Prior art keywords
shear wall
page wallboard
floor
fabricated shear
wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720525762.2U
Other languages
Chinese (zh)
Inventor
马云飞
李青山
孙海宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Sanyi Construction Co ltd
Original Assignee
Sany Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Construction Industry Co Ltd filed Critical Sany Construction Industry Co Ltd
Priority to CN201720525762.2U priority Critical patent/CN206693432U/en
Application granted granted Critical
Publication of CN206693432U publication Critical patent/CN206693432U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

The utility model discloses a kind of fabricated shear wall and fabric structure, it is related to construction engineering technical field.The fabricated shear wall, including wall;Wall includes interior page wallboard, outer page wallboard and connection floor;Interior page wallboard and outer page wallboard relative spacing are set, and are connected between the periphery of interior page wallboard and outer page wallboard by connecting floor, so that interior page wallboard, outer page wallboard and connection floor are collectively forming cavity.Fabricated shear wall with cavity is formed by interior page wallboard, outer page wallboard and connection floor, be i.e. the hollow setting of the fabricated shear wall, then can effectively mitigate the overall weight of shear wall, so as to increase the loading of freight waggon, and then reduce freight;Effectively mitigate the overall weight of shear wall, additionally it is possible to make the reduction of hanging device tonnage, reduce installation difficulty, so that installation cost reduces.

Description

Fabricated shear wall and fabric structure
Technical field
Construction engineering technical field is the utility model is related to, more particularly to a kind of fabricated shear wall and fabric structure.
Background technology
Assembly of shear wall structure, which has, saves labour cost, reduces job site noise dust pollution, shortens duration, production The advantages of quality control is preferably, production efficiency is high, stock utilization is high.
In correlation technique, fabricated shear wall is poured using armored concrete and formed more, then transports prefabricated wallboard Job site is transported to be installed.This concrete panel weight is big, so as to cause freight height, lifts asking for inconvenience Topic.
Utility model content
The purpose of this utility model is to provide a kind of fabricated shear wall and fabric structure, to solve in the prior art The big technical problem of fabricated shear wall wallboard weight.
The utility model provides a kind of fabricated shear wall, including wall;
Wall includes interior page wallboard, outer page wallboard and connection floor;
Interior page wallboard and outer page wallboard relative spacing are set, and interior page wallboard is connected with outer page wallboard by being connected floor Connect, so that interior page wallboard, outer page wallboard and connection floor are collectively forming cavity.
Further, wall also includes deep floor, and deep floor is arranged in cavity, and with interior page wallboard and outer page wall Plate is all connected with.
Further, deep floor is multiple that multiple deep floors are in latticed setting, so that cavity is divided into more height Chamber.
Further, deep floor is by armored concrete pouring molding.
Further, outer page wallboard, connection floor, deep floor and the shaping of interior page wallboard formed by integrally casting.
Further, fabricated shear wall also includes packed layer, and packed layer is filled in the cavity of wall.
Further, packed layer is the one or more in lightweight aggregate concrete layer, foamed concrete layer or benzene plate Combination.
Further, outer page wallboard includes outer page wallboard body and is arranged on the protection of the outer surface of outer page wallboard body Layer, outer page wallboard body is with being connected floor connection.
The utility model also provides a kind of fabric structure, including the tier building unit from top to bottom set and this reality With the fabricated shear wall of new offer, every layer of building unit is provided with fabricated shear wall.
Further, every layer of building unit is included in the laminated floor slab in-situ layer being oppositely arranged on vertical direction and overlapping Floor preformed layer;
The upper end of fabricated shear wall is connected with laminated floor slab in-situ layer, and the upper end of fabricated shear wall and laminated floor slab are pre- Preparative layer connects.
The utility model provides a kind of fabricated shear wall, including wall;Wall includes interior page wallboard, outer page wallboard and company Rib plate;Interior page wallboard and outer page wallboard relative spacing are set, and the periphery of interior page wallboard and the periphery of outer page wallboard pass through Floor connection is connected, so that interior page wallboard, outer page wallboard and connection floor are collectively forming cavity.Pass through interior page wallboard, outer page wall Plate and connection floor form the fabricated shear wall with cavity, i.e. the hollow setting of the fabricated shear wall then can be effective Ground mitigates the overall weight of shear wall, so as to increase the loading of freight waggon, and then reduces freight;Effectively mitigate shear wall Overall weight, additionally it is possible to make the reduction of hanging device tonnage, reduce installation difficulty, so that installation cost reduces.
Brief description of the drawings
Form a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new The schematic description and description of type is used to explain the utility model, does not form to improper restriction of the present utility model. In accompanying drawing:
Fig. 1 is the structural representation according to the fabricated shear wall of the utility model first embodiment;
Fig. 2 is the structural representation according to the fabricated shear wall of the utility model second embodiment;
Fig. 3 is another structural representation of the fabricated shear wall shown in Fig. 2;
Fig. 4 is the structural representation according to the fabric structure of the utility model embodiment.
In figure:Page wallboard in 01-;The outer page wallboards of 02-;03- connection floors;04- cavitys;05- deep floors; 06- packed layers;The sub- chambers of 041-;The deep floors of 051- first;The deep floors of 052- second;100- building units;200- Fabricated shear wall;101- laminated floor slab in-situ layers;102- laminated floor slab preformed layers.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the utility model can To be mutually combined.Describe the utility model in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
It should be noted that the "up" and "down" mentioned in the application, when referring to fabricated shear wall use state, perpendicular The upward "up" and "down" of Nogata.
Fig. 1 is the structural representation according to the fabricated shear wall of the utility model first embodiment.As shown in figure 1, this Utility model provides a kind of fabricated shear wall, including wall;Wall includes interior page wallboard 01, outer page wallboard 02 and connection floor 03;Interior page wallboard 01 and the outer relative spacing of page wallboard 02 are set, and the periphery of interior page wallboard 01 and the periphery of outer page wallboard 02 Connected by connecting floor 03, so that interior page wallboard 01, outer page wallboard 02 and connection floor 03 are collectively forming cavity 04.
Wherein, interior page wallboard 01, outer page wallboard 02 and connection floor 03 are poured by armored concrete and formed, cost Low, intensity is high.
The shape of cavity 04 can be a variety of, such as:Rectangle, circle or abnormity etc..The shape of cavity 04 can be according to even The structure type of rib plate 03 it is different and different, it is preferred that connection floor 03 be in " mouth " font, by interior page wallboard 01 and outside Page wallboard 02 connects, and this is simple in construction, easy processing.
In the present embodiment, the dress with cavity 04 is formed by interior page wallboard 01, outer page wallboard 02 and connection floor 03 With formula shear wall, i.e. the hollow setting of the fabricated shear wall, then it can effectively mitigate the overall weight of shear wall, so as to Increase the loading of freight waggon, and then reduce freight;Effectively mitigate the overall weight of shear wall, additionally it is possible to drop hanging device tonnage It is low, reduce installation difficulty, so that installation cost reduces.
In addition, heat-insulation and heat-preservation can also be played a part of full of air in cavity 04.
Fig. 2 is the structural representation according to the fabricated shear wall of the utility model second embodiment.Fig. 3 is shown in Fig. 2 Fabricated shear wall another structural representation.As shown in Figures 2 and 3, on above-described embodiment basis, further, Wall also includes deep floor 05, and deep floor 05 is arranged in cavity 04, and connects with interior page wallboard 01 and outer page wallboard 02 Connect.
Wherein, the structure type of deep floor 05 can be it is a variety of, such as:Deep floor 05 is in strip or column, its Cross sectional shape can be circle, rectangle, triangle or abnormity etc.;Deep floor 05 can with linear, can with curved, It can also be in annular etc..
Deep floor 05 can extend along interior page wallboard 01 to the direction of outer page wallboard 02, i.e., deep floor 05 is doll Shape, now one end of deep floor 05 be connected with interior page wallboard 01, the other end is connected with outer page wallboard 02.Deep floor 05 may be used also To extend in vertical direction, i.e., deep floor 05 is strip, and now the one side of deep floor 05 connects with interior page wallboard 01 Connect, another side relative with the side is connected with outer page wallboard 02, and one end of the deep floor 05 can be with being connected floor 03 Upper end connects, and the other end connects with being connected the lower end of floor 03, so as to which cavity 04 is divided into more sub- chambers 041;Certainly strengthen Floor 05 can also be in strip and be horizontally disposed with or be obliquely installed.
Deep floor 05 can be made up of materials such as metal, timber.Preferably poured and formed using armored concrete, that is, existed Reinforcing bar outer wrapping concrete, which intensity is big, and cost is low, is advantageous to produce and process.
In the present embodiment, deep floor 05 is set between page wallboard 01 and outer page wallboard 02 inside, is guaranteeing to reduce Under the premise of the weight of shear wall body, the intensity of fabricated shear wall can be improved, so as to ensure what is provided using the present embodiment The security in the house that fabricated shear wall is built into.
As shown in Figures 2 and 3, on above-described embodiment basis, further, deep floor 05 is multiple, Duo Gejia Strong floor 05 is in latticed setting, so that cavity 04 is divided into more sub- chambers 041.
Wherein, multiple deep floors 05 are in latticed setting, mesh shape can be rectangle, triangle, polygon or Abnormity etc..The shape of grid can be the same or different, i.e., multiple deep floors 05 can be set with certain rule can also Random setting.
Such as:Multiple deep floors 05 can be divided into multiple the first linear deep floors and multiple second ribs Plate, parallel interval is set multiple first deep floors successively, and each first deep floor with horizontal direction (or vertical side To) at an angle;Parallel interval is set multiple second deep floors successively, and each second deep floor is and horizontal direction (or vertical direction) is set at an angle;One the first deep floor intersects with each second deep floor, equally One the second deep floor intersects with every one first deep floor, so as to make the grid to be formed be parallelogram.
It is preferred that as shown in Fig. 2 multiple first deep floors 051 are horizontally disposed, and the first deep floor 051 and water Square to angle be zero, multiple second deep floors 052 are vertically arranged, i.e. the second deep floor 052 and horizontal direction Angle is 90 degree, and each first deep floor 051 is arranged in a mutually vertical manner one by one with each second deep floor 052, so as to It is rectangle to make the grid to be formed, and this setup is simple in construction, easy processing, so as to reduce production cost.
And for example:Multiple deep floors can be divided into multiple the first curved deep floors and multiple second ribs Plate, multiple first deep floors are arranged at intervals successively in the horizontal direction, and multiple second deep floors are vertically spaced successively Set, each first deep floor intersects with each second deep floor, so that the grid formed is abnormity.
For another example:Multiple deep floors can be divided into multiple first deep floors, multiple second deep floors and multiple Three deep floors;Parallel interval is set multiple first deep floors successively, and parallel interval is set multiple second deep floors successively, Parallel interval is set multiple second deep floors successively;Each first deep floor intersects one by one with multiple second deep floors, Each first deep floor intersects one by one with multiple 3rd deep floors, each second deep floor and multiple 3rd deep floors Intersect one by one, so that the grid formed is triangle.
In multiple intersections for forming latticed deep floors 05, can by the fasteners such as bolt by intersection plus Strong floor 05 is fixed, or by connecting and fixing, can also be tightened by iron wire etc..It is preferred that added by pouring by multiple Strong floor 05 is integrally formed, and which can simplify processing, the process of connection reinforcement floor 05, so as to improve fabricated shear wall Production efficiency;Other which makes the firm and reliable connection between multiple deep floors 05.
In the present embodiment, multiple deep floors 05 are in latticed setting, then interior page wallboard 01, outer page wallboard 02, connection rib The cavity 04 that plate 03 and multiple deep floors 05 are formed is in latticed, and a grid is a sub- chamber 041, so as to form grid Shape stress system, the ductility of fabricated shear wall can be improved, so as to be advantageous to antidetonation, and then strengthen the security of building.
The fabricated shear wall that the prefabricated the present embodiment of following methods can be used to provide:
First by the outer pouring molding of page wallboard 02;The surrounding of page wallboard 02 pours connection floor 03 outside again;Then according to net Trellis shape sets corresponding mould at each grid, and mould has certain altitude, groove is formed between mould and mould, recessed Poured in groove, so as to form deep floor 05;Then mould is removed;Finally pour interior page wallboard 01.It can be assembled Formula shear wall.
As shown in Figures 2 and 3, on above-described embodiment basis, further, outer page wallboard 02, connection floor 03, add Strong floor 05 and the shaping of the interior formed by integrally casting of page wallboard 01.
In the present embodiment, outer page wallboard 02, connection floor 03, deep floor 05 and interior page wallboard 01 are directly poured and built up It type, then can avoid that various pieces being connected using other connected modes, all parts is turned into an entirety, so that should Fabricated shear wall stability is high, good reliability, and then is further ensured that the security of building.
It is preferred that outer page wallboard 02, connection floor 03, interior page wallboard 01 and deep floor 05 use reinforced concrete Soil, which pours, to be formed, then has unified processing material, and the intensity of armored concrete is high.
As shown in figure 3, on above-described embodiment basis, further, fabricated shear wall also includes packed layer 06, fills out Layer 06 is filled to be filled in the cavity 04 of wall.
In the present embodiment, packed layer 06 can be processed production using novel light insulation material, on the one hand ensure assembling On the premise of formula shear wall is light, the heat insulating effect of wall can be improved, so as to improve the practicality of the fabricated shear wall Property.
Cavity 04 can be completely filled with by packed layer 06;A part of cavity 04 can also be filled, i.e., it is existing in cavity 04 to fill out Fill layer 06 and have air.
The fabricated shear wall that the prefabricated the present embodiment of following methods can be used to provide:
First by the outer pouring molding of page wallboard 02;The surrounding of page wallboard 02 pours connection floor 03 outside again;Then according to net Trellis shape sets corresponding packed layer 06 at each grid, and packed layer 06 has a certain altitude, shape between multiple packed layers 06 Into groove, poured in groove, so as to form deep floor 05;Finally pour interior page wallboard 01.It can be provided with The fabricated shear wall of packed layer 06.
Shown in Fig. 3, on above-described embodiment basis, further, packed layer 06 is lightweight aggregate concrete layer, foams and mix One or more kinds of combinations in solidifying soil layer or benzene plate.
In the present embodiment, packed layer 06 can be lightweight aggregate concrete layer, and lightweight aggregate concrete has lightweight, high-strength, guarantor The features such as gentle fire resisting, and deformation performance is good, and modulus of elasticity is relatively low.So as to improve the overall performance of the shear wall.
Packed layer 06 can also be foamed concrete layer, and foamed concrete has that lightweight, thermal and insulating performance are good, sound insulation is resistance to The advantages that fiery performance is good, low bullet damping property is good.So as to improve the overall performance of the shear wall.
Packed layer 06 can also be benzene plate, and benzene plate has the advantages that light, insulation, fire prevention, waterproof.So as to improve this The overall performance of shear wall.
Certainly according to particular condition in use and economic effect, packed layer 06 can also be lightweight aggregate concrete layer, foaming Any two kinds of combination in concrete layer and benzene plate three, such as:Packed layer 06 includes the lightweight aggregate concrete set gradually Layer and foamed concrete layer.
Certainly, packed layer 06 can also be the combination of lightweight aggregate concrete layer, foamed concrete layer and benzene plate three, can The advantages of to integrate three, further improve the performance of the fabricated shear wall.
As shown in figure 1, on above-described embodiment basis, further, outer page wallboard 02 include outer page wallboard body with And the protective layer of the outer surface of outer page wallboard body is arranged on, outer page wallboard body connects with being connected floor 03.
Wherein, protective layer can be ceramic tile layer or stone material layer, lumber layer, metal level etc., and protective layer can also be clear water Concrete.
Protective layer can not only (outer surface refers to outer page wallboard body away from interior page wall the outer surface of external page wallboard body One surface of plate 01) protected, moreover it is possible to decoration function is played, makes outer page wallboard 02 attractive in appearance.And in prefabricated assembled shearing During wall, protective layer is directly arranged on to the outer surface of outer page wallboard body, then by whole fabricated shear wall transport to Job site is installed, and without being processed protection or decoration to the outer surface of fabricated shear wall again, improves construction Efficiency, the problems such as the environmental pollution for avoiding site operation from bringing.
Fig. 4 is the structural representation according to the fabric structure of the utility model embodiment.As shown in figure 4, this practicality is new Type also provides a kind of fabric structure, including the tier building unit 100 from top to bottom set and multiple the utility model carry The fabricated shear wall 200 of confession, every layer of building unit are provided with fabricated shear wall 200.
The every layer of building unit 100 for the fabric structure that the present embodiment provides, using assembling provided by the utility model Formula shear wall 200 is installed, in light weight because the assembled has hollow structure, then facilitates lifting, can also reduce steelyard ton Position, convenient installation, so that fabric structure construction is simple, efficiency of construction that the present embodiment provides are high.
Specifically, every layer of building unit 100 is included in the He of laminated floor slab in-situ layer 101 being oppositely arranged on vertical direction Laminated floor slab preformed layer 102;The upper end of fabricated shear wall is connected with laminated floor slab in-situ layer, the upper end of fabricated shear wall with Laminated floor slab preformed layer connects.This kind of easily construction simple in construction.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type.

Claims (10)

  1. A kind of 1. fabricated shear wall, it is characterised in that including:Wall;
    The wall includes interior page wallboard (01), outer page wallboard (02) and connection floor (03);
    The interior page wallboard (01) and outer page wallboard (02) relative spacing are set, and the interior page wallboard (01) with it is described Outer page wallboard (02) by it is described connection floor (03) connect so that the interior page wallboard (01), the outer page wallboard (02) and The connection floor (03) is collectively forming cavity (04).
  2. 2. fabricated shear wall according to claim 1, it is characterised in that the wall also includes deep floor (05), The deep floor (05) is arranged in the cavity (04), and equal with the interior page wallboard (01) and the outer page wallboard (02) Connection.
  3. 3. fabricated shear wall according to claim 2, it is characterised in that the deep floor (05) is multiple to be multiple The deep floor (05) is in latticed setting, so that the cavity (04) is divided into more sub- chambers (041).
  4. 4. fabricated shear wall according to claim 2, it is characterised in that the deep floor (05) is by armored concrete Pouring molding.
  5. 5. according to the fabricated shear wall any one of claim 2-4, it is characterised in that the outer page wallboard (02), The connection floor (03), the deep floor (05) and interior page wallboard (01) the formed by integrally casting shaping.
  6. 6. fabricated shear wall according to claim 1, it is characterised in that also including packed layer (06), the packed layer (06) it is filled in the cavity (04) of the wall.
  7. 7. fabricated shear wall according to claim 6, it is characterised in that the packed layer (06) is lightweight aggregate concrete One or more kinds of combinations in layer, foamed concrete layer or benzene plate.
  8. 8. fabricated shear wall according to claim 1, it is characterised in that the outer page wallboard (02) includes outer page wallboard Body and be arranged on the outer page wallboard body outer surface protective layer, the outer page wallboard body and the connection floor (03) connect.
  9. A kind of 9. fabric structure, it is characterised in that including the tier building unit (100) that from top to bottom sets and it is multiple such as Fabricated shear wall (200) any one of claim 1-8, every layer of building unit (100) are provided with the assembling Formula shear wall (200).
  10. 10. fabric structure according to claim 9, it is characterised in that every layer of building unit (100) is included in The laminated floor slab in-situ layer (101) and laminated floor slab preformed layer (102) being oppositely arranged on vertical direction;
    The upper end of the fabricated shear wall (200) is connected with the laminated floor slab in-situ layer (101), the fabricated shear wall (200) upper end is connected with the laminated floor slab preformed layer (102).
CN201720525762.2U 2017-05-11 2017-05-11 Fabricated shear wall and fabric structure Expired - Fee Related CN206693432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720525762.2U CN206693432U (en) 2017-05-11 2017-05-11 Fabricated shear wall and fabric structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720525762.2U CN206693432U (en) 2017-05-11 2017-05-11 Fabricated shear wall and fabric structure

Publications (1)

Publication Number Publication Date
CN206693432U true CN206693432U (en) 2017-12-01

Family

ID=60449805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720525762.2U Expired - Fee Related CN206693432U (en) 2017-05-11 2017-05-11 Fabricated shear wall and fabric structure

Country Status (1)

Country Link
CN (1) CN206693432U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678270A (en) * 2018-06-29 2018-10-19 成都金玉雄辉建筑工程有限公司 Assembled wall body structure
CN108999363A (en) * 2018-07-16 2018-12-14 上海紫霓节能科技有限公司 Perps uses the GRC art stone heat-insulating decorative composite board of bonding semi-flexible
CN109356348A (en) * 2018-07-16 2019-02-19 上海紫霓节能科技有限公司 Plate stitch uses the GRC art stone heat-insulating decorative composite board of bonding semi-flexible
CN109577546A (en) * 2019-01-14 2019-04-05 中南大学 Insulated compound trabs with ribbing
CN110439177A (en) * 2019-07-08 2019-11-12 中国地质大学(武汉) A kind of composite insulation boards for climbing ice wall
CN112160479A (en) * 2020-09-21 2021-01-01 中南大学 Rib plate skeleton concrete cast-in-place board
CN115030393A (en) * 2022-06-15 2022-09-09 郑州牟发建材有限公司 Novel cement product

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678270A (en) * 2018-06-29 2018-10-19 成都金玉雄辉建筑工程有限公司 Assembled wall body structure
CN108999363A (en) * 2018-07-16 2018-12-14 上海紫霓节能科技有限公司 Perps uses the GRC art stone heat-insulating decorative composite board of bonding semi-flexible
CN109356348A (en) * 2018-07-16 2019-02-19 上海紫霓节能科技有限公司 Plate stitch uses the GRC art stone heat-insulating decorative composite board of bonding semi-flexible
CN109577546A (en) * 2019-01-14 2019-04-05 中南大学 Insulated compound trabs with ribbing
CN110439177A (en) * 2019-07-08 2019-11-12 中国地质大学(武汉) A kind of composite insulation boards for climbing ice wall
CN112160479A (en) * 2020-09-21 2021-01-01 中南大学 Rib plate skeleton concrete cast-in-place board
CN112160479B (en) * 2020-09-21 2021-05-11 中南大学 Rib plate skeleton concrete cast-in-place board
CN115030393A (en) * 2022-06-15 2022-09-09 郑州牟发建材有限公司 Novel cement product

Similar Documents

Publication Publication Date Title
CN206693432U (en) Fabricated shear wall and fabric structure
CN105421652B (en) A kind of composite thermo-insulating wall board
CN107740531A (en) Assembled wallboard and its attachment structure
CN101016754A (en) Architectural structure system of preformed hollow load-bearing wall panel and construction method
CN106245821B (en) A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction wall and its construction method
CN107288256A (en) Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof
CN107355043A (en) Prefabricated light external energy-saving wallboard and manufacturing method
CN104727481B (en) Factorial praluction energy-conserving construction wall and preparation method
CN101798857B (en) Special shape column
CN205153276U (en) Composite heat -insulating wall board
CN102776977A (en) Novel heat insulation, fire prevention and earthquake resistance integrated energy-saving wall block for building exterior wall
CN102535841A (en) Construction technology of prefabricated wall panel
CN201883598U (en) Expanded polystyrene (XPS) shaping light-weight solid filling block
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method
CN107386556A (en) Light composite heat insulation outer wall plate
CN209040348U (en) A kind of assembled double steel plate combined shear wall construction with ribbing
CN207609066U (en) Honeycomb core and close rib building roof
CN207160393U (en) Prefabricated light external energy-saving wallboard
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
CN207160360U (en) Combine floor support plate and building structure
CN205557836U (en) Reinforcing apparatus that is connected of assemblyization building wall and post
CN205444514U (en) Bearing light insulation intergral template
CN210798011U (en) Fireproof floor
CN202731083U (en) Heat preservation fire prevention seismic resistance integration novel energy-saving wall block of building external wall
CN106906945A (en) The installation method of insulating light wall slab, light-weight building structure and light-weight building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180413

Address after: 102206, Beijing Changping District Huilongguan North Road 31 Industrial Park

Co-patentee after: SHENYANG SANYI BUILDING DESIGN RESEARCH CO.,LTD.

Patentee after: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.

Address before: 102206 31 Industrial Park, 8 Beiqing Road, Huilongguan, Changping District, Beijing.

Patentee before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190211

Address after: 215300 Room 6, 9999 Chenghu Road, Kunshan Development Zone, Suzhou City, Jiangsu Province

Patentee after: Jiangsu Sanyi Construction Co.,Ltd.

Address before: 102206, Beijing Changping District Huilongguan North Road 31 Industrial Park

Co-patentee before: SHENYANG SANYI BUILDING DESIGN RESEARCH CO.,LTD.

Patentee before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171201