CN206681736U - Goaf casing pipe protection system - Google Patents

Goaf casing pipe protection system Download PDF

Info

Publication number
CN206681736U
CN206681736U CN201720373595.4U CN201720373595U CN206681736U CN 206681736 U CN206681736 U CN 206681736U CN 201720373595 U CN201720373595 U CN 201720373595U CN 206681736 U CN206681736 U CN 206681736U
Authority
CN
China
Prior art keywords
goaf
wall
protection system
tunnel
casing pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720373595.4U
Other languages
Chinese (zh)
Inventor
黄敏
唐绍辉
黄英华
吴亚斌
郭晓强
付俊
何环莎
吕冠颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN201720373595.4U priority Critical patent/CN206681736U/en
Application granted granted Critical
Publication of CN206681736U publication Critical patent/CN206681736U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of goaf casing pipe protection system, including the divider wall being arranged in each tunnel connected with goaf and the barren rock cushion on gob floor is piled up, barren rock cushion is extended in each tunnel to connect completely with the inner side of divider wall.The utility model is when carrying out goaf harnessing after applying to mining excavation or exploitation, directly barren rock can be piled up on gob floor using artificial or scraper, form one of substantially flat barren rock cushion, barren rock is fully used, decrease or even eliminate goaf and collapse the harm brought;Divider wall is recycled to block the tunnel for connecting goaf, can reduce goaf collapse bring impact wave harm, effectively alleviate the dynamic impact disaster that country rock big inbreak in goaf triggers, improve mining security, play the purpose in comprehensive regulation goaf.The utility model is economical and practical, simple to operate, applied widely, the improvement in goaf after be particularly suitable for use in mining excavation or exploitation.

Description

Goaf casing pipe protection system
Technical field
It the utility model is related to goaf harnessing technology, more particularly to a kind of goaf casing pipe protection system.
Background technology
Goaf be by artificially excavate or natural geological movement below earth's surface caused by " cavity ", the presence in goaf So that the safety in production in mine faces very big safety problem, personnel and plant equipment may all be hindered because goaf caves in Evil or damage.Because Goaf Area has, latent property is strong, regular poor, the goaf top plate caving collapse feelings of spatial distribution characteristic Condition is difficult to the features such as prediction, therefore, how to the distribution of Goaf Area, spatial shape feature and the inbreak shape in goaf Condition etc. carries out quantization judge, is always that puzzlement engineers and technicians carry out goaf potential hazard evaluation and rationally determined mined out Punish the key technology difficulty of countermeasure in area.
At present, underground vacant areas has become an important problem for restricting mine development, as mine is to deep mining, Ground pressure increase, underground vacant areas is depressed on powerful ground, cave-in accident easily occurs, especially turns opencut shadow to underground Sound is very big;The substantial amounts of stope of underground mining residual, chamber, tunnel do not carry out timely processing, strip mining transformation are brought serious Hidden danger, while carry out serious threat to mine staff and equipment belt.Lost after particularly most of Medium and smaller mines exploitations A large amount of undressed goafs have been stayed, have caused mining worsening condition, the potential safety hazard thus brought is more and more prominent.
When being administered to the goaf formed after mining, the method that mainly uses at present include filling treatment method, Avalanche facture, ore pillar and artificial post supporting methods and closing method.Filling treatment method establishes filling system, is reached by obturation To the purpose of bashing, but this method needs complicated filling system, while needs to expend substantial amounts of human and material resources and wealth Power, management are also more complicated;Avalanche processing rule limited by factors, as earth's surface whether allow avalanche, earth's surface whether The construction of structures of protection in need or other facilities etc.;Ore pillar and artificial post support rule need to be constructed inside goaf Operation, engineering time length, it is difficult that artificial post connects top;Closing rule must closed periphery slotting to see hard bottom firmly side with ore-rock again Real walling is connect, slotting can only use sledgehammer, hammer drill, pickaxe or mechanical execution, and forbidding must be smooth using method of blowing out, metope, and The shirt rim no less than 0.2m is wiped with, brick wall should wipe one's face, polishing compacting, and work stone wall answers jointing, and construction requirement is strict, process time length It is and cumbersome.
Because above method has certain drawback, domestic Medium and smaller mines will not use substantially, common practice be exactly In tunnel set up a warning sign come inform front it is dangerous, or directly abandon regardless of, hidden danger existing for goaf is not played Any protective action.
Utility model content
The purpose of this utility model be to provide it is a kind of it is economical and practical, simple to operate, applied widely, can effectively reduce and adopt Collapse the goaf casing pipe protection system of brought geological disaster for dead zone.
This goaf casing pipe protection system provided by the utility model, including it is arranged on each tunnel connected with goaf Interior divider wall and pile up the barren rock cushion on gob floor, the barren rock cushion extend in each tunnel with every Inner side from wall connects completely.
The divider wall includes bar-mat reinforcement, some anchor poles and concrete guard wall, concrete guard wall closure with goaf Connection each tunnel in, bar-mat reinforcement is embedded in each end face of concrete guard wall, each anchor pole be closely coupled to concrete guard wall with Between the wall in tunnel.
The draining square hole being communicated with the bottom of the divider wall inside and outside divider wall.
It is communicated with the bottom of the divider wall on the outside of divider wall and the water drain casing tube in goaf.
Trend of the anchor pole along tunnel is at least disposed with two rows, often arranges radial direction of the anchor pole along tunnel wall and is at least disposed with Ten.
The divider wall is apart from least 10 meters of the outward flange in goaf.
The thickness that the barren rock cushion is located on gob floor is at least 1 meter.
The thickness of the divider wall is 2 meters.
The utility model when carrying out goaf harnessing after applying to mining excavation or exploitation, can directly using artificial or Scraper piles up barren rock on gob floor, forms one of substantially flat barren rock cushion, can be filled barren rock Point utilize, decrease or even eliminate goaf and collapse the harm brought;Divider wall is recycled to enter the tunnel for connecting goaf afterwards Row closure, goaf can be reduced and collapsed the impact wave harm brought, effectively alleviate the power that country rock big inbreak in goaf triggers Disaster is impacted, mining security can be effectively improved, play the purpose in comprehensive regulation goaf.The utility model has economy The advantages of practical, simple to operate, applied widely, the improvement in goaf after be particularly suitable for use in mining excavation or exploitation.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is that Figure 1A-A locate cross section structure diagram.
Fig. 3 is that Figure 1B-B locate cross section structure diagram.
Fig. 4 is mplifying structure schematic diagram at Fig. 2 I.
The mark and corresponding component name shown in figure be:1st, divider wall;2nd, barren rock cushion;3rd, tunnel;4、 Gob floor;11st, bar-mat reinforcement;12nd, anchor pole;13rd, concrete guard wall;14th, draining square hole;15th, water drain casing tube.
Embodiment
This goaf casing pipe protection system of the utility model, including divider wall 1 and barren rock are can be seen that from Fig. 1 and Fig. 2 Cushion 2, the barren rock cushion 2 are after mining excavation or exploitation, and the barren rock of formation does not go out gallery, utilize artificial or shovel Fortune machine piles up barren rock to be formed on gob floor 4, and barren rock cushion 2 will keep smooth substantially on gob floor 4, Divider wall 1 is arranged in each tunnel 3 connected with goaf, barren rock cushion 2 extend in each tunnel 3 with divider wall Side connects completely.
From figs. 3 and 4 it can be seen that divider wall 1 of the present utility model includes bar-mat reinforcement 11, some anchor poles 12 and concrete Barricade 13, concrete guard wall 13 are blocked in each tunnel 3, and bar-mat reinforcement 11 is embedded in each end face of concrete guard wall 13, each anchor The one end of bar 12 is embedded in concrete guard wall 13, one end is embedded in the wall in tunnel 3 and is tightly fixed to concrete guard wall 13 On the wall in tunnel 3, wherein bar-mat reinforcement 11 is made of 20 millimeters of φ, the reinforcing bar of HRB400 levels, and bar-mat reinforcement 11 is thick 50 millimeters;Anchor Bar 12 is made of 25 millimeters of φ, the reinforcing bar of HRB400 levels, and anchor pole 12 grows 1.5 meters;The strength grade of concrete guard wall 13 is not low In C25.
From figs. 3 and 4 it can be seen that when the utility model is used in the goaf of relative eminence, at the bottom of divider wall 1 Portion both sides need to set draining square hole 14 and water drain casing tube 15 respectively, and draining square hole 14, which is communicated in inside and outside divider wall 1, to be used to arrange The ponding of the empty inner side of divider wall 1, the one end of water drain casing tube 15 connects through divider wall 1 with its outside, one end passes through and the phase of divider wall 1 The barren rock cushion 2 connect inside goaf with connecting, for emptying the ponding inside goaf.
From figs. 3 and 4 it can be seen that in the utility model, trend of the anchor pole 12 along tunnel is at least disposed with two rows, often Arrange radial direction of the anchor pole along tunnel wall and be at least disposed with ten.
In the utility model, the thickness of divider wall 1 is 2 meters, and it is apart from least 10 meters of the outward flange in goaf, barren rock buffering The thickness that bed course 2 is located on gob floor is at least 1 meter, before the construction of divider wall 1, it is necessary to first clears up substrate, is formed solid Basis;When divider wall 1 pours, manually or mechanically mechanical pudding must be used, it is ensured that connect top quality.

Claims (8)

  1. A kind of 1. goaf casing pipe protection system, it is characterised in that:Including be arranged in each tunnel connected with goaf every From wall(1)With pile up the barren rock cushion on gob floor(2), the barren rock cushion extend in each tunnel with every Inner side from wall connects completely.
  2. 2. casing pipe protection system in goaf according to claim 1, it is characterised in that:The divider wall includes bar-mat reinforcement (11), some anchor poles(12)And concrete guard wall(13), concrete guard wall closure is in each tunnel connected with goaf, steel Muscle net is embedded in each end face of concrete guard wall, and each anchor pole is closely coupled between concrete guard wall and the wall in tunnel.
  3. 3. casing pipe protection system in goaf according to claim 1, it is characterised in that:It is provided with the bottom of the divider wall The draining square hole being communicated in inside and outside divider wall(14).
  4. 4. casing pipe protection system in goaf according to claim 1, it is characterised in that:It is provided with the bottom of the divider wall It is communicated on the outside of divider wall and the water drain casing tube in goaf(15).
  5. 5. casing pipe protection system in goaf according to claim 2, it is characterised in that:Trend of the anchor pole along tunnel is extremely Two rows are disposed with less, are often arranged radial direction of the anchor pole along tunnel wall and are at least disposed with ten.
  6. 6. casing pipe protection system in goaf according to claim 1, it is characterised in that:The divider wall is apart from goaf At least 10 meters of outward flange.
  7. 7. casing pipe protection system in goaf according to claim 1, it is characterised in that:The barren rock cushion, which is located at, to be adopted Thickness on the bottom plate of dead zone is at least 1 meter.
  8. 8. casing pipe protection system in goaf according to claim 1, it is characterised in that:The thickness of the divider wall is 2 meters.
CN201720373595.4U 2017-04-11 2017-04-11 Goaf casing pipe protection system Active CN206681736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720373595.4U CN206681736U (en) 2017-04-11 2017-04-11 Goaf casing pipe protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720373595.4U CN206681736U (en) 2017-04-11 2017-04-11 Goaf casing pipe protection system

Publications (1)

Publication Number Publication Date
CN206681736U true CN206681736U (en) 2017-11-28

Family

ID=60399165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720373595.4U Active CN206681736U (en) 2017-04-11 2017-04-11 Goaf casing pipe protection system

Country Status (1)

Country Link
CN (1) CN206681736U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356584A (en) * 2018-09-28 2019-02-19 长春黄金研究院有限公司 A kind of underground filling is dug up mine the construction method of cast-in-place bed course

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356584A (en) * 2018-09-28 2019-02-19 长春黄金研究院有限公司 A kind of underground filling is dug up mine the construction method of cast-in-place bed course

Similar Documents

Publication Publication Date Title
CN102733827B (en) Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN104612695B (en) One acutely collapses shaft wall restoring and fastening method
CN202969392U (en) Combined support for complex geological deep foundation pit
CN103321653B (en) Method of treating lining after collapse of underground cavern crown
Chen et al. Recent advances in high slope reinforcement in China: Case studies
CN105257301A (en) Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel
CN103774675A (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN104141500B (en) One hardens sand and gravel stratum cavern con struction method
CN104532853B (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN105089670A (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN103321233B (en) The preparation method of groundwater resources retracting device in landslide deep layer draining and sliding mass
Yao et al. Numerical analysis of the influence of isolation piles in metro tunnel construction of adjacent buildings
CN104131566A (en) Method for constructing basement foundation pit without horizontal braces
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN206681736U (en) Goaf casing pipe protection system
CN108374674A (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN104863613A (en) High-side-wall anchored primary support structure for rock strata underground excavation underground structure, and construction method of high-side-wall anchored primary support structure
CN102678127B (en) Method for constructing weakly consolidated non-stratified sandstone tunnel
CN205618170U (en) Protective structure of no template punishment rock mass cavity in tunnel engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant