation, including support bar (1) are used in a kind of municipal administration, it is characterised in that:The support bar (1) is set to two Root, two support bars (1) are symmetrical arranged, and flexible cavity plate (2), the flexible cavity plate (2) are fixedly connected between the support bar (1) It is interior that flexible cavity plate (4) and lower flexible cavity plate (5), the upper flexible cavity plate (4) and lower flexible cavity plate are divided into by dividing plate (3) (5) telescopic cavity is arranged at intervals in, the upper and lower of the flexible cavity plate (2) sets cross tube (6) and sheer pole (7), institute respectively State cross tube (6) and sheer pole (7) is located between support bar (1), the cross tube (6) and sheer pole (7) are fixedly connected with Flexible cavity plate (4) is set to hollow support rails with the expansion link (8) in lower flexible cavity plate (5) telescopic cavity, the support bar (1), props up The both sides of strut (1) are spaced, through tapped through hole is opened up from top to bottom, and the cross tube (6) and sheer pole (7) are set to hollow Bar, the interior insertion screw rod (9) of tapped through hole of the support bar (1), the body of rod of screw rod (9) enter cross tube (6) and sheer pole (7) End support bar (1) is tightened with cross tube (6), sheer pole (7) together with.
2. the guardrail of lower regulation is used in a kind of municipal administration according to claim 1, it is characterised in that:The support bar (1) Lower end is set to vertebral body structure or semiellipsoid structure, and the lower end of support bar (1) opens up pod apertures and connects hangnail.
3. the guardrail of lower regulation is used in a kind of municipal administration according to claim 1, it is characterised in that:The flexible cavity plate (2) Two sides be respectively articulated with knighthead.
4. the guardrail of lower regulation is used in a kind of municipal administration according to claim 1, it is characterised in that:Expansion link (8) pressure Fully entered after contracting in flexible cavity plate (2).
CN201720261945.8U 2017-03-17 2017-03-17 The guardrail of lower regulation is used in a kind of municipal administration Expired - Fee Related CN206721750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720261945.8U CN206721750U (en) 2017-03-17 2017-03-17 The guardrail of lower regulation is used in a kind of municipal administration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720261945.8U CN206721750U (en) 2017-03-17 2017-03-17 The guardrail of lower regulation is used in a kind of municipal administration

Publications (1)

Publication Number Publication Date
CN206721750U true CN206721750U (en) 2017-12-08

Family

ID=60502038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720261945.8U Expired - Fee Related CN206721750U (en) 2017-03-17 2017-03-17 The guardrail of lower regulation is used in a kind of municipal administration

Country Status (1)

Country Link
CN (1) CN206721750U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942194A (en) * 2021-02-02 2021-06-11 阳江市源丰建设工程有限公司 Enclosure structure with noise elimination and shock prevention functions and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942194A (en) * 2021-02-02 2021-06-11 阳江市源丰建设工程有限公司 Enclosure structure with noise elimination and shock prevention functions and construction method thereof
CN112942194B (en) * 2021-02-02 2022-04-01 阳江市源丰建设工程有限公司 Enclosure structure with noise elimination and shock prevention functions and construction method thereof

Similar Documents

Publication Publication Date Title
CN104303893A (en) Assembled thermal insulation greenhouse
CN206721750U (en) The guardrail of lower regulation is used in a kind of municipal administration
CN206607594U (en) The structure with oblique member of construction
CN218347028U (en) Framework suitable for large and medium-sized transformer substation
CN206333096U (en) A kind of gardens cold-proof air partition of aithullium
CN205276992U (en) Self -supporting chimney
CN108551917A (en) A kind of Landscape River movable green belt
CN204225479U (en) A kind of construction formwork that realizes early is torn open and the device of quick detach
CN207277975U (en) A kind of novel garden combined type guard bar
CN207376628U (en) A kind of slip casting bolt for assembled pattern foundation pit supporting structure
CN207135662U (en) A kind of easy-disassembling-assembling planting greenhouse
CN206987436U (en) A kind of green crossing sunshade
CN206157767U (en) Utility tunnel
CN207118371U (en) Ornamental plant climbing frame
CN206600048U (en) The safe purse seine in construction site or municipal gardens
CN205777849U (en) A kind of portable shade net support
CN219327396U (en) Municipal guardrail convenient to dismantle transportation
CN205357376U (en) Stem of noble dendrobium support frame
CN208844614U (en) A kind of new and old supporting compages of underground excavation
CN205284726U (en) Solar energy mosquito killer lamp fixer
CN204715876U (en) A kind of small outdoor tent
CN206713567U (en) A kind of cucumber stem climbing frame
CN205577426U (en) Civil engineering construction uses interim builder's temporary shed
CN206995757U (en) A kind of collapsible goal football
CN212629401U (en) Tree fixing frame for municipal administration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Hongbo

Inventor before: Huang Junjie

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20180214

Address after: 528403 Guangdong Nanlang Hengmen Haicheng city in Zhongshan Province Road (leading warehouse opposite) C zone

Patentee after: ZHONGSHAN JIAHE HARDWARE CO.,LTD.

Address before: 510000 Guangdong Province, Guangzhou high tech Industrial Development Zone, No. 233 science road 231 floor B1B2 building one layer, two layer, three layer, four layer

Patentee before: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Effective date of registration: 20180214

Address after: 510000 Guangdong Province, Guangzhou high tech Industrial Development Zone, No. 233 science road 231 floor B1B2 building one layer, two layer, three layer, four layer

Patentee after: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Address before: 362410 palace tail No. 32, sandalin village, new town, Nanan City, Quanzhou, Fujian

Patentee before: Huang Zhisheng

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

Termination date: 20210317

CF01 Termination of patent right due to non-payment of annual fee