CN206676927U - Water cooling device before a kind of Valve Steel finish rolling - Google Patents

Water cooling device before a kind of Valve Steel finish rolling Download PDF

Info

Publication number
CN206676927U
CN206676927U CN201720216952.6U CN201720216952U CN206676927U CN 206676927 U CN206676927 U CN 206676927U CN 201720216952 U CN201720216952 U CN 201720216952U CN 206676927 U CN206676927 U CN 206676927U
Authority
CN
China
Prior art keywords
water cooling
finish rolling
water
cooling device
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720216952.6U
Other languages
Chinese (zh)
Inventor
李铭贵
翟德建
艾进
张国付
徐丽
沈国平
葛亚军
花辰飞
余新祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shenyuan Special Steel Co Ltd
Jiangsu Taifu Hengtong Special Material Co Ltd
Original Assignee
Jiangsu Shenyuan Special Steel Co Ltd
Jiangsu Taifu Hengtong Special Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shenyuan Special Steel Co Ltd, Jiangsu Taifu Hengtong Special Material Co Ltd filed Critical Jiangsu Shenyuan Special Steel Co Ltd
Priority to CN201720216952.6U priority Critical patent/CN206676927U/en
Application granted granted Critical
Publication of CN206676927U publication Critical patent/CN206676927U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Metal Rolling (AREA)

Abstract

The utility model proposes Water cooling device before a kind of Valve Steel finish rolling, and in being arranged between milling train and pre- finish rolling milling train, it includes nozzle section, water cooling conduit, water exit end, return pipe and backwater casing;Described nozzle section includes one group of nozzle, and it is connected by conduit with water inlet pipe;Set on water inlet pipe Pneumatic diaphragm valve, thermometal detector be arranged in milling train rear end, before infrared temperature detector is arranged on finish rolling milling train, the both ends of the Water cooling device are connected with airway tube, and it is connected with sealing gland magnetic valve;The Pneumatic diaphragm valve, thermometal detector, infrared temperature detector, sealing gland magnetic valve are connected with digital display controller;The end of the backwater casing is provided with air seal set.The Water cooling apparatus structure of the present utility model is simple, easy controlled operation, the cooling procedure of the bar before finish rolling can be accurately controlled, so as to ensure quality of the Valve Steel in the finish-rolling process in rear road, it is ensured that the quality of final Valve Steel.

Description

Water cooling device before a kind of Valve Steel finish rolling
Technical field
The utility model is related to rolled stainless steel technical field, more particularly to martensite and Ovshinsky Valve Steel finishing wire it A kind of preceding Water cooling device.
Background technology
Valve Steel is the material that must use for manufacturing petrol engine and diesel engine inlet and outlet valve, and whole hair Critical material in motivation.General Valve Steel needs to work under high temperature, high pressure, the harsh conditions that height is washed away and height is denuded, because This, it is higher to its performance requirement.For martensite and Ovshinsky air valve steel wire rod, in order to meet Valve Steel to product metallographic and material The requirement of mechanical property, improve the net carbon grade of martensite Valve Steel and austenite wire product, accurately finish rolling need to be controlled to come The temperature of material, it is therefore necessary to Water cooling device is set before finishing mill, by accurately controlling the temperature of finish rolling supplied materials, so as to Reach the technological requirement of temperature control controlled rolling.
Utility model content
In order to meet the finish rolling requirement of martensite and austenite Valve Steel in existing rolling mill practice, the purpose of this utility model It is to provide Water cooling device before a kind of martensite and austenite Valve Steel finish rolling, can accurately controls the temperature of supplied materials, ensures The finish rolling quality of Valve Steel.
To reach the purpose of this utility model, Water cooling device rolls in being arranged on before Valve Steel finish rolling of the present utility model Between milling train and pre- finish rolling milling train, it includes nozzle section, water cooling conduit, water exit end, return pipe and time being connected with return pipe Water tank;Described nozzle section includes one group of nozzle, and it is connected by conduit with water inlet pipe;Air bladder is set on water inlet pipe Valve, milling train rear end during thermometal detector is arranged at, before infrared temperature detector is arranged on finish rolling milling train, the Water cooling The both ends of device are connected with airway tube, and it is connected with sealing gland magnetic valve;The Pneumatic diaphragm valve, thermometal detector, infrared temperature Degree detector, sealing gland magnetic valve are connected with digital display controller;The end of the backwater casing is provided with air seal set.
Preferably, described water cooling conduit is spliced by multiple " Venturi tube " tubulatures, is formed in conduit multiple strong Turbulent cooling zone and flow at high speed Support.
Further preferably, the outlet of the backwater casing is equipped with compressed air nozzle.
Further preferably, during the Water cooling device is placed in after milling train on 15 degree of climbing guide grooves.
Further preferably, it is workshop muddy water that the water inlet pipe, which supplies water, pressure 4-6MPa.
The beneficial effects of the utility model are that the Water cooling apparatus structure is simple, easy controlled operation, can be to finish rolling before The cooling procedure of bar be accurately controlled, so as to ensure quality of the Valve Steel in the finish-rolling process in rear road, it is ensured that The quality of final Valve Steel.
Brief description of the drawings
By detailed description below in conjunction with the accompanying drawings, the foregoing and other objects, features and advantages of the utility model will Become apparent.Wherein:
Fig. 1 show the overlooking the structure diagram of Water cooling device before Valve Steel finish rolling of the present utility model;
Fig. 2 show the main structure diagram of Water cooling device before Fig. 1 Valve Steel finish rolling;
Fig. 3 show the mplifying structure schematic diagram of Water cooling device before Fig. 1 Valve Steel finish rolling;
Fig. 4 show the structural representation of the water cooling conduit of Fig. 1 Water cooling device.
Embodiment
With reference to accompanying drawing structure of the present utility model and feature, details are as follows.
Water cooling device before the Valve Steel finish rolling of an embodiment of the present utility model shown in reference picture 1, Fig. 2 and Fig. 3 Structural representation, during the Water cooling device 20 is arranged between milling train 10 and pre- finish rolling milling train 30, it includes nozzle Section 21, water cooling conduit 22, water exit end 25, return pipe 204 and the backwater casing 24 being connected with return pipe 204;Described nozzle Section 21 includes one group of nozzle, and it is connected by conduit 211 with water inlet pipe 202, there is provided the cooling water source in water cooling conduit 22, it is described Water inlet pipe 202 pick up a muddy water, Pneumatic diaphragm valve 205 is set on water inlet pipe 202, and thermometal detector (not shown) is arranged at In the rear end of milling train 10, before infrared temperature detector 40 is arranged on finish rolling milling train (not shown), the Water cooling device 20 Both ends are connected with airway tube 201,203, and it is generally metal hose, are connected with sealing gland magnetic valve 271, and water shutoff is played by air pressure Effect, prevent and treat cooling procedure in hot water overflow wear water installations;The Pneumatic diaphragm valve 205, thermometal detector, infrared temperature Detector 40, sealing gland magnetic valve 271 are connected with digital display controller 50;The end of the backwater casing 24 is provided with air seal set 27.
The operation principle of Water cooling device of the present utility model is:When rolling milling train 10 during round steel goes out, by installed in Thermometal detector after milling train detects supplied materials signal, and control membrane valve 205 is opened and sealing gland magnetic valve 27 is opened, to wearing Supplied water in water-cooling apparatus, the round steel after cooling feeds back to operating room by the infrared temperature detector 40 before finishing mill Digital display controller 50 on, by the temperature parameter of digital displaying meter, can confirm that whether rolled according to the temperature of technological requirement System, if need can be by the controller of Pneumatic diaphragm valve come the opening of control valve into adjustment, operating personnel for technological temperature Spend to the accurate adjustment of water hydraulic pressure so as to realize the adjustment of intensity of cooling.Water in Water cooling device flows into back through water exit end Water tank 24, then flowed out through return pipe 204 and carry out circulating cooling.
Referring to Fig. 4, described water cooling conduit 22 is the core component of Water cooling device, and rolled piece (round steel bar) 100 exists Directly contacted with water in water cooling conduit, and carry out heat exchange;Water cooling conduit is spliced by multiple " Venturi tube " tubulatures 12, Because " Venturi tube " different zones diameter is different, flow velocity is different so that the water (flow) direction and flow velocity in " Venturi tube " are all continuous Acute variation, strong turbulent flow is produced, so as to improve heat exchange efficiency;As shown in Fig. 2 the water cooling spliced by " Venturi tube " is led Bore forms the tapered tube shape of segmentation, and multiple high turbulence cooling zones 14 and flow at high speed Support are formed in conduit 16, quick, the uniform cooling of rolled piece is realized with this.Described water exit end 25 is to collect the water outlet of water cooling conduit, depressurize, arranging Put.In a preferred embodiment, compressed air nozzle (not shown) is housed in the outlet of backwater casing 24, can be by rolled piece The subsidiary water in surface purges, to prevent inhomogeneous cooling caused by surface water drops.In a preferred embodiment, it is above-mentioned to wear During water-cooling apparatus is placed in after milling train on 15 degree of climbing guide grooves, it is workshop muddy water that water inlet pipe, which supplies water, pressure 4-6MPa, is supplied Water is 120 cubes or so/hour, and the chilling temperature to supplied materials bar is 10-150 DEG C.
Water cooling apparatus structure of the present utility model is simple, easy controlled operation, can be to the cooled of the bar before finish rolling Cheng Jinhang is accurately controlled, so as to ensure quality of the Valve Steel in the finish-rolling process in rear road, it is ensured that the matter of final Valve Steel Amount.
The utility model is not limited to described embodiment, those skilled in the art do not depart from it is of the present utility model In the i.e. open scope of spirit, it can still make some amendments or change, therefore rights protection scope of the present utility model is with claims The scope of restriction is defined.

Claims (5)

  1. A kind of 1. Water cooling device before Valve Steel finish rolling, it is characterised in that milling train during the Water cooling device is arranged on Between pre- finish rolling milling train, it includes nozzle section, water cooling conduit, water exit end, return pipe and the recovery tank being connected with return pipe Body;Described nozzle section includes one group of nozzle, and it is connected by conduit with water inlet pipe;Pneumatic diaphragm valve is set on water inlet pipe, heat Milling train rear end during metal detector is arranged at, before infrared temperature detector is arranged on finish rolling milling train, the Water cooling device Both ends be connected with airway tube, it is connected with sealing gland magnetic valve;The Pneumatic diaphragm valve, thermometal detector, infrared temperature inspection Survey instrument, sealing gland magnetic valve is connected with digital display controller;The end of the backwater casing is provided with air seal set.
  2. 2. Water cooling device before a kind of Valve Steel finish rolling as claimed in claim 1, it is characterised in that described water cooling conduit It is spliced by multiple " Venturi tube " tubulatures, multiple high turbulence cooling zones and flow at high speed Support is formed in conduit.
  3. 3. Water cooling device before a kind of Valve Steel finish rolling as claimed in claim 1, it is characterised in that the backwater casing Outlet is equipped with compressed air nozzle.
  4. 4. Water cooling device before a kind of Valve Steel finish rolling as claimed in claim 1, it is characterised in that the Water cooling dress Put in being placed in after milling train on 15 degree of climbing guide grooves.
  5. 5. Water cooling device before a kind of Valve Steel finish rolling as claimed in claim 1, it is characterised in that the water inlet pipe supplies water For workshop muddy water, pressure 4-6MPa.
CN201720216952.6U 2017-03-07 2017-03-07 Water cooling device before a kind of Valve Steel finish rolling Expired - Fee Related CN206676927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720216952.6U CN206676927U (en) 2017-03-07 2017-03-07 Water cooling device before a kind of Valve Steel finish rolling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720216952.6U CN206676927U (en) 2017-03-07 2017-03-07 Water cooling device before a kind of Valve Steel finish rolling

Publications (1)

Publication Number Publication Date
CN206676927U true CN206676927U (en) 2017-11-28

Family

ID=60393042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720216952.6U Expired - Fee Related CN206676927U (en) 2017-03-07 2017-03-07 Water cooling device before a kind of Valve Steel finish rolling

Country Status (1)

Country Link
CN (1) CN206676927U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114378120A (en) * 2022-02-23 2022-04-22 聊城市科环新材料科技有限公司 Efficient cooling air cooling device for producing super-thick-wall seamless pipes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114378120A (en) * 2022-02-23 2022-04-22 聊城市科环新材料科技有限公司 Efficient cooling air cooling device for producing super-thick-wall seamless pipes

Similar Documents

Publication Publication Date Title
CN102069097B (en) System and process for cooling after H-shaped steel is hot-rolled
CN1322942C (en) Strip steel laminar flow cooling device and cooling control method thereof
CN103357677B (en) Cooling equipment for large bar material
CN109100267B (en) High-pressure cavitation test device and test method for hydraulic oil containing solid particles
CN206676927U (en) Water cooling device before a kind of Valve Steel finish rolling
CN204610014U (en) A kind of diesel engine cooling water piping system
CN104162638A (en) Crystallizer cooling water control device and method
KR100679081B1 (en) Hot steel strip cooling device and cooling method using the same
CN104646438A (en) Water penetration cooling line of controlled rolling and controlled cooling equipment
CN207463833U (en) A kind of energy-efficient wire water-cooled system
CN204421534U (en) The online skin drying device of steel pipe
CN200954521Y (en) Low-pressure water-spraying cooling apparatus for hot milling thin band steel
CN106862510B (en) A kind of adjustable wide magnesium alloy casting and rolling machine of casting roll temperature subregion
CN209174594U (en) A kind of wire and rod controlled rolling and controlled cooling spiral-flow type cooler
CN107090314A (en) The cooling means and cooling system of gasification burner tip
CN211005541U (en) Protective structure for preventing condensation of water-cooling roller
CN210080927U (en) Adjustable guide pipe welding protective cover
CN209508303U (en) The safe circulatory system of the air port Ou Yelu cooling water channel open circuit
CN109174983A (en) A kind of wire and rod controlled rolling and controlled cooling spiral-flow type cooler
CN207554467U (en) A kind of hydraulic station oil-temperature control device of four-column press
JP2009220159A (en) Method and apparatus for cooling steel material
CN206069841U (en) A kind of stream plus tank
CN205341515U (en) Spout device on laminar flow of liquid level hose water conservancy diversion
CN206069868U (en) Stream plus tank
CN106625000A (en) Water-cooling device capable of controlling water flow velocity

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128